Text of the determination
Determination
Case number 710863
Financial firm AAI Limited
Determination | Case number: 710863 Page 2 of 14
Case number: 710863 18 January 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents policy with the financial firm (insurer).
On 15 November 2015 the complainant lodged a claim for damage arising from a
leaking sewerage pipe. Further claims were lodged for a hot water damage following
a storm (31 January 2016) theft (26 February 2016) and storm damage (21 October
2016).
A dispute arose over the quality of repairs and damage caused by the insurer‟s
repairers and ongoing damage due to continued leaks. The complainant says the
leaks have resulted in dangerous soil contamination and severe damage to the home.
The complainant also says the insurer‟s management of the claim has caused severe
stress and impacted her quality of life.
The insurer says movement is unrelated to leaks, and damage is cosmetic. It has
offered to settle the claim based on the complainant‟s quotes with an allowance for
the stress and disruption caused to the complainant.
The complaint says she is unable to accept settlement until issues with the building
are resolved. Her view is the building requires demolition.
1.2 Issues and key findings
Has the complainant established the ongoing damage to the property is due to
an insured event?
No. The panel is satisfied the ongoing damage to the property is most likely due to
movement in the reactive clay soil and not the insured event of escape of liquid.
Ground movement is generally excluded from cover under the terms of the policy.
The insurers liability is limited to damage caused by the leaking sewerage pipe and
rectification of faulty repairs.
Is the Insurers offer fair in the circumstances?
Yes. The insurer‟s offer for rectification is based on the complainant‟s quotes and is
fair in the circumstances. The panel accepts however that the insurer should also
allow a further $10,000 to cover the cost to rectify the cosmetic cracking damage
identified in the reports.
Determination | Case number: 710863 Page 3 of 14
Is the complainant entitled to compensation?
Yes. The offer of $9,000 as compensation for non-financial loss included in the
i nsurers offer of settlement arguably exceeds AFCA‟s jurisdiction under the AFCA
rules. In the circumstances the panel considers this is fair.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of the complainant‟s acceptance of this determination the insurer is to
pay the complainant $111 ,004.05 in settlement of the complainant‟s claim including
her claim for compensation for non-financial loss.
If it has not already done so the insurer should also pay the costs incurred by the
complainant in obtaining the engineering report from RT.
Determination | Case number: 710863 Page 4 of 14
2 Reasons for determination
There has been a full exchange of all relevant information between the parties and
each party has had the opportunity to address the issues in dispute.
Due to the issues involved this matter has been determined by a panel. The panel
comprises the Lead Ombudsman, a member with significant industry experience and
a member with considerable experience as a consumer representative.
This determination follows consideration of all relevant material. It is based on what is
fair in all the circumstances having regard to the relevant legal principles, terms of the
policy, good industry practice including codes of practice and prior determinations
where applicable.
2.1 Has the complainant established the ongoing damage to the property is
due to an insured event?
The complaint has onus to establish claim under the terms of the policy.
It is established insurance law that an insured has the onus to establish, on the
balance of probabilities (that is more likely than not) that a claim falls within the terms
of the policy. This is commonly called a prima facie claim.
The complainant holds a Home Building policy with the insurer insuring her home for
up to $250,000. The policy provides cover for a series of insured events that occur
during the period of insurance including, storm, theft or burglary and escape of liquids.
Cover is subject to several conditions and general exclusions.
The complainant lodged a claim for sewerage which backed up and overflowed into
her home on 15 November 2015. The complainant also lodged claims for storm
damage to a hot water system and her roof on 31 January 2016, loss and damage
from a break in on 26 February 2016 and storm damage on 21 October 2016.
The insurer accepted liability for the claims.
The complainant says the repairs have not been satisfactorily completed in relation to
the above claims, that there was poor workmanship and incorrect or unsuitable
materials being used in the rectification. The complainant says there is ongoing
damage to the property because of leaking pipes causing movement in the property.
The complainant reported strong sewage smells to the insurer and her local council
on numerous occasions. In March 2017 a damaged sewer main adjacent to the
complainant‟s property was identified by council . Council carried our repairs to this
and a sewer line on the complainant‟s property.
The complainant continued to report strong sewage smells. In September 2019 the
insurer tested pipes at the rear of the property and found gaps between pipes and
Determination | Case number: 710863 Page 5 of 14
fittings in the yard, allowing water to escape instead of draining. Further testing over
the entire site in October 2019 identified another leak.
