Text of the determination
Determination
Case number 711546
Financial firm Austagencies Pty Ltd
Determination | Case number: 711546 Page 2 of 17
Case number: 711546 29 January 2021
1 Determination overview
1.1 Complaint
The complainant is a lot owner in an Owners Corporation (OC). The OC holds
insurance with the financial firm (insurer) including for the complainant’s unit.
The complainant made a claim for building damage and for loss of rent. The
complainant says a lot owner within the OC did structural work to the unit above his
which has caused damage to his unit in the OC.
The insurer initially declined the claim because it says there is no event listed under
the policy which provides cover for this damage. As there is no event to claim upon,
the insurer says there is no claim for loss of rent. The insurer also says this is a civil
dispute between the complainant and the OC.
The complai nant says that the insurer’s assessor failed to adequately inspect all of
the damage to his unit and wants his claim paid, which includes loss of rent and some
miscellaneous items.
1.2 Issues and key findings
Has the complainant established a valid claim?
Yes. The insurer accepted part of the claimed damage had arisen from an event listed
under the policy.
Is the insurer entitled to decline the claim or limit the repairs?
Yes. It is fair the insurer can rely on its policy terms and the available information to
decline 30% of the claim.
Is the complainant entitled to loss of rent and other benefits?
The complainant is not entitled to loss of rent pursuant to the policy terms save for
loss of rent while repairs are undertaken.
Is the complainant entitled to compensation?
The claim was not handled adequately and in a timely manner. The insurer is to pay
$5,000 financial loss compensation and $2,000 non-financial loss compensation.
1.3 Determination
This determination is mostly in favour of the complainant.
Determination | Case number: 711546 Page 3 of 17
Should the complainant accept this determination then within seven days of
notification of acceptance the insurer is to make the following payments:
$32,152.12 for repairs
interest pursuant to section 57 of the Insurance Contracts Act on $32,152.12 from
18 February 2020 (the date the claim was denied) until settlement
$1,800 for loss of rent while repairs are undertaken
subject to proof of the re-letting costs and the bond, up to $2,000 for the
reasonable reletting costs
$5,000 financial loss compensation
$2,000 for non-financial loss compensation.
Determination | Case number: 711546 Page 4 of 17
2 Reasons for determination
2.1 Has the complainant established a valid claim?
Complainant has established a valid claim
The complainant must establish on the balance of probabilities he suffered a loss
caused by an event to which the policy responds. This is known as a prima facie or
valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
The complainant says he lost a tenant due to the physical damage to the floor/ceiling
system by the owner of the unit above his unit when renovating their unit. He says
vibration/movement caused the cracking damage in his unit. He says the renovation
and damage caused also created noise which made his unit unliveable.
He also claims the ceiling, the wall surfaces and doors and door jams in his unit have
suffered damage due to tenant’s reaction to the noise from the unit above.
The insurer relied on its adjuster who said there was no damage to the ceiling caused
by the renovations in the unit above. It declined to pay the claim except for damage to
the ceiling caused by the complainant’s tenant when hitting the ceiling with a
broomstick.
It declined the claim for loss of rent saying there was no damage that made the unit
unfit to live in.
After a conciliation, the insurer agreed to appoint another expert. The appointed
engineer identified damage to the ceilings in the entry, lounge and dining rooms which
he said were consistent with damage caused by renovations in the upstairs unit. The
insurer agreed to pay the cost to repair the ceiling in these areas.
The insurer said the remaining damage was not caused by the renovations to the
upstairs unit. Therefore, it was not prepared to pay for all the claimed repairs.
The insurer arranged for a scope of works and quotation to repair based on its scope
of works and made an offer to the complainant which was rejected.
Extracts from the material relied on b y the parties is set out in supporting section 3.3
of this determination.
The policy provides cover for physical loss or destruction of or damage to the property
caused by an event during the period of insurance. An event is defined to mean an
accident causing or resulting in sudden and unforeseen damage to the property.
