Home / Strata Community Insurance Agencies Pty Ltd / Determination 701397

Determination 701397

Declined flood water damage claim relying on non-disclosure, exclusions and insuring provision

FirmStrata Community Insurance Agencies Pty Ltd
Decided2021-02-11
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$693
Non-financial loss$5,000
Amount claimed—
SourceAFCA PDF

Summary

A strata unit owner's flood water damage claim was declined by the insurer on non-disclosure, exclusion and insuring-clause grounds. AFCA found the policy responds, rejected the non-disclosure defence, and ordered accommodation, levies, repairs and legal costs paid plus $5,000 non-financial loss.

The insurer must establish the specific cause of water entry to rely on an exclusion, and must show the extent of its prejudice under section 28(3) of the Insurance Contracts Act 1984 to rely on non-disclosure.

Issues

Subjects and remedies

elderly or capacityhome or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 701397 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 701397 Page 2 of 15 Case number: 701397 3 February 2021 1 Determination overview 1.1 Complaint The complainant is a unit owner in a residential strata development insured with the financial firm (insurer). The body corporate is the insured. The complainant lodged a claim for water damage to her unit as a result of the Townsville Floods in February 2019. The insurer declined the claim for the following reasons:  there were pre-existing issues with the roof and other areas of the building that were not disclosed when the policy was incepted  the loss does not fall within the insuring provision  the loss falls within several policy exclusions The complainant is disputing this. The complainant is seeking for her levies to be refunded and for her accommodation costs to be covered. She is also seeking compensation due to the claim. The complainant was also seeking for the repairs to be completed but this appears to now be financed by the body corporate. 1.2 Issues and key findings Does the policy respond to the claim? Yes. The available information shows the damage resulted from a significant storm. The insurer has not provided sufficient information to show the damage to the complainant’s unit falls within a policy exclusion. Can the insurer deny the claim due to non-disclosure? No. Even if the panel was to accept the body corporate failed to comply with its duty of disclosure regarding pre-existing roofing issues, the insurer has not shown the extent of its prejudice. What is the extent of the insurer’s liability ? The insurer should pay for the complainant’s temporary accommodation costs and refund her levies pursuant to the relevant policy benefits. If the complainant has incurred any repair costs, these should be reimbursed as well. Further, the insurer should reimburse her legal costs. Is the complainant entitled to compensation for delays? The available information shows there were delays which caused the complainant a large degree of stress and inconvenience. The insurer should pay $5,000 for non- financial loss. Determination | Case number: 701397 Page 3 of 15 1.3 Determination This determination is in favour of the complainant. The insurer is to pay for the c omplainant’s temporary accommodation costs and refund her levies pursuant to the relevant policy benefits. The insurer should also refund any costs incurred by the complainant in repairing the property and reimburse her legal costs. In addition, the insurer should pay the complainant $5,000 non-financial compensation. Determination | Case number: 701397 Page 4 of 15 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This decision has been made by a panel consisting of an Ombudsman, an individual with extensive insurance experience and another individual with extensive consumer experience. The decision follows consideration of all the material exchanged. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice (including codes of practice) and previous decisions where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome. 2.1 Does the policy respond to the claim? Complainant required to establish a valid claim The complainant is required to show that, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as establishing a valid claim. If the complainant is able to establish a valid claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. Reports indicates pre-existing issues with the complex Both the insurer’s loss adjuster (E) and the insurer’s expert (W) noted there were several pre-existing issues with the insured property. W provided a roof report. This identified various issues. This included rusty screws and roof debris, water ponding in new dektites, rust damage in sheets, water ponding in box gutters on the southern end of the building, numerous sheet punctures and holes, loose flashings, sealants around pipes having deteriorated. W advised the cause of the water ingress was a combination of excessive rain fall in a short period of time and the poor condition of the roof with prolonged periods between maintenance. W also provided a building report. W found there were numerous leak points. These include the external cladding, windows, roof and external walls. The roof report deals with the causes for water entry from the roof. W noted the following causes for these other areas: Determination | Case number: 701397 Page 5 of 15  external cladding – numerous areas where the sealant broke down or was degraded  most of the windows had evidence of event and old water entry – there were numerous reasons provided for