The complainant says repairs cannot be completed as the property is structurally
compromised, unsafe and movement is ongoing. The insurer says movement
damage is cosmetic only and is a result of excluded causes and is unrelated to leaks.
Leak detection tests reveal possible ongoing leaks
A leak detection test performed by LT on 6 March 2017 using a CCTV camera to
inspect the sewer and stormwater drains revealed no blockages or damage to the
drains.
A leak detection test performed by T plumbing in September 2019 identified gaps in
the fittings in the pipes. T says this would have caused some leaking from the storm
water and sewer drains.
The insurer engaged a geotechnical consultancy firm (HC) to investigate the potential
for leaks to have caused movement damage to the complainant ‟ s home. HC supplied
a report dated 30 October 2019.
HC excavated a borehole at the south east corner of the building near to where
sewerage pipes ran beneath the complainant‟s building (BH1). HC also excavated
another in the complainant‟s yard (BH2), near to council repairs in July 2017.
Soils at BH1 were very moist to 1000mm (42.3%), and at BH2 soil was moist at
1000mm (47.2%). HC says this indicates there may be a leaking sewer pipe, or more
likely there is water in the sewer trench that may be coming from the sewer
easement.
HC noted movement of paving away from the complainant‟s building may indicate
soils are drying out after a leak was repaired, in which case further movement would
be expected.
HC also identified visual evidence of settlement across the site and at the rear of the
property where the sewer easement and pipework run. Photographs supplied by HC
do not clearly depict this settlement, however photographs supplied later by the
complainant clearly show the area has subsided.
HC recommended checking all pipes for leaks and excavating trenches to check for
moisture or free flowing water. HC said soils will take at least a summer period to dry,
and further testing will be needed to confirm when conditions are dry.
The insurer later engaged another expert for soil testing (GT). The scope for GT was
to analyse soil for contamination, however GT also supplied commentary around soil
moisture in its report dated 6 February 2020.
Determination | Case number: 710863 Page 6 of 14
GT found moisture content was greatest in bore holes situated at the south east
corner of the building, at 43.3%, and in the yard east of the building at 42.6%. GT did
not consider the moister level abnormal. The panel notes the tests were conducted
after rain fell in January and February 2020.
DH prepared a report for t he complainant‟s builder MD on 20 April 2020. DH notes
that a camera inspection of the sewer and stormwater drains found the drains to be
fine with no blockages. There was no evidence of leaks.
Experts disagree as to cause of movement
The insurer engaged an engineering firm (SW) to report on the cause of movement
and cracking damage across the property. SW supplied a report dated 1 May 2020
which in summary, found the following:
It is not possible to determine when cracks to the complainant‟s sewerage and
stormwater pipes first occurred, and how much water escaped. The pipes are not
pressurised therefore leaks would only be expected during storms. The amount of
water which would escape from these pipes is minimal
Movement damage occurs from leaks of thousands of litres, not a few litres a day
from a broken sewer line under normal daily use, or the intermittent escape of
stormwater during rainfall events
Sewer main issues and potential leaks occurred over 3 years ago, at a location 5m
from the house. If the leak was the cause of observed movement and damage,
damage would be localised to the area closest to the leak
Breaks in pipes are due to soil movement and lack of flexible joints
Movement is due to seasonal wetting and drying effects on reactive soil
Movement is due to soil drying during low rainfall. SW says the area saw a
continuous dry spell over 2 years until January / February 2020
The cause of a concrete path moving away from the house is due to drying
concrete reducing in size
Potential leaks from damaged sewer pipes in yard and stormwater pipes are not
the cause of movement
The damage is cosmetic, and no rectification work is required to the slab.
SW concluded most of building structure movement is historic, ongoing and due to
reactive soils. SW found movement was exacerbated by:
Variations in soil moisture content. SW says rainfall data shows an unusually dry
period over two years until January and February 2020, and then a wet period
Variable paving, covered and uncovered areas. Gardens and lawn will soak up
rainfall, whereas paved and covered areas will not.
A lack of surface drainage causing rainfall to soak into perimeter soils, in
unpaved/covered areas
Determination | Case number: 710863 Page 7 of 14
The soil drying effect of a large tree, and re-hydration once the tree was removed.
