Summary

The complainant's flood-damaged flooring was poorly repaired and the insurer offered a cash settlement. AFCA ordered settlement based on the complainant's builder quote plus a 30% contingency, $10,000 compensation, and a hygienist review of stored contents, while rejecting the air-conditioning and mould claims.

The insurer accepted defective repairs and could not complete them, so a cash settlement on the complainant's quote with a reasonable contingency was fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 707818 Financial firm RACQ Insurance Limited Determination | Case number: 707818 Page 2 of 12 Case number: 707818 7 May 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents policy with the insurer. The complainant lodged a claim on 8 December 2015 for a flood incident which occurred on 1 May 2015. She says that when the flood event first occurred no visible damage could be seen to the property however, after a few months damage to the flooring was noticed and a claim was lodged. The insurer initially declined the claim however, upon further review it accepted the claim and undertook works to rectify the damaged flooring . The complainant says it was not repaired correctly. She says the floor needs to be repaired and the floors require sanding to ensure they are level prior to a new floor being installed. The complainant also says that mould has since developed within the property which she believes is due to the event. In addition to the issues above, the complainant says her contents have been stored in storage containers and has concerns regarding them being damaged. 1.2 Issues and key findings What is the extent of the insurer’s liability regarding building repairs? The insurer has acknowledged its trade (C) has not undertaken flooring works correctly as per the manufacturer specification. It has confirmed that it is unable to warrant works due to building code issues. I am satisfied it is fair in the circumstances the insurer settle the claim based on the quote provided by (N) for $28,516.76 plus a contingency of 30% for transfer of risk and potential variations. Is the insurer liable for any mould remediation costs? No, I am satisfied, on balance, that the mould present in the property is not a result of the flood event which occurred in 2015. What is the extent of the insurer’s liability regarding contents ? Whilst the insurance policy does not include cover for contents, the insurer arranged for content items to be moved into storage containers whilst flooring repairs are undertaken. It is fair in the circumstances that the insurer appoints an hygienist as previously offered, to inspect the contents upon completion of repairs. Should any contents be Determination | Case number: 707818 Page 3 of 12 damaged as a result of its method of storage or due to moisture damage, the insurer must assess and provide an offer of settlement accordingly. Is the insurer required to pay the complainant compensation? Yes, it is fair in the circumstances that the insurer makes a payment which it has agreed to do, in the sum of $10,000 in compensation for significant delays and poor quality repair issues. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to:  Provide the complainant any outstanding balance of the cash settlement amount of $28,516.76 as per (N) ‟s quote dated 29 June 2020.  Provide the complainant with a contingency amount of 30% being $8,555  Pay the complainant $10,000 as agreed in compensation in accordance with its previous offer.  Appoint an hygienist at the completion of flooring repairs to assess the contents in storage and confirm whether any visible damage is present due to storage method or due to mould and if so, to make a settlement offer accordingly. The insurer is otherwise entitled to decline liability for the balance of the complainants claim and, in particular, with respect to the air conditioning unit and the mould remediation claim. The Insurer is not required to take any further action regarding mould present within the property. Determination | Case number: 707818 Page 4 of 12 2 Reasons for determination 2.1 What is the extent of the insurer’s liability regarding building repairs ? Insurer does not dispute flooring damage When the claim was first lodged by the complainant, the insurer initially declined the claim. This was disputed by the complainant and resulted in the insurer withdrawing its decline and accepted the claim. The insurer authorised its trades (A) to proceed with the necessary repairs to the flooring and this work was completed. The insurer accepts that the work by A was defective and not as per the manufacturer‟s specifications. The insurer says whilst it accepts the damage caused to the flooring of the home, it is now unable to complete the works due to building code issues. In February 2020 building consultant K retained by the C omplainant reported that the Insurer‟s proposed rectification work would add to the thickness of the flooring such that the Complainant‟s home would no longer be compliant with the minimum building code prescribed ceiling height of 2.4 metres. The Insurer accepts this is a problem, contends it was a pre-existing concern and says as a result it will not undertake repairs but proposes to do a cash settlement. At conciliation in mid-2000 the Insurer offered a cash settlement of $26,000 which was rejected. The insurer says whilst it isn‟t willing to undertake the remainder of works, it believes the amount being requested by the complainant is over and above what the insurer ‟ s trades say is required to reinstate the flooring of the home. The insurer says based on the quotes provided by (T) the sum of $22,238.43 is an accurate reflection of the remaining works. This figure includes a 30% uplift on T‟s quotes for transfer of risk and any potential variations. By letter dated 5 May 2020 the Insurer confirmed it was making payment of this amount to the Complainant. This payment was almost 5 years after the original loss occurred. Complainant says cost to repair is more than what insurer has offered The complainant says whilst