Determination | Case number: 711546 Page 5 of 17
The insurer has agreed there is damage which is consistent with the damage caused
by renovations in the upstairs unit. The dispute is about the extent of damage.
Considering the available information and the policy terms I am satisfied the
complainant has established a valid claim.
2.2 Is the insurer entitled to decline the claim or limit the repairs?
Complainant must establish all claimed damage caused by renovations
The onus remains with the complainant to establish all the claimed damage was
caused by the renovations in the upstairs unit.
Once established, the onus then shifts to the insurer to establish the damage was
caused by wear and tear which is a policy exclusion.
Material from parties considered
The insurer’s engineer inspected the complainant’s unit with the complainant on 30
July 2020. He agrees the tenant dented the living room ceiling when using a broom
handle to try to stop the noise above.
He also agrees the renovations and additional imposed loads to the floor joists of the
unit above caused deflection in the joists resulting in the ceiling lining prying loose
from the fixings in the complainant’s unit in some rooms. He did not identify this
damage to the ceiling linings in the bathroom and kitchen.
He was unable to confirm alteration of the floor joists as access to the unit above was
not provided. He thought the increased noise might be because carpet had been
removed from the floors in the unit above, but the reduced soundproofing did not
affect the structural integrity of the floor between the units.
He identified other claimed damage but said it was due to wear and tear, lack of
ongoing maintenance and/or inadequate ventilation.
The complainant has provided lengthy submissions supported by photographs. He
has also provided three quotations for the cost of repairs.
The first quotation (MA) describes the repair work but makes no observation about
the cause of the damage.
In the second quotation (SO) describes how he removed downlights in the kitchen
and bathroom so he could see into the ceiling cavity via camera. He also made small
penetrations into the ceilings of the lounge, dining and main bedroom.
As a result, SO says he saw the unit above had recently changed floor boards and
timber supports in the ceiling space above the complainant’s unit. He also saw recent
building construction debris left in the ceiling space with missing insulation.
Determination | Case number: 711546 Page 6 of 17
SO is supported by WC who provided a third quote. He said the plaster ceili ngs were
damaged due to recent building works in the unit above where the timber floors had
been changed and altered which he also saw via the inspection points in the ceiling
spaces. He agreed that plaster in all main rooms, hallway and entrance had moved
and warped off its supports.
Complainant’s material preferred
Having reviewed all the available information, I prefer the opinions of SO and WC
over the insurer’s engineer because they inspected inside the ceiling.
In circumstances where the timber floors above have been damaged and altered such
that the downstairs unit is noisier, I accept it is fair insulation is placed in the ceilings.
Insurer entitled to decline some of the claim
However, I do not accept all the claimed damage was caused by the renovation
works. I accept there is damage to the walls and door frames which may have been
caused by excessive force by the tenant when slamming doors shut, but this is not
covered by the policy as it is not accidental damage as defined.
Having reviewed the reports and photographs provided, I am satisfied on the balance
of probabilities some of the claimed damage is caused by wear and tear and/or lack
of maintenance.
On the available information, I am satisfied the insurer is entitled to decline some of
the claim.
The insurer points out that the certificate of insurance says the floor structure is
reinforced concrete and not timber but none of the experts raised this point. Had this
been the case I consider at least one of the experts would have noted it.
Fair the insurer pays $32,152.12 for the repairs
The complainant’s quotes do not differentiate between the damage caused by the
renovations above and the damage caused by the tenant or by wear and tear. The
quotes include replacing the ceiling where the tenant caused some damage. The
quotes say the whole ceiling is to be repaired so I am satisfied damage caused by the
tenant with the broomstick is to be paid.
The most recent quotes are from WC and SO and are very similar. I accept SO’s
quotation is a fair estimate of all the claimed cost of repairs. However, as set out
above I do not accept all the claimed repairs were caused by the renovations.
Having considered the reports and photographs I am satisfied it is fair to allow 70% of
the work and value based on the SO quote, which is $29,229.20 including GST.
As the claim is to be cash settled, I am satisfied it is also fair to allow a further 10% for
contingencies and variations which may occur once repairs commence.
