Home / Lloyd's / Determination 703596

Determination 703596

Quality of insurer-authorised repairs to building cracking damage

FirmLloyd's
Decided2020-12-07
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The body corporate for six units said cracks reappeared within a week of insurer-authorised repairs to earlier pipe-leak damage and sought rectification. AFCA found the repairs were substandard, ordered the insurer to rectify them, and required it to assess a former owner's compensation claim.

The policy requires repairs to restore the property to substantially its original condition, and the Code requires the insurer to guarantee quality of repairs it directly authorised.

Issues

Subjects and remedies

home or building damagereassess claimrepair or rectify

Related

All Lloyd's determinations · Find similar determinations

Text of the determination

Determination Case number 703596 Financial firm Lloyd's Australia Limited Determination | Case number: 703596 Page 2 of 9 Case number: 703596 19 November 2020 1 Determination overview 1.1 Complaint The complainant is the body corporate for a block of six residential units. The complainant insured the property under a residential strata insurance policy with the financial firm (the insurer). In 2014, the complainant lodged a claim for movement cracks in the building. In 2016, a plumber found severe leaks from broken sewer pipes under the building. The insurer accepted that the leaking pipes had damaged the building, and agreed to repair the damage. The insurer completed repairs in December 2018. The complainant says cracks reappeared within a week. The complainant wants the insurer to rectify the repairs. The insurer says the new cracks are due to ordinary earth movement, and have nothing to do with the leaks identified in 2016. The insurer says the repairs were done correctly, and do not need rectification. 1.2 Issues and key findings Is the insurer required to rectify the repairs? The quality of the repairs was unreasonably poor. The insurer failed to complete repairs to the standard required by the policy, and by the General Insurance Code of Practice. The insurer must rectify the repairs. 1.3 Determination This determination is in favour of the complainant. The insurer must rectify the repairs. Further details of what the insurer must do to rectify the repairs are set out in section 2.1 of this determination. Determination | Case number: 703596 Page 3 of 9 2 Reasons for determination This determination is based on information submitted by the parties. Each party has had an opportunity to review and respond to the other party‟s submissions. I have considered all of the p arties‟ submissions, but in this determination, I have only commented on submissions directly relevant to the outcome. This determination is based on what is fair in the circumstances, having regard to any relevant legal principles, industry codes or guida nce, good industry practice, and prior determinations of AFCA or its predecessors. 2.1 Is the insurer required to rectify the repairs? Policy covers accidental damage The cover provided by the policy is set out in the product disclosure statement (PDS). Relevant sections of the policy are quoted in section 3.1 of this determination. The policy is an „accidental damage‟ policy, meaning it covers all accidental damage occurring during the period of insurance, unless it is specifically excluded from cover. The policy excludes cover for damage caused by earth movement. However, the insurer accepts that this exclusion does not apply to earth movement that occurs as a direct result of water leaking from a broken pipe. Insurer agreed to repair damage caused by leaking pipes In or about October 2014, the complainant appointed an engineer (MA) to investigate building movement and cracking at the insured property. MA inspected the property, and concluded there was a leaking pipe near Unit 6 (at the southern end of the building). The complainant lodged a claim for the damage. The date of loss was recorded as 15 October 2014. The insurer appointed a loss adjuster (YD R) to manage the claim. In or about February 2016, a plumber appointed by the complainant found severe leaks from broken sewer pipes under the property. The complainant had these pipes replaced by August 2016. The insurer accepted that damage caused by the leaking pipes was covered under the policy, and agreed to repair it. Repairs failed immediately after completion The insurer appointed MA, who re-inspected the property in April 2016, May 2017 and June 2018. In May 2017, MA recommended that the property be left for a further 12 months to allow the soil moisture to stabilise before starting repairs. In June 2018, MA said the cracking had stabilised, and repairs could start. Determination | Case number: 703596 Page 4 of 9 MA produced a scope of works for repairs. According to YDR, the scope of works only included damage caused by the leaking pipes; it excluded any damage caused by ordinary earth movement. The insurer appointed a builder (MMS) to undertake repairs in accordance with MA‟s scope of works. MMS completed repairs in December 2018. The complainant says the repairs were sub-standard, and building cracks started to reappear within a week. YDR inspected Unit 5 in January 2019, but did not mention any cracks. YDR inspected Unit 6 on 25 March 2019, and confirmed cracks had reappeared throughout the unit. YDR said the reappearance of the cracks was unrelated to the leaking sewer pipes identified in 2016. YDR said the cause of the damage was either ordinary earth movement, or a new plumbing leak. Complainant’s engineer says repairs were of poor quality The complainants appointed an engineer (FE), who inspected the property on 15 July 2019. FE‟s report says:  MA was wrong to conclude, in June 2018, that