Home / Search / Determination 711515
Determination 711515
Broker did not follow instructions and delayed response on SMSF property finance, causing missed settlements
Summary
The complainants said the finance broker did not follow their agreed instructions and was slow to respond, causing them to miss property settlements and incur $28,548 in costs. AFCA found the broker acted on the instructions given and was not responsible for the missed settlements, so nothing was ordered.
The broker owed a duty of care to act reasonably, but the complainants had signed unconditional contracts before obtaining finance and bore the risk of settlement.
Issues
- Instructions not followed primary · not upheld“The facts support Mr T's understanding of the 15 September 2016 meeting; Mr T was instructed to make enquiries into SMSF funding for three properties.”
- Delay secondary · not upheld“Mr T was diligent in making the enquiries he was asked to make; two months was reasonable in all of the circumstances.”
Subjects and remedies
broker or intermediarysmsfno remedy
Related
Text of the determination
Determination
Case number 711515
Financial firm Lead Out Financial Pty Ltd
Determination | Case number: 711515 Page 2 of 6
Case number: 711515 27 July 2021
1 Determination overview
1.1 Complaint
In August 2016, Mr B and Ms P (the complainants) entered into two unconditional contracts of
sale to purchase real properties located at 64 W Street and 66 W Street with settlement due
27 February 2017. The purchasers are recorded in these contracts as “[Mr B and Ms P] &/or
nominee”. Mr B and his accountant (Mr J) met with the financial firm‟s br oker (Mr T) on 15
September 2016 to discuss options to purchase the properties.
The content of, and the scope of what was agreed to, at the 15 September 2017 meeting is
contested by Mr B and Mr T, both with divergent recollections.
The complainants are concerned Mr T did not follow the agreed scope of the 15 September
2017 meeting and did not act diligently. They say Mr T‟s lack of diligence caused them to
miss the settlement date for 64 W Street and 66 W Street and incur $28,548 costs.
An AFCA case manager has already provided a recommendation on these issues. The
recommendation was in favour of the financial firm and a copy of it is attached.
1.2 Issues and key findings
Were the findings in the recommendation correct?
The findings in the recommendation were correct and are adopted in this determination. I
have considered the submissions and information provided by the parties before and after the
recommendation.
Do the complainants’ further submissions change the outcome ?
The complainants‟ further submissions do not change the outcome of the recommendation for
the reasons set out in Section 2.2.
Why is the outcome fair?
The outcome of this complaint is fair because Mr T had been asked by the complainants to
undertake enquiries into a complex loan proposal. It was reasonable to expect that it would
take time for Mr T to complete that task.
1.3 Determination
This determination is in favour of the financial firm. The financial firm is not required to pay
any compensation or take any other action.
Determination | Case number: 711515 Page 3 of 6
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The AFCA case manager’s findings in the recommendation were correct
I have reviewed the information provided by the parties and I am satisfied that the case
manager‟s recommendation contains an accurate summary of the complaint, the issues to be
determined, any applicable paragraphs of the rules and any relevant law. The findings in the
recommendation (aside from two mistaken references to dates in 2020 that should read 2016
or 2017) are correct and are adopted in this determination.
As I agree with the recommendation it is adopted as part of this decision. I will not repeat its
findings in this determination. A copy of the recommendation is attached.
The complainants rejected the recommendation
The complainants rejected the recommendation and provided reasons for their rejection. In
summary, the reasons for their rejection are as follows:
Mr T should not have relied on information provided by Mr J as he was not their
accountant or financial advisor
Mr T‟s lack of diligence was a result of his misunderstanding of the complainants‟
requirements
Mr B asked Mr T to only seek finance for 64 W Street at the 15 September 2016 meeting
because Mr T had told him he could not finance all of the properties through his self-
managed superannuation fund (SMSF)
Mr T‟s enquiries to prospective lenders about funding 64 W Street was not a com plex task
that required two months to complete
the complainants were relying on Mr T to provide a prompt response to the prospect of
securing finance as they needed to make decision about, and manage, the sale of R Street
to potentially finalise settlement of the properties.
2.2 Do the complainants’ further submissions change the
outcome?
