After storm water entry, the insurer arranged a make-safe, but the repairer missed cracked tiles and a second rain event caused further damage. AFCA declined loss of rent and found the insurer acted reasonably on the claim, but ordered $750 for non-financial loss because of the repairer's shortcomings.

The first make-safe was not adequate even as an interim measure, and the insurer is at least partly responsible for the resulting upset, which warrants non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 712112 Financial firm Allianz Australia Insurance Limited Determination | Case number: 712112 Page 2 of 10 Case number: 712112 20 August 2020 1 Determination overview 1.1 Complaint The complainant holds a landlord insurance policy with the financial firm (insurer). He lodged a claim on 5 March 2020 for storm damage to the insured property, after he discovered water leaking from above a downlight in the hallway of the property. The complainant was dis satisfied with the insurer’s speed and quality of response to the claim, raising a complaint with AFCA on 11 March 2020. The insurer accepted the claim, organised make-safe work shortly after it was lodged, and made a cash settlement payment to the complainant on 17 March 2020. Another rain event occurred on 4 April 2020 where it became apparent the roof had not been made watertight by the original make-safe. The complainant called the insurer who did not offer a second make-safe at the time, as the relevant department was not open on a weekend. The insurer requested the complainant call back during business hours to speak to the correct people. On 6 April 2020, the complainant contacted the insurer who organised a second make-safe and an urgent reassessment of the damage. On 7 April 2020 the insurer settled the second damage event with a cash payment covering the resulting loss. The complainant is dissatisfied with the insurer’s response and says the insurer unreasonably delayed the make-safe work he was entitled to. The complainant also says he is owed compensation for loss of rent resulting from the insurer’s initial failure to secure the roof against future water ingress, and compensation of $5,000 for the unusual level of frustration, stress, and anxiety he suffered as a result of the insurer’s error. 1.2 Issues and key findings Did the insurer act in accordance with its policy obligations? Yes. The policy does not identify make-safe work as a separate specific entitlement under the policy, however the insurer did undertake make-safe work on both occasions, including within two days of the second event and the further damage occurring. That was not unreasonable in the circumstances. Is the complainant entitled to compensation for loss of rent? No. The property was not tenanted at the time of the loss; nor does the available evidence show that the extent or nature of the damage would have rendered the house uninhabitable so as to trigger the loss of rent provision in any case. Determination | Case number: 712112 Page 3 of 10 Is the complainants entitled to compensation for non-financial loss? Yes. The original make-safe work failed to make the roof watertight, which is what it might reasonably have been expected to do, at least as an interim measure. Although the complainant could, on balance, have commenced repairs before the second rain event, the incomplete make-safe did allow more damage to occur. That caused the complainant avoidable upset and inconvenience, particularly given his financial concerns. It is fair that the insurer pays the complainant a further $750 compensation for the claim experience. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to pay the complainant $750 compensation for non-financial loss. It is not required to take any further action. Determination | Case number: 712112 Page 4 of 10 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. All of the provided material has been read and considered. The parties raised numerous issues in their submissions to AFCA. For the purpose of this determination, commentary is restricted to only those issues considered relevant. This determination is based on what is fair in all the circumstances, having regard to the relevant legal principles, good industry practice (including codes of practice) and prior determinations, where applicable. 2.1 Did the insurer act in accordance with its policy obligations ? Complainant has not established he was denied a policy entitlement The complainant refers to a call to the insurer on 4 April 2020, where he says he was denied the opportunity to make a claim for immediate make-safe work when water entered the property during the second rain event, which occurred on a weekend. The complainant says the insurer owes him make-safe services at all times as outlined in his policy, which he specifically remembers choosing for this feature. The insurer supplied the relevant insurance policy documents which included the product disclosure statement (PDS) in force at the time of the damage. The PDS is clear and easy to read. There is no suggestion the complainant did not receive the PDS, and there is no mention in it of a make-safe service as a specific policy entitlement. The complainant has not supplied any other information to show this was a separate entitlement otherwise offered to him. Make-safe work is something which is broadly undertaken within the industry (depending on the nature and extent of the issue) as a measure to prevent or minimise further damage after what might be an insured event. It is a prudent action designed to avoid further costs; and unless the policy specifically says otherwise, it is at the insurer’s discretion. I am not satisfied the complainant has established a specific policy entitlement to a make-safe; and in any case, I am satisfied the insurer acted reasonably in taking appropriate and prompt action, in the particular circumstances, to do what it could to protect the property on both occasions. At the same time, I note the complainant himself has a responsibility to take any steps that might reasonably be necessary to have any emergency repairs carried out to the property to mitigate further loss or damage. The complainant has not shown he took prompt steps to address the roof repair (which was his responsibility) following the Determination | Case number: 712112 Page 5 of 10 first event, when he was quickly cash settled. In the meantime, however, it appears he did attend to the internal repairs for which the insurer had paid him. Make-safe did not make the roof water-tight The complainant says the insurer’s