Home / IAG / Determination 709886

Determination 709886

Insurer's forensic engineer allegedly over-pressurised water tanks during inspection

FirmIAG
Decided2021-03-31
ProductGeneral Insurance · Motor
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant limited his complaint to alleging that the insurer's engineer over-pressurised his vehicle's water tanks during an inspection. AFCA found the complainant had not established negligence or any loss and made no order.

The complainant bears the onus to prove both the cause and extent of loss, and the evidence did not establish that the engineer's testing caused the damage or a compensable loss.

Issues

Subjects and remedies

no remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 709886 Financial firm Insurance Australia Limited Determination | Case number: 709886 Page 2 of 13 Case number: 709886 31 March 2021 1 Determination overview 1.1 Complaint The complainant held insurance with the financial firm („the insurer‟) covering his 1982 Mercedes Benz Unimog („the vehicle‟). He lodged claims for water damage to the vehicle. The insurer declined the claims on several bases. This includes saying the complainant had not established a valid claim and made fraudulent misrepresentations about the use and storage of his insured vehicles, used the vehicle outside its registration conditions, and was uncooperative. However, as part of its claim investigation, the insurer appointed a forensic engineer („BK‟) to inspect the vehicle. The complainant says BK over - pressurised the vehicle‟s water tanks causing damage. The complainant also says that, regardless of the insurer‟s claim decline, its agent is liable for th e tank damage, and he now wishes to confine his complaint to this issue. The insurer says the complainant was the one who damaged the tanks, and he has not established a valid claim or the extent of his loss. 1.2 Issues and key findings Is the insurer liable for the damage to the water tanks? No. The complainant bears the onus to establish, on the balance of probabilities, that BK damaged the tanks resulting in a loss. The evidence presented is insufficient to do so. 1.3 Determination This determination is in favour of the insurer. The insurer is not liable for the claimed water tank damage. The insurer is not required to take any further action. Determination | Case number: 709886 Page 3 of 13 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature of this dispute, it has been referred to a panel for determination. The panel reviewed and considered all the material provided by the parties. While the parties raised various issues in their submissions, for the purposes of this determination, the panel restricted its commentary to those issues which it considers directly relevant to the outcome only. This determination follows consideration of all the information exchanged, and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice (including codes of practice) and previous AFCA decisions where applicable. 2.1 Is the insurer liable for the damage to the water tanks? Complainant has chosen to confine complaint to alleged damage by BK By way of background, the panel notes:  the complainant reported water damage to the floor of his vehicle which he initially thought was caused by a storm (on 14 December 2019) and, subsequently, an impact with a sand „wash - out‟ (on 15 February 2019)  on 16 June 2020, BK inspected the vehicle to determine the cause of damage. The complainant and a contractor, PM, also attended the inspection  on 27 October 2020, the insurer issued its final decision letter declining the claim essentially on the basis the complainant had not established a valid claim, made fraudulent misrepresentations about the use and storage of his insured vehicles, used the vehicle outside its registration conditions, and was uncooperative. A chronology of some of the key documents and events is set out at section 3 of this determination. The complainant has chosen to focus his complaint on the allegation that BK over- pressurised the tanks causing them catastrophic damage. He has chosen not to dispute the insurer‟s decline of his claims under the policy, although he says he „does not agree with‟ the insurer‟s position. The panel accepts the complainant has the right to make this decision. However, the pa nel has still considered the insurer‟s evidence in support of the claims decline insofar as it is relevant to the issues in dispute. Determination | Case number: 709886 Page 4 of 13 Complainant bears onus to establish allegation The parties agree that BK pressurised the tanks, but disagree about:  whether BK was negligent in doing so  whether any negligence by BK caused the extent of the loss alleged by the complainant. The complainant bears the onus to establish his allegations. The onus requires him to establish both the cause and the extent of the loss. Insufficient evidence that BK’s testing method caused the loss The complainant says BK‟s testing method was inappropriate. He says BK pressurised the tanks by connecting mains water to them and closing the air vents (also referred to as „breathers‟). The complainant says the gravity - feed, „no - pressure‟ tanks cannot withstand pressurisation, and that he tried to stop BK from pressurising them to no avail. BK says the complainant repeatedly interfered with his testing process and ultimately opened the tap fully which led to the over-pressurisation. The complainant provided a report from the engineering firm AR which concludes:  BK‟s original report does not explain the testing procedure and pressure applied in detail  