The complainant's flood-damaged flooring was poorly repaired and the insurer offered a cash settlement. AFCA ordered settlement based on the complainant's builder quote plus a 30% contingency, $10,000 compensation, and a hygienist review of stored contents, while rejecting the air-conditioning and mould claims.
The insurer accepted defective repairs and could not complete them, so a cash settlement on the complainant's quote with a reasonable contingency was fair.
Issues
- Claim amount dispute primary · upheld“It is fair in the circumstances for the insurer to settle the claim on the basis of the quote provided by the complainant's trade N for $28,516.76 plus a 30% contingency.”
- Claim denial secondary · not upheld“The insurer is entitled to decline replacement of the air-conditioning unit.”
- Delay secondary · upheld“$10,000 in compensation for significant delays and poor quality repair issues.”
- Repairs or contractors secondary · upheld“The insurer accepts that the work by A was defective and not as per the manufacturer's specifications.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossreassess claim
Related
Text of the determination
Determination
Case number 707818
Financial firm RACQ Insurance Limited
Determination | Case number: 707818 Page 2 of 12
Case number: 707818 7 May 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents policy with the insurer.
The complainant lodged a claim on 8 December 2015 for a flood incident which
occurred on 1 May 2015. She says that when the flood event first occurred no visible
damage could be seen to the property however, after a few months damage to the
flooring was noticed and a claim was lodged.
The insurer initially declined the claim however, upon further review it accepted the
claim and undertook works to rectify the damaged flooring .
The complainant says it was not repaired correctly. She says the floor needs to be
repaired and the floors require sanding to ensure they are level prior to a new floor
being installed. The complainant also says that mould has since developed within the
property which she believes is due to the event.
In addition to the issues above, the complainant says her contents have been stored
in storage containers and has concerns regarding them being damaged.
1.2 Issues and key findings
What is the extent of the insurer’s liability regarding building repairs?
The insurer has acknowledged its trade (C) has not undertaken flooring works
correctly as per the manufacturer specification. It has confirmed that it is unable to
warrant works due to building code issues.
I am satisfied it is fair in the circumstances the insurer settle the claim based on the
quote provided by (N) for $28,516.76 plus a contingency of 30% for transfer of risk
and potential variations.
Is the insurer liable for any mould remediation costs?
No, I am satisfied, on balance, that the mould present in the property is not a result of
the flood event which occurred in 2015.
What is the extent of the insurer’s liability regarding contents ?
Whilst the insurance policy does not include cover for contents, the insurer arranged
for content items to be moved into storage containers whilst flooring repairs are
undertaken.
It is fair in the circumstances that the insurer appoints an hygienist as previously
offered, to inspect the contents upon completion of repairs. Should any contents be
Determination | Case number: 707818 Page 3 of 12
damaged as a result of its method of storage or due to moisture damage, the insurer
must assess and provide an offer of settlement accordingly.
Is the insurer required to pay the complainant compensation?
Yes, it is fair in the circumstances that the insurer makes a payment which it has
agreed to do, in the sum of $10,000 in compensation for significant delays and poor
quality repair issues.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is required to:
Provide the complainant any outstanding balance of the cash settlement amount of
$28,516.76 as per (N) ‟s quote dated 29 June 2020.
Provide the complainant with a contingency amount of 30% being $8,555
Pay the complainant $10,000 as agreed in compensation in accordance with its
previous offer.
Appoint an hygienist at the completion of flooring repairs to assess the contents in
storage and confirm whether any visible damage is present due to storage method
or due to mould and if so, to make a settlement offer accordingly.
The insurer is otherwise entitled to decline liability for the balance of the complainants
claim and, in particular, with respect to the air conditioning unit and the mould
remediation claim. The Insurer is not required to take any further action regarding
mould present within the property.
Determination | Case number: 707818 Page 4 of 12
2 Reasons for determination
2.1 What is the extent of the insurer’s liability regarding building repairs ?
Insurer does not dispute flooring damage
When the claim was first lodged by the complainant, the insurer initially declined the
claim. This was disputed by the complainant and resulted in the insurer withdrawing
its decline and accepted the claim. The insurer authorised its trades (A) to proceed
with the necessary repairs to the flooring and this work was completed. The insurer
accepts that the work by A was defective and not as per the manufacturer‟s
specifications.