repairers (AR) did not repair the property in a workmanlike manner when performing the first make-safe. The evidence (including the reported findings of repairer P, who conducted the second make-safe) does indicate the first make-safe failed to identify or deal with up to 10 cracked roof tiles, including one directly above the area where the downlight is located and which appears to be the site of water ingress on both occasions. The complainant has provided photographs showing the location of the make-safe work on the roof, and an image of the cracked roof tile which he indicates was the source of the water entry to the property. The first repair is on a tile some meters away from the latter location. The complainant also provided a floor plan of the building showing where the roof locations correlate to the interior of the property. The insurer said AR completed a report and desktop quote, however, those documents have not been provided to AFCA. So while the insurer said the report stated that ‘immediate replacement’ of the damaged roof tile was required , it is not clear if that was the tile over the downlight where the internal damage occurred (rather than the other tile identified in the complainant ’s photos , which was some distance away). It is also not clear what else AR specifically identified as needing repair, apart from a section in the ridge capping which they apparently dealt with. Nor is it clear that the complainant was advised to attend to roof repairs as a matter of urgency. Instead, he says he was told by AR that the work they had done would last for years. I note the roof tiles are a medium colour with a lined pattern to them. The image of the close-up section of broken roof tile does show the crack, which is a potential water entry point, although in the broader images of the roof as a whole, I appreciate an individual crack such as that might not be visible without close inspection. The issue remains, however, whether AR, in their make -safe and report, identified and actually dealt with the specific area of cracking which was responsible for the internal damage. The evidence I have seen suggests they did not. While they may have found one cracked tile, it is apparent they missed others, including the one that led to the damage – in both the first and second rain events. I appreciate that a make-safe is not intended to be a full and final repair. Instead, it is an interim measure meant to minimise further damage until a complete repair can be arranged. In the current case, however, I am not satisfied the first make-safe that was carried out was adequate for even that temporary purpose. Determination | Case number: 712112 Page 6 of 10 Insurer settled the resultant damage in line with the policy The evidence shows the first make-safe did not protect the property from a subsequent rain event affecting the same point in the roof which was meant to have been ‘made safe’ . So even if the insurer was not strictly required to complete a make- safe in the first place, the fact that it did so, meant it was reasonable for the complainant to expect it was sufficient in addressing the area at risk of water ingress , at least in the short-term. The second event caused additional damage, which might have been avoided if either the first make-safe had been more thorough and focussed, or the complainant had acted promptly to carry out roof repairs for which he was responsible. Either way, the insurer then acted swiftly and fairly to pay the complainant for the damage arising from the second event. It was not required to undertake another immediate make-safe, as the evidence does not indicate the circumstance was strictly an emergency (including because the property was not tenanted at the time), and the complainant was himself put in a position to arrange for repairs in full, and could also have arranged his own interim assessment and make-safe on that occasion . The complainant has indicated he had concerns about the amount paid, but ultimately opted to accept the cash settlement in lieu of repairs. He also refers to safety concerns with the downlight in the two-day period during which the second make-safe was not offered before the matter was cash settled. While I appreciate his concerns, no information was provided to clearly show safety issues or harm suffered as a result of any delay. I am satisfied, on balance, the insurer has acted reasonably in dealing with the damage and its obligations, both under the policy and otherwise. At the same time, however, I consider there were shortcomings in the work undertaken by AR in the first make-safe, which meant internal repairs the complainant had completed by the time of the second rain event were themselves damaged and needed to be re-done. It is fair that the insurer paid for that further damage. 2.2 Is the complainant entitled to compensation for loss of rent? Insurer is not required to cover loss of rent in this case The complainant ’s submissions regarding loss of rent are, in essence, based on the proposition that the insurer’s actions resulted in a missed opportunity for him to earn rent from the property, and that caused him hardship as the property is currently mortgaged. The insurer maintains it acted reasonably and promptly in the circumstances. The insurer also says the policy does not offer loss of rent in this instance since the property was not tenanted at the time of the loss in any case, and the policy sets limits on cover for loss of rent after an insured event. Determination | Case number: 712112 Page 7 of 10 The PDS shows that cover applies for loss of rent after an insured event, but specifically only where the property was made uninhabitable while a tenant was in residence; and also subject to the property having been tenanted for 60 consecutive days leading up to the loss. The available information does not show a tenancy in place at the time of the claim on 5 March 2020; the most recent tenancy agreement had ended on 15 February 2020. I have also considered whether it would be fair to otherwise require the insurer to cover the ‘speculative’ loss of rent given the roof report did not identify all the cracked tiles. In the circumstances, however, I am not satisfied that should be required, because:  there is a clear agreement between the parties for loss of rent cover as set out in the PDS, and the circumstances of the matter in dispute do not trigger that cover  the complainant, in accepting a cash settlement on 17 March 2020, assumed the risks associated with organising and managing the repairs to the property  the second event occurred after the complainant had assumed the risk for ensuring the property was watertight and for then carrying out full repairs  the original make-safe was not intended to be a full roof repair  the insurer settled the second water damage event within three days of it being reported to them. The insurer is not required to pay loss of rent, either under the strict policy terms, or otherwise. 