Text of the determination
Determination
Case number 702893
Financial firm Tokio Marine & Nichido Fire Insurance Co Ltd
Determination | Case number: 702893 Page 2 of 17
Case number: 702893 6 November 2020
1 Determination overview
1.1 Complaint
In September 2019, the property owned by the complainant (a company) was used by
the fire service as a base of operations to fight nearby bush fires. The complainant
lodged a claim under their farm protection insurance policy held with the financial firm
(insurer) when the property was damaged by the fires, and by the use of the property
by the fire service.
The complainant says damage was caused to paint work when chlorinated water was
used to soak the property to save it from ember attacks. The complainant also says
the heavily loaded fire trucks caused damage to the driveway, which was not
designed with the use of fire trucks in mind. The complainant also more recently
raised concerns about possible damage to the roof and plumbing/solar pool heating
system of the property, but that has not yet been specifically assessed.
The insurer partially accepted the claim. The insurer says it is willing to attend to
reassess the roof and plumbing/drainage. It declined the damage to the driveway as it
says that is a result of wear, tear and faulty workmanship which is excluded under the
policy. The insurer says there was no damage to the external paintwork.
The complainant disagrees and says the driveway and paint work were in good
condition prior to the incident.
1.2 Issues and key findings
What is the extent of the insurer’s liability for the claim?
Sections of the relatively new driveway exhibited signs of pre-existing damage (from
design issues and normal wear and tear). However, the heavy use by the fire service
has, on balance, caused some sections of the driveway to degrade in a manner and
timeframe which is outside what can reasonably be regarded as normal wear and tear
in a driveway not designed for such use.
That means the insurer is not entitled to decline all liability for the driveway damage. It
is fair in the circumstances that the insurer pays 50% of the complainant‟s quoted
costs of re-sealing of the driveway.
The complainant has not provided any supporting information to establish, on
balance, that the paintwork was damaged by the fire service‟s use of chlorinated
water, or otherwise. The insurer is not liable for the external paintwork.
The insurer has not had the opportunity to further assess the roof and plumbing/solar
pool heating system. If the complainant wants to pursue this element of the claim, it
Determination | Case number: 702893 Page 3 of 17
needs to allow the insurer to assess it as soon as reasonably practicable. The insurer
is required to promptly provide the complainant with the outcome of its assessment,
and then (as appropriate) decline or settle that part of the claim.
1.3 Determination
This determination is partly in favour of the complainant.
The insurer is required to pay the complainant $28,484.89, which is 50% of the
complainant‟s quoted costs of resealing the driveway; together with statutory interest
on that amount, calculated from the date the claim was declined to the date of
settlement.
If the complainant indicates, when accepting this determination, that they wish to
pursue the part of the claim with regard to the roof and plumbing/solar pool heating
system, then the insurer is required to re-attend to assess those areas of the property,
promptly make a claims decision and, as appropriate, settle the claim for those
issues.
The insurer is not required to take any other action.
Determination | Case number: 702893 Page 4 of 17
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This decision has been made by a Panel consisting of an Ombudsman, an individual
with extensive insurance experience and another individual with extensive consumer
experience. The decision follows consideration of all the material exchanged. It is
based on what is fair in all the circumstances having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
previous decisions where applicable.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome.
The complainant is represented in this complaint by an owner/director of the
company.
2.1 What is the extent of the insurer’s liability for the claim?
Complainant required to establish a valid claim
When making a claim, an insured party has the onus of establishing they suffered a
loss covered under the policy.
If a claimable loss is established, the insurer then has the onus of establishing an
exclusion applies, or that it is otherwise entitled to decline the claim.
Policy covers accidental damage
The complainant holds a Farm Protection Policy, which covers multiple insured items
including the „ home ‟. It is an „ accidental damage ‟ policy, meaning it covers accidental
damage that occurs during the period of insurance, unless it is specifically excluded.
The poli cy does not define „accidental damage‟, in which case the usual and ordinary
meaning applies: that is, damage which is unintended and unexpected.
Ther e is no dispute that the complainant‟s driveway was accidentally damaged during
the period of insurance when it was used by fire service vehicles during the bush
fires.
That means the complainant has established a claimable loss in respect of the
driveway.
