Contents settlement limited to $45,000 sum insured after flood, with claim handling delay
Summary
After a burst washing machine hose flooded his home, the complainant disputed the $44,500 contents settlement under a $45,000 sum insured and claimed further losses and incidental costs. AFCA found no further liability beyond the sum insured but awarded $2,000 compensation for the delay in instructing builders.
The complainant had to show on the balance of probabilities that the insurer's conduct caused the further contents loss, which he did not, and non-financial loss is awarded only for an unusual degree of inconvenience caused by delay.
Issues
- Claim amount dispute primary · not upheld
“The insurer is not required to pay anything further to the complainant over and above the sum insured of $45,000.”
- Poor claim handling secondary · not upheld
“The insurer has the right to retain salvage.”
- Delay secondary · upheld
“the time taken to instruct builders to commence repairs is around six months which I consider is too long.”
Subjects and remedies
home or building damagepay non financial loss
Text of the determination
Determination
Case number 702200
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 702200 Page 2 of 9
Case number: 702200 18 November 2020
1 Determination overview
1.1 Complaint
In October 2019 the complainant lodged a claim under his home and contents
insurance policy with the financial firm (insurer) after returning from holidays to
discover his home had been flooded from a burst washing machine hose.
The insurer assessed and accepted the claim. As the complainant’s contents loss
exceeded the policy limit of $45,000, the insurer paid the complainant $45,000.
The complainant disputes the settlement. He says the insurer caused further loss of
his contents due to delays in claim handling and prejudiced his ability to claim through
the washing machine manufacturer by disposing of the machine without his consent.
The complainant also seeks financial losses incurred for incidentals whilst in
accommodation due to building repair and claims handling delays caused by the
insurer and non-financial losses for the claims handling experience.
The case manager provided a recommendation partly in favour of the complainant. As
the complainant has not accepted the recommendation, the complaint has been
referred to me for determination.
1.2 Issues and key findings
Is the insurer ’s liability limited to the sum insured of $45,000
Yes. The insurer is not required to pay anything further to the complainant because
the available information does not establish on the balance of probabilities the
insurer’s actions or inactions caused the complainant’s claimed loss.
Is the complainant entitled to compensation?
Yes. Because of the delay in appointing a builder to commence repairs, there has
been an unusual degree or extent of physical inconvenience and time taken to
resolve the complaint which would have interfered with the complainant’s expectation
of enjoyment or peace of mind.
1.3 Determination
This determination is partly in favour of the complainant.
Should the complainant accept this determination then within seven days of
notification of acceptance, the insurer is to pay to the complainant $2,000
compensation. Otherwise, the insurer is not required to take any further action in
relation to the claim or the complaint.
Determination | Case number: 702200 Page 3 of 9
2 Reasons for decision
I have decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding). I have considered all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
No new material provided after the recommendation
After the recommendation was rejected, neither party provided any further
submissions or new material.
2.1 Is the insurer ’s liability limited to the sum insured of $45,000
Contents were insured for $45,000
There was a claim in relation to theft of items from the premises in January 2020. The
available material indicates the theft claim has been resolved.
It is not in dispute:
the relevant policy schedule shows the contents were insured for $45,000
the complainant has been cash settled $44,500 which represents the total sum
insured less the policy excess of $500.
Parties’ submissions considered
The complainant says the insurer should pay more because:
when he lodged the claim in the late evening of 7 October, due to the unavailability
of a panel restorer, the insurer told him to engage his own restorer who left the wet
contents items which have deteriorated to the extent they are now unsalvageable
and cannot be restored
he is unable to successfully pursue a recovery claim against the manufacturer of
the washing machine because the insurer discarded the washing machine and
hose without his consent and without a causation report
he did not understand the washing machine was to be disposed of, does not know
when this happened and says there was no communication about disposing of any
items save for items which were going in the bin
he was told the restoration company stores contents until further notice and as he
had moved out of the property he was not checking when items were taken away.
