Home / Suncorp Group / Determination 700618
Determination 700618
Claim for additional storm water damage and retaining wall reconstruction costs declined
Summary
The complainant sought further storm water and retaining wall costs after an earlier settled claim, and the insurer declined the additional claim. AFCA decided in favour of the insurer.
The complainant did not establish that the additional damage was caused by an insured accidental event, the ground movement exclusion and like-for-like limit applied, and prior consent obligations were breached.
Issues
- Claim denial primary · not upheld“This determination is in favour of the insurer. The insurer is entitled to refuse payment of the claim in accordance with the terms of the policy.”
- Product terms interpretation secondary · not upheld“Ground movement is excluded; policy only provides like-for-like repairs; repair of the leaking item is not covered.”
Subjects and remedies
home or building damageno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 700618
Financial firm AAI Limited
Determination | Case number: 700618 Page 2 of 7
Case number: 700618 28 September 2020
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm
(insurer). It initially lodged a claim on 15 July 2017 with insurer “C” for damage to
paving and a retaining wall due to the escape of water from a storm water drain. The
complainant had completed repair of the leaking pipe prior to lodging the claim. C
identified through it engineer that the damage most likely occurred during the previous
period of insurance with the insurer.
On 20 September 2017 the complainant submitted the claim to the insurer with
invoices requesting reimbursement. Although there was concern as to the real cause
of damage the insurer settled the claim for $17,381.00 based on invoices submitted.
On 3 September 2019 the complainant submitted a further claim. It says that at the
time of the original works it was not aware of the extent of the additional damage
caused by the leak. Over the period from 2018 until September 2019 it had completed
extensive works relocating the storm water drain and reconstructing the retaining wall.
The complainant seeks $19,069.45 for plumbing costs and 25% – 30% contribution
against an amount of $156,625 paid to reconstruct the retaining wall.
The insurer has declined cover for these additional costs.
1.2 Issues and key findings
Has the complainant established a valid claim for the additional damage?
No. The complainant has not provided sufficient information to establish the additional
loss or damage was caused by an insured event. Further the complainant by
completing all repairs prior to lodgement of the claim has prejudiced the insurers
ability to assess the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to refuse payment of the claim in accordance with the terms of
the policy.
Determination | Case number: 700618 Page 3 of 7
2 Reasons for determination
The complainant is represented by a broker. Any reference to the complainant
includes reference to submissions made by the broker.
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues in dispute. The determination follows
consideration of all the material. It is based on what is fair in all the circumstances
having regard to the relevant legal principles, terms of the policy, good industry
practice including codes of practice and prior determinations where applicable.
2.1 Has the complainant established a valid claim for the additional
damage?
Complainant has onus to establish a valid claim under terms of the policy
The complainant has the onus to establish any loss or damage arises from an event
covered by the terms and conditions of the policy. This is known as a valid claim.
The complainants‟ policy is an accidental loss or damage policy. Accidental loss or
damage is defined as loss or damage that you did not i ntend or expect to happen.
The policy expressly includes loss or damage from storm or the escape of liquid as
accidental damage subject to certain conditions.
The complainant says the initial damage was first observed on or around the 15 July
2017. At that time the complainant had been insured with C from 21 June 2017. C
through its engineer IM identified the damage which had already been repaired most
likely occurred in the previous period of insurance.
The insurer determined that the damage could have occurred due to the escape of
liquid and agree to accept the complainants claim for $17,381.00 based on invoices
provided. It declined some aspects of the claim as related to additional works and
upgrades.
The complainant lodged the further claim on about 4 September 2019 and claims to
have discovered a leak in the underground drainage pipework that passed through
the retaining wall. The complainant initially claimed $175,694.45 for the work
performed. The complainant agrees the works are an upgrade and has requested a
contribution of 25-30% of the costs against the amount of $156,625.00 paid to
construct/reconstruct the retaining wall.
The onus remains with the complainant to establish the additional damage and work
required is related to the original accidental damage claim.
No evidence loss or damage was accidental within meaning of the policy
The complainant says the repairs are related to the initial storm water leak but has
provided no information to substantiate this. The initial engineer‟s report by IM
Determination | Case number: 700618 Page 4 of 7
suggests the damage is related to soil settlement which was the possible cause of the
cracks in the storm water pipes. Ground movement is excluded under the policy.
The complainant says it was advised by an engineer, architect and builder that the
work must be carried out immediately. The complainant has not provided any reports
from these persons to support this allegation. It is reasonable to accept that if the
complainant was able to instruct an engineer, architect and builder, that it could have
notified the insurer prior to the commencement of the work. I further not the work
occurred over 2018/2019
The information provided by the complainant does not establish that there was any
loss or damage that caused it to engage the engineer, architect or builder. There is no
information to indicate that there was any damage from the 2017 claim that had not
been identified.
Policy only provides like-for-like
The policy does not provide for repairs which are of a better standard, specification or
quality than when new. The complainant has not provided adequate information to
justify this percentage it is seeking.
The insurer has already provided settlement for the damage under the initial 2017
claim. Given the works were an upgrade, the policy does not respond to cover these
further repairs.