Determination | Case number: 702893 Page 5 of 17
Complainant says driveway not designed for extensive use by heavy vehicles
In early September 2019, the State fire service utilised the compl ainant‟s property as
a „ base ‟ of operations to fight nearby fires and help protect the complainant‟s property
from the impending bush fire. That continued for more than a week.
The complainant says that during that time the fire service used the propert y‟s
extensive driveway many hundreds of times, so they could access the nearby
National Park to fight the fires.
The complainant says the extensive use by fully loaded fire trucks has caused the
delamination of the top coating of the driveway, since it was not designed for this type
of heavy use. Instead, it was designed as a „ fit for purpose ‟ rural driveway, for use by
light vehicles.
Insurer says driveway damage caused by wear, tear and faulty workmanship
The insurer accepts there is damage to the driveway, however says it has been
caused by faulty workmanship, and wear and tear, which are excluded under the
policy. The insurer has relied on an engineering report provided by CRD.
In its first report, CRD states:
the Insured advised that they were concerned about the amount of gravel that had
delaminated from the driveway, particularly in the driveway end circuit, near the
stables and residence
the Insured advised that the driveway generally had a base layer 150 m m thick of
CBR 45 material. The Insured advised that the base layer was reduced to 100 mm
thick at the top half of the driveway end circuit, for budget reasons
the driveway was approximately 900 metres long from the main road to the junction
where the driveway end circuit began. The driveway end circuit was approximately
800 metres long, and ran clockwise past the arena, guest accommodation, the
stables and the two residences. The driveway was approximately 3 metres wide
the finish to the driveway was observed to be a two-coat seal. Spray seal is a
combination of a spray coat of hot cutback bitumen binder to waterproof the area,
followed by an even spread of aggregates.
CRD reported on the driveway as four separate sections: section one was from the
front gate to the first culvert crossing (the first 250 metres of the driveway); section
two was from the first culvert crossing to the next culvert crossing (390 metres in
length); section three was the next 390 metres of driveway; section four was the
remaining driveway of approximately 800 metres.
CRD concluded:
Determination | Case number: 702893 Page 6 of 17
as advised by the Insured and in responses from the contractor, the sub base was
installed at a depth of 100-150mm. AS 3727:2016 requires a combined depth of
230mm for a base and subbase for light vehicles and 300mm combined
base/subbase depth for commercial vehicles. Based on our site observations and
knowledge of the local area (soils with a high clay content), it is likely this site
would be classified as at least „M‟. A class „M‟ site means the re active clays on the
site would be considered as moderately reactive
it is our opinion that the base depth of the driveway as installed was inadequate for
the site conditions and for the traffic expected.
there were no images or reports of the condition of the driveway before the
bushfire event, except for aerial images. This report was based on the aerial
images and the physical inspection of the driveway
driveway section 1, 2 & 3 – the driveway was in good condition with some
degraded areas. The degraded areas were observed in aerial photographs from
August 2019 (before the bushfire event) It is our opinion that the degraded areas
are the result of faulty design or construction and not the result of use of the
driveway by fire trucks
driveway end circuit – the general condition of the road surface was good. When
the sub base and base of a road are inadequate, the faults in the base become
evident in the road surface by way of cracking to the bitumen surface, or
unevenness in the road surface. The driveway surface from 400 m to 450 m, was
observed to have a large amount of gravel and bare patches at the middle third of
the road. The Insured advised that the road base was 100 mm thick in this section,
in comparison with 150 mm elsewhere. This section also lacked a v-drain on the
high side of the road, potentially allowing surface runoff to enter and soften the
road base. It is our opinion that the condition of the road in this section is due to
long term degradation caused by the result of inadequate design and inadequate
provisions made for the drainage of surface and sub -surface water. The condition
of this section of the road was not due to the extra tra ffic of the bushfire event
the driveway from 400 m to 450 m on the driveway entry circ uit will need to be
excavated to remove the old surface and a new bitumen should be placed on site
to match the existing design and layout. The new sub base material must be
adequately compacted prior to the replacement of the new driveway. A new
driveway can be prepared, in accordance with AS3737 – 1993 Guide to Residential
Pavements.