it is assumed that BK connected the hose to the mains water outlet (which has a nominal pressure of 500kpa), filled the tanks to capacity, then closed off both water system safety air vents (air breathers)  these water tanks were not designed as pressure vessels and therefore have no pressure rating. Any significant applied pressure (i.e., greater than about 10kpa) is inadvisable and pressures of 500kpa will certainly cause the tanks to rupture at the weldments. The air breathers ordinarily allow air to safely egress from the tanks when they are being filled and to prevent any pressurisation from occurring  based on OP‟s plumbing reports, there was „a small water leak prior to the testing‟ by BK  „it is clear that the deliberate closing off of the system air vents and applying mains water pressure to the vehicle water tanks [by BK] has caused a catastrophic failure of the tanks, rendering them damaged and incapable of retaining water‟. The evidence from BK and AR suggests the static mains water pressure is about 510kpa. There is no dispute BK sealed the breathers. BK says his intended testing method was to fill the tanks by „opening the water tap fractionally, to enable the flowing of the water into the tanks in a balanced format.‟ He says that he intended to allow only a „trickle‟ of water to s lowly fill the tanks, not to turn the tap fully on. AR appears to presume – based on the complainant‟s version of Determination | Case number: 709886 Page 5 of 13 events – that BK intended to, and did, turn the tap fully on to apply „mains water pressure‟ to the tanks. This assumption is disputed by BK. Based on the available evidence, the panel is unable to conclude whether the tap was opened fully and, if it was, who was responsible for this. In this regard, the panel notes:  no independent witness has attested to these matters  BK is a credible witness given he is a highly qualified and experienced engineer, but is not an independent witness to this issue  BK‟s contemporaneous report did say that he had to advise the complainant to refrain from interfering with the tap  whilst PM was a witness, he does not say he noticed anyone opening the tap fully  the panel has concerns with the complainant‟s credibility given the insurer‟s uncontested evidence regarding fraudulent misrepresentation and other issues with his evidence. In the panel‟s view, this potentiall y significant factual matter regarding flow rate / volume cannot be determined precisely, and therefore neither can the resultant pressure and damage. Neither AR nor BK provided an opinion on the likely pressure – and likely degree of resultant damage – taking into account:  the flow rate (i.e., the „trickle‟ of water intended by BK as opposed to the flow from the fully opened tap), and  the pre-existing leak, which, depending on the flow rate from the tap, may have prevented a total seal thereby affecting pressurisation. For these reasons, the panel is not satisfied the complainant has discharged his onus to establish it is more likely than not that it was BK‟s negligence that caused the damage to the tanks. Complainant has not established a loss Even if it were shown that BK acted negligently, the panel is not satisfied the complainant has established that this caused any loss. Based on the available information, the panel is not satisfied the original cause of the crack observed by BK was over-pressurisa tion. Rather, as per BK‟s reports, the panel accepts the most likely cause of the crack was gradual deterioration and/or wear and tear. The evidence establishes the crack was pre-existing, but it does appear to have been exacerbated after BK‟s inspection. In this regard, the panel notes:  in February 2020, JM and UE detected a leak to the tanks  on 23 March 2020, the plumber OP detected a leak to the tanks  at that stage, OP applied up to 10kpa of pressure and noted that the leak was „small‟ Determination | Case number: 709886 Page 6 of 13  the complainant an d BK heard a singular “pop” sound after BK closed the air breathers  shortly after this PM observed the tanks „bulging‟ and water „gushing‟ out of the middle tank  PM also said he heard BK comment that the leak was in the area with significant pre-existing rust to the cross beam  BK found only one leak from a pre-existing crack. The leak area was rusted and aligned with the rusted cross beam as well as the water damage to the floor, „highlighting and confirming the point of original leakage‟  on 23 June 2020, OP confirmed that the original leak had been exacerbated. Beyond the exacerbation of the pre-existing leak, the complainant has not provided compelling evidence to establish his loss. OP‟s 23 June 2020 report is insufficient. OP says that apart from the or iginal leak, he has „ personally observed many new leaks without any pressure that did not exist prior to the initial inspection‟ but provides no supporting details or evidence. The panel does not accept the unsubstantiated assertion of OP that additional l eaks were caused by BK‟s testing. AR‟s report relies on OP‟s conclusion that „catastrophic‟ damage occurred to the tanks. It does not advance the complainant‟s position on this issue. In any event, the evidence suggests that, prior to BK‟s inspection, the vehicle had already sustained water damage which rendered it uneconomical to repair. Around 19 February 2020, UE, a Unimog expert and engineer, inspected the vehicle. The inspection was detailed and supported by numerous photographs. UE concluded that, due to the water damage existing at that time, the entire internal structure of the vehicle had to be