The insurer says whilst it accepts the damage caused to the flooring of the home, it is
now unable to complete the works due to building code issues. In February 2020
building consultant K retained by the C omplainant reported that the Insurer‟s
proposed rectification work would add to the thickness of the flooring such that the
Complainant‟s home would no longer be compliant with the minimum building code
prescribed ceiling height of 2.4 metres. The Insurer accepts this is a problem,
contends it was a pre-existing concern and says as a result it will not undertake
repairs but proposes to do a cash settlement.
At conciliation in mid-2000 the Insurer offered a cash settlement of $26,000 which
was rejected.
The insurer says whilst it isn‟t willing to undertake the remainder of works, it believes
the amount being requested by the complainant is over and above what the insurer ‟ s
trades say is required to reinstate the flooring of the home.
The insurer says based on the quotes provided by (T) the sum of $22,238.43 is an
accurate reflection of the remaining works. This figure includes a 30% uplift on T‟s
quotes for transfer of risk and any potential variations. By letter dated 5 May 2020 the
Insurer confirmed it was making payment of this amount to the Complainant. This
payment was almost 5 years after the original loss occurred.
Complainant says cost to repair is more than what insurer has offered
The complainant says whilst she considered the settlement offered made by the
insurer during the conciliation, she was not willing to accept the amount of $26,000.
The complainant says that the works required were as follows:
$6,500 – sanding and sealing of floors
$22,400 – flooring
$3,700 – tiling in laundry and post repair cleaning
The complainant provided a quote from her builde r of choice (N) to substantiate her
position. Upon review of the quote provided by N the costings are as follows:
Determination | Case number: 707818 Page 5 of 12
$22,095.60 - building works
$6,421.16 - for resealing of the existing particle board flooring before installation of
the new underlay
Total $28,516.76
Claim should be settled based on N quote with 30% uplift
The fact that the Insurer is unwilling to undertake the repairs for which it has quoted is
a relevant factor in preferring the quotations obtained by the Complainant. The main
difference between the parties is that the Insurer argues the cost of re-sealing the
particle board flooring ($6,421) is unnecessary. The Complainant expert N
responded on 28 July 2020 stating their concern that areas of the particle board may
be compromised. Considering the inadequacy of the original repairs and the delays
that have followed and which delays have contributed to deterioration and risk of
deterioration to areas of the flooring not readily accessible I have decided it is
reasonable to rely on the quotes provided by the Complainant.
On this basis, I am satisfied it is fair in the circumstances for the insurer to settle the
claim on the basis of the quote provided by the complainant‟s trade N for the amount
of $28,516.76 plus a 30% contingency $8,555 for any potential variations and transfer
of risk. The history of this claim demonstrates the need for a reasonable contingency
factor.
The total amount payable to the complainant is $37,071.76 for remaining flooring
works and works to the laundry including waterproofing, tiling and post repair
cleaning. The Insurer has already paid $22,238.43. This would mean a balance owing
of $14,833.33.
Damage to air-conditioning unit
The complainant says that since the flood event the air-conditioning unit has stopped
working due to water inundation and that this is the proximate cause of the damage .
The insurer says its loss adjuster obtained a professional electrical report from (CA)
which confirms the following:
There was no visible damage to the outdoor condensate unit.
An operations test was completed and the machine was found to be fully operable.
There is no damage identified on the indoor head unit and all functions are
operable.
Machine fully operable, refrigeration gas levels are good. No water damage
identified.
This report confirms that the air conditioner has not been damaged in the claimed
event.
Determination | Case number: 707818 Page 6 of 12
On the basis of the report provided by CA and the absence of any evidence by way of
professional reports by the complainant, I am satisfied on balance, the unit was fully
operational post event and that no damage was identified.
The insurer is entitled to decline replacement of the air-conditioning unit.