In a subsequent report, CRD stated:
as CRD stated in the initial report, the structural condition of the driveway was
„ generally in good condition ‟ (except for a poorly drained section at the top of the
loop). The design and construction of the pavement was not in question, but the
condition of the surface finish was of most concern
Determination | Case number: 702893 Page 7 of 17
the appearance of a roadway with a 2-coat bitumen seal will change in the period
after the construction completes, especially over the first 12 months. Vehicular
traffic over the road surface will always result in the detachment of some gravel
from the final coat. The integrity of the final bitumen coat depends on many
parameters in the installation, such as the ground temperature on the day, the
temperature of the bitumen, the thickness of the installed bitumen coat, and the
rate of application of the gravel. Integrity of the final coat will always be subject to
variance, regardless of the contractor with the best of intentions. All bitumen
coated roadways shed gravel over the first 12 months of use.
Reference to Australian Standards is not unreasonable
The complainant says the insurer‟s expert was incorrect in using the referenced
Australian Standard (AS 3727:2016) when forming its opinion that the driveway
construction was faulty. The complainant contends its driveway is not residential,
which is what the standard refers to. Instead, it is a rural drive, which was constructed
to be fit for purpose for the use of passenger and light commercial vehicles.
While the Panel accepts the complainant‟s position, the Panel also accepts it is not
unreasonable for the expert to use the Standard as a base reference for construction
methods, since there are no prescribed standards for rural driveways. However, the
insurer/its expert elected not to provide a full copy of the relevant Australian Standard
for the Panel‟s consideration, and instead has provided excerpts only.
The excerpt provided states the recommended depth at which the base and sub-base
should be installed is 230mm, whereas the complainant‟s driveway was installed at a
depth of either 100 or 150mm (depending on the particular location). It is on this basis
that the expert states the damage is the result of faulty workmanship.
The Panel has obtained an overview of the Standard, which states as follows:
This Standard specifies the design and construction of pavements for light usage,
low speed, non-commercial applications for vehicles with a gross vehicle mass
not exceeding 10 t. This includes patios, paths, driveways, vehicle crossovers and
recreational pavements such as cycleways.
The Panel is satisfied that clearly it does not reflect or anticipate the use of the
driveway by firefighting vehicles and equipment. The complainant has provided
information that the firefighting equipment in use on the driveway exceeded the 10t
limit significantly; and in some cases the vehicles were almost three times the
recommended limit specified in the Standard.
In the circumstances, the Panel is not satisfied the unqualified use by the insurer ‟ s
expert of that Standard represents a fair or appropriate point of reference in
concluding the driveway was not correctly constructed. CRD did not, for example,
provide its view of whether the weight of the fire service vehicles would have had an
adverse impact on a driveway if it had been constructed to the relevant Standard.
Determination | Case number: 702893 Page 8 of 17
CRD was provided with the complainant‟s submission about the weight of the
vehicles, however, in its further reports, did not specifically address that point; instead
simply stating all driveways would „s hed ‟ gravel during the first 12 months after
construction.
The Panel accepts, based on the CRD reports, there are areas of the driveway which
showed some pre-existing damage which was, on balance, the result of the design
and inadequate drainage.
However, CRD failed to state how the underlying construction methods used on the
driveway would cause the level of delamination observed when the driveway was
inspected. It also failed to address the impact the firefighting equipment would have
had on a driveway which was constructed to the Standard referenced, given they
were above the weight limit to which the Standard applied.
On balance, fire trucks contributed to the delamination of the chip seal
CRD inspected the driveway in January 2020, some three months after the eve nt.
The complainant says the condition of the driveway has deteriorated further since the
event, due to heavy rainfall which occurred between the event and CRD‟s attendance.
The complainant has provided a video and images of the driveway taken shortly after
construction was completed. The Panel has compared these to the images supplied
by the insurer ‟ s expert. It is clear from the images a considerable amount of
delamination has occurred since the driveway was constructed.
CRD has provided aerial images of selected parts of the driveway prior to the event
and shortly after the event. The Panel considers a series of images from the date of
construction, until the event and leading up to the inspection would have been of
more assistance. However, the Panel is satisfied the available images show there are
areas of the driveway which exhibited pre-existing damage; even though the images
are not detailed enough to show the overall condition of the chip seal prior to the
event, which is the area in dispute.
Neither party has given details relating to the likely frequency of use of the driveway
under normal circumstances and what impact this would have on the delamination, if
any.
The complainant is not seeking cover for any structural damage which may have
been caused either prior to the event or by the fire trucks. Rather , the complainant is
seeking cover for the damage the fire trucks did to the chip seal, and its resulting
delamination.
