Cash settlement offer for cyclone damage to home and claims handling

FirmRACQ
Decided2021-04-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$88,378
Non-financial loss$4,000
Amount claimed$218,987
SourceAFCA PDF

Summary

The complainant's cyclone damage claim was cash settled on the insurer's builder quote, which AFCA found unfair. AFCA ordered a 30% uplift, temporary accommodation, expert report costs and $4,000 non-financial loss compensation.

A cash settlement must allow for variations and contingencies, so a 30% uplift on the insurer's actionable quote is fair, and special circumstances justify expert costs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 708936 Financial firm RACQ Insurance Limited Determination | Case number: 708936 Page 2 of 20 Case number: 708936 15 March 2021 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for damage to her home sustained during a tropical cyclone in March 2017. The insurer accepted the claim; however, disputes arose during the repair process. The insurer‟s current offer is based on the amount of $93,770.88 from a quote from its preferred repairer, for damage to the property. It has also offered $2,600.00 for alternative accommodation during repairs. The complainant‟s preference is for cash settlement. She says the insurer‟s of fer is unfair as it is based on an incomplete scope of works and does not allow for contingencies. The complainant says settlement should be based on quote of $199,385.37 for building repair, and $19,602 for asbestos removal, from a local builder. The complainant also describes a poor claims experience and issues with asbestos and mould. 1.2 Issues and key findings Is the insurer’s settlement offer fair? No. The available material establishes the insurer is not entitled to rely just on its preferred quotation as provided. With any cash settlement, an insurer must ensure the amount offered considers variations and contingencies which may occur when repairs commence. In view of the discrepancy betwee n the parties, the issues which remain contested and the uncertainty which remains with the cladding issue, it is fair to allow a further uplift of 30% on the preferred quotation. Is the complainant entitled to compensation? Yes. The complainant is entitled to $4,000 compensation for non-financial loss and $7,322.75 for the cost of reports and expert assistance. Determination | Case number: 708936 Page 3 of 20 1.3 Determination This determination is partly in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainant the following amounts:  $81,054.91 for repairs and temporary accommodation  $4,000 compensation  $7,322.75 for reports and expert assistance If the complainant has already paid for the reports and assistance, then the insurer is also to pay to the complainant interest pursuant to section 57 of the Insurance Contracts Act from the date of payment until the date of settlement. Otherwise the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 708936 Page 4 of 20 2 Reasons for determination 2.1 Is the insurer’s settlement offer fair? The complainant is represented. Where relevant, references to the complainant include references to the complainant‟s representative. The complainant lodged a claim on 30 March 2017 for damage to her home caused by Tropical Cyclone Debbie. The insurer accepted the claim and engaged assessing firm (CL) to attend the property and report on damage. The material provided shows that from the outset, the parties held a differing view about the extent of damage. The complainant says her damage was widespread and included damage to her roof and ceilings, whereas the insurer was of the view damage was more limited. The complainant also raised concerns regarding mould and asbestos contamination. She says the insurer did not address these issues satisfactorily, and the claim was managed poorly, resulting in delays and a stressful experience. The complainant says she has lost faith in the insurer and its repairers and seeks to use he r own preferred repairer. She expects the final cost of repairs to be “around $250,000 - $300,000”. In contrast, the insurer‟s final quote for repairs is $93,770.88. In addition, the complainant asserts the insurer‟s claims management caused stress and she is entitled to compensation for the claims experience and for her experts‟ reports. The dispute is whether the insurer‟s offer to arrange for its preferred builder to carry out repairs or cash settle the complainant based on its own quote is fair in the circumstances and whether the insurer has satisfactorily handled the claims process. Parties’ material and submissions considered The insurer engaged its adjuster and builders and other experts to report on the extent of damage to the home and to carry o ut make-safe repairs. The complainant relies on an engineer and building consultants. A summary of the most