replaced. Considering the complexity and cost involved in doing so, UE declared the vehicle an economic write-off. In addition, the insurer‟s assessor, JM, opined that the method to repair the damage to one tank would be the same as that to repair damage to all six tanks – and would necessitate the disassembly of the internal living structure since the only way to access the tanks is to remove them through the floor. JM concluded that, under the applicable state legislation, the vehicle was a total loss due to the pre-existing water damage as well as the tank leak, considering:  UE‟s comments on the appropriate repair method  the agreed value of the vehicle was $99,000  the undisputed pre-accident market value was $20,000  the undisputed salvage value was $3,500  the estimated cost of repairs according to UE is $129,000 (JM estimates the cost at over $135,000). The complainant‟s repairer, FG, provided two quotes fo r repair, as follows: Determination | Case number: 709886 Page 7 of 13  the first quote, stated to be an assessment of the cost to repair the damage before BK‟s alleged negligence, is for $7,563.60  the second quote, stated to be an assessment of the cost to repair the damage after BK‟s alleged negligence , is for $55,436. According to JM, FG subsequently verbally increased the value of this quote by 20%. The panel prefers UE‟s evidence about the cost to repair the vehicle prior to BK‟s inspection. This is because:  FG‟s qualifications and experience are unc lear, whereas UE appears to be an engineer and a Unimog specialist  FG‟s quotes are dated 23 Nov 2020, well after BK‟s inspection, and are not based on an extensive physical assessment of the damage. No photographs or reports are provided to confirm the extent of the damage  FG‟s pre - incident quote does not answer UE‟s comments about the necessity of dismantling the internal living structure to address the pre-existing damage. For these reasons, the panel is not satisfied the complainant has discharged his onus to establish that BK‟s actions caused him a compensable loss. The insurer is not liable for the damage The insurer is not liable for the claimed damage and is not required to take any further action. Determination | Case number: 709886 Page 8 of 13 3 Supporting information 3.1 Summary of relevant information Chronology of events / documents This chronology is a high-level summary of some of the key events and documents in the claims process. It does not record every ke y document or instance of contact between the parties. Unless text appears in „quotation marks‟, it has been paraphrased by the AFCA case manager. Abbreviations: Com = the complainant FF = the insurer Document / event & date Details FF’s expert (UE) Engineering asse ssment 19 Feb 2020  UE inspected the damage to the subfloor of the camper  „at least 80% of the floor has minor or major storm water damage which, due to the design of this camper, is impossible to repair … without removing the entire intern al structure. All internal walls and cupboards have been constructed of Monopan panelling, which is glued to the floor and external walls. If glued correctly this will not release without major damage to the mating surfac e‟  „[in doing this] there is a very high chance of damaging the external walls as well. All internal cabinetry will need to be remanufactured and assembled into the body. All plumbing and electrical will need to be removed and refitted as it has been run through - out the cabinetry / internal structure‟  „once the internals have been removed further investigation will be required to find out where the storm water is entering the body…‟  „due to the original design and complex nature, and the risk of damaging the external walls, in my opinion thi s body is beyond repair. Due to the amount of work involved in this and the risk of further damage I would not take on this project. I believe it would be cheaper and safer to start from scratch with a new body and therefore would personally deem this camp er as a write - off. Our entry level campers start at $129,000 + GST.‟ Com’ s expert (OP)  „26.03.2020 Attend site to carry out inspection of water leak on RV motor home onsite. …‟ Determination | Case number: 709886 Page 9 of 13 Document / event & date Details Plumbing invoice / asse ssment 31 Mar 2020  „Upon inspection found several poly water tank mounted on the underside of the Rv flooring.‟  „Visual inspection of the removed flooring edges around the perimeter of the Rv found No sign of water damage. Inspection of the removed floor sections around the access penetration ( ports ) found w ater damage on all access penetrations.‟  „Also a section of flooring that had not been removed in the front of the RV had only water damage around the floor access penetration. (port)‟  „A air test was carried out on the water tanks and was found over a per iod of time that the tank pressure had dropped to 0kpa.‟  „water was also visible dripping from the underside of the RV which this was not prior to the test being carried out.‟  „This indicates a leak in the tank or plumbing system.‟  „Inspected the tank joiners that are in a Sharkbite Polyethylene piping system and all looks good and not deteriorated due lack of maintenanc e.‟  „Condensation was visible on the underside of a access penetration that was still in place inside the RV.‟  „Th is indicates a wat er leaking from water storage area and rotting out the timber flooring.