The Panel accepts the driveway would „ shed ‟ gravel over the first 12 months of use.
The Panel is satisfied a portion of this delamination has occurred due to regular use
and can be attributed to general wear and tear. However, the Panel is not satisfied
Determination | Case number: 702893 Page 9 of 17
the insurer has shown, on balance, the entire delamination of the chip seal was the
result of wear and tear or faulty workmanship.
At the time of the event, the driveway was approximately 10 months old, as
construction was completed in or around November 2018. The Panel is satisfied the
driveway would eventually require resealing, but the insurer has not shown the
constructed method would require resealing on a yearly basis.
The Panel is satisfied the use of the fire trucks has caused the delamination to occur
sooner and to a greater extent than it would have from the intended comparatively
low/different use for which it was designed.
Fair that insurer contributes 50% of quote cost of driveway repairs
The evidence does indicate some pre-existing damage and drainage issues with the
dri veway. CRD‟s report equates that to approximately a quarter (416m) of the 1700m
long driveway. That means the insurer should not be liable for 25% of the related
repair costs.
As well, there was, on balance, already some delamination prior to the event. The
Panel considers a further 25% reduction for general wear and tear is fair in the
circumstances.
That means the insurer is liable for 50% of the driveway resealing costs.
The insurer did not obtain a scope of works or a quote for the resealing of the
driveway. The complainant has provided a quote from the original company which
constructed the driveway. It has established the costs to reseal the driveway at
$56,969.78, excluding GST.
The Panel is satisfied it is fair in the circumstances that the insurer pays $28,484.89
towards the complainant‟s quoted cost of driveway repairs.
Given the age of the quote, and the time which has already passed since the claim
was made, the insurer is also required to pay statutory interest on that amount,
calculated from the date that part of the claim was declined until the date of
settlement.
Complainant says paintwork was damaged due to the use of chlorinated water
The complainant says while the fire service was using the property as a base, it used
both the prop erty‟s rainwater and chlorinated pool water to soak the property to save
it from ember attacks. The complainant contends that, as a result of the use of
chlorinated water, the paint has lost its gloss and has become „ chalky ‟ in nature.
The complainant says the property was painted approximately three and half years
prior to the event, but that since the event, the property appears five years older due
to the damage caused by the chlorinated water.
Determination | Case number: 702893 Page 10 of 17
Insurer says there is no evidence the paintwork is damaged
The insurer says there is no evidence the use of chlorinated water has caused any
damage to the external paintwork of the main dwelling. It relies on a report from CRD,
which states:
the Insured is claiming that the external cladding has been damaged as a result of
chlorinated water being sprayed over it during the fire event
the exterior cladding appeared to be a Weathertex or similar type of exterior
cladding
inspection found no evidence of any type of rotting, splitting or cracking of the
cladding
inspection found no evidence of any type of fading, staining or flaking to the
painted surface of the external weatherboard cladding
the chemical in bleach is the same chemical found in liquid chlorine; bleach is just
weaker by volume than liquid chlorine. The above information from Weathertex
advise to use bleach on the cladding. The diluted chlorine in the pool water would
be significantly less potent than the bleach
a chlorinated pool is most unlikely to cause any harm to adjacent timber. The
important thing from a timber point of view is the pH of the water. We are not
experts on pool chemicals, but we understand that the usual pH of swimming pool
water is between 7 and 8. Since 7 is neutral on the pH scale, neither acidic nor
basic (alkaline), the water is usually slightly towards the alkaline side
sodium hypochlorite (Pool Chlorine) will 'burn' or even kill plant life and grass if you
are not careful; sodium hypochlorite evaporates cleanly, without residue or stain
in the Insured ‟ s case there was no damage to the grass or plant life surrounding
the residence, indicating that the chlorinated water was heavily diluted
in summary there was no sign of any damage to the external cladding of the
residence.
The complainant contends there are fundamental flaws in CR D‟s report. The
complainant says it is of most relevance that CRD estimated the age of the building at
10 years. The complainant says the property was only constructed three and a half
years ago and the life expectancy of the paint is 10 years.
The complainant says this supports his position the chlorinated water has caused the
paint to fade and caused it to appear older, as the gloss has been removed in the
process of soaking the property.
The complainant contends CRD‟s reference to Weathertex, is a guess as to the type
of boards used in construction; however, the complainant has not provided any
information which shows the boards are from a different manufacturer. Further, the
complainant says the boards used were painted after installation and any reference to
the Weathertex maintenance guide is irrelevant.
