Determination 706218
Denial of accidental water damage claim from incorrectly installed air-conditioning waste pipe
Summary
A strata policyholder claimed for water damage to a bathroom caused by an incorrectly fitted air-conditioning waste pipe, and the insurer denied the claim as gradual damage. AFCA found the damage was accidental and ordered payment of $24,138.40 for necessary repairs, less the waste pipe reinstatement cost, plus interest.
The proximate cause was a sudden accidental water leak from faulty workmanship, not gradual deterioration, wear and tear, or excluded rot and mould, so the resulting repairs are covered less the excluded rectification cost.
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case number 706218
Financial firm Lloyd's Australia Limited
Determination | Case number: 706218 Page 2 of 9
Case number: 706218 1 October 2020
1 Determination overview
1.1 Complaint
The complainant was a beneficiary of a Residential Strata Insurance policy with the
financial firm (insurer). The complainant lodged a claim as the result of an incorrectly
installed air-conditioning unit, causing water to leak into the bathroom.
The insurer denied the claim.
The case manager provided a preliminary view which was in favour of the
complainant. The insurer has rejected this decision and the matter has been referred
for determination.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
On the information provided to me, on balance, I am satisfied that the damage arose
as a result of an incorrectly fitted air conditioning unit that led to water damage in the
bathroom. I am also satisfied that the complainant neither knew or ought to have
known of this defect.
I am further satisfied that the primary cause of the damage was the water leak and
that any mould that existed was a secondary consequence. The accidental damage
led to the claim.
The insurer is not entitled to deny the claim.
The complainant is only entitled for payment for the necessary repairs carried out by
her builder.
This determination is in favour of the complainant.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to pay the complainant a further $24,138.40 to cover the cost
of the repairs.
The insurer is also to pay interest on this amount at the rate calculated in accordance
with section 57 of the Insurance Contracts Act 1984 (Cth), from 14 November 2019
(the date of the invoice) until the payment date.
Determination | Case number: 706218 Page 3 of 9
2 Reasons for determination
I have decided this case on what is fair in all circumstances, having regard to the
relevant legal principles, good industry practice, industry codes of practice and
previous relevant decisions of AFCA and predecessor schemes.
I have considered all material submitted by both parties, both before and after the
preliminary assessment. I am satisfied that documentation I have relied upon has
been provided to both parties.
2.1 Is the insurer entitled to deny the claim?
Onus on complainant to show a valid claim
The onus is on the complainant to show, on the balance of probabilities, they have
suffered a loss caused by an event to which the policy responds. This is known as a
prima facie or valid claim. If the complainant can show a valid claim, the onus shifts to
the insurer to show, on the balance of probabilities, an exclusion applies if it is to seek
to deny or limit liability for the loss. The insurer must show all or some of the claimed
loss was caused by an exclusion or otherwise.
The complainant was the beneficiary of a Residential Strata Policy. The policy
provided cover for accidental damage.
The complainant has established a valid claim. It is up to the insurer to show that this
claim is excluded under the terms and conditions of the policy.
Plumbing report
The insurer obtained a report from a plumber (SP).
The plumber provided a report dated 17 May 2019. The plumber found as follows:
Shower (Good, noting that the wall tiles, grout lines, spindles, screen and waste
pipe are in a good or serviceable condition)
Vanity (Good, noting that the overall and tapwarewater supply) are in a good or
serviceable condition)
Noted
vanity
poorly installed waste pipe
all spray testing of relevant areas did not indicate any water egress
all pressure testing to the property held for approximately 15 minutes … Indicating
no current leakage concern
water damage affecting carpentry as a result of waterless, bladder trap has been
installed upside down and is not allowing water to exit freely, causing water to build
up and overflow into cabinetry, causing damage to affected area
Determination | Case number: 706218 Page 4 of 9
defects are considered to be the result of workmanship.
Complainant obtains builder’s report
The complainant obtained a report from a builder (PZ).
