Home / IAG / Determination 707156
Determination 707156
Denial of accidental damage claim for property damage
Summary
Homeowner's accidental damage claim for a cracked foundation linked to a broken stormwater pipe was denied as pre-existing and gradual. AFCA upheld the denial but ordered $2,000 non-financial loss compensation for poor claim handling.
The insurer's engineering evidence showed the damage pre-dated the policy and was gradual deterioration, and the complainant gave no contrary expert evidence.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim under the terms and conditions of the policy.”
- Poor claim handling secondary · upheld“The insurer accepted that the claim management provided fell significantly short of what the complainant should have expected.”
Subjects and remedies
pay non financial loss
Related
Text of the determination
Determination
Case number 707156
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 707156 Page 1 of 6
Case number: 707156 26 November 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim for damage to his property which he says was
caused by a broken stormwater pipe. The financial firm (insurer) denied the claim on
the basis that the damage was caused over a period of time and pre -dated the
commencement of the policy.
The case manager provided the parties with a preliminary view in this matter. The
view was in favour of the insurer. The complainant disputes this and the matter has
been referred for determination.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
On the information provided to me, I am satisfied that:
the insurer’s engineer has provided a report which shows that the damage to the
property occurred prior to the commencement of the policy
the complainant has not provided any information that disputes this
The insurer is entitled to deny the claim under the terms and conditions of the policy.
Is the complainant entitled to non-economic compensation?
On the information provided I am satisfied that the conduct of the insurer was not up
to the expected standard. The insurer has acknowledged this. It is fair that they pay
the complainant $2,000.
1.3 Determination
This determination is in favour of the insurer.
The insurer is to pay the complainant $2,000 compensation.
The insurer is not required to take any further action.
Determination | Case number: 707156 Page 2 of 6
2 Reasons for determination
I have decided this case on what is fair in the circumstances, having regard to the
relevant legal principles, good industry practice, industry codes of practice and
previous relevant decisions of AFCA and predecessor schemes. I have considered all
the material submitted by both parties, before and after the preliminary view. I am
satisfied the documentation I have relied upon has been provided to both parties.
2.1 Is the insurer entitled to deny the claim?
Onus on complainant
The onus is on the complainant to show, on the balance of probabilities, they have
suffered a loss caused by an event to which the policy responds. This is known as a
prima facie or valid claim. If the complainant can show a valid claim, the onus shifts to
the insurer to show, on the balance of probabilities, an exclusion applies if it is to seek
to deny or limit its liability for the loss. The ins urer must show all or some of the
claimed loss was caused by an exclusion or otherwise.
The complainant holds a Building and Contents Policy with the insurer.
The policy provides cover for accidental damage.
I am satisfied that the damage would be considered accidental damage and therefore
the complainant has established a valid claim. The insurer must show why the claim
is excluded.
Circumstances of the claim
The complainant says that he has been living in the property for approximately three
years and that he had completely renovated the interior including some exterior work.
He says that the first issue occurred following very heavy rain and flooding when he
noticed the damage.
Following the complainant lodging the claim, the insurer arranged for a plumber to
inspect the property.
The plumber (TP) provided a report dated 2 September 2019. TP was advised by the
complainant that the ‘ front right-hand corner of the house is cracking and splitting in
the bedroom, the front entrance and the external brickwork .’ TP carried out a pre ssure
test for the hot and cold water lines in which the pressure held. By use of CCTV, he
found a broken section of the pipe in the front yard. He stated, ‘ it is our professional
opinion that storm water is exiting the damage pipe and seeping into the ground which
is causing the ground to sink in the home to then crack’.
The insurer obtained a further report from a builder’s building services firm who
concluded that further investigation is required. The insurer then appointed an
Determination | Case number: 707156 Page 3 of 6
engineer (CC). CC provided a report dated 20 January 2020. CC provided an
extensive report and provided conclusions which included the following:
the south west corner of the insured property is settled differently due to a long-
term drainage issue that has occurred over more than a decade and commenced
prior to the purchase of the house
resultant movements and cracking were old based on various findings included in
this report
external drainage issues were not addressed prior to the internal renovations and
continued to affect the foundations as a result
the extremely dry weather in the first four months of 2019, further exacerbated
foundation movement issues.
The (TP) report identified that ‘ there was a break in a stormwater pipe in the middle of
the front yard. Based on an image of pipe break received from TP on 20 January
2020, the stormwater system remains functional and the break is not a significant
contributor to the damage’.