the cracking had stabilised to the point that repairs could start. MA‟s report of June 2018 showed the cracking had progressed since its previous inspections. MA should have undertaken detailed level surveys to determine whether the building had stabilised (rather than relying solely on visual inspections)  MA should have recommended measures to help the repairs withstand movement, such as: > reinforcing the walls to allow them to resist tensile forces (as the walls‟ ability to resist tensile forces had been compromised by cracking) > adding control joints to allow movement at discrete locations > fixing cornices only to the ceilings, so that they would not be damaged by differential movement between the ceilings and walls  MMS‟ repairs were of poor quality: they left the building with mis -matched mortar and drummy plaster, and they did not follow MA‟s recommendations on how to repair cracks. FE‟s report includes photographs of the new cracks. The look similar in severity to the cracks that were repaired (as shown in MA‟s report of June 2018). Evidence does not show damage caused by ordinary soil movement MA‟s report of June 2018 said the building would likely crack in the future, and would require patching and painting at regular intervals. This was because:  the building is solid masonry, which is the type most susceptible to cracking  the soils in the area are highly reactive (meaning they expand when wet, and contract when dry)  there are large trees nearby, which will dry the soil. Determination | Case number: 703596 Page 5 of 9 In response to FE‟s report, MA said any cracking that occurred after MMS completed repairs was probably due to ordinary earth movement. The insurer relies on MA‟s opinion, and says the new cracks have occurred due to ordinary earth movement. I am n ot persuaded by MA‟s opinion, because:  MA‟s report of June 2018 said the building was stable enough to support repairs  the new cracks are severe, appeared immediately after repairs, and appeared in the same areas that were repaired  ordinary earth movement would have affected the building since it was built in the 1960s; there is no evidence that the building had similar ground movement issues before the sewer pipes broke  ordinary earth movement would affect the entire site, but the recent cracking has occurred only on the southern side of the building; there is no evidence of similar cracking on the northern side  MA says large nearby trees could dry the soil, but these trees are on the eastern side of the building  MA says soils in the region are highly reactive, but FE says they are only moderately reactive, and movement at the surface is usually small. Furthermore, no soil samples have been taken to confirm that the soil at the site is typical of soils in the region  MA did not inspect the property after MMS completed repairs. Repairs should have been able to withstand ordinary movement For the above reasons, I am not satisfied that the recent cracking is due to ordinary earth movement. However, even if I was, I would still conclude that the repairs authorised by the insurer were sub-standard. All buildings are affected by ground movement. Any builder or engineer repairing a building should consider how the repairs will respond to movement. That was especially true in this case, where the building had been damaged by ground movement, and the insurer had monitored the site for more than two years waiting for the ground to stabilise. It would have been impossible to make the repairs completely impervious to movement. However, the insurer‟s experts should have ensured the repairs could withstand ordinary movement for a reasonable time. The insurer and its experts have not said what measures, if any, were taken to ensure the repairs would resist movement . FE‟s report says there are specific steps that could and should have been taken to allow the repairs to resist movement, but the insurer has not responded to this. Determination | Case number: 703596 Page 6 of 9 Severe cracks appeared in the repaired areas almost immediately after repairs were completed. This indicates the insurer‟s experts failed to take reasonable steps to ensure the repairs would resist movement. YDR said the new cracks may have been caused by a new plumbing leak (which may have caused additional ground movement that the insurer‟s experts could not have anticipated). However, there is no evidence that this is the case. FE found that both MA‟s scope of works and MMS‟ repairs were “inadequate to ensure the reasonable longevity of the repairs”. Based on the available evidence, I am satisfied that this finding is correct. Insurer must rectify repairs The policy says the insurer subscribes to the General Insurance Code of Practice. The Code requires an insurer to guarantee the quality of repairs if it selected and directly authorised the repairer. The policy says that if the insurer repairs property, it will restore the damaged part of the property to a condition that is substantially the same as its condition when new. The repairs authorised by the insurer were of unreasonably poor quality, and did not restore the damaged parts of the property to a condition substantially the same as their condition when new. In accordance with the policy terms, and the Code, the insurer must rectify the work. To rectify the work, the insurer must appoint suitably qualified experts to:  confirm that the soil and building are stable enough to support repairs (and stabilise them if they are not)  prepare a scope of works to repair all damage caused by the leaks identified in 2016, and rectify the repairs completed in 2018. The scope of works must include measures to ensure the repairs will withstand ordinary soil movement for a reasonable time  undertake repairs in accordance with the scope of