Home / QBE / Determination 707304

Determination 707304

Claim denied for deck tile and framing damage

FirmQBE
Decided2020-12-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer denied a home deck damage claim, relying on gradual process and construction exclusions. AFCA found the damage was caused by construction defects, not an excluded cause, and ordered the insurer to indemnify the claim with interest from 25 October 2019.

The damage arose from an identifiable accidental event tied to construction, and the insurer did not establish that an exclusion applied.

Issues

Subjects and remedies

pay claimpay interest

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 707304 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 707304 Page 2 of 8 Case number: 707304 10 December 2020 1 Determination overview 1.1 Complaint The complainant holds a home and contents policy with the financial firm (insurer). He lodged a claim on 23 September 2020 after noticing damage to his deck tiles. The insurer denied the claim as it says the damage was not caused by an insured event. The complainant disputes this. He says the cause was likely due to a drainage pipe from an air-conditioning unit. This should be covered under the policy. In order to resolve the complaint, the complainant requests the insurer accept the claim and undertake repairs accordingly. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. The complainant has established a valid claim under the accidental damage extension. The insurer has not shown the claim falls within the policy exclusions it is relying upon. 1.3 Determination This determination is in favour of the complainant. The insurer is required to indemnify the complainant under the policy and as set out in section 2.1. Determination | Case number: 707304 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Complainant must establish a valid claim The complainant must show, on the balance of probabilities, that he suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once this is established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies. Complainant has established a valid claim The policy responds to loss or damage caused by an insured event. The policy also provides an additional ben efit called ‘Accidental damage extension for your home and contents in the home’. This responds in the following circumstances: If you have insured your buildings and/or contents, we insure you for physical loss or damage caused by accidental damage to your home, contents or both, depending which you have insured, that is not insured under the insured events (a) to (p) listed under, ‘Section 2: Cover for your Home & Contents – Insured events’. Accidental damage means loss or damage that is accidentally, suddenly, unintentionally and unexpectedly caused by an identifiable event (other than by Insured events (a) to (p)). Accidental damage does not include the misplacement, or failure to locate any item nor unexplained disappearance of any item. There is no dispute the deck has sustained damage during the period of insurance. Further, I accept this damage was accidentally, suddenly, unintentionally and unexpectedly caused by an identifiable event. The identifiable event being either the construction of the deck, the breaking of the tiles or water penetrating the structure underneath to destabilise the structure. Therefore, the complainant has established a valid claim. The insurer must show that a policy exclusion applies. Engineers say the damage is due to the way the deck is constructed The insurer has referred to several policy exclusions. This includes: loss or damage resulting from or caused by:  any gradual process, Determination | Case number: 707304 Page 4 of 8  wear, tear, rust, corrosion, depreciation or gradual deterioration …  settling, shrinkage or expansion in building, foundations, walls or pavements Both parties have provided engineer reports. The complainant’s engineer, R, provided two reports. In effect, R said the damage to the house and deck framing has been principally caused by the breakdown of the water resistance of the deck flooring. R says the mechanism of this was mainly associated with the construction of the deck. This included inadequate coverage of the adhesive of the tiles and control joints not being aligned between the tiles and the cement sheets underneath. These led to the tiles cracking and the decking water proofing being compromised. The insurer’s engineer, I, is relatively consistent with R regarding the control joints. Policy exclusions do not apply I find R’s evid ence persuasive. Whilst water entry has resulted in damage to the balcony, I am not satisfied this is the cause of the damage. The available information shows the cracking of the tiles is the cause of the water entry and resultant damage. According to both R and I, the cause of the cracking is associated with the construction of the deck. Given this, I do not accept the policy exclusions referred to by the insurer applies. This is not damage caused by wear and tear. This is because both R and I attribute the damage to way the deck was constructed, not through ordinary use over a period of time. I do not accept the damage was caused by any gradual process. The damage began when the tiles cracked. This has led to the waterproofing being compromised and the resultant damage now claimed. Whilst the overall damage has occurred over a period of time, the exclusion requires the cause of the damage to be a gradual process. The cause was the way the deck was constructed. This way it was constructed cannot be described as a gradual process. The damage is not caused by settling, shrinkage or expansion. This is because R and I have said the damage is caused by the way the deck was constructed, not these factors. Insurer must indemnify the complainant Therefore, after careful consideration of all the