this. The information provided shows that both prior and after the event, the body corporate had been actively involved in attempting to address the maintenance related issues associated with the roof. The body corporate provided evidence of several reports, and numerous invoices paid, in attempting to address the roof issue. The body corporate also provided a report from the contractor it engaged (BM) to assist in maintaining the roof. Whilst BM acknowledged there were various issues, BM noted the following points:  dektites will be replaced over time  there is only surface rust and there is no issue with it  dints on the roof have not caused leaks  stainless steel box gutters will pond – replacing them would be a major structural change  several holes have been identified and repaired  other issues have been identified but have not resulted in leaks  the roof does not need to be replaced – there is still a lot of life to it There is also evidence to show that numerous units had suffered water damage prior to the insurer being on risk. Insurer’s expert does not identify the cause of damage to the unit After careful consideration of all the available information, the panel notes the following. W’s reports set out issues with the building as a whole. However, W does not provide specific evidence about the cause of water damage to particular units. For instance, regarding the complainant’s unit, W only noted the following: In Bed 1 we noted that after the mould contaminated plasterboard ceiling was removed there was visible light between the flashing and roofing. W makes no reference as to whether this visible light was the cause of water entry and, if it was, what the cause of that was. The insurer has relied on the fact that W’s reports highlight various issues with the property. From this, it appears the insurer infers the damage to all of the units, including the complainant’s one, are attributable to one of these issues. Determination | Case number: 701397 Page 6 of 15 The panel is not persuaded there is sufficient basis to support such an inference. It is not apparent that all of the damage, including the c omplainant’s unit, can be attributed to the pre-existing issues identified by W. The damage followed a significant weather event. This, of itself, could have been sufficient enough to cause the water entry. It was therefore incumbent on the insurer to instruct W to identify the specific cause of water entry to the complainant’s unit in order to show why the policy does not respond . W’s report is silent on this. The complainant also referred to a second event that, she says, resulted in additional water entry. She has provided a report from MP which said: Sump had debris caught in outlet causing major overflow The insurer disputes this and has made submissions in support. However, no expert opinion has been provided to dispute MP’s opinion, which is specific to the complainant’s circumstances . The policy responds to the claim There is no dispute that the event which caused the water entry was a significant one. Further, W’s roof report accepts that one of the causes of damage is excessive rainfall in a short period of time. The policy responds in the following circumstances: We will pay up to the Sum Insured shown on the Schedule for Section 1, against Loss or Damage to Your Insured Property … Loss or Damage is defined to mean: direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy The complainant’s claim meets this criteria. The evidence shows the damage resulted from rainfall events, one of which was classified as a significant one. This would be damage to property from a sudden and accidental cause. The policy exclusions relied upon by the insurer do not apply. This is because the panel is not satisfied the available information shows that the reason the water entered into the property was due to an excluded event. W’s report provides a general opinion on the overall property. W does not provide a specific view of how the water entered the complainant’s property. W’s roof report makes it clear the excessive rainfall is a causal factor. The complainant has provided a view from another expert which says that another possible cause is debris in the sump. This was not refuted in W ’s report . Determination | Case number: 701397 Page 7 of 15 Therefore, after careful consideration of all the available information, the panel is satisfied the policy responds to the claim. This decision is not a precedent for other units The panel acknowledges there are numerous other units that have also suffered damage in this significant weather event where the insurer may not have accepted liability. The panel explicitly notes this decision is specific to the complainant’s unit alone and is based on the available information at the time this decision was issued . It is not meant to be a precedent for the other units. Instead, each other unit will have to be determined based on the specific evidence relevant to that unit. This may potentially result in different outcomes if compelling evidence is produced showing the damage to the other units falls within a policy exclusion or is otherwise not covered by the policy. For reasons explained, the panel is not persuaded that is the case for the complainant’s unit. 2.2 Can the insurer deny the claim due to non-disclosure? Insurer says there was non-disclosure The insurer says there are non-disclosure issues. This is to do with the pre-existing issues with the roof and the fact there had been previous water entry to several units. Sections 21 and 28 of the Insurance Contracts Act 1984 is