relevant material relied on by the parties is set out in supporting section 3.3 of determination. In April 2017 the insurer engaged an asbestos co ntractor (AS), a builder (AR) and a restorer (D) to complete a make safe. They performed make safe work and obtained laboratory reports and say they performed the asbestos make safe on the property in accordance with the relevant code of practice. In June and July 2017, the builder (CB) reported no further mould, and no storm related issues with ceiling materials. The restorer (J) attended in June and July 2017 Determination | Case number: 708936 Page 5 of 20 and cleaned and treated blinds, walls and ceilings in various rooms. Mould clearance laboratory testing was passed at the time of sampling. Because the complainant asserted the roof was damaged and sagging, a roofing report was obtained. AR had conducted a full roof and ceiling inspection and said that all ceilings appear to be in good condition with no sign of damage or water penetration. This opinion was confirmed by the builder (CB) who provided a roof report in June 2017. After inspection CB said he found no evidence of water leaks or batten lift. The first asbestos make safe cost $4,883.51 and included removal of all damaged vinyl and carpet and sanitising of subflooring and lower wall areas. The complainant says the make safe was not complete and complains mould and asbestos contamination continued. In February 2018 a building consultant (CC) provided a report and scope of works for the complainant. He says that although the vinyl floor coverings were removed by the make safe repairers the vinyl floor covering contained asbestos which remained on top of the timber flooring which was covered b y mats. Relevant to the issue of temporary accommodation, he also said demolition and re-construction repairs will take about two months. The engineer (MB) inspected the property for the complainant in December 2018. He says the upper level floor coverings have been partially removed with remnants of asbestos containing lino evident. He also refers to a potential release of asbestos fibres to exterior cladding on the southern and eastern sides. In August 2019 the complainant obtained a quotation from HC to remove the asbestos vinyl flooring (about 25 m²) in the amount of $19,602. Mould was noted at the time of inspection and the view was it is likely fibres are present within the potentially water damaged timber floor boards and in the ceiling space. In February 2019 samples were taken to detect and report on mould which showed levels of mould described as high and immunocompromising. As for the roof, MB says the sheeting is in relatively good condition. He notes undulations but after inspection within the ceiling space says there was no evidence of roof framing damage and says the roof undulations may have been present since construction. At each of the gable ends to the roof MB says there were clear gaps between the barge flashing and underlying roof sheeting and says windblown water would have entered the ceiling space this way and through two puncture holes. He concedes some of the gaps in these flashings may have existed prior to the cyclone. Determination | Case number: 708936 Page 6 of 20 The parties tried to agree on a common scope of works. Initially, the insurer obtained costings at $40,997.12 and $50,473.30. In October 2017 the complainant engaged HC who provide a quotation to repair the damage at $192,240.57. This was amended in April 2019 to $199,385.37. In attempt to resolve the differences between the scopes and cost of repairs the insured arranged a meeting on site in October 2019. This meeting was attended by the insurance loss adjuster (DS) and the complainant‟s representative, HC and the insurer‟s builder (A). DS had previously visited the property in July 2019. He concluded the insurer should cover the ceilings and asked A to provide an updated scope and quote to address mould staining in the ceilings and the asbestos issue. A attended and photographed the site in November 2019 and met with the insurer to review the scope and provide a liability quote. A was also asked to add to the scope the issue of cladding. A‟s final quote to repair in October 2019 was $93,770.80. The insurer says the quote from HC is excessive. As a result of the inspection by its internal quality and technical loss adjuster and A it offered to cash settle the complainant based on A‟s quote. The complainant says the quote provided by HC is the most realistic and the quote from A is manifestly inadequate. The insurer says the repairs can be effectively completed as per the quotation from A, but it has exercised its option to cash settle based on the policy terms. It added that if the complainant wanted the insurer to directly authorise A to undertake the repairs as per A‟s quotation (less any costs already settled) the