Determination | Case number: 702200 Page 4 of 9
The insurer says:
it is unclear who spoke to the complainant on the evening the damage was
discovered as the first formal record of contact with the insurer was not until 7:19
am on 8 October 2019
because of the extent of damage to the property, it is probable the water had been
leaking for some time and therefore any delay in the restoration or actions or
inactions by the restorer has not caused further damage
some of the damaged items were owned by the complainant’s parents and the
insurer cannot agree to a retrospective adjustment to the sum insured in order to
accommodate the parents’ property
the claim was settled on a total loss basis and in accordance with the policy terms,
the insurer had the right to dispose of the salvage as it deemed appropriate
the washing machine was disposed of in the presence of the complainant
recovery from the manufacturer is unlikely to be successful as the taps to the
washing machine were not turned off as recommended by the manufacturer
the complainant cannot show the washing machine was installed and operated in
accordance with manufacturer’s specification.
Insurer has not caused the claimed loss and is not required to pay more
The compl ainant must establish on the balance of probabilities the insurer’s actions or
inactions have caused the further loss claimed over and above the sum insured of
$45,000.
I have considered the material provided by the parties. A summary is included in
supporting section 3.3 of this determination.
On the available material I am not satisfied the complainant has established the
insurer’s actions or inactions has caused the claimed loss because:
the policy terms are clear. Contents were only insured for $45,000. I accept the
parents’ contents could not be retrospectively included in the policy.
the available objective information (the insurer’s file note 8 October 2019 9.02am
and the emails from the restorer) indicate the complainant probably engaged his
own restorer late on 7 October 2019, as when he contacted the insurer early on 8
October 2019 the insurer confirmed he could keep his own restorer because the
restorer had been on site since last night.
even if the complainant was advised to engage his own res torer in the phone call
which took place on 7 October 2019 at 10:37pm, it is not established the restorer
caused the claimed damage as it is probable significant damage had been done to
the home and contents already because both the complainant’s restorer and the
insurer’s adjuster say water had flooded the house over an extended period ,
causing severe damage.
Determination | Case number: 702200 Page 5 of 9
whatever the circumstances surrounding the disposal of the washing machine, the
available material does not establish a claim against the manufacturer of the
washing machine is likely to be viable in circumstances described by the
complainant’s restorer and the insurer’s adjuster. The restorer describes the hose
“was tightened and popped off.” The adjuster describes a burst and broken water
pipe which is evidenced by a photograph in his report. The washing machine
manufacturer refers to the requirement to turn off taps to prevent the chance of
flooding should a hose burst.
the policy terms are clear. The insurer has the right to retain salvage.
In summary, having considered the available material, and for the reasons stated, I
am not satisfied the insurer is required to pay anything further to the complainant over
and above the sum insured of $45,000.
2.2 Is the complainant entitled to compensation?
Compensation paid in some circumstances
The complainant is dissatisfied with the way the claim was handled. He says there are
delays in commencing the building works, he was provided with inadequate
assistance and there was lack of information regarding the progression of the claim.
He claims incidental costs including:
travel costs each day to drop off and pick up children
initial food costs for the first few days due to lack of ability to cook in the hotel
moving costs, as he moved at least 3 times during this period
additional childcare costs throughout the period
The complainant also says he has been unable to work since 2 December 2019. He
acknowledges this is not solely due to the claim but says it has added further stress to
his existing condition.
The insurer offered $500 compensation as a gesture of goodwill.
When the claim was made, temporary accommodation was arranged and continues
to be arranged.
The insurer’s adjuster contacted the complainant on the 11 October 2019 and
attended to assess the damage on 15 October 2019.
The adjuster appointed contractors who assessed the salvage work, damaged
contents and floor and mould remediation. On or about 27 November 2019 the
complainant was paid $44,500 for the damaged contents.
On 17 January 2020 the adjuster reported demolition works were nearing completion
and quotes for repairs were being obtained.
Determination | Case number: 702200 Page 6 of 9
By 14 February 2020 comparison quotes for the building works were obtained and in
its report of 6 March 2020 the adjuster recommended the acceptance of a bu ilder’s
quote.
On 25 March 2020 ongoing accommodation arrangements were made and the builder
was authorised to commence building works.
Insurer to pay the complainant $2,000 compensation
AFCA will award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation.
Having reviewed the available material, I acknowledge the loss event and the claim
process was very stressful and caused great inconvenience. Severe damage was
done to the complainant’s home and contents. Because of the nature of the damage,
the complainant and his family have had to live in temporary accommodation.