Determination | Case number: 702893 Page 11 of 17
CRD has relied on a maintenance guide for Weathertex cladding to form its view that
chlorinated water would not cause any damage to the external paintwork. However,
CRD has not confirmed this is the type of cladding used on the complainant‟s
property. Nor did CRD confirm if the cladding was pre-painted before installation, or
when it was last painted. CRD also elected not to obtain information around the type
of paint used and its finish (i.e. gloss, satin, matte).
Complainant has not established on balance the paintwork sustained damage
However, the onus is on the complainant to show on balance the external cladding
was damaged by the use of chlorinated water.
The complainant says the external cladding was painted approximately three and a
half years prior to the event. However, it has not provided any information to support
this position. Nor has the complainant provided any supporting information around the
type of external cladding or details of the paint used, and the recommended care
instructions.
The complainant has provided one image of the property prior to the event, which the
Panel has compared to the images taken by the insurer after the event. However, the
image is not persuasive in showing a difference in the paint work pre- and post-
event.
On the available evidence, the Panel is not satisfied the complainant has shown the
use of chlorinated water caused damage to the external paintwork. That means, the
complainant has not established a claimable loss for the paintwork under the policy.
Insurer to assess roof and plumbing/solar pool heating
The complainant has indicated the insurer did not adequately assess the roof , as well
as also claiming the plumbing/solar pool heating system was damaged in the fires.
However, the complainant did not want to allow the insurer the opportunity to assess
those parts of the property.
It is not fair to hold the insurer liable for any such damage if it has not been allowed to
properly investigate and assess it.
If the complainant still believes there was damage which the insurer should cover
under the policy, then the complainant is required to allow the insurer to undertake a
reasonable assessment of those parts of the property, as soon as reaso nably
practicable. The insurer should then provide the complainant with the outcome of its
investigation and assessment, along with its claims decision and the settlement of
that part of the claim, as appropriate.
Determination | Case number: 702893 Page 12 of 17
3 Supporting information
3.1 Expert reports
Record Key points
Insurers expert ( CRD )
Report
29 January 2020
EXECUTIVE SUMMARY
Driveway from the front gat e to the end circuit (approximately 900
metres) - It is our opinion that the degraded areas of the roadway
surface are the result of faulty design and construction and not the
result of short term use of the driveway by fire trucks.
Driveway end circuit (approximately 800 metres) – It is our opinion
that the condition of the road in this section, particularly between
400m and 450 m from the fr ont driveway road, was due to long
term degradation caused by the result of inadequat e provisions
made for the drainage of surface and sub - s urface water. The
condition of this section of the road was not due to the extra traffic
of the bushfire event.
Observations
The driveway was approximately 900 metres long from the main
road to the junction where the driveway end circuit began. The
driveway end circuit was approximately 800 metres long, and ran
clockwise past the arena, guest accommodation, the stab les and
the two residenc es. The driveway was approximat ely 3 metres
wide.
There was very little nominal long term degradation of the
driveway surface observed over the length of the driveway in the
form of longit udinal cracks. When found these longitudinal cracks
are consistent with differential settlement in the subbase layer
caused by the narrow loading from the vehicle wheels. Settlement
in the area of the wheel tracks of the driveway, relative to the
central portion of the driveway, causes tension failu re and
subsequent lateral separation of the bitumen surface.