2.2 Is the insurer liable for any mould remediation costs?
Complainant says mould is due to the flood event
The complainant says that at the time of the incident occurring high moisture readings
were recorded throughout the building and that she believes this to be the cause of
mould.
The complainant has provided photos of mould in the family room floor which was
uncovered when the tiling was removed. The complainant also says the insurer ‟ s
builder C obtained approval for a variation to remove and replace flooring in the
kitchen, lounge room and laundry due to black mould.
Insurer says mould unrelated to event
The insurer says it has obtained a hygienist report from (E) to determine the
proximate cause of the mould formation and a report from (W) a restoration specialist
to support its position.
The report provided by W states:
“as per our previous observations it is our opinion that gutters and roof drainage
have been blocked and subsequently overflowed during periods of rain…indicated
by mould growth to external eaves”
W is of the opinion that the current mould formation around the home is not due to the
flooding event but rather due to blocked pipes and gutters causing overflow during
periods of rain.
The report provided by E states it is of the opinion the mould is likely due to multiple
contributing factors and says that a majority are from potential top down water leaks.
E also states that some materials within the property had elevated moisture content
which is most likely from more recent water activity.
E also says that it is highly unlikely that the elevated moisture content identified in
some of the materials is from the 2015 event as there was no standing water or
excess subfloor soil moisture at the time of their attendance.
Determination | Case number: 707818 Page 7 of 12
Insurer entitled to decline mould damage
Based on the evidence provided I am satisfied the report provided by E to be most
persuasive and that the likely cause of mould growth is not due to the claimed event
in 2015.
It is important to note that the loss occurred in May 2015 and E attended the property
four years later in December 2019. Therefore, I am not satisfied the on-going elevated
moisture readings are due to the flood event and the most likely cause of mould
formation is due to top down water leaks.
On this basis, the insurer is entitled to decline this aspect of the claim and is not
required to take any further action.
2.3 What is the extent of the insurer’s liability regarding contents?
Complainant says contents potentially damaged
The complainant says whilst she doesn‟t hold a contents insurance policy through the
insurer, it has accepted the temporary removal of her items whilst works are
undertaken. The complainant has raised concerns regarding the method of storage
and says there is a high possibility her contents may have either been damaged or
mould affected in the process of storage.
Insurer has agreed to appoint a hygienist
During the conciliation conference, the insurer has offered to appoint a hygienist post
repair to undertake an inspection of the contents stored in containers whilst the
repairs are being completed.
The insurer confirmed the hygienist will assess the items prior to them being put back
into the home and should any damage be found due to mould or improper storage it
will consider settlement of these items.
Insurer’s offer reasonable in the circumstances
Given there is no evidence to suggest any of the contents currently in storage have
been affected by mould or damaged due to improper storage methods, I am satisfied
that upon completion of repairs the insurer must appoint a qualified hygienist to
undertake a review of all contents items which have been stored by the insurer‟s
trades to confirm that no damage has been caused due to improper storage or mould.
Should damage as foreshadowed be found, I find it is fair in the circumstances the
insurer ‟ s hygienist assess the items and the insurer provide a settlement offer
accordingly.
Determination | Case number: 707818 Page 8 of 12
2.4 Is the insurer required to pay the complainant compensation?
Insurer acknowledge concerns / delays and offered compensation
The insurer says that it acknowledges the delays and poor quality repair issues
experienced throughout the claim. It has offered the complainant the amount of
$10,000 in compensation to resolve this aspect of the complaint. The Insurer has
recently confirmed it is agreeable to pay this amount to the Complainant as
compensation for the delays and difficulties experienced.
The complainant did not accept the offer as she advised she did not want it to affect
her complaint with AFCA. She says that she would like this to be addressed as part of
AFCA‟s determination.
AFCA has power to award compensation of up to $5,000 for non-financial loss where
there has been an unusual amount of:
Physical inconvenience
Time taken to resolve a situation
Interference with the complainant‟s expectations of enjoyment or peace of mind
Based on the evidence on file, I am satisfied the amount of $10,000 agreed to be paid
by the Insurer is fair and reasonable and further compensation is not warranted over
and above this amount.