PZ found as follows:
floor tiles abutting the kickboard vanity did not run under the vanity unit. Removal
of the vanity has compromised the waterproofing on the floor and up the wall
water had seeped under floor tiles and under the waterproofing which made
underneath side of the tiles wet and also screed was wet
waterproofing cannot be patched or repaired under Australian Standards
we were required to remove the floor tiles across the entire floor, which included
the walk-in shower base
the plaster behind the vanity was water-damaged and mouldy and was also
required to be replaced
the kickboard under the vanity was mouldy
the replacement plaster has also compromised the waterproofing.
PZ then listed the steps to remove water damage vanity and reinstate the
compromised waterproofing:
Determination | Case number: 706218 Page 5 of 9
The Product Disclosure Statement (PDS)
The PDS provides as follows:
Determination | Case number: 706218 Page 6 of 9
Insurer’s position
The insurer says:
the policy provides relief against loss resulting from a sudden and accidental event
the policy excludes loss which has occurred gradually or over a period of time and
that which is the result of faulty workmanship and/or faulty materials
the loss encompassed all of the above excluded perils given that the cause was a
combination of faulty workmanship and/or faulty materials which resulted in a long-
term, gradual leak and ingress
given the longstanding and gradual nature of the loss, this claim should have been
declined (in full)
offer of settlement already exceeds the insured’s entitlements
original decision on the claim was subsequently viewed to be done in error
the insurer has paid for the repairs according to the loss adjustor’s expert finding
and scope of works provided.
SP had provided a scope of works for the bathroom/ensuite as follows:
supervision of trades and materials
disconnect all plumbing to facilitate repairs, reconnect on completion
carefully remove stone from vanity unit setting aside for re-use
remove and dispose of LHS carcass, shelf and two texture laminate doors
supply and install new and manufactured vanity unit to best match existing
reinstall stone top to existing position
prepare and paint one associated wall (approximately 12sqm)
leave site clean and tidy.
Determination | Case number: 706218 Page 7 of 9
The quote for this was $7,524 inclusive of GST.
The insurer has reconfirmed its rejection of the preliminary view and stated:
The primary reasoning for our dispute of AFCA’s preliminary determination is that
we strongly believe that the outcome is based on a flawed interpretation of the
Policy Wording, Terms & Conditions and Exclusions.
AFCA appear to be in agreement with our findings that the loss stems directly
from an instance of Faulty Workmanship.
However, they have overlooked the fact that the ensuing damage has occurred
gradually and has been on-going since practical completion of construction and
this has taken place over a course of (at least) 1-3 years until the damage
became apparent in circa January 2019.
The policy will not pay for damage ‘ caused by non - rectification of a defect, error or
omission that the insured was a ware of, or should reasonably have been aware of’ .
It is accepted, by the complainant, that the the loss stems from an instance of faulty
workmanship. However, I accept that the complainant was not nor ought to have been
aware of the faulty workmanship.
The policy provides further that the insurer will not pay for ‘the cost of rectifying faulty
or defective materials or faulty or defective workmanship’ The fault or the defective
workmanship is the mistake made in fitting the airconditioning unit. The insure r is not
liable for the cost of re - installing the air conditioner waste pipe as the cost of rectifying
the defect is excluded from cover under the policy. It is noted that this cost is not
itemised in the invoice provided by the complainant. However, I do not acce pt that this
extends to the accidental damage caused by the water leak.
Water damage is not gradual deterioration
The insurer says the damage is likely to have been ongoing since the unit was made
available for occupation. I accept on the available information that the damage would
have occurred each time the air conditioner was used.
SP said the damages indicated ‘long term’ water exposure and considered would be
approximately 1-3 years old. There is no evidence regarding use of the air conditioner
by previous tenants.
The insurer says the damage was caused by a long-term and gradual leak rather than
a single accidental event. As noted above, there is no dispute that the incorrectly
installed waste pipe was the cause of damage. The defective installation of the waste
pipe was the single accidental event.
