Water pipe leak claim: exploratory works paid, internal and external damage and repairs declined
Text of the determination
Determination
Case number 708996
Financial firm AAI Limited
Determination | Case number: 708996 Page 1 of 15
Case number: 708996 30 October 2020
1 Determination overview
1.1 Complaint
The complainant held home building and contents insurance policy with the
financial firm (insurer). A claim was lodged on 11 February 2019 for water damage
after two water pipes burst a few weeks apart in January and February 2019.
The insurer ’s engineer found no structural damage but recommended a further
assessment after the soil dried out for 12 months. The complainant despite
acknowledging this advice proceeded with exploratory works and internal and
external damage repairs. The complainant says this was necessary for health
reasons. He says he was given the impression the insurer would reimburse him
for his costs and kept the insurer updated.
The insurer has declined the claim. It says at no time did it accept liability and the
complainant’s actions have prejudiced its ability to determine liability.
1.2 Issues and key findings
Has the complainant established a valid claim within the terms of the
policy?
The complainant has established a valid claim for the costs of locating the source
of the escaped liquid and to repair the damage caused by the exploratory work.
Is the insurer liable for the internal and structural damage?
The complainant has prejudiced the assessment of any potential structural
damage as set out under section 2.2 of this determination. The panel is further
satisfied the balance of the internal and external damage is not covered under the
terms of the policy.
Did the insurer promise to cover the complainant’s repair costs?
The panel is satisfied the insurer did not mislead the complainant to believe it
would accept liability for the claim or the costs of repairs.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 business
days of the complainant’s acceptance of this determination, the insurer is to pay
the complainant a total of $42,361 with interest in line with section 57 of the
Insurance Contracts Act 1958 (Cth) from 5 December 2019 until the date of
payment.
Determination | Case number: 708996 Page 2 of 15
2 Reasons for determination
There has been a full exchange of material between the parties, and each party
has had the opportunity to address the issues arising from that.
Due to the complexities involved in this dispute, it has been referred to a panel for
determination. The panel is comprised of the Lead Ombudsman, a member with
considerable industry experience and a member with extensive experience as a
consumer representative.
While the parties raised various issues in their submissions, for the purposes of
this determination, the panel has restricted its commentary to those issues which
it considers directly relevant to the outcome.
This determination follows consideration of all e information exchanged. It is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice
and previous decisions where applicable.
2.1 Has the complainant established a valid claim within the terms of
the policy?
Complainant bears onus to establish claim falls within terms of policy
It is established insurance law that an insured has the onus to establish on the
balance of probabilities (that is, more likely than not) that a claim falls within the
terms of a policy. This is commonly called a prima facie claim.
The complainant ’ s home and contents policy provides cover for a series of insured
events including the escape of liquid from fixed drains and pipes. The relevant
policy section is set out at 3.1 of this determination.
The complainant says a crushed stormwater pipe leaked a large amount of water
into the foundation soils which caused erosion and ground movement which, in
turn, caused the water supply pipe to burst at the back and front of the property.
He says this resulted in further soil saturation and both internal and external
damage.
Evidence establishes multiple leaks from supply and crushed stormwater
pipes
The insurer appointed several assessors to inspect the damage, including :
builders (A, P and C), plumbers (BB), and an engineer (IL). The complainant also
provided reports from a plumber (JN) and an engineer (ZC). The key reports are
summarised at section 3 of this determination.
Determination | Case number: 708996 Page 3 of 15
The assessors initially found two leaks from a supply pipe. In addition, the
complainant’s plumber, JN, and engineer, ZC, reported a crushed stormwater
pipe; they suggest the pipe seeped water over years until it finally burst, flooding
the foundation soils and causing ground movement which burst the supply pipe.
The insurer does not acknowledge the issue with the stormwater pipe. As noted
below, its plumbers, BB, did not comprehensively inspect the pipe. During the
review of the claim the building co -ordinator, C, declared there was no evidence of
a crushed or broken pipe.
Based on the complainant’s reports and photographs (which show the broken pipe
in-situ), and in the absence of a compelling submission from the insurer to the
contrary, the panel is satisfied that the stormwater pipe was crushed and a source
of the escape of liquid.
IL reported a significant increase in water usage based on the water rate notice for
the period October 2018 to January 2019 consistent with the burst pipes. The
panel is satisfied that the volume was significant (and its ultimate extent
unknown), based on the reports of JN, ZC and IL.
The panel is satisfied the complainant has established a valid claim for loss and
damage arising from the escape of liquid.