insurer would discuss this with the complainant. T he complainant says she does not want the insurer‟s builders to complete any works but wants to be cash settled so she can engage her own builders. Cash settlement is fair in the circumstances There is no dispute the property was damaged by storm. The dispute is in relation to the extent of damage caused by the cyclone event. The complainant must establish on the balance of probabilities all the claimed damage was caused in the cyclone event. The panel accepts the policy terms allow the insurer to cash settle the claim by paying to the complainant what it would cost the insurer to rebuild or repair the home, however the insurer must exercise this option fairly. In this instance, the panel accepts the relationship between the parties has probably broken down to such an extent that a cash settlement is fair in the circumstances. Determination | Case number: 708936 Page 7 of 20 Insurer entitled to rely on A’s quote The panel has carefully considered all the material provided by the parties including the photographs. The panel notes the lengthy submissions by the complainant about the inadequacies of the offer and how A‟s quote is inadequate. The panel is satisfied A‟s quote covers all issues in dispute which have been established as claim-related, including the make safe and repairs including asbestos and items damaged by the cyclone. Having reviewed the available material, the panel is not satisfied there was cyclone damage to the roof itself . Moreover, the insurer has now agreed to repair ceilings. A‟s quote includes the removal of relevant cladding and the cost to certify for new cladding. It also includes the cost to remove asbestos from cladding, ceilings, wall linings, floor coverings, underlay and cabinetry. The complainant asserts not only is there a significant difference in repair costs but that the insurer has not allowed for any compliance related upgrades necessitated by the replacement of external cladding or roofing. The complainant also says it is unfair to rely on a price that will very likely have variations once repairs commence. The insurer says it cannot be determined if any upgrades would be required until the cladding is removed and inspected by the certifier. The cost for the certifier was added to the insurer scope. If additional works were required, the insurer says the builder would send those through as a variation. The insurer concedes that until repairs commence, this would be unknown, and upgrades may not even be required. The panel has considered the quotations provided by the complainant but is satisfied A‟s quote is an actionable quote and will cover all known cyclone related repairs. The panel notes A‟s photographs and the amount of time A spent inspecting the property. The quote is comprehensive and addresses the cyclone damage. The panel is not satisfied the quotes relied on by the complainant establish all the items claimed were damaged by the cyclone. The panel considers the quotes and material relied on are insufficiently persuasive and appear to include items unrelated to the cyclone. On balance the panel prefers A‟s actionable quote as a basis for settlement. The panel notes the insurer‟s scope has increased but does not agree this derogates from A‟s final quote which was arrived at after a thorough inspection and meeting on site and with assistance from the insurer‟s senior adjuster. An uplift of 30% on A’s quote is fair in the circumstances With any cash settlement, an insurer must always ensure the amo unt offered considers variations and contingencies which may occur when repairs commence. In view of the discrepancy between the parties, the issues which remain contested and the uncertainty which remains with the cladding issue, the panel is satisfied it is fair to allow a further uplift of 30% on A‟s quotation. Determination | Case number: 708936 Page 8 of 20 Although the complainant suggests temporary accommodation should be backdated until June 2017, she has been living in the house. The available evidence establishes it would take around eight weeks to complete repairs. A period of two months to complete repairs was also suggested by the complainant‟s builder (CC). In these circumstances, the panel is satisfied an allowance for $2,600 for temporary accommodation expenses is fair. From its settlement offer, the insurer has deducted items which were previously settled and paid in the amounts of $6,043.55 and $38,027.58 (building repairs previously settled and paid in or about June 2018). The complainant says she has been underpaid $3,085.16. Whatever the merits of this assertion, the panel has taken this into account when allowing a 30% uplift. The complainant has also referred to the cost of moving her furniture while repairs are undertaken. The panel noted the policy says the insurer will pay the