Storm damage claim settlement, refused repair costs and reimbursement of contractor costs

FirmHollard
Decided2021-08-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$126,277
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A smash repair business with storm damage to its building disputed the insurer's settlement and refused cover for some works. AFCA ordered the insurer to increase its alucobond settlement to $126,277.48, repair cracking and cover pipe removal, reimburse contractor costs and pay interest.

Under the reinstatement or replacement terms the insurer must settle event-related damage including reasonable hire and contingency costs, and it had not shown that the cited exclusions applied.

Issues

Subjects and remedies

natural disastersmall businesspay claimpay interestrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 710339 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 710339 Page 2 of 8 Case number: 710339 28 May 2021 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy with the financial firm (insurer) which covers a smash repair business and the building it is run from. The complainant lodged a claim after a storm caused damage on 20 December 2018. The claim was accepted, and repairs and rectification are ongoing. The complainant says the claim has been poorly managed. The repairs often require rectification, appointments have been missed, and due to this he has needed to devote considerable amounts of his own time to managing the claim. The insurer says the claim is large and complex, and in the circumstances its management of the claim has been reasonable... 1.2 Issues and key findings Is the insurer liable for repair rectification? The parties continue to work toward rectification of repairs with the complainant recently appointing an independent assessor to review whether the repairs require rectification. This issue is no longer subject of this determination Is the insurer ’s offer to settle the claim for the damaged alucobond fair? No. The panel considers it is fair the insurer increases its offer to the complainant to $126,277.48 as set out in section 2.2 of this determination. This will take into account the relevant hire costs, transfer of risk and contingencies Is the insurer liable for the cracked plaster and painting? Yes. The insurer is liable to repair the cracking and the cost of removing and replacing fixtures when painting walls as set out in section 2.3 of this determination. It is not required to paint to the top side of cable tray. Should the insurer reimburse the complainant costs? Yes. The insurer is liable for contractors engaged to act in its behalf. It should reimburse the complainant any costs owed by its contractors. 1.3 Determination This determination is partly in favour of the complainant. The insurer is required to settle the claim as set out in section 2 of this determination. Determination | Case number: 710339 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer liable for repair rectification? The Complainant runs a large crash repair business specialising in prestige vehicles. It is run from a very clean, neat, tidy and professional looking workshop in inner Sydney. The panel provides this context as the nature of the business and the clean housekeeping of the workshop areas should be considered when discussing different aspects of this claim - this is not a small untidy repairer - quite the opposite. The complaint arises from a storm/hail event in December 2018. There is no dispute the policy covers the event. The building suffered considerable damage because of the storm, and the subsequent claim has become complicated with ongoing disputes between the parties. The claim is large and complex. Other repairs are ongoing yet are expected to be completed soon. The parties remain at odds over some repairs which the insurer says have been carried out satisfactorily, and the complaint says require rectification. These are:  the quality of remediation works to an office ceiling  repairs which may have reduced the efficacy of the air-conditioning system  whether sarking repairs have been completed satisfactorily  whether awning repairs have been completed satisfactorily  the quality of roof repairs (and whether screws require replacement)  repairs to a toilet. In principle any repairs that have been undertaken by the FF repairer that are not adequate or to the appropriate standard or scope would need to be rectified. While the complaint has been with AFCA, the parties have continued resolve rectification. Most recently the complainant appointed an independent assessor to assess the repairs and report on any further rectification required. The complainant is hopeful that this will resolve the remaining issues relating to the rectification of any repairs. In view of this the panel is not required to determine this aspect of the complaint. 2.2 Is the insurer’s offer to settle the claim for the damaged alucobond fair? Yes, the offer should be increased to $126,277.48 to take into account, hire costs, transfer of risk and contingencies. Insurers quote is for all event related damage. There is dispute whether the insurer’s cash settlement offer for damaged alucobond was fair and reasonable. The submissions show the insurer increased its offer on numerous occasions after its quote was found to be insufficient to allow for repai rs. Determination | Case number: 710339 Page 4 of 8 The insurer has recently obtained a quote from the complainant’s preferred supplier which it says is actionable. The quote for $109,806.51 is significantly lower than the complainant’s quote for $170,000 which included additional work unrelated to the insured event. The complainant agrees the latest quote is for all alucobond damaged by the event, yet says it is likely the repair costs will increase. Having reviewed both quotes, the panel notes the insurer’s quote does not include hire costs for a scissor lift and boom lift. The panel also notes neither quote allows for margins or other unforeseen costs. The panel accepts the insurer’s quote is for all event related damage . As it is actionable it is fair this should form the basis for settlement. Offer to be increased to allow for hire costs, transfer of risk and contingencies. The panel considers it fair that the offer be increased to include the cost of a scissor and boom lift and allow for the transfer of risk and contingencies. It is fair in the circumstances that a 15% allowance ($16,470.97) be added to the quote to cover the hire costs, contingencies and transfer of risk. The panel determines the insurer is to increase the offer to settle the claim for the alucobond to $126,277.48 2.3 Is the insurer liable for the cracked plaster and painting? Yes. The insurer should repair the cracks in the plaster and remove and reinstate the pipework when painting. Insurer