CC in discussion with the complainant noted the following:
the house was purchased approximately three years ago
the south west bedroom was renovated about one year ago
the cracks in the bedroom were first noticed in April 2019
they had not previously noted flooding around the house.
The complainant has not provided a report in relation to the damage to the property.
In these circumstances, I am relying on the information provided by the complainant
together with the reports provided by the insurer.
Product Disclosure Statement (PDS)
The complainant added accidental damage cover to the property in December 2018.
The PDS provides as follows:
Accidental damage
Buildings Insurance
[…]
You can choose to cover your home and contents for accidental damage – that is,
mishaps around your home that are caused unintentionally.
Covered under Buildings Insurance
damage to your home that is caused unintentionally – for example, you’re in the
roof space and accidentally put your foot through the ceiling.
[…]
Not covered
damage caused by: inherent defects and structural defects
[…]
Determination | Case number: 707156 Page 4 of 6
damage that is covered under a listed event shown in Table 2.1 – see page 23
[…]
General exclusions for all covers and benefits
[…]
What we don’t cover
Loss, damage, injury or death arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
[…]
subsidence or landslide unless it happens immediately as a result of:
[…]
a storm
[…]
rainwater run-off
I have accepted that the damage to the property is covered under accidental damage,
from December 2018, in that it is a mishap around the home that was caused
unintentionally
The insurer has argued that the photographs obtained by CC and as confirmed by CC
indicates that the gap on the south west corner was formed several seasons ago. The
insurer also referred to CC’s photos which show that gap filler was no t applied
indicating the gap occurred prior to the previous painting.
The insurer further refers to CC’s report which indicates that the recent internal
cracking, which occurred in recent years since the renovation, is consistent with the
effect of ongoing seasonal foundation movement caused by unresolved drainage
issues.
The insurer has further referred to CC’s report with a conclusion that ‘it appears most
of the loss is very long term, which would mean the loss predates the policy period,
which commenced on 19 December 2017 (the claim was received on 27 May 2019).
The insurer further states ‘while some damage will have occurred during the policy
period, the engineer (CC) clarifies this is a result of seasonal moisture fluctuations in
the foundation soils, worsened by the relative dry period at the start of 2019 and there
is no indication any notable portion of the damage was caused by or worsened by the
presence of the leaking stormwater line. The insurer denied the claim because:
‘most of the loss would h ave occurred prior to the policy period commencing (meaning
there can be no claim for the same)
for the remaining loss, this was attributed to poor site drainage and seasonal moisture
fluctuations, which will enliven policy exclusions for gradual deterioration and storm.’
On the information provided, I am satisfied that the damage occurred as specified by
CC with the external building movement being relatively old and pre-dating the
renovations. I am also satisfied any movement that has occurred since the accidental
Determination | Case number: 707156 Page 5 of 6
damage endorsement is small and not compared with other movements internally. I
am also satisfied that the leaking pipe is unlikely to have caused the accidental
damage, which, on balance likely to be gradual deterioration.
The complainant has not provided any information or expert reports that I consider
refute CC’s findings.
In the circumstances, the insurer is entitled to deny the claim.
2.2 Is the complainant entitled to non-economic compensation?
Breaches of general insurance code of practice
The insurer has accepted there have been multiple breaches of the general insurance
practice including:
7.13 – we will keep you informed about the progress of your claim at least every 20
business days
7.14 – we will respond to retain requests made by you or about your claim within
10 business days
7.16 – once we have all relevant information having completed all enquiries, we will
decide whether to accept or deny your claim and notify you of our decisions within
10 business days
7.17 – our decision will be made within four mo nths of receiving your claim, unless
exceptional circumstances apply. If we do not make a decision within four months,
we will provide the details of our complaints process.
The insurer accepted that the claim management provided fell significantly short o f
what the complainant should have expected and acknowledged that the experience
warrants an award of compensation and had offered an amount of $1,500.
AFCA can award up to $5,000 in relation to non-financial loss. The award for
compensation will occur where there has been an unusual amount of:
physical inconvenience
time taken to resolve a situation
interference with the complainant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation for non-financial loss, AFCA expects
the complainant to:
be moderately robust
bear the normal degree of inconvenience experienced when a problem occurs and
take reasonable steps to minimise the inconvenience suffered.
Determination | Case number: 707156 Page 6 of 6
In the current circumstances, I am satisfied that the insurer failed in its dealing with
the complainant and that the complainant would have suffered physical
inconvenience and given the time taken to resolve the situation, interference with their
expectation of enjoyment or peace of mind.
In the circumstances, it is appropriate to award $2,000 in financial compensation.