‟  „Job complete‟ FF’s expert ( BK ) Engineering report 16 June 2020 (inspection date)  „to determine the area of water distribution/origin it was necessary to pressurise the water reticulation system. A water hose was attached to the outlet within the repairer‟s premises wit h the faucet partially opened to enable the respective six water tanks to be refilled. During this process it was necessary to advise the owner to ref rain from int erfering with the faucet‟  „as the tanks filled, it was noted that no - 5 water storage tank began to express water, however the water leakage point could not be determined‟ immediately, so BK sought permission to drill a hole in the tank top  th is revealed a leak from a horizontal fissure / crack  the leak had likely been occurring over a period of at least five years, judging by the degree of rust to the nearby cross beam  there was no evidence to support the theory that an impact caused the cra ck, and considering the location of the crack and nature of the damage (among other reasons), impact is an implausible caus e  the previous repairer CC noted in their report of 17 April 2020 that damage to a support bracket proves downward force consistent with impact, and inferred that this damaged the tanks. However, the support bracket is only a type of cover installed by the current or previous owner, its screws have corroded, and it has no structural relations hip to the tanks. Determination | Case number: 709886 Page 10 of 13 Document / event & date Details Damage to the bracket has not damaged the tanks  „examination of the underside of the vehicle, whilst the water was leaking, clearly identified the water was originating from the fissure (crack) in No 5 water tank‟  „The “modification” to the floor is not of military standard, who wo uld utilise a resin bonded plywood, thereafter would not seal any access apertures or ports in the floor with a plastic cover. This type of budget aperture seal is predominantly used in caravans and marine vessels, where the substrate material is significa ntly different. This to me illustrates an amateur product and installation. I cannot find a reason to cut such apertures to gain access to a tank top, that does not require maintenance. My theory relates that at a preceding time they were installed for the purpose of determining a leakage of water, as no other logical reason applies‟  the full extent of the leak cannot be det ermined until the tanks are removed  the crack occurred due to gradual deterioration. Com’ s expert (OP) Plumbing report 23 June 2020  when they conducted their test on 26 March, they observed a „small leak‟ when the tanks were „full of water under no additional pressure and the air vents were open‟.  at that time they fitted a pressure gauge, applied up to 10k pa of air pressure, and obs e rved the pressure slowly dropping, which indicated a leak in the tanks or plumbing  on 23 June during BK‟s inspection, OP observed „huge amounts of water leaking from the tanks and sub floor‟  „water was leaking from tanks under no induced pressure and was n ot overflowing out of tank vents‟  „the leak has dramatically increased since [the previous inspection]‟  OP has „pers onally observed many new leaks without any pressure that did not exist prior to the initial ins pection‟. Com’ s experts (AR) Engineering re port 16 July 2020  BK‟s original report does not explain the testing procedure and pressure applied in detail  it is assumed that BK connected the hose to the mains water outlet (which has a nominal pressure of 500kpa), filled the tanks to capacity, then clo sed off both water system safety air vents (air breathers)  the water tanks were not designed as pressure vessels and therefore have no pressure rating. Any signific ant applied pressure, i.e., greater than about 10kpa, is inadvisable and pressures of 500kpa will certainly cause the tanks to rupt ure at the weldments. The air breathers ordinarily allow air to safely egress from the tanks when they are being filled and to prevent any pressurisation from occurring  based on OP‟s plumbing reports, there was „a sma ll wat er leak prior to the testing‟ by BK  „it is clear that the deliberate closing off of the system air Determination | Case number: 709886 Page 11 of 13 Document / event & date Details vents and applying mains water pressure to the vehicle water tanks [by BK] has caused a catastrophic failure of the tanks, rendering them damaged and incapable of retaining water‟. Com’ s expe rt (PM) Witness statement Undated (mid/late 2020 )  he heard the complainant tell BK not to block the breat hers / vents when filling the tanks and to fill them slowly bec ause they are gravity - feed „no pressure‟ tanks and need time to equalise  the complainan t pulled the clamp off and said again it needed to be open, but BK insisted it needed to be closed to pressuris e the tanks  „after a while water came out passenger side front there is another breather there as well. The inspector then clamped it off too‟  t he complainant removed the clamps on the two breathers „several times‟ but BK ignored the complainant‟s protests and re - clamped the breat hers  PM then went around to the driver‟s side while the complainant and BK stayed on the passenger‟s side of the vehicl e  they were near the door when the complainant asked: „what was that loud pop?