The complainants‟ further submissions do not change the outcome of the recommendation.
The matters discussed at the 15 September 2016 meeting are in dispute
The matters discussed at the meeting between Mr B, Mr J and Mr T on 15 September 2016
are disputed.
Mr B says Mr T had made it clear that he would not be able to finance any of his properties in
the superannuation environment. He says Mr T was instructed to consider other options for
the finance of 64 W Street. Mr T says he was instructed to explore the potential of financing
62 W Street, 64 W Street and 66 W Street through the complainants‟ self -managed
superannuation funds with the prospect of a potential future property development.
The facts support Mr T’s understanding of the 15 September 2016 meeting
My first observation is that Mr T may have avoided this complaint had he clearly defined the
scope of work by preparing terms of engagement with the complainants. I note the Finance
Determination | Case number: 711515 Page 4 of 6
Brokers Association of Australia Code of Conduct, which is indicative of good industry
practice, does not require finance brokers to prepare terms of engagement, so I do not
consider Mr T‟s failure to do so to be a breach of good industry practice. Nevertheless, it
would have been helpful and is a useful risk management strategy to avoid
misunderstandings.
In the absence of terms of engagement or any other document that sets out the parties
shared understanding of Mr T‟s scope of work, I am left with the parties‟ conflicting
recollections.
I am satisfied both parties‟ recollections are honestly held. Both parties‟ recollections, without
more, are equally plausible.
This leaves me to determine which of the parties‟ recollectio ns is more compelling than the
other by having regard to contemporaneous documents and circumstances.
It was reasonable for Mr T to rely on information provided by Mr J
On 27 August 2016, Mr B sought advice from Mr J on how best to structure the purchase and
finance of two properties he and Miss P acquired the previous weekend. Mr J responded on
13 September 2016 outlining the benefits of financing through a self-managed
superannuation fund (SMSF) . The email finished with „I will introduce you to the broker to run
the finance process for your SMSF and broader needs‟.
In Mr B‟s timeline of events he stated:
Email to [Mr J], the accountant/advisor for our SMSF, advising of the purchase and
seeking advice as to ownership structure and financing.
Both parties provided a copy of the same detailed summary of the complainants ‟ financial
position prepared by Mr J.
The financial summary included:
Mr B and Miss P‟s property listing with market values and outstanding loan balances
a list of the rental property outgoings
Mr B and Miss P‟s net annual salary amounts
Mr B‟s annual pension amount
estimated personal dividend earnings
personal and SMSF cash and equity balances
In all of the circumstances, I consider it was reasonable for Mr T to conclude that Mr J was
authorised by the complainants to provide the information. This is supported by Mr B‟s email
to Mr J on 20 September 2016 where Mr B asked Mr J to forward the SMSF information to Mr
T.
The contemporaneous information and circumstances s upport Mr T’s position
The 20 September 2016 email also supports Mr T‟s recollection of the scope agreed at the
meeting of 15 September 2016. It is not plausible that Mr B had instructed Mr T to only look
at options for funding 64 W Street outside of the superannuation environment and then, five
days later, ask Mr J to send financial information about the complainants‟ SMSF to Mr T.
Determination | Case number: 711515 Page 5 of 6
I also consider it more likely than not that the complainants intended to acquire 62 W Street
as part of a property development scheme by the time Mr B met with Mr T and Mrs J on 15
September 2016 as it was an adjoining property to 64 W Street and 66 W Street. This is
evidenced by a spreadsheet prepared by Mr J on 12 September 2016 and provided to Mr T
by Mr J ahead of the 15 September 2016 meeting. The spreadsheet identified 62 W Street
as property to be acquired by the complainants‟ SMSF.
I therefore accept that Mr T was instructed by Mr B to make enquiries into the possibility of
funding 62, W Street, 64 W Street and 66 W Street t hrough the complainants‟ SMSF.
Mr T was diligent in making the enquiries he was asked to make
It follows from this finding that Mr T‟s task was in fact a complex one a nd it would take time
for him to explore the potential of securing the necessary funding with the complainants‟
SMSF as borrowers.