Insurer is liable for the exploratory costs and to repair damage caused by
exploratory work
The policy provides cover for the reasonable costs of locating the source of the
escaped liquid and the cost to repair the building damage caused by the
exploratory work. Building is defined in the policy and includes pathways and
driveways.
The invoice provided by the complaina nt for work performed includes costs of
locating the burst pipes and crushed stormwater drain as follows:
1. Cutting the concrete paths …. $2,161
2. Demolition and excavation of side path …. $15,000
3. Rear path manual excavation ……. $4,500
4. Removal of debris ……. $6,700
5. Remove and replace front driveway …. $14,000
Total …… $42,361
A identified the leaking pipes had undermined the driveway and the storm water
had been blocked. The complainant’s plumber JN a nd engineer ZC confirm the
leaking pipes had undermined the driveway and pathway. Plumber BB, the
Determination | Case number: 708996 Page 4 of 15
assessor and engineer IL did not address the issue or the need to repair the
damage caused by the exploratory work or leaking pipes to the pathways or
driveway.
In the absence of information to dispute the findings of JN and ZC, the panel
accepts that the insurer should meet to costs as identified and pay the
complainant $42,361.
2.2 Is the insurer liable for the internal damage or external damage?
No structural damage to house established
There is no evidence of structural damage. The complainant has not established
any structural damage to the house itself arose as a result of an insured event.
Neither JN nor ZC reported structural damage to the dwelling. At best they find
that soil movement may have affected the pipework.
IL observed no cracking or other evidence of structural damage to the house. The
panel accepts IL’s conclusions in this regard. There was movement, but this did
not result in damage to the house itself. IL is suitably qualified, and the report is
detailed. IL supported the observations with photographs and floor level
measurements, which recorded only slightly elevated levels in the south eastern
corner of the house near the stormwater pipe leak.
Complainant prejudiced the insurer’s asse ssment of the structural damage
IL acknowledged that a large amount of water had entered the subfloor and it
would not be unusual for movement to occur as the soil dried out. IL considered it
necessary to allow a drying out period of 12 months to determine the extent if any
of movement. The panel accepts IL was suitably qualified to make such a
recommendation. This is not unreasonable and a common requirement where
there has been significant inundation of a property. The insurer was willing to
reassess the presence of any resultant structural damage after the drying out
period.
The complainant disagreed with IL’s soil drying recommendation and decided to
press ahead with exploratory works and repairs.
The policy says the insured must allow the insurer to assess damage and must
not conduct repairs without the insurer’s consent, failing which the insurer may be
entitled to reduce its liability.
The complainant says ZC observed a degree of moveme nt sufficient to affect the
pipework, which shows the movement needed to be addressed immediately. This
assertion is not supported by expert evidence . The comments by ZC do not in the
panel ’s view undermine the merit of IL’s recommendation.
Determination | Case number: 708996 Page 5 of 15
The complainant says that IL failed to address the stormwater pipe. The panel
agrees but the complainant has provided no evidence to explain how this would
undermine the correctness of the recommendation. IL proceeded on the
assumption that a significant amount of water entered the founding soils, and this
assumption would not likely be altered by the presence of an additional leak.
The complainant says he had to undertake all repairs to mitigate the risk of mould
re-occurring. The panel notes that the mould was remediated relatively early in the
claim process.
The panel accepts this was necessary, as were the repairs to the pipes. However,
beyond this it is not entirely clear how the complainant’s works would have
mitigated the risk of mould re-occurring given the water had already saturated the
soil.
To the extent there may have been developing damage as the soil dried out, the
insurer has been prejudiced by the complainant’s actions. It is now not possible to
determine the extent, if any, of structural damage attributable to the insured event.
Renovations, improvements, preventative, unrelated works – not covered
Once the leaks were discovered and repaired, the complainant took the
opportunity to complete repairs, renovations, improvements, preventative and
other works not directly related to the insured events. Without being exhaustive,
the additional/unrelated works include:
the renovation of/upgrades to the laundry and bathroom. Whilst the
complainant suggests the bathroom works were necessary to dry out the soil,
this is not supported by expert evidence
the repair/installation of the retaining wall
other improvements and preventative measures, including to the foundations
and front of the property and garden area
the neighbour’s driveway.
The panel is satisfied such work was not required because of the insured events.
Other damage not related to leaking pipes
IL and the other assessors noted internal damage including swollen
joinery/architraves to the doors on the eastern side of the building, as well as
corrosion to the base of the laundry cabinet trough.
Other assessors, including ZC and the builders, variously observed the external
damage, including damage to the archway, garden and efflorescence to the
brickwork.