Determination | Case number: 707818 Page 9 of 12
3 Supporting information
3.1 Relevant policy extracts
Record Key points
PDS
Page 17
What is not covered
We cover loss or damage to your home or contents that is caused
by certain events. We call them insured events. For us to cover you
for loss or damage caused by an insured event, the event must
happen:
- at th e insured address, and
- during the period of insurance.
We describe the ins ured events on pages 17 - 27
PDS
Page 19
Your cover
Insured events
We cover loss or damage to your home or contents that is caused
by certain events. We call them insured events. For us to cover you
for loss or damage caused by an insured event, the event must
happen:
• At the insured address; and
• During the period of insurance.
We don’t cover some situations, events and type s of loss or
damage to your home or contents. T hose exclusions are set
out in thi s section under each of the insured events.
We describe the ins ured events on pages 19 - 29. Under each
insured event, we show:
✓ Yes What we cover
x No What we don‟t cover – that is, the exclusions that apply
to the cover we provide for the insured event.
$ Limits Any dollar limits that apply
PDS
Page 55 - 57
We don't cover you under your policy for loss or damage to your
home or contents or legal liability which is caused by or arises in
connection with any of the following items or events:
Any event or accident that starts or happens outside the period of
insurance shown on your Certificate of Insurance.
PDS
Page 62
Settling your claim
Options to settle your claim
We may choose, at our option, one or more of the following ways to
settle your claim:
1. Rebuild or repair your home as new – that is, rebuild or repair it
using the same materials if they are readily available in Australia or
equivalent materials in term s of quality, purpos e and specifications.
2. Pay you the cost to us – that is, pay you what it would cost us to
rebuild or repair your home as new up to the:
- home sum insured
- sum insured that applies under the optional benefit „Landlord‟s
fixtures a nd fittings‟
Determination | Case number: 707818 Page 10 of 12
3.2 Relevant report extracts
Record Key points
financial firm’s expert (CL )
Electrical Report
19 - 12 - 2019
CAUSATION - How, Why and Where of the Damage
Found a split system AC LG 8kw that client stated had been
submerged under water. There was no visible damage to the
outdoor condensate unit. A complete operations test was complete d
and the machine was found to be fully operable. There is no
damage identified on the indoor head unit and all functions are
operable.
Conclusion/Summary
Machine full y operable, refrigeration gas levels are good. No water
damage identified.
Recommendations For Repair?
There are no recommended repairs.
financial firm’s expert (W )
Restorers Report
19 - 12 - 2019
Cause of Damage: Initial instructions advised that ground water
from flood event in 2015 had affected crawl space and underside
of flooring. W have also been advised secondary leaks were
discovered in bathroom and ensuite. At time of our i nspection on
the 5th December 2019 it was noted that in our o pinion there also
appears to be multiple roof leaks and possible gutter overflows.
Details of Damage: In our opinion w at er is entering into eaves
And running down wall cavity in kitchen and toilet. W r ecommend
a roof insp ection.
Actions Taken :
06/12 Attended site, met with Assessor, Builder and Hygienist.
Inspected site, checked moisture readings, photographed damage.
Builder cut section of particleboard subfloor to allow inspection of
crawl space under property. W ‟s Techn ician entered crawl space
and inspected – no visible microbial growth to underside of flooring.
Crawl space was not wet. Relative humidity recorded at 15% at 33
degrees outdoors, 51% at 33 degrees in kitchen and 43% at 33
degrees in crawl space.
Using ther mal camera to inspect walls showed that there was
possible water damage to walls in multiple areas of property.
Upon external inspection of property it was noted that eaves
sheets are water marked and mould affected in up to 5 different
areas. It was al so noted that bulkhead to rear door has a roof
change of direction above it and purple ceiling above air
conditioning unit near ent ry has poor flashing to roof over entry –
this could also possibly be another point of water entry.
Recommendations.
W recommend a roofing ins pection be complet ed and await
Hygienist Report.
financial firm’s expert (E )
Hygieni st Report
19 - 12 - 2019
Summary of Findings
From the assessment conducted, we have determined that the
c ause of the mould growth on various surfaces is likely due to
multiple contributing factors with the majority from pot ential top down
water leaks.