I consider that two months to make enquiries across multiple lenders about the potential to
borrow funds through an SMSF to acquire three investment properties for development was
reasonable in all of the circumstances.
Mr T was not required to enquire into Mr J’s authority
Mr B also claimed Mr J did not have a financial advisor‟s licence to enable him to provide
information on behalf of the complainants. However, it was not Mr T‟s responsibility to
confirm whether or not Mr J held an Australian financial service license or was authorised by
a licensee.
In the absence of information to show Mr B specifically told Mr T not to rely on the information
provided by Mr J, I cannot find Mr T had made an error by having regard to information
provided by a professional that appeared to have properly engaged by Mr B to act on his
behalf.
2.3 Why is the outcome fair?
The outcome is fair
The outcome of this complaint is fair because Mr T had been asked by the complainants to
undertake enquiries into a complex loan proposal. It was reasonable to expect that it would
take time for Mr T to complete that task.
I also note the complainants had entered into unconditional contracts for the purchase of the
properties. It is my understanding they purchased the properties at auction and it is
customary for unconditional contracts to be exchanged between vender and purchaser
following a successful auction bid by the purchaser. However, a prudent purchaser would
ensure they have sufficient finance arranged before the auction.
Determination | Case number: 711515 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
I have determined this complaint based on what is fair in all the circumstances, having regard
to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The parties have completed a full exchange of the relevant information, and each party has
had the opportunity to address any issues raised. I have reviewed and considered all of the
information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted our
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the relevant
circumstances.
3.2 Other matters raised that do affect the outcome
The broker’s initia l response did not contain a threat of legal action
Mr B claims Mr T‟s initial response to his concerns threatened him with legal action if he
persisted with the complaint.
Mr B sent the broker a letter of demand on 30 October 2019 seeking damages for „bre ach of
contract/or breach of duty‟ to the sum of $28.548 due to missing the settlement of 64 W
Street. The broker‟s solicitor responded to the letter of demand on 19 November 2019 in
detail rejecting Mr B‟s claims. The letter did not contain any threats of legal action.
Recommendation
Case number 711515
Financial firm Lead Out Financial Pty Ltd
Recommendation | Case number: 711515 Page 1 of 9
Case number: 711515 8 December 2020
4 Overview
4.1 Complaint
The complainant is represented by its directors, Mr B and Ms P. In August 2016, Mr B and Ms
P signed two unconditional contracts of sale to purchase two adjoining properties 64 and 66
W Street. Mr B approached the broker with a proposal to obtain finance for the properties in
his Self-Managed Super Funds (SMSF). The broker was unable to obtain the finance. Mr B
and Ms P ended up financing one property in a SMSF and set up another company (the
complainant) that financed the purchase of the other.
The complaint is about whether:
the broker followed the agreed plan for finance after meeting with Mr B and his accountant
the broker unreasonably delayed the process
the complainant incurred a loss due to the actions of the broker.
4.2 Issues and key findings
Did the broker follow Mr B’s instructions appropriately?
Based on the contemporaneous evidence the broker followed the instructions provided by Mr
B‟s accountant to consider financing their properties in SMSFs.
Did the broker delay in responding to the complainant’s loan application?
The broker considered finance of three properties in SMSFs which would be deemed as
complex requiring more time to assess than standard loans.
Did the complainants rely on the broker’s response ?
Mr B approached two other brokers within weeks of meeting the broker and did not have
enough funds outside his SMSFs to complete the finance of either property. I do not believe
that Mr B did or should have reli ed on the broker‟s response.
Has the complaint suffered loss due to the broker’s actions?
The broker‟s actions did not cause the complainant to miss settlement and incur penalty fees.
The property purchase contracts of sale were executed unconditionally, prior to Mr B meeting
with the broker and it was his responsibility to coordinate the finance by the required times.
4.3 Recommendation
This recommendation is in favour of the broker. The broker is not required to compensate the
complainant.