Determination | Case number: 708996 Page 6 of 15
IL found the house had an absent/deficient vapour barrier under the slab which
facilitated rising damp which in turn resulted in the efflorescence to the brick walls,
the swelling of the joinery, the corrosion of the laundry tub and, presumably, the
mould. The panel notes that IL does not actually prove an absent/defective vapour
barrier by invasive testing.
Damage most likely long term
The panel accepts that the leaking pipes occurred in the period between October
2018 and January 2019. This is supported by the water rate notice that shows a
significant increase in water usage in that period compared to the three previous
quarters.
The photographs of the damage to the doors, joinery, architraves and laundry
cabinet show extensive damage. The panel accepts that it is unlikely such
extensive damage occurred in the short period (i.e. between October 2018 and
January 2019) prior to the leaking pipes being identified.
The panel accepts that most likely the efflorescence and corrosion and swelling
was due to gradual deterioration from the rising damp over several years. The
panel notes in support of this the complainant’s comments that the efflorescence
had been observed for a few years.
The policy excludes cover for gradual deterioration, corrosion, wear and tear,
rising damp and the like. The panel accepts the insurer is entitled to rely on the
terms of the policy to refuse payment of the additional damage.
2.3 Did the insurer promise to cover the complainant’s repair costs?
Evidence does not establish insurer promised to cover the repairs
There is no dispute that the complainant had received the policy documents. The
documents clearly set out the complainant’s obligations. The policy clearly sets
out “What you must do” and what happens if you do not comply.
The complainant says the insurer should be liable for his repair costs because:
he put the insurer on notice that he would go ahead with the works
he kept the insurer updated as the works progressed
the insurer failed to inspect the site when invited to do so by the complainant
the insurer neglected to instruct the complainant to cease works
the insurer, by its conduct, promised to cover the costs / did not say he should
not go ahead, thereby giving him the impression the costs would be covered.
The complainant relies on the principle of estoppel to seek reimbursement from
the insurer and bears the onus to establish his allegations.
Determination | Case number: 708996 Page 7 of 15
Based on the available information, the panel is satisfied that:
the complainant was advised that no repairs (other than to the pipes) should
commence for 12 months to allow the soil to dry out
the complainant made a conscious choice to proceed with the repairs
regardless of the position on coverage
at no stage did the insurer say it would accept liability for the repairs
the insurer offered no indication to the complainant to lead him to assume the
repairs would be covered
the complainant has proceeded with the repairs on his belief that the insurer
would be liable
it was not reasonable for the complainant to adopt the assumption as to
coverage and incur costs in reliance on this assumption.
In these circumstances, the available information is not sufficient to establish
estoppel or misleading conduct by the insurer. The insurer is not liable to pay the
repair costs.
Determination | Case number: 708996 Page 8 of 15
3 Supporting information
3.1 Key policy provisions
Insuring provision
Determination | Case number: 708996 Page 9 of 15
The insured’s obligations
Determination | Case number: 708996 Page 10 of 15
3.2 Key reports and events
The table below contains a summary of key reports and events. It does not record
every report or instance of contact between the parties. Unless text is put in
“quotation marks”, it has been paraphrased to some extent.
Abbreviations:
Com = the complainant or his representative
FF = the insurer
Date / document Event / details
Com’ s expert (JN)
Plumbing asse ssment
Date of assessments: 18
Jan and 12 Feb 2019
Date of report: 16 Jun 2019
[some of the works referred
to appear to have been
undertaken bet ween
February and June 2019]
on 18 January I found and repaired a leak to a water supply line
at the rear of the property, adjacent to the south wall of the
bathroom, which had apparently been cracked by ground
movement
on 12 February 2019 I repaired another leak to the same pipe at
the front of the property under the driveway adjacent to the south
west corner of the property. I also found a crus hed stormwat er
pipe beneath the pa th surfac e near the first leak
the escapes of liquid caused int ernal damage (including to the
walls, rust to the laundry tub, swelling/rotting of skirtings and
doors, mould) as well as external damage (including to
brickwork, the settlement of the driveway and front path , garden
bed and the falling away of the side path archway)
I undertook extensive exploratory work, repaired some of the
damage, treated the mould and brickwork (which in some
instances required replacement ), replaced the pipework in the
lau ndry and refitted a new bathroom
the stormwater pipe at the rear was badly crushed which would
have allowed water to build up there over a long time
the pipework along the side of the hous e may be unstable
the water pipes feeding the laundry and upper back yard were in
bad condition and I temporarily repaired them, but note they will
need replacement
all the stormwater and regular water pipes need replacement, all
the walls require new render or acid washing.