she considered the settlement offered made by the insurer during the conciliation, she was not willing to accept the amount of $26,000. The complainant says that the works required were as follows:  $6,500 – sanding and sealing of floors  $22,400 – flooring  $3,700 – tiling in laundry and post repair cleaning The complainant provided a quote from her builde r of choice (N) to substantiate her position. Upon review of the quote provided by N the costings are as follows: Determination | Case number: 707818 Page 5 of 12  $22,095.60 - building works  $6,421.16 - for resealing of the existing particle board flooring before installation of the new underlay  Total $28,516.76 Claim should be settled based on N quote with 30% uplift The fact that the Insurer is unwilling to undertake the repairs for which it has quoted is a relevant factor in preferring the quotations obtained by the Complainant. The main difference between the parties is that the Insurer argues the cost of re-sealing the particle board flooring ($6,421) is unnecessary. The Complainant expert N responded on 28 July 2020 stating their concern that areas of the particle board may be compromised. Considering the inadequacy of the original repairs and the delays that have followed and which delays have contributed to deterioration and risk of deterioration to areas of the flooring not readily accessible I have decided it is reasonable to rely on the quotes provided by the Complainant. On this basis, I am satisfied it is fair in the circumstances for the insurer to settle the claim on the basis of the quote provided by the complainant‟s trade N for the amount of $28,516.76 plus a 30% contingency $8,555 for any potential variations and transfer of risk. The history of this claim demonstrates the need for a reasonable contingency factor. The total amount payable to the complainant is $37,071.76 for remaining flooring works and works to the laundry including waterproofing, tiling and post repair cleaning. The Insurer has already paid $22,238.43. This would mean a balance owing of $14,833.33. Damage to air-conditioning unit The complainant says that since the flood event the air-conditioning unit has stopped working due to water inundation and that this is the proximate cause of the damage . The insurer says its loss adjuster obtained a professional electrical report from (CA) which confirms the following:  There was no visible damage to the outdoor condensate unit.  An operations test was completed and the machine was found to be fully operable.  There is no damage identified on the indoor head unit and all functions are operable.  Machine fully operable, refrigeration gas levels are good. No water damage identified.  This report confirms that the air conditioner has not been damaged in the claimed event. Determination | Case number: 707818 Page 6 of 12 On the basis of the report provided by CA and the absence of any evidence by way of professional reports by the complainant, I am satisfied on balance, the unit was fully operational post event and that no damage was identified. The insurer is entitled to decline replacement of the air-conditioning unit. 2.2 Is the insurer liable for any mould remediation costs? Complainant says mould is due to the flood event The complainant says that at the time of the incident occurring high moisture readings were recorded throughout the building and that she believes this to be the cause of mould. The complainant has provided photos of mould in the family room floor which was uncovered when the tiling was removed. The complainant also says the insurer ‟ s builder C obtained approval for a variation to remove and replace flooring in the kitchen, lounge room and laundry due to black mould. Insurer says mould unrelated to event The insurer says it has obtained a hygienist report from (E) to determine the proximate cause of the mould formation and a report from (W) a restoration specialist to support its position. The report provided by W states: “as per our previous observations it is our opinion that gutters and roof drainage have been blocked and subsequently overflowed during periods of rain…indicated by mould growth to external eaves” W is of the opinion that the current mould formation around the home is not due to the flooding event but rather due to blocked pipes and gutters causing overflow during periods of rain. The report provided by E states it is of the opinion the mould is likely due to multiple contributing factors and says that a majority are from potential top down water leaks. E also states that some materials within the property had elevated moisture content which is most likely from more recent water activity. E also says that it is highly unlikely that the elevated moisture content identified in some of the materials is from the 2015 event as there was no standing water or excess subfloor soil moisture at the time of their attendance. Determination | Case number: 707818 Page 7 of 12 Insurer entitled to decline mould damage Based on the evidence provided I am satisfied the report provided by E to be most persuasive and that the likely cause of mould growth is not due to the claimed event in 2015. It is important to note that the loss occurred in May 2015 and E attended the property four years later in December 2019. Therefore, I am not satisfied the on-going elevated moisture readings are due to the flood event and the most likely cause of mould formation is due to top down water leaks. On this basis, the insurer is entitled to decline this aspect of the claim and is not required to take any further action. 