Recommendation | Case number: 711515 Page 2 of 9
5 Reasons for recommendation
5.1 Did the broker follow Mr B’s instructions appropriately?
The broker owed the complainant a duty of care
A broker is required to act in the best interests of their client, and to discharge their
responsibilities with due care, skill, competency, honestly and integrity. This includes promptly
and properly managing their customer‟s loan application. The Finance Brokers Association of
Australia Code of Conduct lists the responsibilities of a finance broker to the client:
A Finance Broker, when acting on behalf of a Client in relation to a Finance Broking transaction
will seek to:
3.1 General
3.1.1 Discharge its responsibilities and duties competently and wit h integrity and honesty.
3.1.2 Act in the best interest of the Client but in a manner consistent with the Finance
Broker‟s appointment document and this Code.
3.1.3 Exercise reasonable care and skill.
…
Credit Applications and Contracts
3.2.1 Promptly advise the Client if a credit application is declined or consideration thereof by
the Credit Provider is delay ed or deferred pending the supply of further information
required from the Finance Broker, Client or other party
…
3.2.6 Take reasonable steps to obtain from the Credit Provider and promptly convey to the
Client, relevant information and documents supplied by the Credit Provider.
The above broker responsibilities are consistent with section 12ED of the Australian
Securities and Investment Commission Act 2001.
The contemporaneous evidence supports a complex finance transaction
Mr B and the broker have different recollections of their first meeting on 15 September 2020.
Mr B says that the broker made it clear that he would not be able to finance any of his
properties using his SMSFs. He says the broker was to consider other options for the finance
of 64 W Street. The broker says he was told to consider finance for three properties using the
SMSFs with the prospect of a potential future development.
It is important to confirm the complexity of the proposal the broker was asked to consider. The
complexity will also determine whether the broker satisfied or breached his duty of care with
the time he took to respond. Finance for a single residential property through a company
would be significantly easier to consider than SMSF finance for three properties which would
be considered as a complex proposal.
Recommendation | Case number: 711515 Page 3 of 9
Both Mr B and the broker provided a spreadsheet prepared by Mr B‟s accountant detailing Mr
B and Ms P‟s property, loan, income and cash position. 62, 64 and 66 W Street propert ies are
part of the spreadsheet summary with an ending comment „refinance/loan to SMSF‟.
Mr B provided copies of his email correspondence with his account and the broker showing
the following:
27 August 2016 – Mr B advised his accountant that he has purchased two adjoining
properties and considering finance through SMSF as that is where most of his liquid funds
are.
27 August 2016 – Accountant answers transaction is “doable”.
13 September 2016 – Accountant sends Mr B an email detailing benefits of finance of
properties through SMSF.
20 September 2016 – Mr B sends his accountant a request to forward his SMSF financial
information to the broker.
2 October 2016 – Mr B seeks an update on the finance for his properties
15 November 2016 – The broker responds to Mr B that he was unsuccessful in seeking
SMSF loans
In his submissions to AFCA, Mr B says there were only two properties being considered
during the first meeting with the broker and not three. He had signed contracts of sale for 64
and 66 W Street and the third property was not being considered. Mr B ended up taking an
option to purchase 62 W Street at a later date and completed the purchase of all three
adjoining properties.
The broker provided to AFCA and shared with Mr B a letter from the lender he was inquiring
about finance through, confirming that they were considering a SMSF loan for three
properties and apologising for the time taken to respond.
Based on the contemporaneous evidence provided I am satisfied that the proposal the broker
was asked to consider was complex in nature involving loan transactions for multiple
properties in SMSFs.
The complainant did not complete an application form
There was also disagreement between the parties as to what contractual obligations existed
between the broker and Mr B. Mr B says there was an implied agreement.
The broker says there was no formal application completed and he advised Mr B that his
proposal was marginal from the first meeting. The broker advised that he was going to
consider the proposal with his lenders and provide feedback.
Mr B had committed to purchasing two properties and provided the broker with requested
financial, personal, company and SMSF information. Regardless of whether a formal
application was executed between Mr B and the broker, the broker still owed Mr B a duty of
care to act in a reasonable manner.
Recommendation | Case number: 711515 Page 4 of 9
5.2 Did the broker unreasonably delay the process?
The broker took two months to provide a response
The broker and Mr B first met on 15 September 2016. The broker provided his confirmation
that he could not assist Mr B with finance on the 15 November 2016. The only evidence of
communications between the two parties in the interim is a follow up email from Mr B to the
broker on 2 October 2016 requesting a response to his finance proposal. The broker
responded on the 3 October 2016 with a message that he will get back to Mr B shortly. The
next confirmed communications between the two parties occurred the day before the broker
provided his decline.
