Home / Suncorp Group / Determination 700721
Determination 700721
Garage ceiling storm damage claim declined for lack of insured event
Summary
The complainant claimed $8,386 for storm-related garage ceiling damage and the insurer declined the claim. AFCA found the evidence did not show a storm or other insured event caused the damage, which was attributed to structural defects.
The complainant must establish a valid insured event, and the builder and engineer reports did not link a storm to the ceiling damage.
Issues
- Claim denial primary · not upheld“I do not consider the complainant has provided sufficient information to show a storm event caused the damages claimed.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 700721
Financial firm AAI Limited
Determination | Case number: 700721 Page 2 of 6
Case number: 700721 22 July 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) following discovery of
bowing/sagging to the garage ceiling. The complainant says a broken roof tile caused
water ingress to the property and is claiming for the resultant damage from the storm
event, not the additional structural work required at the property. She says she has
provided sufficient information to show a storm event damaged the ceiling, therefore
these costs should be covered.
The insurer says the complainant has failed to establish an insured event caused the
damages. It says the bowing/sagging of the ceiling was due to a number of building
defects, therefore it declined the claim.
1.2 Issue and key findings
Is the insurer entitled to decline the claim?
The insurer is entitled to decline the claim because there is insufficient information
showing a storm event, or any other insured event, caused the bowing/sagging to the
garage ceiling.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim and is not required to take any further
action.
Determination | Case number: 700721 Page 3 of 6
2 Reasons for determination
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.
The complainant was represented during the course of the dispute. References
throughout the determination to the complainant include reference to the
representative.
2.1 Is the insurer entitled to decline the claim?
Complainant has initial onus to establish valid claim
The initial onus is with the complainant to establish the loss is covered by the policy.
This is known as a valid (or prima facie ) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to
establish, on balance, the application of a policy exclusion or that it is otherwise
entitled to decline the claim under the policy.
The complainant holds a home and contents policy, providing cover for a number of
insured events, including storm. The product disclosure statement (PDS) defines
storm as: ‘a storm, cyclo ne or severe atmospheric disturbance. It can be
accompanied by strong winds, rain, lightning, hail, snow or dust’.
The complainant provided a report from a builder (JM) dated 7 January 2020. JM
stated it attended the property on 10 May 2019 and found a cracked roof tile above
the garage, which had been allowing water to ingress into the roof cavity. JM says it
replaced the roof tile and provided photographs of the broken roof tile and water
staining below.
The complainant also provided a report from an engineer (DJ) dated 29 June 2019,
which states DJ attended the property on 28 May 2019 to investigate the cracking and
sagging of the garage ceiling. DJ stated the focus of the site inspection was the
‘excessive deflection of the counter strutting beams and related members’. DJ stated:
existing counter strutting beams fail under ultimate strength and serviceability
conditions
existing hanging beams and hip rafters satisfy ultimate strength conditions and are
within a reasonable tolerance for serviceability
Determination | Case number: 700721 Page 4 of 6
existing strut angles to support undrpurlins are not in accordance with timber-
framed construction standards
sagging and cracking of the ceiling plaster is aligned with the excessive deflection
of the counter strutting beams
delamination of the ceiling plaster at the garage entry may be due to water ingress.
DJ recommended new counter strutting beams and new counter beams and struts to
existing underpurlins be installed.
The complainant says DJ provided recommendations to strengthen the roof and
improve the structure, however it does not state the roof did not comply with the
relevant standard at the time of construction. The complainant also says she is not
seeking these costs to improve the roof structure, she is seeking the resultant
damage of $8,386, which includes the demolition, tile replacement and reinstatement
of the ceiling. The complainant is also seeking additional costs incurred to obtain
additional information , including the engineer’s report and advice.
The complainant says there is evidence of broken roof tiles in the same area where
the ceiling collapsed and evidence of water damage. She says this means a storm
caused the collapse of the ceiling.
The complainant provided information from the Bureau of Meteorology (BoM) to show
there was rainfall in the area of her property on 8 May 2019 and high wind gust
speeds around that date. The complainant says wind speeds were recorded at
72km/h on 7 May 2019, which would have dislodged and broken a roof tile and
allowed rain to enter the ceiling space, causing the damages.
The complainant says the damage occurred due to a sudden and unforeseen event.
She says the reports confirm the building was in good general condition and there
were no maintenance issues relating to the roof.
Insurer says no evidence a storm caused the damages
The insurer appointed a builder (JL) to attend the property. JL attended the property
on 10 May 2019 and stated:
there were damages to the ceiling plaster above the roller door and scratches to
the roller door
the remaining ceiling plaster to the garage is cracking due to stress and load
related movement and after accessing the ceiling space it was clear this was the
cause of damage
two roof strutting/counter beams have been installed incorrectly
the hanging beam closest to the garage door is being stressed and deflecting
the sarking is deteriorating and missing over the area of the ceiling collapse.
JL stated there were no storm created openings and the roof was in good condition. It
stated the ceiling collapse was due to many building defects.
Determination | Case number: 700721 Page 5 of 6
The insurer says the complainant has failed to establish an insured event caused the
damages. It says the bowing/sagging of the ceiling was due to a number of building
defects.
In response to the complainant’s reports the insurer obtained a further response from
JL, which stated it did not observe any water stains to the underside surface of the
ceiling plaster in the area around the roller door. It says it also inspected the roof tiles
above the collapsed section of ceiling plaster and did not observe any broken or
dislodged roof tiles.
The insurer says whilst JM stated there was broken roof tile, it has not explained in
detail how the broken roof tile relates to garage ceiling damage and therefore does
not show an insured event caused the damages at the property.
Insurer entitled to decline the claim
As an independent third party, AFCA can only base any decision it makes on the
documentary evidence avai lable. Whilst the complainant provided reports and BoM
data, I do not consider this information is sufficient to show an insured event caused
the bowing/sagging to the garage ceiling . This is because:
JM states there was a broken tile on the roof and some evidence of water ingress,
however does not comment on the cause of damage to the ceiling
DJ states delamination of the ceiling plaster at the garage entry may be due to
water ingress, but does not provide a persuasive view that a storm event caused
the damage
the BoM data is not sufficient to show a specific storm event caused the damage
claimed, in the absence of any more persuasive report linking a storm event with
the damage
JL’s report is detailed on the cause of damage and I am persuaded by its
conclusion regarding the cause of damage being issues with the structure of the
garage rather than any single insured event
whilst the complainant says JL did not inspect the roof, JL confirms it inspected the
roof above the collapsed ceiling and provided photographs in support.
The complainant raises concerns with the number of reasons the insurer has declined
the claim and ho w it failed to consider the complainant’s evidenc e. However, an
insurer is entitled to provide a number of reasons for why a claim is declined and I
cannot see any evidence that the insurer failed to consider the complainant’s
evidence, given it asked JL t o comment on the complainant’s reports.
Having regard to all of the circumstances of the dispute, I do not consider the
complainant has provided sufficient information to show a storm event, or any other
insured event covered under the policy, caused the damages claimed. This means
the insurer is entitled to decline the claim.
Determination | Case number: 700721 Page 6 of 6
Given the complainant has not established an insured event caused the damages, it
is not necessary to consider whether any exclusions apply to the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.