reasonable costs to store contents if an insured needs to move out of the home because an insured event makes the home unfit to live in. In view of the nature of the repairs, which include sanding floors and asbestos removal, the panel is satisfied it is fair the Insurer pay to store the complainant‟s furniture while repairs are undertaken. In June 2017, the complainant‟s builder CB estimated it would cost $480 to remove and reinstate furniture. Given that estimate was made more than three years ago, the panel considers that should also be uplifted. The panel is satisfied it is fair the insurer pays to the complainant $624 to remove and reinstate furniture while repairs are undertaken (being $480 plus 30%). Considering amounts already paid, insurer to pay to the complainant $81,054.91 Therefore, taking all matters into account and for the reasons stated, should the complainant accept this determination then within seven days of notification of acceptance, the insurer is to make the following cash settlement payment to the complainant in the amount of $81,054.91, made up as follows: A‟s final quote $93,770.80 Plus 30% uplift $28,131.24 Plus, temporary accommodation $2,600.00 Plus, removal/reinstatement (inc uplift) $624.00 Total due $125,126.04 Less amounts already paid $6,043.55 Determination | Case number: 708936 Page 9 of 20 $38,027.58 Total due to the complainant $81,054.91 2.2 Is the complainant entitled to compensation? Compensation is paid in some circumstances The complainant says she has suffered because of the poor way the way the claim has been handled and this has caused her stress and affected her health. AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant‟s expecta tion of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Insurer to pay complainant $4,000 compensation The insurer was made aware, via its adjuster (CL), that the complainant held genuine concerns regarding asbestos contamination, and other aspects of the claim. The panel notes the insurer had tested for asbestos, yet overall considers it did not adequately address the complainant‟s concerns. In September 2017 CL suggested the complainant was causing unnecessary delays, yet in November 2017 CL advised the insurer she was clearly disturbed, overwhelmed and had genuine fears. The panel considers this indicates the complainant was vulnerable, necessitating a compassionate approach. The pane l considers the complainant‟s concerns were not given appropriate attention and consideration. To the complainant, the issues were daunting. She held legitimate concerns of asbestos and mould contamination, both of which are known to be potentially adverse to health. The panel considers the insurer did not discard the complainant‟s concerns, as it arranged asbestos and mould testing. Yet given the complainant‟s insistence, her vulnerable position, and her later reports confirming asbestos and mould issues, the panel does not consider her concerns were adequately addressed. The complainant has described the impact this has had on her life. Her submissions convey her exasperation, stress and distress in managing the claim. Her decision to Determination | Case number: 708936 Page 10 of 20 engage a representative was a result of her frustrations with the claims process and the insurer‟s inability to bring the matter to a conclusion. While the panel acknowledges the efforts made by the insurer to bring about a resolution by arranging a site inspection in October 2019, the panel also considers there has been unusually long time in bringing about a resolution in this case noting the claim was made in March 2017. Taking all matters into account, the panel is satisfied the insurer‟s claims management has caused significant disruption, stress and inconvenience to the complainant. The panel is satisfied an award of S4,000 compensation is fair and appropriate in the circumstances Insurer to pay to the complainant $7,322.75 for reports and assistance AFCA can also awar d the complainant‟s costs of pursuing a complaint (such as legal and other professional costs, and travel), but will not usually award more than $5,000 unless special circumstances apply. In determining whether to award such costs, AFCA takes account of the fact that AFCA is free for consumers and parties do not usually need to be represented. However, an award may be made, for example, if a complaint is of such complexity that a reasonable complainant is unlikely to be able to put his or her case forward without assistance, or a complainant is unable to put his or her case forward due to a disability or vulnerability. The complainant engaged a representative to assist in her claim. Additionally, she engaged builders and an engineer to provide her with advice and reports on the issues in dispute. The complainant claims she has paid a total of $7,322.75 for expert reports and