2.3 What is the extent of the insurer’s liability regarding contents? Complainant says contents potentially damaged The complainant says whilst she doesn‟t hold a contents insurance policy through the insurer, it has accepted the temporary removal of her items whilst works are undertaken. The complainant has raised concerns regarding the method of storage and says there is a high possibility her contents may have either been damaged or mould affected in the process of storage. Insurer has agreed to appoint a hygienist During the conciliation conference, the insurer has offered to appoint a hygienist post repair to undertake an inspection of the contents stored in containers whilst the repairs are being completed. The insurer confirmed the hygienist will assess the items prior to them being put back into the home and should any damage be found due to mould or improper storage it will consider settlement of these items. Insurer’s offer reasonable in the circumstances Given there is no evidence to suggest any of the contents currently in storage have been affected by mould or damaged due to improper storage methods, I am satisfied that upon completion of repairs the insurer must appoint a qualified hygienist to undertake a review of all contents items which have been stored by the insurer‟s trades to confirm that no damage has been caused due to improper storage or mould. Should damage as foreshadowed be found, I find it is fair in the circumstances the insurer ‟ s hygienist assess the items and the insurer provide a settlement offer accordingly. Determination | Case number: 707818 Page 8 of 12 2.4 Is the insurer required to pay the complainant compensation? Insurer acknowledge concerns / delays and offered compensation The insurer says that it acknowledges the delays and poor quality repair issues experienced throughout the claim. It has offered the complainant the amount of $10,000 in compensation to resolve this aspect of the complaint. The Insurer has recently confirmed it is agreeable to pay this amount to the Complainant as compensation for the delays and difficulties experienced. The complainant did not accept the offer as she advised she did not want it to affect her complaint with AFCA. She says that she would like this to be addressed as part of AFCA‟s determination. AFCA has power to award compensation of up to $5,000 for non-financial loss where there has been an unusual amount of:  Physical inconvenience  Time taken to resolve a situation  Interference with the complainant‟s expectations of enjoyment or peace of mind Based on the evidence on file, I am satisfied the amount of $10,000 agreed to be paid by the Insurer is fair and reasonable and further compensation is not warranted over and above this amount. Determination | Case number: 707818 Page 9 of 12 3 Supporting information 3.1 Relevant policy extracts Record Key points PDS Page 17 What is not covered We cover loss or damage to your home or contents that is caused by certain events. We call them insured events. For us to cover you for loss or damage caused by an insured event, the event must happen: - at th e insured address, and - during the period of insurance. We describe the ins ured events on pages 17 - 27 PDS Page 19 Your cover Insured events We cover loss or damage to your home or contents that is caused by certain events. We call them insured events. For us to cover you for loss or damage caused by an insured event, the event must happen: • At the insured address; and • During the period of insurance. We don’t cover some situations, events and type s of loss or damage to your home or contents. T hose exclusions are set out in thi s section under each of the insured events. We describe the ins ured events on pages 19 - 29. Under each insured event, we show: ✓ Yes What we cover x No What we don‟t cover – that is, the exclusions that apply to the cover we provide for the insured event. $ Limits Any dollar limits that apply PDS Page 55 - 57 We don't cover you under your policy for loss or damage to your home or contents or legal liability which is caused by or arises in connection with any of the following items or events: Any event or accident that starts or happens outside the period of insurance shown on your Certificate of Insurance. PDS Page 62 Settling your claim Options to settle your claim We may choose, at our option, one or more of the following ways to settle your claim: 1. Rebuild or repair your home as new – that is, rebuild or repair it using the same materials if they are readily available in Australia or equivalent materials in term s of quality, purpos e and specifications. 2. Pay you the cost to us – that is, pay you what it would cost us to rebuild or repair your home as new up to the: - home sum insured - sum insured that applies under the optional benefit „Landlord‟s fixtures a nd fittings‟ Determination | Case number: 707818 Page 10 of 12 3.2 Relevant report extracts Record Key points financial firm’s expert (CL ) Electrical Report 19 - 12 - 2019 CAUSATION - How, Why and Where of the Damage Found a split system AC LG 8kw that client stated had been submerged under water. There was no visible damage to the outdoor condensate unit. A complete operations test was complete d and the machine was found to be fully operable. There is no damage identified on the indoor head unit and all functions are operable. Conclusion/Summary Machine full y operable, refrigeration gas levels are good. No water damage identified. Recommendations For Repair? There are no recommended repairs. financial firm’s expert (W ) Restorers Report 19 - 12 - 2019 Cause of Damage: Initial instructions advised that ground water from flood event in 2015 had affected crawl space and underside of flooring. W have also been advised secondary leaks were discovered in bathroom and ensuite. At time of our i nspection on the 5th December 2019 it was noted that in our o pinion there also appears to be multiple roof leaks and possible gutter overflows. Details of Damage: In our opinion w at er is entering into eaves And running down wall cavity in kitchen and toilet. W r ecommend a roof insp ection. Actions Taken : 06/12 Attended site, met with Assessor, Builder and Hygienist. Inspected site, checked moisture readings, photographed damage. Builder cut section of particleboard subfloor to allow inspection of crawl space under property. W ‟s Techn ician entered crawl space and inspected – no visible microbial growth to underside of flooring. Crawl space was not wet. Relative humidity recorded at 15% at 33 degrees outdoors, 51% at 33 degrees in kitchen and 