Denial of additional water and mould damage claim and cash settlement contingency
Text of the determination
Determination
Case number 702401
Financial firm AAI Limited
Determination | Case number: 702401 Page 1 of 7
Case number: 702401 23 July 2021
1 Determination overview
1.1 Complaint
The complainant lodged a claim in February 2019, on her home and contents policy with the
financial firm (insurer), for water damage sustained to her property following a storm.
The insurer accepted the claim and agreed to settle part of it by undertaking mould
remediation once the complainant had completed required maintenance work. The insurer
then offered to cash settle the remaining repairs.
Before the claim was fully settled, the complainant discovered additional damage to the home
and lodged a second claim as advised by the insurer, in September 2019. The insurer denied
liability for the additional damage on the basis the damage:
occurred over time and was not due to a single event as required by the policy, and
was caused by defects of which the complainant would have been aware.
The complainant disputes the insurer’s decision and says further repairs are necessary
because:
all of the damage was caused by the initial claim, or
was due to the insurer failing to complete mould remediation properly.
She further says she was not aware of any alleged defects.
1.2 Issues and key findings
Is the insurer’s cash settlement offer fair ?
The insurer is not liable for the additional damage being claimed by the complainant. This is
because the available information does not show the damage is covered by the policy.
The insurer should increase its cash settlement by 20%. This is to account for the realistic
possibility that additional works will be required for the accepted scope of works and the fact
the risks of the works are passing to the complainants. The insurer should also pay interest
on this additional sum.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to pay the following in full and final settlement of this complaint within 21 days
of being notified the complainant has accepted the determination:
an additional amount of $12,800.85
interest on the above amount pursuant to section 57 of the Insurance Contracts Act from 7
October 2019 until payment is issued
Determination | Case number: 702401 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer’s cash settlement offer fair?
The insurer accepted liability for the initial claim and offered a cash settlement
The insurer arranged a builder (A) to attend and assess the first claim in February 2019. In its
report of March 2019, A reported:
Attended site and conducted a leak detection to the main bathroom, laundry and
laundry bathroom. … Damage to the property is consistent with a leak over a
period of time. Found evidence of water leaking from the roof and in between
brick/plaster cavity that separates the bathroom and laundry. Water is leaking
between the cladding of the roof and box gutter, due to sealed rain heads water is
unable to overflow and is escaping into the building.
Whilst the insurer’s assessment indicated there was faulty workmanship to the roof that
caused or contributed to the water entry, the insurer agreed to accept the resultant damage.
The resultant damage identified was to the bathroom, laundry and hallway.
The insurer asked the complainant to complete maintenance works before repairs would be
authorised. The complainant did so.
The insurer’s builder (J) assessed the property, arranged a make safe and prepared a scope
of works. J noted mould remediation was required and the insurer appointed (R) to complete
this work.
Once R completed the remediation, the insurer arranged for (E) to assess the result. E
reviewed the laundry and bathroom and reported the mould remediation was successful.
On re-attending for an inspection, the insurer’s assessor noted ongoing condensation and
pooling of water. The assessor determined there remained non-event related damage for
repair and recommended an engineer assess causation.
An engineer (M) assessed the property. M reported the external pavements were improperly
constructed as it was allowing water to enter the underlying soils and seep through the
brickwork into the subfloor structure.
Given this, the insurer decided to cash settle the balance of the claim. The insurer arranged
for a final scope of works from J. The insurer then made a cash settlement to the complainant
in the sum of $64,004.23 based on J’s scope of works and quote .
Insurer denied claim for additional damage
Before the insurer settled the initial claim, the complainant told the assessor there may be
mould in the kitchen and powder room. The insurer required the complainant to lodge a
second claim for this as it did not accept it was related to the first event. The complainant did
so.
Following further investigation into both claims, the insurer identified there was subfloor
moisture and mould that extended beyond the areas accepted for the first claim. The insurer
Determination | Case number: 702401 Page 3 of 7
says this additional damage was not caused by the accepted event. Further, the insurer says
the cause of this additional damage is not covered by the policy.
The complainant disputes this. The complainant says all of the damage is due to the first
event or the insurer’s poor repairs. The complainant provided a report and quote from R in
support. R says the subfloor cavity shows a large extent of moisture damage throughout the
home. This has resulted in rising damp that requires extensive works to be conducted. These
works include the main living area of the home.
R quoted $459,096 to do all these works. The complainant also provided a report by A,
occupational hygienist, who confirmed the extensive presence of mould and moisture in the
subfloor.
Subfloor issues were not caused by the claimed event
The available information shows there is extensive subfloor moisture. There appears to be no
dispute this has been the main cause for the extensive repairs recommended by R.
Numerous reports have been provided on these claims. The panel does not propose to go
into all of them in detail. However, the panel makes the following references and comments in
these reports that are relevant to this dispute:
two engineers (M and H) engaged by the insurer agree the subfloor moisture has been
happening over a long time – these have been due to poor ventilation, external paving not
being graded away from the subfloor and an inadequate drainage system
observations within the subfloor are consistent with the fact this is long term – the
presence of efflorescence and the fact the area is still moist 12 months after the first claim.