assistance. In the circumstances of this claim and complaint, the panel considers there were complex issues in the claim which reasonably required professional assistance particularly in view of the expert reports obtained by the insurer and expertise available to the insurer. The complainant‟s representative identified building code requirements which had not been identified by other experts. The complainant‟s concerns raised directly with the insurer had not been met with an assuring response. Her decision as to whether to accept the offer, given her lack of experience in such matters, necessitated careful consideration. Taking all matters into account including the complexity of the complaint, the complainant‟s age and vulnerability, the panel is satisfied speci al circumstances Determination | Case number: 708936 Page 11 of 20 apply. The panel is satisfied it is fair the insurer compensates the complainant for all the expert reports and the assistance claimed. The panel notes some of the invoices have been provided. Subject to provision of all the invoices, the panel is satisfied it is fair the insurer pays to the complainant $7,322.75. If the complainant has already paid for these matters, then the insurer is also to pay to the complainant interest pursuant to section 57 of the Insurance Contracts Act from the date of payment until the date of settlement. Determination | Case number: 708936 Page 12 of 20 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notic e have been exchanged with the complainant. 2. Your cover Insured events We cover loss or damage to your home or contents that is caused by certain events. We call them insured events. For us to cover you for loss or damage caused by an insured event, the event must happen:  at the insured address; and  during the period of insurance. Determination | Case number: 708936 Page 13 of 20 We don’t cover some situations, events and types of loss or damage to your home or contents. Those exclusions are set out in this section under each of the insured events. We describe the insured events on pages 19-29. Under each insured event, we show: Yes ✓ What we cover No  What we don‟t cover – that is, the exclusions that apply to the cover we provide for the insured event Limits $ Any dollar limits that apply Storm A storm has very strong winds and may also involve heavy rain, hail or snow. For example, a cyclone. A storm is not just continuous bad weather on its own. Yes ✓ A storm causes loss or damage to your home or contents. No  Loss or damage caused by:  power surge (but we may cover you if another insured event at your home causes the power surge)  rain, hail or snow after it reaches the ground (but we may cover that under the insured event „Flood‟ as flood or water runoff).  A storm that happens during the first 72 hours from when we first cover your home or contents (but we do cover you if you take out your policy when you sign a contract to buy your home or we replace another insurance policy).  Loss or damage to:  lawns or grass  swimming pool and spa covers and liners that are more than 5 years old  free standing walls.  Anything that happens while you‟re renovating your home (but we do cover wind damage caused by the storm).  The items we don‟t cover as your home or contents shown on pages 13 and 16  The general exclusions shown on pages 61-63. Determination | Case number: 708936 Page 14 of 20 Temporary accommodation We pay your reasonable temporary accommodation costs after an insured event happens. Yes ✓ If we agree to pay your claim for an insured event and you need to move out of your home because the event makes your home unfit to live in, then we pay (or reimburse you for) your:  reasonable short-term accommodation costs for up to 14 days from when the insured event happened  ongoing accommodation costs while your home is being rebuilt or repaired for up to 12 months from when the insured event happened until your home is fit to live in. No   You are not living in your home when the insured event happens.  The general exclusions shown on pages 61 - 63. Limits $ Ongoing accommodation costs up to the market rent for your home when the insured event happened. $ Up to 10% of your home sum insured for each claim. $ We pay this benefit on top of your home sum insured. General exclusions What we don’t cover This section outlines the general things we don‟t cover under your policy. They are known as general exclusions. Specific exclusions also apply to certain parts of your cover and are shown as crosses (  ) where we describe the cover you have under your policy. Those specific exclusions are shown in the section „Your cover‟ under any relevant event or benefit that is outlined on pages 19-60. Also, we don‟t cover certain items as part of your home or conte nts which are listed on pages 13 and 16. General exclusions These general exclusions