There was very little „pothole‟ damage (where water infiltrates
under the edge of the bitumen causing the subgrade to soften and
for the bitumen surface to detach)
Conclusions
As advised by the Insured and in responses from the contractor,
the subbase was installed at a depth of 100 - 150mm. AS
3727:2016 requires a combined depth of 230mm for a base and
subbase for light vehicles and 300mm combined base/subbase
depth for commercial vehicles. Based on our site observations and
knowledge of the local area (soils with a high clay content), it is
likely this site would be classified as at least „M‟. A class „M‟ site
means the reactive clays on the site would be considered as
moderately reactive
It is ou r opinion that the base depth of the driveway as installed
was inadequate for the site conditions and for the traffic expected
There were no images or reports of the condition of the driveway
before the bushfire event, except for aerial images. This report
was based on the aerial images and the physical inspection of the
Determination | Case number: 702893 Page 13 of 17
Record Key points
driveway
Driveway section 1, 2 & 3 – the driveway was in good condition
with some degraded areas. The degraded areas were observed in
aerial photographs from August 2019 (before the bushfir e event) It
is our opinion that the degraded areas are the result of faulty
design or construction and not the result of use of the driveway by
fire trucks
d riveway end circuit – the general condition of the road surface
was good. When the sub base and bas e of a road are inadequate,
the faults in the base become evident in the road surface by way
of cracking to the bitumen surface , or unevenness in the road
surface. The driveway surface from 400 m to 450 m, was
observed to have a large amount of gravel and bare patches at the
middle third of the road. The Insured advised that the road base
was 100 mm thick in this section, in comparison with 150 mm
elsewhere. This section also lacked a v - drain on the high side of
the road, potentially allowing surface runof f to enter and soften the
road base. It is our opinion that the condition of the road in this
section is due to long term degradation caused by the result of
inadequate design and inadequate provisions made for the
drainage of surface and sub - surfac e water . The condition of this
section of the road was not due to the extra traffic of the bushfire
event
e ffective drainage will also prevent any pooling or flooding of areas
of pavement or at the edge of paved areas. The road cont ractor
should identify any drai nage issues and ensured they were
addressed in the final design stage
Insurers expert ( CRD )
Report
27 March 2020
The exterior cladding appeared to be a Weathertex or similar type
of exterior cladding
Inspection found no evidenc e of any type of rotting, splitting or
cracking of the cladding
Inspection found no evidenc e of any type of fading, staining or
flaking to the painted surfac e of the external weatherboard
cladding
On questioning the caretaker and asking him to point out any
fading or staining to th e boards he was not able to only to say that
they aren‟t the same as they were prior to the event
I asked for clarification and what was meant, and he advised that
the Insured had indicated that all the boards have faded as a
result of the chlorine
Insur ers expert ( CDR )
Report
8 May 2020
AS3727 Pavements Part 1: Residential, was creat ed “to provide
criteria to ensure that residential pavements are designed and
constructed to provide an acceptable level of performance”. There
is no prescribed standard for rural driveways.
i t is our opinion that the actual vehicle traffic into the property
would have included vehicles over 3 tonnes, and up to 10 tonnes,
for normal rural operations. P advised in their response to written
Determination | Case number: 702893 Page 14 of 17
Record Key points
questions that the roadway was designed for use as a rural
driveway. The driveway has not been designed in accordance with
AS3727, in particular, the depth of pavement was described as
150 mm, compared with 230 mm required by AS3727. The
driveway was observed to be in reasonable condition during the
inspection, with very little pothole damage to the pavement or
cracking to the pavement surface. The exception was the driveway
end circuit, in particular the section from 400 m to 450 m from the
start of the circuit. As described in the CRD report, this section of
driveway had a lar ge crossfall (sic) . It is our opinion that the
degradation of the road surface in this area was from inadequate
design and construction for drainage of surface and subsurface
water There was no v - drain on the high side of the roadway,
allowing surface runo ff to enter and soften the roadway pavement.
It is our opinion that the short term use of the driveway by the fire
vehicles has not caused the cur rent condition of the driveway.
Insurers expert (C RD )
Report
8 May 2020
t he Bureau of Meteorology reported c onsecutive daily totals of 48
mm and 55 mm in April 2019, as well as monthly totals of over 394
mm and 247 mm at the end of 2018, in the loc al area, aft er the
construction of the road. It is our opinion that the lack of a „V‟ drain
at 400 m to 450 m along the driveway end circuit had contributed
to the deteriorated condition of the driveway surface. A “V‟ drain
on the high side of a road is a normal requirement for compet ent
road construction. We did not see any damage to the road surface
from the fire, as stated in the A email above
We agree that the entire driveway (bas e layer and coating) does
not need to be rebuilt. It is not clear what extent of the 1.7
kilometre driveway for whic h the A email suggests replac ement of
the seal coating. The base layer was observed to be in good
condition (except for the 400 m to 450 m along the driveway end
circuit, lacking a „V‟ drain on the high side). The driveway ent ry
(Driveway sections 1, 2 & 3 in the CRD report ) was observed to be
in good condition with some surface degradation areas visible in
aerial photographs from August 2019 (before the fire event). There
was surface degradation in the driveway end circuit between 400
and 450 m from the start of the section. It is our opinion that the
degradation was due to the result of inadequate construction
provisions for drainage of the surface and sub - surface water, due
to the lack of normal drainage
t he change in the appearanc e of the coating at different locations
of the driveway does represent differing conditions of the road
surface at the different ages of the driveway. The appearance of a
roadway with a 2 coat seal will change in the period after the
construction completes, especially over the first 12 months.