declined cracking damage and says some painting is unnecessary The complainant disputes the insurer’s decision to refuse cover for certain damage and works. The insurer has refused the following:  the cost of removing and reinstalling pipes and conduits when painting walls  the cost of removing cables to allow the top of cable trays to be painted  corroded purlins which it says has been over time and is unrelated to the event  rectification of its repairs after cracks appeared in plaster on the basis the damage is a result of ongoing building movement Insurer is liable to repair the cracks in the plaster The insurer says it is not liable for rectification of its repairs after cracks appeared in plaster on the basis the damage is a result of ongoing building movement. It has referred to a report from a building consultant, however this has not been included in submissions. Determination | Case number: 710339 Page 5 of 8 The loss adjuster comments on a claims adjustment schedule spreadsheet, dated 6 November (presumably 2020), notes the crack will continue to reappear due to building movement. Earlier comments from 22 October (also presumably 2020) refer to evidence of previous structural repairs unrelated to the event. The insurer initially accepted the cracking was related to the insured event and settled this damage. At this point evidence of previous repairs was not considered reason to refuse cover. The panel considers the insurer is liable for this damage. In absence of the building consultant report, and any other relevant material such as soil reports, floor level surveys, and so on, the panel is not satisfied the insurer has shown an exclusion applies to this damage. Given its concerns the panel notes the insurer is entitled to choose its method of settlement and may cash settle the damage so long as settlement is on a reinstatement or replacement basis. Removal and reinstatement of pipes is required to achieve a suitable finish The insurer says it should not be liable for the cost of removing and replacing pipes and conduits as the premises is a commercial workspace, and walls would typically be considered utility surfaces. In short, the insurer’s view is that in painting the premises, as a workshop, it is not necessary to do it to the same standard as painting a residential home, or administration space. Having viewed images of the space, as indicated above , the panel notes it appears meticulously neat and tidy. The exterior of the property presents as immaculate and professional. The entire premises, in the panels view, is not consistent with assumptions about workshops being maintained with less care than, say, an office building. The building consultant says it would not be typical to remove and reinstall pipes, conduits and so on to facilitate painting of commercial wall surfaces. The panel agrees, yet this is subjective and does not absolve the insurer’s obligation to settle in line with policy provisions. The panel considers, given the meticulous presentation of the property, the insurer is liable for the cost of removing and reinstalling pipes and conduits from warehouse and wash bay walls. Insurer is not required to paint the top side of cable trays The complainant requests the insurer remove cables from cable trays to allow the top side of trays to be painted. The insurer says its decision to cover painting of the underside of the cable tray was made without an admission of liability and further there is no aesthetic benefit for painting to top side. Determination | Case number: 710339 Page 6 of 8 Photographs show the cable tray is suspended high above the workshop floor. The panel agrees with the insurer that there is no aesthetic benefit to painting the above side. Of note, the submissions show the insurer has agreed to cover painting the underside of the cable tray, despite its view the damage (rust) has gradually occurred and is unrelated to the insured event. This determination should not be interpreted as suggesting the insurer can or should retract commitment to paint the beneath side or pay the costs of moving vehicles beneath. 2.4 Should the insurer reimburse the complainant costs? Insurer is liable for contractors engaged to act on its behalf The complainant supplied the insurer with an invoice of $250 for costs incurred in cleaning a workshop floor after the insurer had carried out repairs. Additionally, the insurer agreed to cover awning lighting and workshop cameras. The submissions show:  On 21 August 2020 the insurer’s loss adjuster (SW) was tasked to determine if the insurer or the builder (JL) should reimburse the cost of awning lighting  On 3 November 2020 SW determined JL should reimburse the complainant for the cost of damaged workshop cameras  On 19 October 2020 SW determined JL should reimburse the complainant for the cost of cleaning the workshop floor. The submissions do not show JL has settled the complainant for cleaning or workshop cameras, or that SW has decided whether the insurer or JL should reimburse the cost of awning lighting. Insurer should reimburse any unpaid costs and pay interest The panel considers the insurer should without delay reimburse any costs which remain outstanding. It is fair that the insurer, if it has not already done so, reimburse the complainant for any costs incurred in cleaning the workshop floor after the repairs the costs of the awning lighting and the cost of repairing any damaged workshop camera’s. It should also pay interest on these costs, calculated in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) from the dates SW was tasked with determining who should reimburse costs and the cost SW determined LJ should reimburse. Determination | Case number: 710339 Page 7 of 8 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the lead ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience as a [field of expertise]. 3.2 Policy wording What we pay Reinstatement or replacement Where the Policy Schedule shows that You are insured for ‘Reinstatement or replacement’ then, when: a) Buildings, Specified Items or Contents are lost or damaged We will, at Our option unless stated otherwise: … iv. pay the cost of rebuilding, repairing or replacing the Buildings, Specified Items or Contents, provided that if You choose not to rebuild, repair or replace the Buildings, Specified Items or Contents, We shall effect settlement on an ‘Indemnity value’ basis; ‘Reinstatement or replacement’ is subject to the following conditions: … Determination | Case number: 710339 Page 8 of 8 d) We will only pay to return the Property Insured to a condition substantially the same as, but not better or more extensive than, its condition when new, using building materials readily available and in common use in the Commonwealth of Australia.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.