Home / Elders Insurance (Underwriting Agency) Pty Limited / Determination 712472
Determination 712472
Denial of flood damage claim after Cyclone Debbie
Summary
Farm owners claimed about $30,000 for water damage after Cyclone Debbie, and the insurer denied it as flood damage excluded under the policy. AFCA upheld the flood exclusion but ordered the insurer to pay $3,155 for storm-related plaster and roof repairs, plus interest.
Once stormwater mixes with floodwater the damage is flood, and the timing of inundation after peak rainfall showed the property was flooded by the Tweed River rather than by stormwater runoff.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to rely upon its policy exclusion for flood, to deny the claim.”
- Product terms interpretation secondary · not upheld
“Once rainwater mixes with flood water, it is all considered flood water; a flood exclusion will usually apply.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case number 712472
Financial firm Elders Insurance (Underwriting Agency) Pty Limited
Determination | Case number: 712472 Page 2 of 7
Case number: 712472 19 November 2020
1 Determination overview
1.1 Complaint
On 5 April 2017, the complainants lodged a claim with the financial firm (the insurer)
for damage to their property following Cyclone Debbie. After investigating the claim,
the insurer denied cover on the basis that the damage was caused by flood which is
excluded under the policy.
The complainants dispute the insurer’s assessment stating that flooding from the
Tweed River did not cause the damage to their property but rather, it was caused by a
shallow overland flow that formed prior to becoming flooded.
To resolve this complaint, the complainants would like the insurer to accept the claim
and cover the cost of repairs which they estimate at $30,000 .
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Based on the available information, the insurer is entitled to deny the claim for flood
related damage under the terms of the policy and in accordance with this
determination.
The insurer is required to meet the complainants ’ claim for storm related damage to
their house including damage caused to the roof.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the flood damage and is not required to undertake any
further action.
The insurer is required to reimburse the complainants $675 for plaster repairs and
$2,480 for repairs to the roof, plus interest in accordance with section 57 of the
Insurance Contracts Act 1984, calculated from the date these amounts were paid,
until the date of payment by the insurer.
The complainants are to provide proof of payment to the insurer, of these amounts.
Determination | Case number: 712472 Page 3 of 7
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The complainants ’ farm insurance policy with the insurer provides cover for physical
loss or damage to farm property caused by an insured event under the policy,
including storm (including cyclone or hurricane) and/or rain, which may be
accompanied by snow, sleet or hail.
Policy does not provide cover for flood
However, the policy specifically excludes loss or damage directly or indirectly caused
by or arising out of flood.
Flood is defined on page 9 of the product disclosure statement (PDS) as:
Flood means the covering of normally dry land by water that has escaped or
been released from the normal confines of any of the following:
(a) a lake (whether or not it has been altered or modified);
(b) a river (whether or not it has been altered or modified);
(c) a creek (whether or not it has been altered or modified);
(d) another natural watercourse (whether or not it has been altered or modified);
(e) a reservoir;
(f) a canal;
It is accepted insurance law that the insurer carries the onus to establish the
application of its policy exclusion for damage caused by flood.
The exchanged material confirms that the policy was taken out several years prior to
the 2017 claimed loss. The complainants were made aware by the insurer that their
policy did not have flood cover based on the numerous renewals and information
provided with such renewals.
Circumstances of the loss
The exchanged material confirms that there was a significant weather event
throughout Australia and in the loca l area to the complainants’ property during the
latter part of March 2017.
The available evidence confirms that inundation of the complainants’ property
occurred in the morning of 31 March 2017.
Determination | Case number: 712472 Page 4 of 7
Insurer says majority of damage due to flood
The insurer provided a report from its hydrologist (WR) dated 5 May 2017, which was
prepared following a site inspection on 21 April 2017, together with a supplementary
report dated 20 August 2019, which was in response to further information provided
by the complainants.
During its site attendance WR noted that the complainants’ property consists of
numerous buildings for residential and commercial purposes and the main dwelling is
a two-story building that was inundated on the ground floor, along with several out
buildings.
The floor levels of the buildings on the property vary from 2m Australian Height Datum
(AHD) to 3m AHD. AHD is the height measured above sea level.
According to WR, the complainants’ property is located on the southern floodplain of
the Tweed River. Further, two Bureau of Meteorology (B OM) rain fall stations are
located near the complainants at Tumbulgum and Murwillumbah (Tweed River).
Following the site inspection and review of the data from the BOM, WR concluded
that the water inundation of the complainants’ property was due to flood water from
the Tweed River.
WR ’s analysis is based on a review of the rain fall intensity data which shows that it
peaked between 2100 hrs 30 March 2017 and 0000 hrs 31 March 2017, at the
Tumbulgum station. WR used the rain fall intensity data to estimate the water level at
both the Tumbulgum and Murwillumbah Bridge rainfall stations, as well as the
approximate time of initial inundation of the compla inants’ property.