apply to all of the cover we provide under your policy. We don‟t cover you under your policy for loss or damage to your home or contents or legal liability which is caused by or arises in connection with any of the following items, events or circumstances: … Determination | Case number: 708936 Page 15 of 20 Loss not linked to event  Loss to your home or contents which can‟t be linked to any identifiable event (but we do cover you if you have an optional benefit under „Items away from home‟ – see page 57) Rust and mould  Rust, corrosion, rot, mould or gradual deterioration caused by light, air, the climate (which includes wind, rain or sand) or the passage of time. Wear and tear  Wear and tear through normal use. What we pay for your home Limits apply to what we pay for certain items or under certain extra benefits or optional benefits – see Tables 3 and 4 on page 69. We may pay extra benefits on top of your home sum insured as shown in Table 4. Settling your claim Options to settle your claim We may choose, at our option, one or more of the following ways to settle your claim: 1. Pay the cost to have your home rebuilt or repaired as new – that is, pay to rebuild or repair it using the same materials if they are readily available in Australia or equivalent materials in terms of quality, purpose and specifications. 2. Pay you the cost to us – that is, pay you what it would cost us to rebuild or repair your home as new up to the: - home sum insured - sum insured that applies under the optional benefit „Landlord‟s fixtures and fittings‟. We also pay any extra benefits that apply to your claim. We may change our mind and pay you the cost to us to complete the remaining repairs if you don‟t cooperate reasonably with us 3.3 Extracts from relevant material relied on by parties Record Key points Financial firm’s asbestos Contractor (AS) Report 14 September 2017  Attended site 3 April 2017 to make safe. Sealed up and spray - painted the raw edges on all penetrations and tested carpets .  Laboratory report shows no asbestos detected in carpet.  October 2017 asbestos report showed asbestos present in right side hous e soffit and final sheet backing in toilet and bathroom  December 2017 AS and D confirm performed an asbestos make Determination | Case number: 708936 Page 16 of 20 Record Key points safe on the property in accordance with the code of practice for the safe removal of asbestos 2011. Financial firm’s builder (A R ) Make - safe Report 19 April 2017  [AR] attended site 07.04.2017 at 11 am as requested by insurer to complete a mak e safe. The owner advised the roof on the left - hand side appears to be lifting and the ceilings have sagged in the bedrooms, etc. A full roof and ceiling inspection was undertaken however both the roof and all ce ilings appeared to be in good condition, wit h no sign of damage or water penetration. No make safe was required.  Invoice noted - Full roof and ceiling inspection undertaken, roof and ceiling both found to be in good condition with no sign of damage or water penetration. Financial firm’s re storer ( D ) Report April 2017  D attended site 7 April 2017.  Water ingress via windows and doors.  Summary of res ultant damage included asbestos make safe required, kitchen cabinetry damage, floor covering carpet damaged, vinyl flooring damaged in kitchen dining hallway toilet bathroom, two door cabinet damage, roller blind blew off, rugs damaged.  Buil der assessment required.  Asbestos make safe carried out for $4,883.51 Mak e safe removed all damaged vinyl and carpet and sanitised all subflooring and lower wall areas. Quotation 20 April 2017  Quote to remove existing windows and supply and fit new win dows, security door and flyscreens. Damage repair assessment (CL) 23 April 2017  Damaged areas include exterior wall, exterior, fencing windows bedroom 2, lower toilet, lino shade sail @ $39,625.59. Insurer’s loss adjuster (CL) First report 23 April 2017  Inspected and photographed property 22 April 2017.  Long list of items presented but CL says some are not storm related.  Attached damage assessment and says asbestos element is being assessed.  Notes insured is adamant that the roof of the home susta ined damage and is sagging. Not ed that the roof line is not consistent, but it appears to typical for a home of this age and construction. According to the ins ured a builder was by and came to the same conclusion as us but she is still insisting that there is storm related issues.  Recommend an engineer inspect. Insurer’s loss adjuster (CL) Third report April 2017  Second quotation from builders AB. Trying to agree on common scope of works.  Engaged J to clean mould and spray areas of asbestos concern.  Asked complainant to obtain her quote.  