Determination | Case number: 711546 Page 7 of 17
Should the complainant accept this determination then within seven days of
notification of acceptance the insurer is to pay $32,152.12 for the cost of repairs.
The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts
Act on $32,152.12 from 18 February 2020 (the date the claim was denied) until
settlement.
2.3 Is the complainant entitled to loss of rent and other benefits?
The policy provides for loss of rent in certain circumstances
The complainant requires the insurer to compensate him for loss of rent.
He says the tenant vacated the unit in February 2019 because he could not live there
because of the noise. He first claimed $500 (and later $450) a week loss of rent.
The complainant also says the insurer has unreasonably delayed the matter. He sa ys
he recently assessed the unit for potential rental income and now says his rental loss
is $600 per week.
He claims the loss should cover the period from when the tenant vacated plus an
allowance for repairs which he estimates to be about 3 to 4 weeks. He claims $62,400
for lost rent.
The insurer says loss of rent is not payable because the unit did not sustain damage
that would make it unfit to be occupied for its intended purpose. The tenant moved out
as he could not live in the unit with noise from the above unit, not because there was
any damage to the unit making it unfit to live in.
The policy provides for additional benefits following damage covered under section 1
of the policy. It will pay costs and expenses incurred in consequence of the damage.
An additional benefit is loss of rent. Where the unit is leased (or would have been
leased) the insurer will pay the loss of rent incurred by the complainant if the unit is
made unfit to be occupied for its intended purpose.
Damage to the ceiling did not make it unfit to be occupied
I accept the damage to the ceiling did not make it unfit to be occupied. I also accept
that in consequence of the renovations the complainant’s unit was noisier. I note the
adjuster says he could hear no noise, but I accept th e complainant’s contention this
was because the tenants were not then at home.
Both SO and WC saw the unit above had changed floor boards and timber supports
in the ceiling space above the unit and this change damaged the ceiling below. In
view of the further information from the engineer I am satisfied it is probable therefore
that the complainant’s unit was noisier because carpets were replaced with
Determination | Case number: 711546 Page 8 of 17
floorboards in the unit above, not because of the damage to the ceiling which
occurred in the renovation.
Therefore, I do not accept the rent has been lost because of the damage to the
ceiling. I do not accept the complainant is entitled to past loss of rent pursuant to the
policy terms.
Fair the insurer pays $1,800 lost rent while repairs are undertaken
However, considering the kind of repair work which needs to be done, I accept the
property will be unfit to live in while it is repaired.
No information is provided by the complainant’s contractors about the time to repair.
Having considered the work which has to be done and in the absence of information
to the contrary, I accept the repairs will take up to 4 weeks.
While the complainant makes various assertions about the amount of rent he has lost,
he has provided no independent objective proof of the amount of lost rent.
Considering the nature of the unit and its location, I accept $450 per week rent is
reasonable.
I am satisfied it is fair in the circumstances the insurer pays $1,800 for loss of rent
while the repairs are undertaken.
Reasonable re-letting costs to be paid subject to proof
The complainant also claims for entitlements which arise under the policy and which
might apply in certain circumstances.
As I am not satisfied the lot is unfit for occupation because of the damage done to the
ceiling, the insurer is not liable to pay for maintenance fees and strata levies.
The complainant claims for the reasonable costs of re-letting his unit.
The policy says the insurer will pay up to $2,000 for the reasonable re-letting costs
incurred by the complainant where the unit is leased and the tenant at the time of the
damage advises they will not be re-occupying. The amount payable is reduced by a
bond or deposit the complainant is entitled to receive or retain from the tenant.
Based on my findings in this determination and subject to proof of the re-letting costs
and the bond, I am satisfied it is fair the insurer pays up to $2,000 for the reasonable
reletting costs.
Determination | Case number: 711546 Page 9 of 17
2.4 Is the complainant entitled to compensation?
Compensation paid in some circumstances
In relation to the claim for loss of rent, the complainant says the insurer has
unreasonably delayed the matter.