Further, these factors are not consistent with the first event being the cause
the complainant’s experts (R and A) do not say the source of this subfloor moisture was
caused by the first event – R’s report offers no opinion as to the cause and A noted the
extent of mould growth is likely to have occurred over a prolonged period
The panel also notes the first claim involves the roof leaking between the brick/plaster cavity
that separates the bathroom and laundry. It is unlikely this leak could have caused such
extensive moisture and mould through the subfloor that remains evident almost twelve
months afterwards. Also, as discussed above, no expert has said this event could have
caused such extensive issues.
The complainant says this extensive mould was due to R not fully performing the works it was
engaged to do.
The panel does not agree. None of the experts say this. R was engaged to remediate the
damaged areas. According to hygienist E, this was done. The available information does not
show R was supposed to remediate all mould affected areas that are not caused by the
claimed event.
Insurer is not liable for the additional damage claimed
The complainants’ policy responds in the following circumstances:
When you have home cover, your home is covered for accidental loss or damage
at the insured address and in the period of insurance, subject to the conditions,
limits and exclusions in this policy.
Determination | Case number: 702401 Page 4 of 7
Accidental loss or damage is loss or damage from incidents you did not intend or
expect to happen, e.g. accidentally breaking kitchen tiles, cracking a stone bench
top or breaking a window.
Incident is defined to mean:
… a single incident, accident or occurrence which you did not intend or expect to
happen
Based on the available information, the panel does not accept the additional damage was
caused by an ‘incident’ as defined by the policy.
This is because the available information shows the subfloor moisture issues, and resulting
mould damage, has been happening over a long period of time. This is because of various
site drainage issues that is resulting in water continually entering the subfloor.
This is supported by both engineers . It is consistent with the experts’ observations of the
subfloor. It also seems implausible that a leaking roof event could have caused such
extensive subfloor issues.
The available information also shows this has been the main cause of the additional damage
denied by the insurer. The panel does not accept the claimed event from early in 2019 could
have caused all the damage being claimed. Neither is the panel persuaded the insurer’s
works have caused, or contributed to, the additional damage sought.
Given all this, the panel is not persuaded the policy responds to the additional damage. As
stated above, the policy only responds to accidental loss or damage. Accidental loss or
damage must be from an incident. The available information does not show an incident has
caused the additional damage.
Insurer should pay a 20% contingency fee
J’s quote and scope of works set out the balance of the repairs required for the first claimed
event. Based on the available information, the panel accepts these scope of works fairly
reflect the repairs required for the accepted event.
It does not appear this quote is actionable. Further, given the extent of the works required, it
is realistically possible further variations may be required. In addition, the risks of the works
are passing to the complainant.
Given this, it is fair in all the circumstances for a 20% contingency to be allowed. This means
the insurer should pay an additional $12,800.85. The insurer is also to pay interest on this
amount pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from 7
October 2019, being when the insurer sought to cash settle the claim, until the balance is
paid.
Determination | Case number: 702401 Page 5 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and e ach
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
Determination | Case number: 702401 Page 6 of 7
3.2 Relevant policy wording
Section Relevant wording
What you are covered for
p. 29
Home cover
When you have home cover, your home is covered for
accidental loss or damage at the insured address and in
the period of insurance, subject to the conditions, limits
and exclusions in this policy.
Accidental loss or damage is loss or damage from
incidents you did not intend or expect to happen, e.g.
accidentally breaking kitchen tile s, cracking a stone
bench top or breaking a window.
There are some things we do not cover and these are
shown in the ’General exclusions’ on pages 79 to 86.
Accidental damage
Accidental loss or damage includes loss or damage from incidents
such as:
…
Storm;
…
Escape of liquid
Additional features
p. 30
Temporary accommodation when you have home cover
When an ins ured incident damages your home to the extent you
cannot live there, and we agree, we will pay for your reasonable
temporary accommodation costs for the time it will take to repair or
rebuild your home to a liveable condition…
The most we will pay is:
up to 4 weeks in short term accommodation agreed to by us (e.g.
standard rat es for a hotel, motel or serviced apartment);
then if necessary
up to another 100 weeks in residential accommodation of a similar
standard to your home.
General exclusions
pp. 79 - 86
You are not covered under any section of this policy for damage,
loss, cost or legal liability that is caused by, arises from or involves:
…
Consequential losse s or extra costs following an incident
covered by your policy
consequential loss (financial and non - financial loss) or extra costs
following an incident covered by your policy, such as:
…
professional, expert, legal, consulting or valua tion costs, unless you
obtained our prior written authority to incur these costs
…
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or
should reasonably have known about) and did not fix before the l oss
Determination | Case number: 702401 Page 7 of 7
or damage occurred (e.g. if there are signs that a defect previously
caused damage, we will not pay a later claim for further damage
from this defect).
…
Escaping liquid
wear and tear, or loss or damage by the escape of liquid
occurring as a result of a gradual process of leaking, splashing,
dripping or overflowing over a period of time when you could
reasonably be expected to be aware of this condition;
the cost of repairing or replacing the item from which the liquid
escaped;
…
Failing to take care of your home or contents
your failure to:
…
fix faults and defects as soon as you become aware of them.
…
How we settle your claim
p. 94
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we
will decide if we will:
repair damage to your home;
rebuild your home;
pay you what it would cost us to repair or rebuild your home;
pay you the sum insured for your home.
Words with special
meanings
p. 111
“Incident” means a single incident, accident or occurrence which
you did not intend or expect to happen.
“Storm” means a storm, cyclone or severe atmospheric
disturbance. It can be accompanied by strong winds, rain, lighting,
hail, snow or dust.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.