‟  PM did not hear the „pop‟ where he was standing; the complainant came over to PM‟s side to ask him if he heard it, and then ret urned to the passenger‟s side with PM  water was f lowing underneath and the wat er was turned off  PM looked in the door and observed the tanks „bulging‟ and after the complainant raised the bed he noticed „water gushing up from the middle tank‟  BK climbed in and released the clamps and said the frame near the tank was rusted and there must have been water leaking from that point previously  BK said they needed to cut the top out of the tank to see „what had let go‟  the complainant was concerned about the „loud pop that preceded the damage to the tank and the large amount of water gushing out of the now broken tank‟. FF’s expert (BK) Engineering report / witness statement 13 August 2020  the complainant interfered with the testing process by pulling out the tanks‟ vent pipes and disconnecting the hose at th e tap fitting saying it was broken (although it was not broken when it was first connected to the tap)  when water started flowing from the tap, BK sealed the vents with adhesive tape  „at that point [the complainant] was at the water tap and opened it fully , thereby pressurising the system from a „trickle flow‟ to a full pressure flow‟  BK intended to fill the tanks by „opening the water tap fractionally, to enable the flowing of the wat er into the tanks in Determination | Case number: 709886 Page 12 of 13 Document / event & date Details a balanced format, as the water must flow through th e interconnecting pipes. If you have a high flow rate it will only fill one tank and vent itself‟  „when standing outside the vehicle, after I terminated the water supply, I did hear a “pop” and assumed it was air entrapped venting. On entering the vehicle water was being discharged mid centre of the cross beam, where the dezincification (loss of galvanising) had previously occurred, highlighting and confirming the point of original leakage‟ … the rust „is indicative of long - term water concentration between the plywood floor and the cross beam‟  BK connected the water hose to the tap, but the complainant opened the tap up fully to achieve maximum flow and pressure  the local council has verbally confirmed that the water pressure at the relevant location is rat ed at 510kpa as a static pressure, and that when the valve is opened the pressure reduces to 300kpa  „ Only one leak was discovered, where the fracture is exhibited by the expressing of water and the dezin cification (rust) on the cross beam exactly where the leak was located. This rust did not formulate within one hour of my testing and is indicative of long - term water concentration between the plywood floor and the cross beam. ‟  the report of AR was not based on a physical inspection of the vehicle or witness ing the incidents that took place during BK‟s inspection; it is based on the complainant‟s version of events  the report of AR establishes that it was impossible for the undercarriage to have been impacted by the washout and the complainant has not provided any phot os of the alleged washout  it is implausible that a storm caused such localised damage; a storm would not have caused the degree of observed corrosion to the crossbeam near the location of the leak . The nature of the damage is not consistent with h aving been caused by a storm . FF’s expert (BK) Statutory declaration 13 Oct 2020  to test for leaks, it was necessary to fill / pressurise the tanks  BK connected the hose to a water outlet at the premises about 20 metres away from the vehicle  he „slightly opened‟ the wat er tap to let water into the tanks and returned to the vehicle. The complainant was at the tap  no water seemed to be flowing so he walked back to the tap and informed the complainant, who used his hand to fracture the hose connection, stoppi ng the flow of water completely  BK retrieved a new hose with a brass fitting and turned on the tap again „with minimal flow‟  he also fitted a „partial seal‟ on the overflow vents, to enable air in the tanks to be displaced by water Determination | Case number: 709886 Page 13 of 13 Document / event & date Details  BK was at the vehicle an d the complainant was at the tap at this point  BK then observed the complainant „turn the control valve to the fully open position‟, and shouted at the complainant to leave the tap alone  the complainant attempted to interfere with the testing process multi ple times and made disparaging remarks about BK and the insurer‟s agents  BK then returned to the tap and turned it off  he observed water flowing from the tank top. The leak area was rusted and aligned with the rusted cross beam as well as the water damage to the floor. Com’ s expert (FG) Quote to repair damage prior to BK’ s inspection 23 Nov 2020  „ Prior to damage caused by [BK] ... By pressurising plastic tanks and intentionally closing air vent safety events causing tanks to visually expand till they exploded...  „ Cut out flooring, but not included cupboards, lockers under fixed furniture. Replace with new rot - proof flooring, bonded to the subframe. Overlay with new vinyl flooring, glue and reinstall, trim, labour and material'  the value of the quote is $7,563.60 (inc GST) Com’ s expert (FG) Quote to repair damage after BK’s inspection 23 Nov 2020  „After damage caused by agent for insurer, by intentionally closing safety air vents, then exposing tanks to city water pressure caused tanks to expand till they exploded.‟  „Repair damage done by agent… When he closed off air vents and pressurised 6 plast ic tanks cause tanks to explode.‟  „To replace tanks complete body must be removed and separated from floor. Tanks custom fabricated to fit space between frame in floor, replumbed, floor replaced, vinyl covering to floor replaced ETC‟  the value of the quo te is $55,436 (inc GST) Com statutory declaration 9 Dec 2020  the contents of the PM report regarding the testing by BK on 16 June 2020 are correct.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.