FF’s expert (A)
Building asse ssment
14 Feb 20 19
Initial review
“A was appointed to inspect a possible escape of liquid claim at
this property.
Upon inspection of the customers, front A has advised a copper
pipe under the customer's pavement had burst last week.
Previous to this, one month ago there was a burst to the
backyard furt her up the conc rete path. There is cracking for brick
archway bet ween these areas. Inside is showing signs of
Efflorescence.
Determination | Case number: 708996 Page 11 of 15
Date / document Event / details
Customer advised there are damages to rooms inside however A
was unable to inspect as people were sleeping in the rooms at
the time of inspection. As A was unable to inspect all the
property SOW is hard to determine
A has organised a leak detection to confirm if there is any more
leaks and conduct thermal imaging. O nce the leak det ection is
performed, we will have a clearer idea where the water has
travelled.
Please be advised an engineer may be needed for this claim.
TBC with the leak detection findings.”
Leak detection
“Arrived on site to assess damage and conduct a leak detection.
The Insured has had two burst pipes repaired at the front and
rear right hand side of the property, he believes they had been
leaking for a while as the water bills have been high.”
A pressure test was performed and passed indicating no further
leaks to the mains pipe work.
Damage was not ed with movement to the archway near the
burst. The laundry cabinetry has rusted, the laundry door frame
has swollen and there is efflorescence staining and damage to
walls.
Not all downstairs rooms could be inspected at the time of
attendance due to people sleeping in them.
Inspected and tested bot h the laundry and toilet wit h no issues
found.
Inspected the shower, found the screen to be leaking and some
grout missing around the drain. However, water did not appear to
be escaping underneath the tiles.
The shower walls are in a good condition.
FF’s expert (BB)
Plumbing report
21 Feb 2019
Second FF leak detection:
the complainant repaired a burst pipe at the front and a burst
pipe at the rear
a pressure test showed no further leaks to the mains pipe work
the laundry tub is rusted, the laundry door frame is swollen and
there is efflorescence staining and damage to walls
there are no issues with the laundry and toilet or the shower.
FF’s exper t (IL)
Engineering asse ssment
19 Mar 2019
the average daily water usage at the property bet ween October
2018 and January 2019 was nearly 5 times greater than the
average daily water usage at the same time in the preceding
year
there was no significant ext ernal damage to the property
efflorescence was widespread in the lower level walls of the
dwelling, with no discernible pattern
we saw several instanc es of swollen joinery/architraves to the
doors on the eastern side of the building, as well as corrosion to
Determination | Case number: 708996 Page 12 of 15
Date / document Event / details
the base of the laundry tub. No other internal damage was
sighted or report ed during our inspection
we measured the hy drostatic floor levels, whic h showed the
levels in the south eastern area of the dwelling (ensuit e and
bathroom) were slightly higher t han the rest of the dwelling.
Apart from this area, the levels throughout the rest of the
dwelling were generally relatively level, with no discernible
pattern of movement
we do not believe the escape of liquid caused any structural
damage to the dwelling. Otherwise one would expect non -
uniform movement, in the area of the leak. Although the floor
levels at the sout h east near the leak were slightly higher, no
damage (for example cracks) was seen
however, given a large amount of water has entered soils
bene ath the subfloor, it would not be unusual for movement to
occur as the soil dries out
the efflorescence to the brick walls was likely caused by rising
damp due to a defective / absent vapour barrier underneat h the
concrete slab. Damage was not localised bu t was rather
wides pread throughout the lower level, which shows it was not
caused by an escape of liquid. The rising damp caused the
damage to the brick walls and the swelling of the joinery and the
corrosion of the laundry tub
as a large volume of water h as entered the founding soils, we
recommend a 12 - mont h soil drying out period to allow the soils
to return to a relatively stable moisture profile. The insured
should monitor the dwelling during the drying out period and
report any new cracking or foundati on movement to us. Should
the dwelling remain relatively stable with no further cracking
reported, no further action will be required and no structu ral
repairs would be nec essary.
FF’s expert (BB)
Plumbing report
1 Apr 2019
BB plumbing attended again on 1 April 2019 and found:
the sewer line is clear and runs to the east of the property
the bathroom to the south - east is currently being renovated
it is difficult to clearly see the stormwater pipes running east and
west of the property due to debris
ther e is some root intrusion to the pipes in the front garden
waste pipes from the Jacuzzi room to the nort h east of the
property are connected to the stormwat er line which is against
regulations.
18 Apr 2019 FF claim decision ba sed on IL engineer report
advis ed of 12 month drying period to see any resultant damage
but at the moment there’s nothing.