The broker says there was phone communication updates between the two parties made
between the first meeting and the decline on 15 November 2016. The phone communications
have not been substantiated or confirmed by Mr B.
The broker provided a letter from a financial firm that he had proposed Mr B‟s loans to. The
letter says:
‘ I am writing to confirm that in September 2016 we did receive a scenario from you to
consider for Mr B. Thi s scenario was for the consideration of 3 propertie s being
purcha sed that the client wanted to finance within his SMSF.
Whilst we first di scussed the scenario in late September 2016, we were not able to give
it consideration until late October, early November 2016 given workloads at the time.
After workshopping the scenario with credit, we agree that it was not a transa ction that
the bank could support. ’
This letter supports the broker‟s claim that he did not unreasonably delay the process. Rather
the time taken to provide an answer was due to the complexity of the proposal and the time
taken by the financial firm to consider the scenario. Based on the available information, a two-
month response is not considerably excessive. The complexity of the transactions as well as
the banks response supports the requirement for extra time required for the broker to
respond.
The complainant says he relied on a timely response from the broker
Mr B says he was relying on the broker‟s quick response to his loan proposal to consider
selling another owned property. As the broker took close to two months to provide a decline
response he struggled to market and sell his property in time to assist with the W Street
settlements. He also claims that the time taken for the broker to respond compromised the
property settlements as he had to seek alternative finance options. Mr B was not successful
in completing finance by the contracted settlement dates and incurred significant penalty fees.
In the accountant‟s asset, income and liabilities spreadsheet of Mr B and Ms P ‟s financial
position that was shared with AFCA, their cash and liquid funds position was also disclosed.
Mr B and Ms P had just over $30,000 in liquid funds available outside of their SMSFs. It is
unlikely $30,000 would have been enough to settle either 64 or 66 W Street based on
standard loan to value ratios most lenders would require. Mr B should have been aware that
Recommendation | Case number: 711515 Page 5 of 9
he would have needed to raise further cash to settle the properties regardless of the response
the broker provided.
Mr B did not wait until the broker responded with a decline of his loan proposal. On 5 October
2016 Mr B sought assistance from a second broker which was also unsuccessful. He then
approached a third broker on 1 November 2016. Mr B says the second and third brokers were
only considering a SMSF loan and not the finance outside of the SMSF that the broker was
considering. He has not provided anything to support this claim. Given Mr B met with the
second and third brokers weeks before the broker provided his decline, it is unlikely Mr B
would have only sought assistance for one loan.
Based on the evidence it seems likely Mr B was aware his loan proposal was marginal
because he took steps to attempt to obtain finance elsewhere even before receiving the
broker‟s response.
5.3 Did the com plainants rely on the broker’s response ?
The complainant did not rely on the broker’s response
As set out above, the time taken by the broker to confirm a response was considerable. Part
of the reason for the time taken was that Mr B‟s proposal was a compl ex transaction requiring
more consideration. The information supports a finding that Mr B was made aware of the
difficulties of his proposal from the first meeting with the broker. Mr B took steps soon after by
consulting with other brokers to assist with his finance requirements.
Mr B also says he was seeking a quick response from the broker to consider whether he
would need to sell another owned property. It was not the broker‟s responsibility to ensure Mr
B and Ms P had adequate liquid cash to proceed with the settlement of the properties he had
already committed to purchasing. Prior to meeting with the broker, Mr B would have been
aware of the need to liquidate more assets and of the time would have been required to
adequately market and sell the property and should have taken action accordingly.
5.4 Has the complaint suffered loss due to the broker’s
actions?
Mr B and Ms P signed unconditional contracts of sale without finance approval
Mr B and Ms P signed unconditional contracts of sale prior to meeting the broker and
confirming finance. As the broker did not influence Mr B and Ms P to sign the contracts before
obtaining finance, he is not responsible for penalties relating to missed settlements. The
responsibility to meet settlement was Mr B and Ms P‟s reg ardless of whether the broker failed
in his duty of care or not.