There is evidence that suggests the subfloor soil has experience d
excess moisture at some stage but it cannot be confirmed if this was
from a flood water ingress event or from other plumbing leaks.
At the time of our assessment, some materials within the property
Determination | Case number: 707818 Page 11 of 12
Record Key points
had elevated moisture cont ent whic h is most likely from more recent
water activity.
Due to the time lapse since the reported subfloor wat er ingres s, it is
highly unlikely that the elevated moisture cont ent identified in some
of the materials is from that event as there is no standing water or
excess subfloor soil moisture at the time of our attendance.
Due to the amount of mould identified within th e property along with
the excess moisture in some of the materials, it is highly
recommended that a full roofing integrity assessment is conducted
to identify any roof leaks or stormwater overflow issues that may be
allowing rainwater into the ceiling or e ves of the property.
Findings – Observations
Evidence of Exce ss Moi sture
Visible water marks were observed on timbers in the subfloor below
the master bedroom ensuite and the granny flat subfloor.
The subfloor soil had evidence of excess moisture at some stage in
the form of dried out/cracked up mud/dirt.
Water Damaged Materials
Although some subfloor timber materials have evidence of excess
moisture (water staining), no actual water damaged mat erials were
observed.
Mould Type Odours
A strong mould type odour was noticeable throughout the property
including the granny flat. When thes e odours exist in properties that
have had known water damage, they are typically microbial volatile
organic compounds (MVOCs) whic h are produced at certain stages
of the moul d growth cycle. This is generally when
materials have sufficient moisture (excess) in order to be actively
growing.
Material Moisture Content
At the time of our attendance, the moisture content in various tested
materials ranged from normal (unaffected) to elevat ed.
This included wall and ceiling plasterboard as well as various
sections of the timber flooring throughout the property.
The material moisture content was inconsistent throughout the
property indicating localised wetting as opposed to excess mois ture
from one event that has affected the entire property.
Visible Mould Growth
At the time of the assessment, visible mould growth was identified
various sections of the wall and ceiling plasterboard in the living and
dining areas as well as the timber ve netian window blinds
throughout. No mould growth was observed on materials in the
subfloor area.
Di scussion
Much of the visible mould growth throughout the property is
consistent with prolonged periods of high humidity within the
property. Due to the perio d of time that has lapsed since the
reported flooding event, it is our opinion that the mould
growth within the living areas of the property and the mould odours
noted during our assessment are from recent water activity within
the property.
If a significa nt amount of water ent ered the subfloor area and
increased the humidity within the property to the point where mould
would grow, we would expect to see more severe mould growth on
the subfloor timber materials.
At the time of our attendance, we were advise d that a significant
amount of flooring material had already been removed and replaced
so the condition of those materials was not able to be conducted.
Determination | Case number: 707818 Page 12 of 12
Record Key points
We were not made aware of any cleaning or remediation of the
subfloor area prior to our attendance. It should be noted that due to
the climate of South East Queensland, there are prolonged periods
of high ambient relative humidity (>65%) and if properties do not
have adequate humidity control, the int ernal humidity levels can be
the same as outside leading to mould growth on materials.
It is our opinion that the random locations of excess material
moisture content, visible mould growth and mould associated odours
within the property are related to more recent localised minor water
ingress events most likely from “top down” water leaks. This would
need to be confirmed by conducting a thorough roofing assessment.
Minimum Recommendations
We highly recommend that suitably qualified consultant/trade
conduct a thorough assessment of the roofing, gutters and facias to
determine if there are any leaks or pathways for water ingress.
All wet areas within the property should also be thoroughly assessed
to determine all current water proofing and plumbing is integral.
Due to the amount of visible moul d growth, det ailed cleaning and
remediation of the property is required to remove all mould.
3.3 Other matters
Damage to shower
The complainant raised possible reasons for the failure of the shower after this file
moved to determination. She advised this was an afterthought, it was confirmed with
the complainant this will not be considered as part of this determination which she has
accepted.
The complainant is aware should she wish to dispute this aspect further, she is able
to raise a separate complaint.