2.3 Is the complainant entitled to compensation for non-financial loss? The insurer responded quickly to the complainant’s concerns The complainant says the insurer’s responses to his concerns were slow, causing him to have to follow up repeatedly with the builder who performed the assessment, and a range of other people including, eventually, the insurer’s chief executive officer. It appears he felt compelled to do so, given the financial impact of the property not being able to be rented out because of the repairs needed. The broad timeline of relevant events is:  on 5 March 2020 the claim was lodged, with insurer organising the make-safe work by the following day and assigning the claim for assessment of the damage  on 11 March 2020 the complainant lodged his initial complaint with AFCA outlining his concerns that the insurer was causing him financial hardship as the property was not tenanted and could not be rented until the repairs were complete.  on 17 March 2020 the complainant received the settlement payment for the damage. The insurer waived the policy excess as part of the settlement. However, the complainant also says the insurer was being slow to respond, wait times were Determination | Case number: 712112 Page 8 of 10 too long, the insurer was not diligently following up the claim outcome, and he had not been provided with the information necessary to implement the settlement of the claim  on 4 April 2020 the complainant discovered water damage had occurred again to the property. He contacted the insurer who advised him the department who handles his concerns were not available on a weekend and advised further contact would need to occur during business hours. The complainant emailed his concerns to the insurer’s CEO  on 6 April 2020 the complainant lodged his second complaint with AFCA, and also contacted the insurer to express his concerns  on 7 April 2020 the insurer organised a second builder to attend to the make -safe work. It then made a settlement payment for the further damage. While I appreciate the complainant’s need to have the property repaired as soon as possible, I am not satisfied he has established the insurer’s responses were slow or unreasonable in the circumstances; nor that it failed to meet its obligations under the General Insurance Code of Practice (GICOP). The evidence shows the complainant brought his complaint to AFCA even before the relevant GICOP timeframes had elapsed. I acknowledge the financial impact of the damage on the complainant, given the need to repair the damage before he could rent the property out again. However, I am not persuaded that the insurer was solely or primarily responsible for that financial impact in the first place. I also consider that overall it acted promptly and appropriately when it became aware of the issues, including the further damage. At the same time, however, the fact of having to deal with damage from the second rain event, will have led to delays in the property being ready for renting ; although it is not clear that it was actually ready and ‘on the market’ when the second event happened, and (as noted above) the complainant himself might have taken steps to repair the roof sooner. Complainant should be compensated for non-financial loss Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss. We will only award this type of compensation in limited circumstances, such as if a complainant suffers an unusual degree of stress, inconvenience, or loss of peace of mind because of the way the insurer handled the claim. I acknowledge that making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. However, compensation is not awarded for the ordinary degree of inconvenience that comes with making a claim. In this case, however, I am satisfied the complainant did suffer an unusual level of inconvenience and considerable upset when the same damage occurred twice in the space of a month. That is particularly so as he says he was led to believe by AR that Determination | Case number: 712112 Page 9 of 10 there was no urgency in him attending to the roof itself, given the first make-safe. As well, his financial concerns were exacerbated by the chain of events, for which the insurer is at least partly responsible (in terms of the impact of the actions of its appointed repairer). It is also clear from the complainant’s submission s that he has felt the insurer was not being direct or altogether truthful in the way it represented the evidence and circumstances of its dealings with the claim. I consider it fair and appropriate that the insurer pay the complainant $750 as compensation for non-financial loss. Determination | Case number: 712112 Page 10 of 10 3 Supporting information 3.1 Relevant policy terms 11. Rental costs after an insured event (Applicable only when you have buildings cover or the building is part of a strata title development and you have contents cover) If the buildings are damaged by an insured event covered by your policy, to such an extent that your tenant cannot live in them, or we agree access to or use of the buildings was not possible if any of the insured events covered by this policy occur during the period of insurance and causes: • damage to other property in the vicinity of the buildings; or • damage within the strata title development itself, where the building is a lot; and • this damage prevents access to or use of the building for a minimum perio d of 7 days, we will pay for your loss of rent on the buildings: • for the length of time which we agree is necessary to reinstate your buildings or for which access is denied, or • up to a maximum period of 12 months, whichever period of time is the lesser. The amount we will pay will be based on the weekly rent payable by your tenant as at the date of damage to the buildings. We will not pay for your loss of rent if: a. the buildings have not been tenanted for more than 60 consecutive days immedia tely before the date of the loss or damage; or b. you did not have a contract in place for your buildings to be tenanted within the 30 days immediately following the date of the loss or damage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.