Determination 705487

storm-damaged home claim cash settlement amount and delay

FirmSuncorp Group
Decided2022-01-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$39,253
Non-financial loss$2,000
Amount claimed$65,000
SourceAFCA PDF

Summary

The individual complainant claimed storm damage to his home after a tree fell and disputed the insurer's $30,194.28 cash settlement offer, seeking $65,000 and complaining of claim delays. AFCA found the insurer's offer reasonably based on expert assessments but required a 30% uplift for contingency and inflation, totalling $39,252.56, plus $2,000 non-financial loss.

The insurer's expert-based quote is a reasonable starting point, but because it is over 12 months old and lacks a contingency allowance, a 30% increase is fair and reasonable; delay caused unusual stress warranting $2,000 compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 705487 Financial firm AAI Limited Determination | Case number: 705487 Page 1 of 5 Case number: 705487 27 October 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). On 11 February 2020, the complainant lodged a claim after his home was damaged by a tree that fell during a storm. The insurer accepted the claim and offered $30,194.28 to cash settle the claim. The complainant disagrees with the cash settlement amount offered and wants the insurer to pay him $65,000. He is also dissatisfied with delays in the handling of his claim. 1.2 Issues and key findings Is the insurer entitled to limit its liability under the claim? The insurer’s offer of $30,194.28 to cash settle the claim is reasonably based on the expert assessments of its builder and engineer. However, the quote is now more than 12 months old and it does not include a contingency allowance. The insurer is required to increase its cash settlement offer by 30% - being 20% for a contingency allowance and 10% for a reasonable uplift for inflation for materials and labour. Accordingly, the insurer must pay the complainant $39,252.56 to settle the claim. Is the complainant entitled to non-financial loss compensation? Yes. The insurer has offered to pay the complainant $2,000 non-financial loss compensation for a delay in the handling of the claim. This is fair and reasonable in the circumstances. Why is the outcome fair? T he insurer’s cash settlement offer is reasonably based on expert assessments. However, it is fair and reasonable that this offer be increased by 30% to include a contingency allowance (20%) and to cover inflation (10%) since the offer was made. It is fair and reasonable that the insurer pays the complainant $2,000 for non-financial loss compensation for a delay in handling the claim. 1.3 Determination This determination is partly in favour of the insurer. Within 14 days of acceptance of this determination, the insurer is required to pay the complainant $39,252.56 to settle the claim and $2,000 for non-financial loss compensation. Determination | Case number: 705487 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer entitled to limit its liability under the claim? The insurer’s offer of $30,194.28 to cash settle the claim is reasonably based on the expert assessments of its builder and engineer. However, the quote is now more than 12 months old and it does not include a contingency allowance. The insurer is required to increase its cash settlement offer by 30% - being 20% for a contingency allowance and 10% for a reasonable uplift for inflation for materials and labour. Accordingly, the insurer must pay the complainant $39,252.56 to settle the claim. As I have allowed 10% for inflation, interest is not payable on the cash settlement. Insurer’s c ash settlement offered based on expert assessments There is no dispute that the complainant’s home was damaged by a tree that fell during a storm. The insurer has accepted the claim, and it has offered to cash settle the claim for $30,194.28. The insurer says its liability has been correctly calculated in accordance with the assessment and the quote provided by its assessor/builder, D. The insurer appointed its engineer (IE) in April 2020 to assess the damage caused by the fallen tree (the storm event). IE’s report confirmed that various structural elements of the home were damaged by the impact of the fallen tree. In relation to the bathroom area, the report noted there were cracked tiles in the bathroom on the upper level of the house, including floor and wall tiles. IE says the cracks in the floor tiles appeared to be dirty. However, the complainant explained that he cleaned the bathroom floor and dirt entered the cracks. IE also says the cracked floor tiles were for the entire width of the bathroom, while the cracked wall tiles were only for a smaller area. IE’s findings were referred to D, who inspected the complainant’s home on 22 June 2020. D provided more detail of the extent of the damage from the fallen tree, noting damage to:  left-hand side boundary fence  external left-hand side stone retaining wall  terracotta tiles in ground level carport area  ground floor ceiling  office ceiling  bedroom 2 ceiling  living room timber stained door jambs  floor tiles to the centre of bathroom on far left-hand side of home (cracked in line where the sub-floor sheets join). D