WR notes:
The data shows that the Tweed River peaked at Tumbulgum at 3.96 mAHD at
1115 hours on 31 March 2017. By comparison, the water level peaked at
Murwillumbah Bridge at 5.84 mAHD almost 7 hours earlier at about 0430 hours
on 31 March 2017.
WR states:
the maximum depth of the inundation at the subject property was caused by the
Tweed River, which peaked at 3.96 mAHD at the Tumbulgum gauge
water flowed onto the property form the south after flood water over topped from
the Tweed River into the Tweed Valley way southeast of the property
the peak water level at the property is consistent with the water levels at the
Tumbulgum Gauge and the timing of the initial inundation was several hours
behind the gauge station however, this is likely due to the flood plain taking longer
to fill up
Determination | Case number: 712472 Page 5 of 7
short-duration rainfall intensities recorded at Tumbulgum were not particularly
severe and would not have generated sufficient runoff to cause stormwater
inundation of the property
The panel notes that inundation by stormwater runoff usually correlates with the
maximum intensity period for rainfall. The complainants’ property was inundated to a
level of 1.9m which suggested that there was flood damage rather than damage
caused by rainfall as rainfall runoff does not rise to such depths of water. Typical
stormwater inundation will be no more (and usually a lot less) than 50cm.
WR notes that the peak period of rainfall intensity was 45mm/hr between 2200hrs and
2300hrs on 30 March 2017 and was considered a 1 in 20 ARI (meaning it happens
about once every 20 years).
Therefore, this suggests that rainfall or storm water runoff was not the the cause of
inundation as:
the peak rainfall intensity occurred about four hours prior to the first reported
inundation of the complainants’ property
when inundation occurred, rainfall had almost ceased by this time
there had been a significant drop off in rainfall in the preceding hours.
WR concludes that based on the available data and information the property was
inundated by the Tweet River floodwater which flowed from the southwest of the
complainants’ property .
Complainants say the damage to the property was caused by an overland flow
In response to WR’s report, t he complainants provided their own hydrology report of
JH dated 15 April 2019 . JH’s notes that that the water level at the Cane Road Bridge
is a more accurate geographical land mark to see whether flood water overtopped the
Tweed River causing flood water to inundate the complainants’ property.
In addition, JH states that the evidence is not consistent with water being from a
backflow or inundation from Tumbulgum, as the water would have flowed towards the
north.
JH concludes by stating that the property was initially inundated due to an overland
flow, however, does not provide any evidence that this was caused by storm water
runoff or during the peak rainfall intensity.
In response to JH’s report, WR provided a supplementary report. WR note that based
on JH ’s hydrograph, floodwater from the Tweed River overtopped its banks in the
vicinity of Cane Road Bridge. This was approximately nine hours prior to the
inundation of the complainants’ property.
In addition, the floodwater from Bartlets Creek which is approximately 50m to the
north of the complainants’ property would have flowed north.
Determination | Case number: 712472 Page 6 of 7
The insurer is entitled to decline the flood damage
Significantly, WR was of the view that given the property was not inundated above
floor level prior to 0300 hrs on 31 March 2017, stormwater runoff alone would not
have inundated the property above floor level prior to the arrival of the Tweed River
flood waters.
In this regard, the panel notes that the peak rainfall intensity in the local area occurred
during 30 March 2017 and there was little rainfall on 31 March 2017. As such, the
inundation after 0300 hrs on 31 March 2017, occurred sometime after the peak
rainfall intensity.
The panel accepts that stormwater runoff is generally associated in the time with
intense rainfall periods and that the inundation did not occur during such period.
Given the topography of the area and the fact that the inundation was sometime after
the peak insensitive of rainfall, the panel accepts WR’s c onclusion that the inundation
at the complainants’ property was not caused by stormwater runoff and the inundation
was the result of floodwater from the Tweed River.
The insurer is entitled to rely upon its policy exclusion for flood, to deny the claim.
Therefore, the insurer is not required to meet to cost of the flood related damage
caused by the inundation at the complainants’ property.
The insurer is required to cover the storm related damage
During assessment of the claim, the insurer’s loss adjuster a ttempted to obtain
information and quotes from the complainants that related to storm damage. Such
damage is covered under the policy.
The information was not provided, prior to repairs commencing. The complainants
later provided a quote for repairs to plaster totalling $675 and repairs to the roof
totalling $2,480. These quotes relate to repairs caused during the storm for which the
insurer is liable for, pursuant to the terms and conditions of the policy.
The insurer is required to pay these costs plus interest in accordance with section 57
of the Insurance Contracts Act 1984, calculated from the date the amounts were paid
by the complainants, until the date of payment by the insurer.
The complainants are to provide proof of payment to the insurer.
Determination | Case number: 712472 Page 7 of 7
3 Supporting information
3.1 3.1 AFCA approach to this dispute
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determination.
The determination is made by a panel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
All panel members have extensive experience in flood claims. In November 2017, the
panel chair Ombudsman attended the local area to consider a number of claims made
at local properties.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Rainwater that mixes with flood water is flood
The courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether
there was any rainwater runoff damage before the flood water arrived at the insured
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.