Determination | Case number: 706218 Page 8 of 9
The policy states the insurer will not pay for loss or damage caused by gradual
deterioration. The policy excludes wear and tear.
‘Wear, Tear’ is defined in the policy to mean damage or a reduction in valu e through
age, ordinary use or lack of maintenance. Gradual deterioration provisions have a
similar meaning, and exclude damage resulting from natural deterioration over time.
The damage was caused by the incorrect fitting of the air conditioning pipe. The
damage incurred is not damage from ordinary use or natural deterioration but is
accelerated damage by reason of water leaking from the incorrectly installed waste
pipe.
The policy does not cover damage from rot or mould. However, there was water
damage which would have occurred prior to the rot and mould. The area was needing
repair because of the water damage and it would be unfair and illogical to exclude the
repairs on the basis the rot and mould subsequently occurred.
The evidence indicates that any rot and mould evident in the bathroom was a result of
the intervening water leak rather than being caused by natural deterioration over time.
The evidence also shows the waste pipe was installed upside-down, which is due to
defective workmanship rather than any inherent or latent defect in the pipe itself.
The proximate cause of the damage was the incorrect fitting of the air conditioning
pipe. The subsequent damage was caused by this and was not due to a gradual
deterioration, wear and tear or latent defect under the policy.
Consideration of scope of works claimed
The complainant has provided an invoice for $33,330 for a full strip o ut and refit of the
bathroom. PZ says that, as the tiles did not extend under the vanity unit, the
waterproofing was compromised when the vanity was removed. Unfortunately, the
insurer was not given the opportunity to assess or verify this damage as the bathroom
was stripped before the assessor attended.
SP has however acknowledged the potential risk of damaging the waterproofing if
care was not taken removing the vanity and concedes that, if it was compromised, a
full refit of the bathroom would be required to allow for the application of a new
waterproof membrane.
PZ has provided photos showing the vanity installed directly onto the waterproofing
and states that the waterproofing was damaged when the vanity was removed.
Nothing has been provided to me that convinces me that PZ’s view in relation to the
waterproofing is incorrect.
If SP had completed the works, the same risk would have been present, and a
variation would have been allowed if the waterproofing had been breached.
Determination | Case number: 706218 Page 9 of 9
On the information provided, on balance, I am satisfied that the bathroom strip out
was required and the damage to the waterproofing occurred as part of the repair
process.
SP also accepted that the plaster behind the vanity would have been damaged due to
the amount of water in the base of the kicker, which was black and swollen. While SP
said that an accredited mould restoration company should have been appointed to
see if the mould in the sheeting could have been surface treated (which may have
saved on plaster works required), SP also said that any damage to the timber
framework could not be determined without removing the plaster, and that it was likely
the bottom plate was affected. The damage was determined by PZ as a trades person
and I accept that it was necessary to repair it.
On the information provided I accept the works completed were necessary to repair
resultant damage to the bathroom.
The insurer is required to reimburse these costs, in accordance with the terms of the
policy, less the cost of reinstalling the waste pipe. The insurer is also entitled to
subtract the amount already paid.
The complainant has provided a revised quote stating the existing vanity basins,
vanity and shower mixers, shower rose and toilet were all reinstalled during the repair
works. The revised quote also states that the cost of reinstalling the waste pipe was
included in the quote, and allows for a deduction of $110 for this work, being the
minimum call out fee for the plumber as the reinstallation only took 20 minutes. The
insurer has not made any submission or provided any information indicating that this
deduction is unreasonable.
Accordingly, I consider the insurer should pay the complainant a further $24,13 8.4 0,
being the balance of the repair costs necessary to reinstate the bathroom, less the
cost of reinstalling the waste pipe. The insurer is to pay interest on the remaining
settlement amount at the rate calcu lated in accordance with section 57 of the
Insurance Contracts Act 1984 (Cth), from 14 November 2019 (the date of the invoice)
until the payment date.