The complainant engaged an engineer (RT) to carry out a forensic investigation report
on slab and dwelling defects. RT concludes the sab has risen, is still rising, and the
movement is a result of the initial escape of liquid from sewerage pipes.
RT says AS 2870-2011 Residential slabs and footings for design over 50 years
defines a change in level between 15 mm and 25 mm as moderate damage, and
greater than 25 mm over a 3-meter straightedge as severe. Changes in level of this
severity are seen in the complainant‟s home.
Additionally, RT noted walls were out of plumb by 30mm in one room, 20mm in
another, and 10mm on several other walls. RT says VBA Guide to Standards and
Tolerances 2015 considers a change over 5mm in buildings under 2 years old as
defective. RT notes the building is over 2 years old, however says tolerances can
indicate whether a building is fit for purpose. This was most severe near the eastern
wall.
RT says the movement is ongoing. RT says cracks described in the SW report of 23
March 2020 have widened or narrowed since this report, also suggestive of ongoing
movement.
RT found moisture readings in walls was higher near floor level in some locations
near the east wall. RT says this is atypical and suggests, in absence of any other
cause, this is due to slab dampness due to wet soils in these locations.
RT notes the pre-purchase report shows cracking near to a disjointed downpipe. RT
notes the pipe was repaired when the complainant purchased the property, and the
cracking has narrowed significantly. RT says this is evidence that the reactive soil can
lift foundations.
RT also says a side path which has separated from the home is evidence of the home
rising, rather than the path sinking. RT notes the path remains at original level
compared with fence posts, and says the light, non-load bearing path is unlikely to
sink. RT notes, relative to the dwelling, the path is 40mm lower than it was originally.
RT accepts there is no evidence of severe cracking. However, RT says the strong
nature of the well-engineered raft slab has allowed the slab to move. RT says this
differential settlement allows greater localised movement relative to the whole, which
is typically more damaging to other structural elements. RT does not explain how this
is more damage, or to which structural elements.
Additionally, RT notes a crack in the stormwater drain, repaired by council on 7 and 8
September 2020, occurred where the pipe crosses the sewer line. The panel notes it
is this line which HC recommended the insurer excavate to check for moisture. RT is
Determination | Case number: 710863 Page 8 of 14
of the view all issues with pipes and drainage are attributable to the initial damaged
council main.
Complainant has not established ongoing ground movement due to an insured
event
The complainant has the onus to establish on balance of probabilities that the loss
arose in circumstances that fall within the terms of the policy. The panel finds the
reports provided are inconclusive.
SW has consistently highlighted the reactive clay soil as the dominate cause of the
damage. SW concludes movement damage is unlikely to occur from a leak of a few
litres a day from a single household as identified tin the report from T. SW describes a
dry period over two years until January or February 2020, and then a period of wet,
and says movement damage has been accentuated by changes in soil moisture
content.
HW notes the soil was moist in October 2019 during the dry. GT found similar
readings following the rain in January and February 2020.
SW also says soil drying effects were accentuated by the soil drying effects of a
nearby tree, and its subsequent removal. An arborist LT says the tree did not
influence the building when in place, or after it was removed.
SW concluded poor site drainage would contribute to movement. RT notes the JM
survey found the exterior building surface levels were greater than surrounding
property and says site drainage is adequate.
The property is over 20 years old. The pre-purchase report identified some movement
to the property in December 2014. The reports do not identify when the sewer started
to leak. Both RT and SW consider this was before the purchase of the property by the
complainant.
On balance the Panel is not persuaded that the ongoing damage had been caused by
the escape of liquid within the terms of the policy.
No evidence soil contaminated above harmful levels
GT reports only Zinc was detected above the EPA limit on 1 sample. Arsenic results
were all below the EPA limits. No abnormal moisture conditions were observed in the
boreholes. None of the chemicals tested were above the relevant NEPM HIL A levels
for land use or no chemicals were detected above the harmful level for human health.
LM found elevated levels of nitrate in the complainant‟s yard at 161.6mg/kg at the
footpath. However, there is no information to show this presents a danger.
The panel recognises the complainant is distressed at the possibility her soil is
contaminated and has reported complications, although unsubstantiated. The panel is
Determination | Case number: 710863 Page 9 of 14
not satisfied the available information is sufficient to establish the soil had been
contaminated to harmful levels.