Com’ s expert ( ZC ) I was told there was a leak near the rear of the bathroom in the
south west corner of the property which lasted at least a week
the footings rest on shallow rock. This means any movement
Determination | Case number: 708996 Page 13 of 15
Date / document Event / details
Engineering asse ssment
Date of assessment: 27
May 2019
Date of report: 16 Jun 2019
was not caused by normal settlement of the foundations
the brickwork, door frames and skirtings have been water
damaged over t ime, as has the laundry tub attached to the damp
wall
the stormwater pipe under the path at the rear of the property
was crushed and did not discharge water through. This means it
would cause water to build up in the area over time. It is also the
most likely cause of the rupture in the water supply line
the damaged stormwater pipe is right outside the laundry wall,
which explains how the most severe dampness and mould have
affected the nearby walls in the centre and rear end of the house
the leak happen ed near the downpipe. The stormwater line
trench can easily become a channel for water to mak e its way to
the front of the building, contributing to the movement of the
driveway
the water leak at the rear of the property is the sole cause of the
movement t o the front driveway.
FF’s expert (PA)
Internal asse ssment
report
27 Jun 2019
FF asse ssor PA attends si te of Com’ s works
“ On attending onsite, I was advised by the customer that he has
begun repairing damage from what he believes is a result of the
leaking pipes at the property. The customer has begun extensive
repairs to the property. The paving at the southern and eastern
s ide of the house has been removed. A new retaining wall has
been installed along the southern boundary. The customer has
replaced several steel internal door frames and has replaced
cabinetry at the rear laundry. Skirting boards in the home have
also been replaced. The customer also believes that the front
driveway has dropped due to the leak and is going to have this
section of the driveway replaced. The customer advised me that he
will spend over 100k in completing thes e repairs and is continuing
with re pairs regardless.
The Engineers report provided by [our builders] advised that there
is no visible resulting damage from the leaks at the property. The
customer disagrees with these findings and believes that the works
completed to date are all related to the leak and should be covered
as part of the claim. The customer has provided his own Engineers
report which outlines both internal and external damage. A
Plumbers report has also been provided .
… It is my opinion that the customer has prejudiced the cla im by
proceeding with repairs prior to the drying out period elapsing and
before [the FF] were able to properly identify all result ant damage. ”
FF’s expert ( C )
Determination | Case number: 708996 Page 14 of 15
Date / document Event / details
Building co - ordinator
report
25 Nov 2019
“ 1/ The front driveway. There are photos showing an approx
displacement of 20mm on one concret e panel only, near the
entrance. As the mandatory drying time was not adhered to, we
cannot determine if this panel would have returned to its original
position. As such we cannot cover any cost associated with thi s.
Also additional concrete works have been done to the front yard
that were not there prior to the event.
2/ There is no evidence to support the claim that the storm water
pipe was broken or crushed. The supplied photos only show a
pile of broken pipes wi th no evidence of the pipes insitu in a
broken state. Our CCTV shows a blockage only and as such
this could have been cleaned with a jetting service.
3/ The retaining wall: we have been given no structural
engineering reports to confirm the side parting w all was
displaced by any event. The insured had a duty of disclosure to
inform FF if additional works were required. As FF were not
given any evidence or any opportunity to inspect, these works
are not covered.
To that point we will not cover any works on the neighbouring
property.
4/ Bathroom: The leak detection was done on the 21/02/2019
and found that the bathroom renovations had already begun.
There is no scientific evidence to support the claim for damage
to this room. It is fair and reasonable to con clude this room was
not affected by any of t he burst pipe events as listed.
In conclusion, I note: the insureds plumber and Engineer have
not supplied any scientific evidence to support their “opinion”
based reports. Where’s all of the [the insurer’s builders’] reports,
the IL reports and the leak detection reports have substantial
photographs supporting the position of the events.
I agree with IL’s report to the fact that no damage has been
sustained to the dwelling from a bust pipe eve nt. My reasoning
for this is confirmed by the full dept h corrosion to the Laundry
trough, the full depth corroding to the solid steel door jambs. This
kind of corrosion t akes at least 10 years to rise to a height of
200mm above finished floor heights, not from a burst pipe for 2 -
3 months.
As the insured has diminished our ability to accurately assess all
damage, refused to accept the mandatory 12 month drying
period and commence renovations before we could complete our
investigations, it is my recommendati on these claims be declined
on the grounds that I cannot scientifically attribute any damage
to the burst wat er pipe as described.
It is however fair and reasonable to conclude that there is no
vapour barrier under the house as described in the independent
link report which would explain the level of corrosion and the
effervesce to the brickwork.”
Determination | Case number: 708996 Page 15 of 15