Policy excludes cover for ground movement
IM suggest the possible cause of damage is ground movement which in turn has
caused the leak to the storm water drain. Damage caused by ground movement is
excluded from cover. The insurer would be entitled to deny the claim if the damage
was caused by ground movement.
Policy excludes repair of leaking item
The complainant is claiming reimbursement for the plumbing costs. The works done
in relation for plumbing included repair of the leaking pipe. The policy clearly does not
respond to the repair of the item from which the liquid escaped. Therefore, the insurer
was entitled to deny the claim for reimbursement of these costs.
Complainant did not comply with her obligations under the policy
The policy clearly sets out an obligation for the insured to obtain the insurer‟s consent
prior to arranging or authorising repairs, unless it is an emergency and the insurer
cannot be contacted. The insurer is entitled to refuse the claim for non-compliance
with this requirement.
The claim notes show the insurer was contacted by the complainant‟s broker in
September 2019, after the works were completed. The complainant says it needed to
get the works done as an emergency. Whilst the complainant says the situation was
Determination | Case number: 700618 Page 5 of 7
precarious, there is no information to show the immediacy of the works required. A
builder, architect and engineer were contracted, along with notification being made to
the council. There is no evidence to suggest the complainant attempted contact the
insurer prior to the works.
The complainants conduct has prejudiced the insurers ability to assess the cause of
the damage and its liability. If there was evidence to show the loss was covered by
the policy and the costs are reasonable, then the prejudice would be limited.
However, there is no evidence to establish either the cause of the loss or damage or
that the costs or the percentage now claimed are reasonable.
Insurer is entitled to deny the claim
As the complainant has not established a claim within the terms of the policy the
insurer is entitled to deny the claim.
Even if I were to agree the complainant had established the damage was accidental,
the available information suggests that more likely than not the damage was caused
by ground movement. The insurer would be able to rely on the exclusion to refuse the
claim. In addition, the fact that the complainant completed all the works over a period
between 2018 and 2019 without notifying the insurer has prejudiced the insures ability
to assess liability and it would be able to rely on the terms of the policy to refuse
payment of the claim
Determination | Case number: 700618 Page 6 of 7
3 Supporting information
3.1 Policy wording
Reference Wording
Page 28
What you are covered for
Home cover
When you have home cover, your home is covered for accidental
loss or damage at the insured address and in the period of
insurance, subject to the conditions, limits and exclusions in this
policy.
Accidental loss or damage is loss or damage from incidents you did
not intend or expect to happen, e.g. accidentally breaking kitchen
tiles, scorching a bench top or breaking a window.
Page 64
General exclusions
You are not covered under any section of this policy for damage,
loss, cost or legal liability that is caused by, arises from or involves:
Escaping liquid
the cost of repairing or replacing the item from which the liquid
escaped;
Page 65
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide,
collapse, shrink age or any other earth movement, but we will cover
landslide or s ubsidence damage to your home if it is c aused by any
of t he following insured incidents if the damage t hey caus e happens
within 72 hours of the insured incident:
storm;
flood;
earthquake or tsunami;
explosion.
Page 72
What you must not do
do not carry out or authorise repairs without our consent unless you
cannot contact us and need to mak e emergency repairs to prot ect
your home or contents .
Page 73
If you do not comply
If you do not c omply with „What you must do‟ and „What you must
not do‟ we can reduc e or refuse your claim or cancel your policy.
Page 79
We will not:
pay extra to replace your home or contents to a better standard,
specification or quality than they were before the loss or damage
occurred except as stated in the meaning of „new for old‟
Page 80
New for old’ does not:
mean of a better standard, specification or quality than when new.
3.2 Expert reports
Record Key points
financial firm’s expert (I M ) stormwat er drainage pipework contained in filling soil that has
Determination | Case number: 700618 Page 7 of 7
Record Key points
Engineer r eport
29 September 2017
undergone settlement movements could sustain damage and
develop leaks as a result of the soil settlement movements.
Water escaping from a point or points of leakage from the
stormwat er drain s could exacerbate both settlement movements
in the filling soil, and movements of a retaining wall retaining, or
constructed in, filling soil .
Financial firm’s expert (C L )
Loss adjuster report
10 October 2017
On looking over the “repair” invoices, specifically the one from
GNL, all their work appears to have been in the construction of
buttress walls to stabilise the original wall, no mention of any
work being done on the main wall, so work seems to be of a
sta bilising nature to prevent furt her movement.
Further we have discussed the issue of these buttress walls with
a long established brick and block contractor we have used in the
past and he has questioned the met hodology used by the
Insured‟s contractor as the photos appear to show rows of
limestone blocks below ground level to form a type of foundation
or footing, his advice being that any foundation needs to be of
properly laid and formed concrete with adequate steel reinforcing
in it.
He has also mentio ned that such buttress walls because of their
height (being more than 500mm high) may well have needed an
Engineers Certificate and been signed off by the building
inspector of the City of Greater Geraldt on
Financial firm’s expert (C D )
Internal Assessor r eport
20 November 2019
an accurate liability has already been determined and settlement
issued for $17,381.00. The additional works completed by the
policy holder are upgrades and not on a like for like basis to
return the property to pre - loss condition.
no coverage exists for the repair of the item from which the liquid
escaped .