Mr B and Ms P signed unconditional contracts of sale without finance arrangements in place
and by doing so, accepted the risk that they may not be able to obtain finance for the
properties.
I do not consider the broker has failed in his duty of care when he was not able to secure
finance for complex financial proposal within the time frame expected Mr B and Ms P. As it
was, Ms B and Ms P were unable to find finance in the form they initially intended through any
of the brokers they engaged.
The complainants had time to settle the properties
Recommendation | Case number: 711515 Page 6 of 9
The broker confirmed that he could not assist Mr B and Ms P with finance on 15 November
2016. Settlement for 64 and 66 W Street was to take place by 27 February 2017. Mr B had
over 90 days to complete settlement after the brokers advice and the timeframe was more
than adequate to seek alternate arrangements for finance. The broker was not responsible for
the complainant missing the property settlements.
The broker is not required to compensate the complainant.
Recommendation | Case number: 711515 Page 7 of 9
6 Supporting information
6.1 How AFCA assesses complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. If we find we need information from a third party, and
that information needs to be tested, we may not be able to continue considering your
complaint.
When we assess complaints, we consider available documents, the recollections of the
parties, and all relevant circumstances. We give more weight to contemporaneous
documentary information (that is, documents prepared at the time of the event).
If there are no relevant documents, we will decide what is most likely to have occurred based
on the information provided to us. If there are conflicting recollections and these are evenly
weighted, we may find that a claim cannot be established.
Recommendation | Case number: 711515 Page 8 of 9
6.1.1 Date &
source
6.1.2 Key points
6.1.3 26 Aug
2016
6.1.4 Mr B and Ms P sign unconditional Contracts of Sale to
purchase 64 and 66 W Street
6.1.5 Purchase price:
64 W Street - $1.504Million
66 W Street - $1.04Million
Settlement – 27 February 2020
6.1.6 27 Aug
2016
6.1.7 Mr B emails his accountant advising of the purchase of the
two properties and seeks information on whether SMSF
can enter a joint venture arrangement with himself and Ms
P to finance the purchase of the properties.
6.1.8
6.1.9 Accountant responds to Mr B that the transaction sounds
plausible
6.1.10 29 Aug
2016
6.1.11 Mr B‟s accountant advises that they will need to set up to
bare trust and how to secure the property purchases
through the SMSFs.
6.1.12 30 Aug
2016
6.1.13 Mr B registers two bare trusts.
6.1.14 15
Sept
2016
6.1.15 Mr B, his accountant and broker meet
6.1.16 16
Sept
2016
6.1.17 Broker requests financial information from Mr B
6.1.18 20
Sept
2016
6.1.19 Mr B provides the requested financial information
6.1.20 2 Oct
2016
6.1.21 Mr B seeks an update from broker
6.1.22 3 Oct
2016
6.1.23 Broker respond that he will respond soon
Recommendation | Case number: 711515 Page 9 of 9
6.1.24 5 Oct
2016
6.1.25 Mr B approached second broker. No finance provided.
6.1.26 1 Nov
2016
6.1.27 Mr B approaches third broker
6.1.28 2 Nov
2016
6.1.29 Mr and Ms P sign contract of sale to purchase 62 W Street
Purchase price - $1.16Million
Settlement – 2/5/2017
6.1.30 14 Nov
2016
6.1.31 Mr B seeking urgent response from broker
6.1.32 15 Nov
2016
6.1.33 Broker advised he has not been successful in sourcing
finance for Mr B
6.1.34 Dec
2016
6.1.35 Mr B seeks assistance from fourth broker
6.1.36 3 Feb
2017
6.1.37 Mr B registers company to acquire 62 and 64 W Street
6.1.38 10 Feb
2017
6.1.39 Mr B signs Contract of Sale for owned property that will
assist with W Street purchases
60 - day settlement
6.1.40 Feb
2017
6.1.41 66 W Street settles
6.1.42 4 May
2017
6.1.43 64 W Street settles
6.1.44 16 May
2017
6.1.45 62 W Street settles
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.