AFCA can award compensation for indirect financial loss caused by the insurer’s
conduct capped at $5,000 per claim.
The claim was made on 30 November 2019. It was not until a more thorough
investigation was made by the eng ineer in July 2020 that the insurer’s position
changed. A scope of works and a quotation were obtained but an offer was not made
until 8 December 2020.
The complainant did not make a claim until November 2019. He has not adequately
explained what occurred between the time the tenant left the property in February
2019 and the time of making the claim. He has not provided a lease agreement or
other proof of rent paid by the tenant.
Fair the insurer pays $5,000 financial loss compensation
Nonetheless, in the absence of rebuttal information I accept the property was leased
for around $450 a week. I also accept the insurer took too long to decide, by which
time the complainant should have been indemnified and the property repaired in
readiness for another tenant.
In all the circumstances, I am satisfied it is fair the insurer pays $5,000 financial loss
compensation because of the way the claim was managed.
The complainant has other complaints about the way the claim was handled. These
complaints include that there was delay in processing the claim as the claim was not
properly assessed by the adjuster and engineer and delays in responding.
AFCA will award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation.
Fair the insurer pays $2,000 non-financial loss compensation
The complaint made by the complainant has generally been consistent.
Determination | Case number: 711546 Page 10 of 17
The claim was mostly denied until it became clear to the insurer that the claim initially
made included damage to the complainant’s unit. Despite accepting part of the claim,
it delayed in obtaining information and making an offer.
In the circumstances I accept there has been an unusual degree of physical
inconvenience and time taken to resolve the complaint which would have interfered
with the com plainant’s expectation of enjoyment and peace of mind.
I am satisfied it is fair the insurer pays $2,000 compensation.
Determination | Case number: 711546 Page 11 of 17
3 Supporting information
3.1 Our Approach
As advised to the parties, we have considered it appropriate to expedite this
complaint in accordance with the Operational Guidelines to the AFCA Rules, due to
the nature of the complaint. Accordingly, this complaint has not been the subject of a
recommendation and has proceeded directly to determination.
This complaint has been determined based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer’s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
Section 1
Property: Physical Loss, Destruction or Damage
1. Cover
This Section covers:
Physical loss or destruction of or damage to Insured Property caused by an Event
occurring during the Period of Insurance and not otherwise excluded. Unless stated
otherwise in this Section 1, the most We will pay is the Sum Insured. ….
Determination | Case number: 711546 Page 12 of 17
2.3 Event
Occurrence or accident causing or resulting in sudden and unforeseen, physical
loss or destruction of or damage to Insured Property
5. Additional Benefits
Following loss, destruction or damage covered under this Section 1 of the Policy
(or in other circumstances described in any of the Additional Benefits below), We
will also pay, in addition to the Sum Insured, the following amounts, costs and
expenses incurred in consequence of the loss, destruction or damage:
….
5.7 Maintenance fees and strata levies
The maintenance fees and strata levies required to be paid by the Lot Owner to
You during the period the Lot is unfit for occupation following loss, destruction or
damage.
5.16 Costs of losses incurred by the Lot Owner
We will also pay the following amounts, costs and expenses incurred by a Lot
Owner in consequence of loss, destruction or damage covered under this
Section 1.
The combined total amount We will pay for Additional Benefits 5.16 a) to i) below
is limited to whichever is the greater of i) or ii):
i) 25% of the Sum Insured or $500,000, whichever is the greater; or
ii) any other amount or percentage shown in the Policy Schedule.
At Our option, we will settle claims under this Additional Benefit directly with the
You or any Lot Owner.
b) Loss of Rent, & Temporary Accommodation
i) Loss of Rent
Where the Lot is leased out or would have been leased out, the Loss of Rent
incurred by the Lot Owner if the Lot or Common Area is made unfit to be occupied
for its intended purpose.
We will pay from the time of the loss, destruction or damage until the time the Lot
is re-let following completion of Reinstatement or Replacement of Your Insured
Property, provided the Lot Owner takes all reasonable action to obtain a new
tenant.