Cert ain payments recommended. Insurer’s builder (CB) Quotation 2 June 2017  Scope of works and main estimate to fix shade sail, fencing, window awnings, some cont ents works including asbestos removal from remaining vinyl flooring to bathroom and WC, external works which included removal of asbestos to some wall cladding, downstair s toilet, bedroom 2, storeroom: total Determination | Case number: 708936 Page 17 of 20 Record Key points $50,473.30. Insurer’s builder (AB) Quotation 14 June 2017  Provided scope of works and job costings caused by cyclone including asbestos removal, carpentry, electrical, painting, shade sails and awnings, glazing, insu lation, fencing and floor covers $40,997.02 Insurer’s builder (CB) Roof report 12 June 2017  Inspected and completed a roof report 7 June 2017.  Insured stated that there was mould evident to the ceilings in some parts of the house which we witnessed. She was unsure whet her there was damage to the roof from the flying debris in the cyclone and noted no signs of water ingress since the event. She was also worried about the state of the internal roof which we inspected as good as we could which was difficult due to the shallow roof pitch and small access to the ceiling space. We found no evidence of water leaks or batten lift in the areas inspected. Claims damage in the storage/sauna room under the house which has water damage to walls and a fluoro light. Nil emergency work and further loss prevention meas ures required. Insurer’s builder (CB) Make safe r eport 29 June 2017  Inspected with complainant 21 June 2017 and noticed no further mould, vinyl flooring glued directly to floor, no storm related issues with ceiling mat erials and noted possibility of spraying to the holes in the asbestos eave. Insurer’s re storer (J) R eport June 2017 Attended June and July 2017 and cleaned venetian blinds, applied antimicrobial to affected areas and clean and treat walls and ceilings in various rooms – sent to laboratory and mould clearanc e testing was obtained. Report from M 6 July 2017 provided report - rated normal. Clearance testing passed at time of sampling. Complainant’s quote (HC) 4 October 2017  Quotation to repair Cyclone Debbie damage $192,240.57. Complainant’s building consultant ( CC ) Report and scope of works 13 March 2018  Inspected and photographed 28 February 2018 and prepared scope of works.  Residence sustained average high winds impact damage and water damage including roof linings missing paint, window awnings, eaves and soffits, external and int ernal paint work, entire upper level ceilings, boundary fencing, flooring, electrical light fitti ng  Property and residence TC Debbie damage has become far worse with time since the initial event of TC Debbie. Residence and property has sustained damage to all areas as described in the Report Details above, and I do not consider that there are any pr e - existing problem issues which have had seen any consequenc es on the now obvious and full extent of TC Debbie damage.  No urgent requirements and issues other than the fact that the vinyl floor covering removed by the make safe repairers did contain Asbest os and Asbestos cont ained products remain on top of the timber flooring which the Insured has simply been covered Determination | Case number: 708936 Page 18 of 20 Record Key points with forms of matting.  Demolition and reconstruction repairs will cause disruption which will mean the house will be unoccupied for about tw o months.  Detailed scope provided including demolition, roof and roof plumbing, carpentry and joinery, plasterer, electrical and refrigeration, flooring, painter and miscellaneous. Many photographs provided including Image 28: Typical view of high winds m ovement and water damage to the upper level Asbestos Contained ceiling linings requiring removal and replacement before painting. This is TC Debbie damage. Insurer’s builder (AB) Quotation 3 September 2018  Scope of works and job costings to complete the repairs in relation to the cyclone damage $46,129.55. Complainant’s engineer (MB) Engineering report 24 December 2018  Inspected and photographed property 20 December 2018.  Some works done since Cyclone eve nt but evident those works only partially complete.  Upper level floor coverings have been partially removed with remnants of asbestos containing lino evident.  A mould contamination specialist should be engaged to treat the property prior to repairing flo ors.  Because of the possible contamination, complainant installed a small cabin in the backyard.  Painted conc rete floor at the front entry is consistent with water damage like other floors affected by the cyclone.  Upper level c eilings throughout the residence had undergone movement resulting in sagging/undulations, separations at cornices and “popped” fixings. Paint - work to some ceilings was deteriorating/ flaking and visible mould was evident to several areas. All these issues are consistent with tho se caused by differential pressure wit hin the ceiling space in comparison to the underlying living areas, and/ or moisture within the ceiling space.  