Vehicular traffic over the road surface will always result in the
detachment of some gravel from the final coat. The integrity of the
final coat depends on many parameters in the installation, such as
the ground temperat ure on the day, the temperature of the
bitumen, the thickness of the installed bitumen coat, an d the rate
of application of the gravel. Integrity of the final coat will always be
Determination | Case number: 702893 Page 15 of 17
Record Key points
subject to variance, regardless of the contractor with the best of
intentions. All bitumen coated roadways will shed gravel over the
first 12 months of us e
t he base layer w as in good condition (except for part of the
driveway end circuit). In our opinion, the degradation of part of the
end circuit was due to inadequate construction of the drainage in
that area. In our opinion, degradation of the surface has occurred
over the life of the driveway due to the softening of the subgrade
due to the lack of drainage.
Insurers expert (CRD )
Report
15 June 2020
AS3727. 1 Pavements - Residential provides criteria to ensure that
residential pavements are designed and constructed to provide an
acceptable level of performance. There is no other Australian
Standard that attempts to provide prescriptive criteria for
pav ements, for this purpose. There is no specific Australian
Standard for rural driveways. It is our opinion that the variability in
the ground conditions encountered on rural properties, and the
spectrum of vehicles using the driveways would require such a
r ural driveway standard to be too onerous to be practicable. CRD
were unable to gain access to the design (if carried out) from the
contractor, other than a res pons e stating “The driveway was
constructed using standard flexible pavement techniques” and “t he
driveway was designed and constructed fit for purpose as a rural
driveway”.
t he code requirements for pavement thickness are the same for
class S and M conditions i.e. “most silt and clay sites” or
“moderately reactive clay sites”. As CRD stated in the i nitial report,
the structural condition of the driveway was generally in good
condition, so the focus of the report was not directed to the
pavement thickness, but to the surface finish
the structural condition of the driveway was “generally in good
condit ion” (except for a poorly drained section at the top of the
loop).
t he appearance of a roadway with a 2 coat bitumen seal will
change in the period after the construction completes, especially
over the first 12 months. Vehicular traffic over the road surf ac e will
always result in the detachment of some gravel from the final coat.
All bitumen coated roadways shed gravel over the first 12 months
of use.
3.2 Relevant Policy Wording
Product Di sclosure Statement 25 September 2017
Page 7
What’s NOT COVERED
Determination | Case number: 702893 Page 16 of 17
Product Di sclosure Statement 25 September 2017
These apply to all sections of this policy and where a section of this policy has parts each part and the
balance of that section not within a part.
..
Wear and Tear and Faulty Workmanship
For wear and tear, fading, scratching or marring, gradual deterio ration or developing flaws, rust,
corrosion, rot, normal upkeep or making good, inherent or structural defects, faulty design or faulty
workmanship
..
Page 16
Cover Sections HOME BUILDI NGS
WHAT’S COVERED
Option 1 Priority Choice
Your Home Buildings that are at the Location. They are covered against loss or damage caused by
the following events, if they happen during the period of cover:
(1) Perils
Loss or damage that is caused by:
[a] Fire;
..
[m] Water that comes from a fire sprinkler sys tem; or
[n] Water that bursts leaks or overflows from a bath, fixed home appliance, gutter, shower base, sink,
toilet fitting, fixed tank, swimming pool, spa or pipe. We do not pay for repair or replacement of the
item that burst or leaked.
..
Option 2 Pr iority Plus
Your Home Buildings that are at the Location. They are covered against accidental loss or damage
during the period of cover, along with the perils covered under Option 1 Priority Choice
WHAT’S NOT COVERED
Option 1 Priority Choice; and Option 2 Priority Plus
..
(4) Faulty Design or Material
Any loss or damage that arises from:
[a] Fault, error or omission in design, plan or specification;
Determination | Case number: 702893 Page 17 of 17
Product Di sclosure Statement 25 September 2017
[b] Latent, structural or inherent defect; or
[c] Use of faulty materials.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.