Determination | Case number: 711546 Page 13 of 17
f) Cost of re-letting
Up to $2,000 any one Event for reasonable re-letting costs incurred by the Lot
Owner, where the Lot or Common Area is leased out and the tenant at the time of
the loss, destruction or damage subsequently advises they will not be
reoccupying the Lot or Common Area they previously leased.
The amount We pay will be reduced by a bond or deposit that the Lot Owner is
entitled to receive or retain from the tenant.
3.3 Extracts from expert Reports
Complainant's experts:
Record Key points
Complainant’s expert
(MA)
Quotation
13 November 2019
Supply and install acoustic insulation to living room, dining room,
kitchen, hall, entry, laundry, bedroom 1 and bedroom 2; paint and
painting; removal of all cornices and replace with square set
cornice; removal and reinstate light fittings; plastering;
$ 45,114.80 including GST.
Complainant’s expert
(SO)
Quote by SO
15 November 2020
Plastering service inspected wit h complainant 13 November
2020.
Removed the downlights in the kitchen and bathroom and was
able to see into the ceiling cavity via a camera. Made some small
penetrations into the ceiling of the lounge, dining and main
bedroom.
At all these inspection points saw the unit above has recently
changed floorboards and timber supports in the ceiling space
above the complainant’s unit.
Also, a lot of recent building construction debris left in the ceiling
space with missing insulation.
Confirm that the ceilings in this unit have been damaged due to
recent building works above.
Tenant hit the ceiling numerous times causing damage.
Internal wa lls have had picture hooks removed causing wall and
paint damage which needs repair and re - paint.
Walls around for internal wall door frames have cracked and
need to be re - patched and paint ed. Caused by tenant using
excessive force when slamming doors shu t.
Describes the scope of works including to remove and replace
ceiling and supply and install insulation: $37,960 plus GST.
Determination | Case number: 711546 Page 14 of 17
Record Key points
Complainant’s expert
(WC)
Quote by WC
18 November 2020
Condition of ceiling plaster is poor and not repairable.
Plaster needs to be removed and new plaster fitted.
Plaster ceilings have been damaged due to recent building
works in unit above where the timber floors have been changed
and altered. This is noticeable via inspection points into your
ceiling space. This has caused the plaster in all main rooms,
hallway and ent ranc e to unsecure itself off the supports, move
and warp.
In a few locations indication tenant hitting plaster ceiling with hard
object.
Damage to some main walls by occupants where picture hooks
have been removed and walls around four doorways.
Quoted materials and labour to makegood the ceilings and walls
by damage caused by unit above and tenant: $41,915.50.
Insurer’s Experts:
Record Key points
Financial firm’s expert
Report by CS
17 December 2019
During our attendance on 16 December 2019 were advised that
the tenant vacated the unit because he was unable to live with
quiet, peace and enjoyment. Since February 2019 the
complainant has been regularly staying overnight in unit to se e if
what the tenant claimed that was unbearable to stay in the unit
due to the noise above is correct.
States that all movements from occupants located above can be
heard in his unit directly below and alleges that the issue started
from the time that the lot owner above physically damaged the
structural integrity of the floor/ceiling above the lot. They removed
the carpet and underlay, physically damaging the flooring and
ceiling structure.
Says the physical damage to the timber floor structure and ceilin g
has now created an unbearable noise in his unit making it
unliveable.
During attendance could not hear any noise from above but
understand the unit above had undergone extensive renovations
towards the latter part of 2018 with hardwood flooring being
in stalled.
Except for the damaged plaster ceiling caused by the tenant
hitting the ceiling with a broomstick, there is no structural damage
to the building.
Financial firm’s expert Reviewed report and scope from CR.
Determination | Case number: 711546 Page 15 of 17
Record Key points
Report by CS
13 August 2020 Visible damage to the ground floor lot has occurred as a result of
a number of different events.