43% at 33 degrees in crawl space. Using ther mal camera to inspect walls showed that there was possible water damage to walls in multiple areas of property. Upon external inspection of property it was noted that eaves sheets are water marked and mould affected in up to 5 different areas. It was al so noted that bulkhead to rear door has a roof change of direction above it and purple ceiling above air conditioning unit near ent ry has poor flashing to roof over entry – this could also possibly be another point of water entry. Recommendations. W recommend a roofing ins pection be complet ed and await Hygienist Report. financial firm’s expert (E ) Hygieni st Report 19 - 12 - 2019 Summary of Findings From the assessment conducted, we have determined that the c ause of the mould growth on various surfaces is likely due to multiple contributing factors with the majority from pot ential top down water leaks. There is evidence that suggests the subfloor soil has experience d excess moisture at some stage but it cannot be confirmed if this was from a flood water ingress event or from other plumbing leaks. At the time of our assessment, some materials within the property Determination | Case number: 707818 Page 11 of 12 Record Key points had elevated moisture cont ent whic h is most likely from more recent water activity. Due to the time lapse since the reported subfloor wat er ingres s, it is highly unlikely that the elevated moisture cont ent identified in some of the materials is from that event as there is no standing water or excess subfloor soil moisture at the time of our attendance. Due to the amount of mould identified within th e property along with the excess moisture in some of the materials, it is highly recommended that a full roofing integrity assessment is conducted to identify any roof leaks or stormwater overflow issues that may be allowing rainwater into the ceiling or e ves of the property. Findings – Observations Evidence of Exce ss Moi sture Visible water marks were observed on timbers in the subfloor below the master bedroom ensuite and the granny flat subfloor. The subfloor soil had evidence of excess moisture at some stage in the form of dried out/cracked up mud/dirt. Water Damaged Materials Although some subfloor timber materials have evidence of excess moisture (water staining), no actual water damaged mat erials were observed. Mould Type Odours A strong mould type odour was noticeable throughout the property including the granny flat. When thes e odours exist in properties that have had known water damage, they are typically microbial volatile organic compounds (MVOCs) whic h are produced at certain stages of the moul d growth cycle. This is generally when materials have sufficient moisture (excess) in order to be actively growing. Material Moisture Content At the time of our attendance, the moisture content in various tested materials ranged from normal (unaffected) to elevat ed. This included wall and ceiling plasterboard as well as various sections of the timber flooring throughout the property. The material moisture content was inconsistent throughout the property indicating localised wetting as opposed to excess mois ture from one event that has affected the entire property. Visible Mould Growth At the time of the assessment, visible mould growth was identified various sections of the wall and ceiling plasterboard in the living and dining areas as well as the timber ve netian window blinds throughout. No mould growth was observed on materials in the subfloor area. Di scussion Much of the visible mould growth throughout the property is consistent with prolonged periods of high humidity within the property. Due to the perio d of time that has lapsed since the reported flooding event, it is our opinion that the mould growth within the living areas of the property and the mould odours noted during our assessment are from recent water activity within the property. If a significa nt amount of water ent ered the subfloor area and increased the humidity within the property to the point where mould would grow, we would expect to see more severe mould growth on the subfloor timber materials. At the time of our attendance, we were advise d that a significant amount of flooring material had already been removed and replaced so the condition of those materials was not able to be conducted. Determination | Case number: 707818 Page 12 of 12 Record Key points We were not made aware of any cleaning or remediation of the subfloor area prior to our attendance. It should be noted that due to the climate of South East Queensland, there are prolonged periods of high ambient relative humidity (>65%) and if properties do not have adequate humidity control, the int ernal humidity levels can be the same as outside leading to mould growth on materials. It is our opinion that the random locations of excess material moisture content, visible mould growth and mould associated odours within the property are related to more recent localised minor water ingress events most likely from “top down” water leaks. This would need to be confirmed by conducting a thorough roofing assessment. Minimum Recommendations We highly recommend that suitably qualified consultant/trade conduct a thorough assessment of the roofing, gutters and facias to determine if there are any leaks or pathways for water ingress. All wet areas within the property should also be thoroughly assessed to determine all current water proofing and plumbing is integral. Due to the amount of visible moul d growth, det ailed cleaning and remediation of the property is required to remove all mould. 3.3 Other matters Damage to shower The complainant raised possible reasons for the failure of the shower after this file moved to determination. She advised this was an afterthought, it was confirmed with the complainant this will not be considered as part of this determination which she has accepted. The complainant is aware should she wish to dispute this aspect further, she is able to raise a separate complaint.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.