As described above, wind and moisture had ample opportunity to enter the ceiling space, and the various ceil ing damages are entirely consistent with thos e influences. As such, the author attributes these ceiling damages to TC Debbie.  Upper level w all linings/ cavities throughout the upper - level of the residence directly adjoin the ceiling space. As such, those is sues which have occurred within the ceiling space (pressures and moisture accumulation) are also likely to have occurred within the wall cavities … Accordingly, these wall damages are attributed to TC Debbie.  Damage to the low - level interior storeroom wall and water staining to interior low - level walls is also attributable to the cyclone.  As for roofing, f rom the roof - top, damage was evident to barge flashing whereby gaps were clearly evident between the flashing and the underlying roof sheeting. To be effec tive in weather - proofing the interface between roof sheeting and the adjac ent gable - ends, the flashings should be installed tight along the top of the roof sheets. Some of the gaps as seen to these flashings, may have existed prior to TC Debbie, as evidenc ed by constant gap - width even at the location of screw fixings. However, other such gaps are not of constant width and have only opened at locations between fixings. As it is feasible that the gaps of constant width could have occurred due to fatigue of th e screw fixings, the author attributes this damage to the winds of TC Debbie. Determination | Case number: 708936 Page 19 of 20 Record Key points  As for miscellaneous exterior damage, some damage to exterior cladding (southern and eastern sides) had been taped over to confine asbestos fibres. Whilst it was not possible to directly inspect the nature of the damage, it is entirely reasonable to expect that impacts can result from wind - blown debris strikes. As such, it is the author‟s opinion that this damage is very likely to have been caused by TC Debbie.  Paint damage to the cladding has occurred to all sides of the house.  Damage to window awnings and boundary fence and rear pergola caused by high winds in cyclone.  Considering that the damaged cladding contains asbestos, rectification will involve removal and replac ement, r at her than in - situ repairs. Analytical report (ML) February 2019  Samples taken in February 2019 to detect and report on mould.  Level of mould and bacteria det ected in the sample submitted for analysis were elevat ed, high or very high and have been shown to be in immunocompromising. Complainant’s quote (HC) 23 April 2019  Quote for cyclone Debbie repairs to lounge/kitchen sunroom bedrooms 1,2, 3 - bathroom toilet hallway storeroom downstairs WC asbestos removal scaffold external work fencing waste management builders clean, insurance and margin (15%) $199,385.37. Complainant’s quote (HC) 19 August 2019  Removal of asbestos vinyl fl ooring approximat ely 25 m² $19,602. Insurer’s loss adjuster (DS) Report 7 November 2019  Attended site 2 October and met with complainant‟s representative, HC and A to complete a new scope and quote in view of complainant‟s engineers report.  Previously visited property 13 July in relation to asbestos damage  Concluded insurer should cover the ceilings.  Re - attended with A to provide an updated scope and quot e for event related damages. Inspected rooms. Insurer to include the ceilings and some e xtra wall sheeting which is separate to the wall linings originally scoped by AB.  Having reviewed updated scope rec ommend it encompasses the event related repairs with the removal of the ceilings this will also alleviate the minor mould staining and the as bestos issue will also be addressed. Insurer’s builder (A) Quotation 2019  A attended and phot ographed site 6 November 2019 and met with insurer to review the scope of works and provide a liability quote based on items agreed on site - estimated total repair cost including GST $90,732.73. Insurer’s builder (A) Quotation 30 Octobe r 2019  DS and A say the scope and quote is fair and complies with all building requirements but to save further arguments regarding the cladding asked A to add this to the scope.  Scope increased to $93,770.80. Permit requirements  Complainant highlighte d where there are substantial repairs greater than 20% to structural and non - structural framing members it is recommended current standards are applied and advic e should be obtained from a builder or engineer if repair work Determination | Case number: 708936 Page 20 of 20 Record Key points extensive. 3.4 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails.  Parties‟ expert reports , scopes of work, invoices and quotations.  Insurer‟s reports from adjuster.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.