works. Determination | Case number: 703596 Page 7 of 9 3 Supporting information 3.1 Relevant policy terms Product Disclosure Statement and Policy Wording The General Insurance Code of Practice (page 11) The Insurers are signat ories to the Gener al Insurance Code of Practice. The Code aims to raise standards of practice and service in the insurance industry. It:  promotes better communication bet ween insurers and customers which will lead to better public understanding of ins urance to allow customers to make informed choices; and  outlines good standards of practice and service to be met by insurers to enhance their reputation for responding efficiently to their customers‟ needs. Policy 1 – Building & Common Contents (pages 16 – 23) We will pay In the event of any physical loss, destruction or damage not otherwise excluded occurring during the period of insurance stated in the Certificate of Insurance, or any renewal thereof at the situation of the Property Insured we will, subject to the provisions of this policy including the limitation of our liability, indemnify you in accordanc e with the applicable Basis of Settlement. Basi s Of Settlement 1. Reinstatement Replacement The basis upon which the amount payable to you is to be calculated shall be the cost of reinstatement of the Property damaged at the time of its reinstatement subject to the following provisions and subject also to the terms, conditions and Limit(s) or Sub Limit(s ) of Liability of this policy. For the purposes of the insurance under this Clause, „reinstateme nt‟ shall mean: … 1.2 Where Property is damaged, the repair of the damage and the restoration of the damaged portion of the Property to a condition substantially the same as but not better or more extensive than its condition when new. … Determination | Case number: 703596 Page 8 of 9 Policy 1 – Building & Common Contents (pages 16 – 23) 7. Excluded Per ils We shall not be liable in respect of: … 7.5 Physical loss, destruction or damage directly or indirectly caused by, or arising out of: a) erosion, subsidence, earth movement or collapse resulting therefrom other than earthquake… b) normal settling, seepage, shrinkage or expansion in buildings or foundations, walls, pavements, roads and ot her structural improvements, creeping, heaving and vibration. c) birds, moths, termites or other insects, vermin, rust or oxidation, mildew, mould, contamination or pollution, wet or dry rot, corrosion, change of colour, dampness of atmosphere or ot her variations in temperature, evaporation disease, inherent vice or latent defect, loss of weight, change in flavour, texture or finish, smut or smoke from industrial operations apar t from sudden and unforeseen damage resulting therefrom. d) wear and tear, fading, chipping, scratching or marring, gradual deterioration or developing flaws, normal upkeep or failure of design. e) error or omission in design, plan or specification or failure of design. f) faulty materials or faulty workmanship. … General Conditions & Exclusions (pages 44 – 46) APPLYI NG TO POLICIES 1 - 8 1. General Exclusions None of these Policies provide cover for loss, damage, destruction or liability directly or indirectly caused by, or happening through, or in consequence of: … 1.4 Loss or damage that is caused by: 1.4.1 erosion, subsidence, landslide or earth movement no matter how caused (other than earthquake); 1.4.2 wear, tear, rust, corrosion or gradual deterioration. 3. Due Diligence You must take all reasonable care and precautions for the safety and protection of the Property Insured and must at all times use due diligence in maintaining the Property Insured in such order and condition as to minimise the risk of loss, destruction or damage insured against any should any damage have occurred prior to the commencement of the insurance and such damage not have been repaired or made good. We shall not be liable for such damage nor for any resultant loss, destruction o r damage. Determination | Case number: 703596 Page 9 of 9 General Insurance Code of Practice 7. CLAIMS Repair Workmanship and Materials 7.20 Where we have selected and directly authorised a repairer, we will: a) accept responsibility for the quality of the workmanship and mat erials; and b) handle any Complaint about the quality or timeliness of the work or conduct of the repairer under our Complaints process. 3.2 Complainant represented by insurance broker The complainant was represented by a n insurance broker. In this determination, submissions made by t he complainant‟s representative are treated as if they were made by the complainant. 3.3 Insurer must consider compensation claim from former unit owner The former owner of Unit 6 (who sold the unit in March 2020) says she suffered financial losses because the insurer mishandled the claim. Specifically, she says:  she was unable to let the unit (or had to let it at a discounted rate)  the unit took much longer than usual to sell  the unit was sold for much less than it would have been sold for if the insurer had repaired the building properly. The former owner also says she suffered non-financial loss (i.e. stress and inconvenience) because the insurer mishandled the claim. AFCA told the former owner that if the insurer was found to have mishandled the claim, she could claim compensation from the insurer her for losses she suffered as a result. The insurer would then be given an opportunity to assess her claim. In this determination, I have found that the insurer mishandled the claim by failing to complete repairs to a reasonable standard. The insurer must now assess whether the former owner of Unit 6 suffered any loss as a result. If the former owner is not satisfied with the insurer‟s assessment, she may lodge a complaint with AFCA.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.