relevant to this issue. Section 21(1) of the Act sets out the insured’s duty of disclosure. Section 28 provides the remedies available to the insurer if an insured fails to comply with its duty of disclosure. In particular, section 28(3) of the Act is relevant. This says: If the insurer is not entitled to avoid the contract or, being entitled to avoid the contract (whether under subsection (2) or otherwise) has not done so, the liability of the insurer in respect of a claim is reduced to the amount that would place the insurer in a position in which the insurer would have been if the failure had not occurred or the misrepresentation had not been made. This means the insurer must show the extent of its prejudice from any alleged non- disclosure. Evidence does not establish the insurer’s prejudice The insurer was asked to provide further information to support its position about non- disclosure. In response, the insurer provided a statutory declaration from SD, National Technical Manager. Determination | Case number: 701397 Page 8 of 15 SD included excerpts of the relevant underwriting guidelines. Relevant to this were the following: Property situated North of the 23 rd Parallel constructed prior to 1995 and/or where construction of the walls is iron/steel, asbestos sheeting and/or roof comprises tiles (concrete/clay) and/or inferior walls, roof and floors. SD also refers to the fact there was EPS in the walls, which would require a referral to the policy underwriter. SD then said: Based on the fact that the Insured Property was located north of the 23 rd Parallel and the Insured Property was constructed with inferior building material, I would not even have considered this policy be referred to [A] for special consideration, but would have made the decision that the risk should not have been underwritten It is not clear that the body corporate knew there was EPS is in the walls. The insurer has not provided evidence to show this. SD says the ‘presence of EPS is something either the Insured knew of or ought reasonably to have known of’. This misunderstands the duty of disclos ure. An insured is required to disclose what they know, not what they should have known. Therefore, the panel does not accept there is any basis to conclude there was non- disclosure regarding EPS. In reviewing SD’s evidence, it seems his view was at least, in part, based on the fact EPS should have been disclosed. He makes numerous references to this. SD does not say that based on the pre-existing issues with the roof alone, and excluding the EPS, this would have led to a decline. Further, having reviewed the underwriting evidence, it is not clear these pre-existing issues would have resulted in a decline. For instance, the insurer does not specifically identify, beyond the EPS, what inferior material was not disclosed which would have engaged the relevant guideline. Therefore, SD’s statutory declaration does not support the insurer’s position that it would have declined the risk due to the body corporate’s alleged non -disclosure about the pre-existing issues with the roof. Insurer cannot deny the claim due to non-disclosure This means that even if the panel were to accept the body corporate failed to comply with its duty of disclosure regarding the property’s pre -existing issues, the insurer has not established the extent of its prejudice under section 28(3) of the Act. It follows the insurer cannot deny the claim on this basis. Determination | Case number: 701397 Page 9 of 15 2.3 What is the extent of the insurer’s liability ? Repairs to the unit are being paid for by the body corporate According to the complainant, the repairs are being arranged by the body corporate. Therefore, it appears the complainant has not suffered a loss in this regard. If the complainant has, however, suffered any loss regarding the repairs, then the insurer is liable to indemnify this. It is possible the body corporate may have a right to claim for its costs given the insurer has not es tablished an entitlement under the policy to deny the complainant’s claim. This will need to be addressed between the body corporate and the insurer as the body corporate is not a party to this dispute. The insurer is liable for a refund of levies The complainant is requesting a refund of levies for the time she has been unable to live in the unit. The insurer advises a refund of levies is only triggered if the loss or damage is accepted. As detailed above, the panel is satisfied the policy responds. Therefore, the insurer is liable for a refund of levies under the policy terms. The insurer is liable for temporary accommodation costs The policy responds in the following circumstances: When a Lot Owner occupies their Lot We will pay the reasonable cost of Temporary Accommodation they necessarily incur if their Lot is made unfit to be occupied for its intended purpose by: (i) Loss or Damage that is admitted as a claim under Section 1 ; or The panel accepts there is loss or damage covered by the policy. Given the presence of mould, and the complainant’s advanced age, the panel also accepts it was unfit to be occupied for its intended purpose. Therefore, the insurer should cover the complainant’s reasonable temporary accommodation costs she has incurred pursuant to the policy coverage. Insurer should reimburse the legal costs The complainant also incurred $693 in legal fees to assist her in this claim. Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. Determination | Case number: 701397 Page 10 of 15 The complainant is elderly and was unwell during portions of the claim. It is clear this claim was impacting her significantly. There were a range of issues being raised by the insurer. There were also numerous parties involved in this claim. This included the insurer, the broker, the body corporate and the other claimants in the complex. Given all this, the panel accepts it was reasonable for the complainant to engage the assistance of a lawyer. Therefore, it is fair the insurer reimburses these legal costs. 2.4 Is the complainant entitled to compensation for delays? AFCA may award compensation for non-financial loss Under the AFCA Rules, we may award compensation (capped at $5,000) for non- financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We adopt a conservative approach to the award of compensation for non-financial loss and expect complainants to be moderately robust and bear the usual s tress and inconvenience associated with an insurance claim. However, we do consider the complainant’s particular circumstances and how the actions of the insurer have impacted them. Evidence indicates delays in assessing the claim The complainant is dissatisfied with the time taken to assess the claim. At the time the complaint was lodged with AFCA, the complainant advised she had been out of her home for 12 months. The insurer says it is unfortunate there were delays. The insurer advises the causes of the delays were:  the body corporate did not provide the required information  the body corporate’s building manager often obstructed access to the premises  complexity of the damage claimed  issues with appointing a building consultant at the time. The insurer says these were issues outside its control. In addition, the insurer advises the complainant’s unit was treated for mould by July 2019. The panel agrees some of the delays were caused by the insured. The panel also agrees these were outside the insurer’s control. However, the panel does not agree the complexity of the damage and issues appointing a building consultant were outside the insurer’s control. The panel is satisfied there were delays in assessing the claim, in which the insurer could have done better. Determination | Case number: 701397 Page 11 of 15 Some compensation is warranted in the circumstances The complainant is an elderly person. The delays mentioned above were beyond her control. Further, the insurer could have done better in handling the claim. This includes engaging an expert to determine the specific cause of water entry to the complainant’s unit. In addition, the complainant was unable to use the unit throughout all times. The panel considers these factors would have caused the complainant substantive stress and inconvenience and interfered with her peace of mind. Therefore, considering the impact this had on the complainant, the panel is of the view an award of $5,000 compensation for non-financial loss is fair in all the circumstances. Determination | Case number: 701397 Page 12 of 15 3 Supporting information 3.1 Relevant policy wording Claims procedure s – page 14 1. What You must do As soon as You discover that something has happened that is likely to result in a claim, You must: (a) take all reasonable steps to reduce Loss or Damage and to prevent any further Loss or Damage; … 3. How to make a claim When you make a claim you must: … provide details of what has occurred and when requested complete and return Our claim form promptly together with all letters, documents, valuations, receipts or evidence of ownership that You have been asked to provide; … 6. You must assi st Us Before We will pay anything under this Policy, You must: (a) comply with all the requirements of this Policy; (b) give Us all information and assistance which We reas onably require in relation to the claim and any proc eedings; (c) and allow Us access to any and all documents that We reasonably require to ascertain the maintenance history of the Building. General Definitions – page 19- 21 Loss or Damage means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by the policy. Wear, Tear means damage or a reduction in value through age, ordinary use of lack of maintenance. Section 1 – Insured Property – page 22 What we cover This Section contains Parts A, B and C that provide cover against the Events listed below which occur during the Period of Insurance Section 1 – Part A You are covered for the following Events Determination | Case number: 701397 Page 13 of 15 1. We will pay up to the Sum Insured shown on the Schedule for Seciton1, against Loss or Damage to Your Insured Property on the basis set out in ‘Claims – basis of settlement… Exclusions – what We do not cover under Parts A, B and C – page 28 1. We will not pay for Loss or Dam age: …. (c) (i)… (ii) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration or developing flaws; (iii) caused by lack of maintenance or failure to maintain Your Insured Property in a reasonably good state of repair. (d) caused by non-rectification of an Insured Property defect, error or omission that You were aware of, or should reasonable have been aware of. 3.2 Expert Reports Report Key points insurer ’ s expert (E ) First Assessment Report 16 April 2019  sighted damage to 26 units and some common areas.  since inspection, the site manager advised there is also damage to an additional four units.  the cause of the rain water entry in each unit is varied.  there appears to be leaks through windows in many un its, through air conditioner installations and possible through external wall fittings.  further investigation is required to determine each cause of water entry.  