I do not accept all the inconvenience and stress has been caused by the insurer’s
claims management. Generally, the available information shows the complainant was
kept informed. The complainant was paid for total loss of contents within about seven
weeks of the claim being made. The complainant has provided medical certificates
showing he had other health issues unrelated to this claim.
I acknowledge significant damage has been done to th e complainant’s home and the
repairs are significant. However, the time taken to instruct builders to commence
repairs is around six months which I consider is too long. I accept this delay would
have added to the complainant’s stress and inconvenience sus tained.
The incidental matters claimed by the complainant are not payable pursuant to the
policy terms. The available information does not establish the incidental matters
claimed were incurred by the insurer’s claims handling. Some of the incidental
matters claims may have been incurred in any event or are consequential upon the
claim itself.
Taking all matters into account I am satisfied an award of compensation of $2,000 is
fair in all the circumstances.
Determination | Case number: 702200 Page 7 of 9
3 Supporting information
3.1 Our Approach
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer’s Notice of Response . Both the policy document and the Notice
have been exchanged with the complainant.
How to change your policy
It’s important that all the details in your policy schedule are current and correct.
You must tell us as soon as possible if circumstances occur, or if changes or alterations are
intended or made which increase the risk of loss, damage or injury as this may limit your
cover or prevent you from claiming on your policy.
……
You’ll need also t o consider the level of your sum insured when making changes such as:
purchasing new items that increased the value of your contents (you’ll need to revise
your sum insured:
additions or renovations to your building
purchasing watches, jewellery or items c ontaining gold or silver…
How we settle a contents claim
We will decide how we will settle your claim
If your contents of a loss or damage, we will decide whether to:
Repair an item
Replace an item or
Pay you the cost to repair or replace the item.
Where we settle a contents claim, we are entitled to retain the salvage.
Where claims are made for less than the sum ins ured, you will be fully insured again for your
contents for the amount shown on your Policy Schedule.
Where a claim is for a total loss and we pay you the sum insured, then your policy comes to
an end and no refund of your premium is due.
Determination | Case number: 702200 Page 8 of 9
3.3 Extracts from material relied on by parties
Date Action
Certificate of insurance Building sum ins ured: Full building replacement
estimate $454,255.46.
Cont ents sum insured. You’ll need to determine a sum
insured for your contents. The sum insured is the
dollar amount it would cost to replace your contents
brand new.…
Cont ents sum insured Estimate $65,000
What sum insured would you like for your contents ?
$45,000
Specified valuables $5, 000.
Loss adjuster report (S)
17 October 2019
Inspected and photographed damage 15 October 2019
– resultant water damage because of burst/broken
water pipe to washing machine.
Photographed the washing machine pipe that burst.
Complainant ret urned after holiday and found floor
flooded with water. Investigated and found water pipe
to the washing machine had burst/brok en resulting in
water flooding the house for an unknown period.
Complainant turned off water supply and cal led insurer
and was advised to appoint a restorer and appointed F
to attend to the restoration.
F has attended, installed dehumidifiers and dryers and
removed skirtings from walls and lower level ceilings.
Damage is visible and obviously due to burst wate r
pipe and it is clear water flooded the house over an
extended period causing severe damage.
Describes the house and the damage. Complainant,
wife and children live in the first level and parents live
in the lower level – both levels self - sufficient.
Re quire a restorer to uplift and dispose of damaged
floor and inspect and compile a schedule of loss for
the damaged contents.
Emergency service s report (F)
30 October 2019
Loss 7 October 2019 because of washing machine
hose disconnection.
Complainant identified the washing machine hose was
tightened and popped off causing water to go through
the whole house (the amount of days or hours is
unknown).
Attended 11 pm and re - attended 8 October 2019.
Described remediation work undertaken over se veral
days.
Loss adjuster report (S)
8 November 2019
Describes the work done by various contractors.
AR engaged to assess affected contents items and
prepare a non - restorable contents manifest. Awaiting
finalised list in order to obtain replacement quot ations
Determination | Case number: 702200 Page 9 of 9
Date Action
from panel suppliers.
Increase cont ents reserve to $45,000 inc GST due to
the amount of contents items which are affected.
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails.
Parties’ reports.
Photographs.
Correspondence between the insurer and contractors.
Correspondence between the complainant and the washing machine
manufacturer.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.