provided a detailed scope of work and a repair quote for $30,194.28, inclusive of margins and GST. This was reviewed by the insurer’s assessor who agreed with the cost of repairs calculated. Determination | Case number: 705487 Page 3 of 5 The complainant disputes the quantum The complainant provided two quotes in September 2020 from a builder (L) totalling $49,231 for various bathroom repairs and fixtures and fittings. These quotes cover works to strip out the entire bathroom, plumbing, tiling, water-proofing and replacing current fittings. The complainant says the bathroom needs to be replaced to avoid further damage. The insurer says bathroom fixtures and fittings can be re- used, and that D’s quote covers their removal and reinstatement. The insurer says it advised the complainant it would consider a quote from an alternative provider based on D’s scope of work as a basis to calculate the repair cost. Through the course of this complaint, the complainant has provided three further quotes: one from builder G for bathroom repairs ($54,824.18), one for plastering work ($2,085.60) and one for painting work for the carport and cedar doors in the living room ($3,200). In considering D’s scope of works and quote of 17 July 2020, I note that it covers painting and plastering for the bathroom, bedroom 2, carport and office, and it also covers painting for the living room doors. In considering the complainant’s quote from G, I note that while it does provide for the retention and reinstalling of the vanity, wall cabinet and tapware, it includes a significant amount for other items and materials such as waterproofing, a new shower screen, a free standing bathroom tub and a custom made vanity. In considering this information, I am satisfied that the complainant has not provided any expert information to show that the assessment of the extent of the damage by the insurer’s engineer and builder is not fair and reasonable. Further, I find that quotes provided by the complainant include items that are already covered by D’s quote, or they cover items that are not necessary to repair the damage caused by the fallen tree and the storm. Accordingly, I am satisfied that the insurer’s quote prepared by D (based on the assessment by engineer IE) is a reasonable starting point for the settlement of the claim. Insurer must increase offer by 30% for contingencies and inflation I am satisfied that the complainant has not provided expert information to show that the insurer’s assessment of the damage caused by the fallen tree , and the insurer’s quote for repairs are unreasonable. The insurer’s offer of $30,194.28 to cash settle the claim is reasonably based on the expert assessments of its builder and engineer. However, the quote is now more than 12 months old and it does not include a contingency allowance. It is fair and reasonable that the insurer is required to increase its cash settlement offer by 30%. This includes 20% for a contingency allowance to account for the transfer of risk to the complainant for any unforeseen damage and any additional work required once repairs commence. It includes 10% for a reasonable uplift for inflation for materials and labour since the quote was provided in July 2020. Accordingly, the insurer must pay the complainant $39,252.56 to settle the claim. As I have allowed 10% for inflation, interest is not payable on the cash settlement. Determination | Case number: 705487 Page 4 of 5 2.2 Is the complainant entitled to non-financial loss? Yes. The insurer has offered to pay the complainant $2,000 non-financial loss compensation for delays in the handling of the claim. This is fair and reasonable in the circumstances. AFCA can award compensation for non-financial loss AFCA ’s Rules provide that we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We will only award this type of compensation if there has been an unusual degree of stress, inconvenience, or delay. We will not award compensation for the usual amount of inconvenience involved in making a claim. Complainant is entitled to non-financial loss for delayed assessment The complainant says that the insurer is responsible for unreasonable delays in the assessment of his claim. The insurer has acknowledged that there was a considerable delay from April to July 2020 in obtaining the report from D, and that this negatively impacted the complainant’s claims experience. The insurer has offered $2,000 compensation for non-financial loss compensation for stress and inconvenience caused by this delay. On considering available information and the complex nature of this claim (including the property’s construction) , I am satisfied that the insurer’s offer of $2,000 is fair and reasonable in the circumstances. 2.3 Why is the outcome fair? The insurer’s cash settlement offer is reaso nably based on expert assessments. However, it is fair and reasonable that this offer be increased by 30% to include a contingency allowance (20%) and to cover inflation (10%) since the offer was made. It is fair and reasonable that the insurer pays the complainant $2,000 for non-financial loss compensation for a delay in handling the claim. Determination | Case number: 705487 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.