sighted water damage throughout the various units to the walls, ceilings, cornices and skirt ings  some of the damage sighted included rotten elements.  the site manager advised no water ent ry had been report ed before.  however, there was rotting evident in a number of units which indicates long term water damage.  there are a number of units whic h require immediate remediation due to mould spores and health risks.  without knowing the cause of the rain water ent ry, the policy response cannot be determined. insurer ’ s expert (E ) Second Assessment Report 21 June 2019  engaged W to carry out mould remediation works on unit 83 as a proactive measure to mitigate further cont amination and damage. Insurer’s expert (W) Roof Report 17 July 2019  no evidence of serious safety hazards was found on the roof.  the roof sheeting has not been installed as per the manufacturer’s installation guide. Determination | Case number: 701397 Page 14 of 15 Report Key points  that all the debris is removed from the gutters .  recommend that the rusty surfaces are treated to reduce further damage.  that the cause of the rec ent wat er ingress w as a combination of excessive rain fall in a short period of time and poor condition of the roof/prolonged periods bet ween maintenance.  that the roof penetrations are assessed and sealed as required. Insurer’s expert (W) Building Report 6 August 2019  t he external façade and roof have numerous leak points.  some of the roof leak points have or are in the process of being rectified.  the new roof sheeting has not been installed as per AS/NZS 1562.1:1992 Design and installation of sheet roof and wall cladd ing – Metal.  it is my opinion I recommend that the body corporate engage the services of a professional façade investigate company to abseil and assess all of the external penetrations and windows whic h are the causes of a large percentage of the leaks.  each window should be wat er tested to identify exact leak points, so an accurat e scope can be drafted.  this will be the only way to economically and successfully identify the leak points.  it is my professional opinion that due to the age, condition of roof surface and ongoing leaks that consideration and planning commence for future roof replacement.  the external façade especially on the top levels which were accessible and visible have ev idence of movement cracks which require appropriate treatment.  that t he windows and flashings in this complex have not been installed as per AS2407 or AS1288 and require immediate rectification to limit further substrat e or remediation works in throughout this complex.  windows on the east side have been repaired a number o f times.  that the tiles in the common areas are fully wat er tested and any leak areas are rectified to reduce water damage to the substrate and ceilings linings.  some of these were evident during the inspection as the building washed down and water was c omin g out through the ceilings linings below level 19.  unit 91 balcony is currently unsafe and will require assessment by a qualified engineer. insurer ’ s expert (E ) Third Assessment Report 19 November 2019  insured has submitted copies of Committee Meeti ng, Annual General Meeting and Extraordinary General Meeting Minutes from October 2014 to September 2019.  found references to ongoing roof maint enance and fire compliance issues. Determination | Case number: 701397 Page 15 of 15 Report Key points insurer ’ s expert (E ) Fourt h Assessment Report 23 January 2020  there were a number of reasons for the water ent ry .  a number of maintenance issues associated with the roof were raised on or around October 2016.  the rainwater entry appears to be largely from around the windows and external façade of the building.  a number of the ro of issues previously identified appear to have been resolved in more recent times or are in the process of being addressed as part of maintenance works being carried out by the insured.  insured advised unit 83 had pre - existing damage in the same areas fro m a previous event that had not been repaired.  it does appear that in more recent times, particularly just prior to the event and post the event, the insured has been actively involved in attempts to address the maintenance related issues associated with the roof that had been a significant issue in the past as can be seen from the historical meeting minutes.  the water ent ry from this recent event does appear to be largely related to the issues with windows and external façade of the building.  these issu es appear to be included within the tender documents provided by the insured, which form part of the ins ured’s proposed 10 - year maintenance programme. Complainant’s expert (S) Report 22 June 2020  the property is not in normal environment fungal ecology.  the MB and the ceiling cavities are in need of mould remediation.  levels of fungal spores in the air are generally low in other areas apart from ceiling and some wall cavities, some of the measure d surfaces are extremely high contaminated with mould and need remediation.  it is not clear how much, if any, remediation and/or structural drying was done.  in order to remediate this property, an independent scope of works should be produced by a qualif ied remediation company in conjunction with this report. Complainant’s expert (M) Email 24 September 2020  attended the unit on 23 March 2019  sump had debris caught in outlet causing major overflow. 3.3 Other material considered  complainant’s submissions  insurer’s submissions  statutory declaration from underwriter  minutes of body corporate.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.