2.2 How should the claim be settled?
Insurer’s offer is to be increased to $111,004.05
The insurer, while denying the ongoing damage was related to an insured event has
offered to cash settle the complainant $101.004.05 based largely on the
complainant‟s builder‟s quotes. The complainant has refused this offer. The
complainant also says the conduct of the insurer and its trades was unacceptable and
caused harm and distress.
The insurer obtained a quote of $26,952.35 from a builder (BB) dated 2 May 2020 for
rectification and repair of damage caused by trades. However, to resolve the matter, it
offered settlement based on non-itemised quotes from the complainant‟s preferred
builder (MD). The offer does not include the cost of repairing the complainant‟s
gazebo on the basis it has not been damaged because of an insured event. The offer
of $101.004.05 consists of:
MD quote for resultant damage, rectification and repair - $73,047.00
Compensation (including contingencies on repairs) - $9,000.00
Contingency payment to cover unforeseen additional repair costs $10,957.05
Accommodation allowance to facilitate repairs $8,000.00
The insurer had engaged SW to report on defective workmanship and damage by
trades. SW recommends:
rectification of damaged floating timber flooring in study / bedroom three
rectification of variation in stained finish to bathroom skirting board
no rectification to hole in kitchen bench and scratches in cupboards .
On review, the panel is of the view the complainant has not established the hole in the
kitchen bench and scratches in cupboards are a result of the break in.
The offer covers the loss or damage as assessed by MD, includes additional costs for
temporary accommodation and allowances for contingencies such as the damage to
the floating floor and bathroom skirting boards.
The panel accepts however that given the inconclusive nature of the reports that it is
fair to also allow for the repair of any cosmetic damage and that a further allowance of
$10,000 should be made for that contingency. In the panel ‟ s view it is fair the insurer
increases its offer to $111,004.05 to cover the complainant‟s loss.
Determination | Case number: 710863 Page 10 of 14
For the avoidance of doubt, this determination finalises all the various claims referred
to herein and acceptance of this determination by the complainant will conclude all of
these claims.
2.3 Is the complainant entitled to compensation for non-financial loss?
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-
financial loss (capped at $5,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant‟s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear
a normal degree of inconvenience during a claim.
Insures offer includes compensation for non-financial loss.
The panel accepts the complainant is entitled to compensation for non-financial loss.
For the sake of brevity, the panel does not propose to describe in detail the
management of the claim or r estate the complainant‟s specific concerns. Suffice to
say the complainant describes the impact and emotional toll as severe.
The complainant supplied a letter from her treating psychologist outlining concerns for
her emotional and physical wellbeing. Lett ers from the complainant‟s GP and
advocate reflect these concerns.
The complainant says the insurer made unfounded accusations which impacted her
reputation and caused stress and severe anxiety. The submissions include an email
in which the insurer apologises for allegations made by its repairer, and
acknowledges similar commentary is made by its consultants. It commits to redacting
comments relating to the complainant‟s mental health, and allegations she damaged
her own property.
The insurer has included in its offer $9,000 for compensation for delays and other
contingencies. This exceeds the AFCA cap. In the circumstances the Panel accepts
this is a fair and reasonable amount.
Complainant entitled to compensation for professional costs incurred.
AFCA may decide a financial firm contribute towards costs incurred by a complainant
during a complaint if we consider because of the complexity of a complaint and the
complainants circumstances the complainant needed assistance to understand and
establish the claim.
Determination | Case number: 710863 Page 11 of 14
The complainant obtained an i opinion from RT which provided a contrary view to SW.
The panel considers the complaint was technical complex, and that RT supplied a
valuable opinion which assisted the complainant ‟ s position.
The panel notes the insurer has already paid for numerous reports including reports
provided by the complainant. The panel is satisfied that if the insurer has not already
done so, it fair the insurer pays for the report from RT subject to the complainant
providing the relevant invoice or receipt.
Determination | Case number: 710863 Page 12 of 14
3 Supporting information
3.1 Policy wording
What you are covered for - Insured Events
We cover the building for loss or damage at the insured address caused by an
insured event during the period of insurance. There are some things we do not cover
and these are shown in the „We do not cover‟ section of the following tables on pages
16 to 25 and in the „What we do not cover - general exclusions‟ on pages 35 to 40
Escape of liquid
Loss or damage to the building caused by liquid leaking, overflowing or
bursting from any of the following:
> …
> any drain, fixed pipes, roof gutters or guttering and rainwater downpipes,
drainage and sewage systems;
> ….