Damage at the front ent ry door frame (cracking of wall surfaces
and rusting of the door frame) is consistent with long - term
dilapidation that is typical with the age of the dwelling and
common use of the door.
Moisture damage to the walls and skirting board in the bathroom
is due to a lack of adequate ventilation and suitable ongoing
maintenance.
Visible signs of dilapidation, wear and tear observed in the
kit chen area are consistent with its long - term use and lack of
suitable ongoing maintenance.
Financial firm’s expert
Report by CR
12 August 2020
Forensic engineer inspected and photographed Unit 1 (Lot 2)
(the insured unit) wit h complainant on 30 July 2020.
Building about 90 years old and in relatively fair condition.
Complainant owned and rented out unit 1 for many years. Unit 1
and unit 2 have n ear identical floor layouts. Early 2019, tenant
vacated because of excessive noise from renovations above him
in unit 2. Claimed renovations reduced the level of soundproofing
between the units. Complainant stayed in the unit 1 to verify
tenant’s claims an d agreed soundproofing not acceptable.
Tenant damaged the ceiling in the living area with dents in the
ceiling lining caused by impacts from broom handle.
Indent ation damage caused by the tenant is a cosmetic issue
only and has not contributed to the cei ling lining separation.
Ceiling lining has pried loose from fixings in several places in
entry hall, lounge and dining areas in unit 1.
Claimed renovations took place to unit 2 and additional imposed
loads to the floor joists of unit 2 that occurred during the
renovation have caused some excess short - term deflection in the
floor joists, resulting in the ceiling lining prying loose from the
fixings in unit 1.
No evidence to suggest the floor joists have been altered. The
floor structure was observed to be a dequate at the time of
inspection, however alteration of the joists was unable to be
confirmed, as access to unit 2 was not provided.
Soundproofing reduction between floor levels is a non - structural
issue and would not impact the integrity of the flooring . However,
the apparent increase in noise may be a result of removal of
carpet floor coverings from unit 2.
Cracking was observed to the perimeter of the front entry door
frame and in the wall surfac e. Dilapidation to these areas is
considered to be normal and expected for a building of this age
and construction.
Determination | Case number: 711546 Page 16 of 17
Record Key points
Moisture damage to the bathroom is due to a lack of adequate
ventilation during the common use of the room, and lack of
suitable ongoing maintenance.
Signs of dilapidation in the kitchen are typi cal for a building of this
age, and due to lack of suitable ongoing maint enance.
No evidence of any ceiling lining damage in the bat hroom and
kitchen areas that had been caused from renovation activities in
the upper storey unit (unit 2).
Financial firm’ s expert
Scope of works by CR
12 August 2020
Scope provided details of building work required to rectify the
damage to the ceiling at ground floor unit 1.
Scope is for reinstatement of the ceiling to a similar condition as
existed before the event.
Scope for reinstatement works to the entry area, living area,
dining area and completion and clean up .
Financial firm’s expert
letter from CR
26 August 2020
Provided further clarification of report.
Were unable to verify the presence of any ceiling s eparation
damage in the bedrooms and main corridor associated with
having been caused by the tenant of either unit, whether
malicious or otherwise. The only damage to these areas we were
aware of can be attributed to general wear and tear, and not
intentio nal damage. The (complainant) directed our attention
primarily to the entry area, lounge and dining areas, where
damage was most apparent.
Cracking to the doors is wear and tear and consistent with the
use the doors.
Impact damage to the ceiling consisten t with end of broom stick.
Reduced soundproofing of the floor consistent with carpet having
been removed from the unit above and this has not affected the
structural integrity of the floor between the units
Damage to the ceilings is detailed in the scope provided and
would generally require additional screw fixings, patching and
painting of the ceilings to the cornice line.
F inancial firm’s expert
Scope Works/quotation
(TB)
3 December 2020
Provided deskto p quotation for reinstatement of damage as per
CR’s scope of works $2,150.61 including GST.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails.
Determination | Case number: 711546 Page 17 of 17
Parties’ expert reports.
Photographs, scopes of work and quotations.
Correspondence between the parties.