available information, I note the following. The complainant has established a valid claim under the accidental damage extension. The insurer has not shown the policy exclusions it is relying upon applies. Determination | Case number: 707304 Page 5 of 8 Therefore, the insurer must indemnify the complainant under the policy. If the insurer cash settles the claim, it must also pay interest pursuant to section 57 of the Insurance Contracts Act 1984. Interest applies from 25 October 2019, when it denied the claim, until payment is made. Determination | Case number: 707304 Page 6 of 8 3 Supporting information 3.1 Relevant policy extracts Record Key points PDS Listed events Page 21 - 28 The listed events are:  Fire, smoke or explosion  Storm (including cyclone or hurricane) and/or rain…  Lighting or thunderbolt  Earthquake or tsunami  Theft or attempt ed theft  Malicious acts  Riots, civil commotions, industrial or political disturbances  Bursting, leaking, discharging or overflowing…  Impact…  Accidental breakage  Fusion  Power surge  Erosion, subsidence, landslide or earth movement…  Damage caused by animals or birds  Deliberate or int entional acts PDS Additional exclusions applying to the policy Report DD Month YYYY These Additional exclusions apply to cover for your home, contents, legal liability, additional benefits and valuables or malicious damage by tenants, tenant’s visitors or family (if you have chosen these options). This Policy doe s not cover: (a) loss or damage intentionally caused by you or a member of your family or a person acting with your consent or the consent of any member of your family; (b) loss or damage resulting from or caused by: the lawful seizure, confiscation, nationalisation or requisition of the property insured, destruction of or damage to property by any government or public or local authority, the delib erate application of heat (for example, this would include where an element under or forming part of a ceramic cook - top causes damage to the cook - top), inherent defects, structural defects, faulty workmanship, faulty design. […]  any gradual process.,  wear, tear, rust, corrosion, depreciation or gradual  deterioration,  fungus, mildew, mould, algae, atmospheric or climatic  conditions (other than as described under insured event,  (b) storm),  settling, shrinkage or expansion in buildings, foundations,  walls or pavements, […] Determination | Case number: 707304 Page 7 of 8 3.2 Professional reports Record Key points financial firm ’s expert ( IM ) Report 23 - 10 - 2019 CONCLUSION We found no evidence to suggest that the cracking damage evident within the balcony’s tiled floor has occurred due to any normally insurable event, such as pipe leakage or impact. In our opinion, based on the available evidence, the cracking within balcon y’s tiled floor finishes near the northeast corner of the building has occurred due to sagging/deterioration of the timber members below. The sagging of these timber members has been caused by gradual long - term timber deterioration and rot due to moisture ingress through the tiled balcony floor. In our opinion, the cracking within the tiled floor that generally extends parallel to the hous e and pool area is related to the movement joints in the tile diaphragm not matching the compressed fibre cement sheet joints. In this respect, the construction does not comply with the generally accepted best practise for construction of this type. We recommend that the ins ured owner engages suitably qualified professionals to advise them of any reinstatement work that m ay be required to rectify the balcony damage, and to ensure that the balcony and supporting steel beams are structurally competent and safe. We trust this report is sufficient for your present requirements. If y ou have any furt her queries regarding this m atter, please do not hesitate to contact the undersigned. C omplainant’s expert (R ) Report 23 - 06 - 2020 CONCLUSION The construction is such that it does not meet with requirements and that this would mean that the whole of this structure should be reviewed. Associated with this is that the cantilever already had a slope to the outside of 30 - 40mm and therefore slope wa s not a problem to discharge water. However with movement that is happening in the tiles and possibly leeching through joints in the FC sheeting this has given cause to depletion of the L VL joist and these have delaminated in the centre at the north end a nd has led to excessive deflection then giving cause to more influx of moisture. It is interesting to not e that a rain condition was nominated in one of the reports of Impart a Engineers and that this is located at Clontarf; this is a long way from Clontarf in elevation and we have not had seasonal perpetual rain since 2004 and that since then we have had 1 season of rain which was only for 2 - 3 days and only approximately 120mm. This would affect the influx of water however this is not the cause. Noted tha t from the 2004 to the current rain is approximately 9 years and that normally our rain periods range between 4.5 - 6 years. The member sizes as estimated, the minimum member for simple supported joists is 240x58 L VL 15 and the deflection should be to a mi nimum as any movement will release and crack the tiles. This is to satisfy deflection limit for tiles as span/1000. OPINION Determination | Case number: 707304 Page 8 of 8 Record Key points Given this, we are of the opinion that the construction of the deck is allowing water to permeate through so giving cause to dela mination of dry rot of inclusion of water into the floor joist; thus giving cause to the excessive flexure and movement within the FC deck releasing tiles and also giving cause to excessive penetration of normal rain conditions leading to the current failu re of the deck to ensure the water tightness of the structure being the habitable areas.