What we do not cover – general exclusions
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or
any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
„Storm‟;
„Flood‟ (but only if you have cover for insured event „Flood‟);
„Earthquake and Tsunami‟;
„Explosion‟.
3.2 Summary of additional reports
Record Key points
Building consultant report
(GC )
Compliance audit
22 March 2017
… the owner has maint ained the site in an immac ulate condition.
All surfaces throughout the building were spotless, external paving
was clean and primarily unmarked, and the roof and its gutters
were devoid of veget ation and blockage material. In my
experi ence of inspecting domestic buildings over the past 40
years, very few properties have been as clean as this particular
building. I conclude from my observations that it is necessary for
Determination | Case number: 710863 Page 13 of 14
Record Key points
any workers attending the property to be respectful of the
condition of the building, and to complet e work in such a manner
that will not leave the work in a lesser state of presentation than it
was prior to works.
In my view, a building permit should have been obtained prior to
executing works of this nat ure in the shower area. This is because
the removal of wall framing in a wet area is both structural work,
and the wall framing is attached to wall and shower base materials
that are required to be waterproof pursuant to BCA 2015 Part
3.8.1, and AS 3740 - 2010.
It is likely that the work executed from the rear of t he shower area
(from bedroom 3) has adversely affected the waterproof mat erials
and construction in the shower area.
Insurer’s plumber ( TP )
Report
6 September 2019
Upon inspection we found Gaps between pipe and fittings in the
backyard allowing water to escape instead of draining.
Insurer’s plumber ( TP )
Report
3 October 2019
… the pipe under the driveway is holding water…
… a tee junction was not connected to the stormwater line,
causing water to spill into th e ground.
Insurer’s Geotechnical
engineer (HC)
Investigation Report
30 October 2019
The footings for this building are founded quite shallow in
extremely reactive CLAY soils. Small changes in soil moisture
conditions will result in large volumetric soil changes. Where there
is a differential in soil moistures across a site the result will be
movement of the foundations and in turn damage to the building.
The moisture samples indicate that the CLAY soils at the site are
saturated at Borehole 1 to a depth of at least 1000mm and there is
a high moisture reading at 1000mm for Borehole 2. This is close to
the depth that you would ex pect a trench to be from the sewer and
this indicates that there may be either a leaking sewer pipe or
more likely that there is w ater in the sewer trench itself that may
be coming from the sewer easement. Further investigation would
be required to determine this.
It was also noted that the concrete paving has settled away from
the building. This may be that the leaking service / wat er source
has been repaired and that the CLAY soils are drying out. If this is
the case then further movement of the concrete paving and the
building is to be expected.
It is recommended that all of the services and plumbing in the
backyard area are checke d for leaks and that any trenches are
excavated to check for moisture / free flowing wat er.
Insurer’s Geotechnical
engineer (GT)
Soil contamination report for
existing dwelling
6 February 2020
Zinc concentration in sample BH5/ 0.5m was 220 mg/kg, above the
“Fill Material” upper limit of 200 mg/kg and below the “Category C”
upper limit 35,000 mg/kg. Hence the fill material in borehole
BH5/0.5m is classified as “Category C” contaminated soil for
disposal purposes.
Soil Moisture Content:
Determination | Case number: 710863 Page 14 of 14
Record Key points
> No abnormal moisture c onditions were observed in the soil
profiles.
> The moisture content test results indicate that all the samples
collected were in a moist condition. The moisture content of
natural Silty Clay from boreholes BH4/ 1.0m, BH4/2.0m and
BH5/1.0m was found ranging b etween 33.5% to 43.4%, which
indicates a moist condition.
Complainant’s soil
consultant (LM)
Report
24 March 2020
A comparison between laborat ory analytical results of soil from the
control sample (BH1) against soil sampled from the backyard
(BH2 and BH3) suggest that nitrogen is potentially leaking from
sewer infrastructure on the eastern boundary of the property, as
nitrogen conc entrations were elevated in samples from this area.
Recommendation
> LRM recommends that the sewer line be inspected to iden tify
any damage or leaks.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.