Home / QBE / Determination 699499
Determination 699499
Denial of flood-damage claim under flood exclusion
Summary
After a 2019 Townsville flood event damaged his commercial building, the complainant disputed the insurer's denial of the balance of his claim and his six-month loss of rent claim. AFCA found the water was flood water excluded by the policy and that the six-week rent offer was fair, so no payment was ordered.
Rainwater that mixes with floodwater that has escaped a watercourse is flood water, and the policy excludes flood where no flood cover was purchased.
Issues
- Claim denial primary · not upheld“The insurer is entitled to rely upon the terms and conditions of the policy to deny the balance of the complainant's claim.”
- Claim amount dispute secondary · not upheld“The panel considers the insurer's offer of six weeks loss of rent is fair and reasonable in the circumstances.”
Subjects and remedies
business interruptionnatural disasterno remedy
Related
Text of the determination
Determination
Case number 699499
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 699499 Page 2 of 8
Case number: 699499 24 September 2020
1 Determination overview
1.1 Complaint
The complainant held a business insurance policy with the financial firm (insurer). The
insured property is in Hermit Park, Queensland.
A claim was lodged under the policy after the complainant ’s property was inundated
with water on 2 February 2019, during a heavy rainfall event.
The insurer has accepted that part of the claim relating to the damage from rainfall
coming through the roof, but maintains that most of the inundation was caused by
flood, which is excluded from cover under the terms of the policy.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
Based on the available material, the insurer is entitled to deny the balance of the
claim as:
the policy specifically excludes loss or damage caused by flood
on balance, other than the water that came through the roof, the water that caused
the loss was flood water.
What is the extent of the insurer’s liability regarding loss of rent?
The panel considers the insurer’s offer of six weeks loss of rent is fair and reasonable
in the circumstances.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to rely upon the terms and conditions of the policy to deny t he
balance of the complainant’s claim.
Determination | Case number: 699499 Page 3 of 8
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The complainant’s business policy with the insurer provides cover for damage to
buildings caused by or resulting from insured perils including storm, tempest or
rainwater. Cover is subject to the terms, conditions and exclusions under the policy.
The policy specifically excludes damage caused by flood, unless the schedule
indicates that flood risk is insured. Flood is defined on page 11 of the product
disclosure statement (PDS) as:
FLOOD means the covering of normally dry land by water that has escaped or
been released from the normal confines of any of the following:
(a) a lake (whether or not it has been altered or modified);
(b) a river (whether or not it has been altered or modified);
(c) a creek (whether or not it has been altered or modified);
(d) another natural watercourse (whether or not it has been altered or modified);
(e) a reservoir (whether or not it has been altered or modified);
(f) a canal (whether or not it has been altered or modified); and
(g) a damn (whether or not it has been altered or modified).
The policy schedule indicates that the optional endorsement for flood was not
included.
The exchanged material indicates the complainant was aware he did not have flood
cover.
Circumstances of the loss
In late January and early February 2019, the city of Townsville and surrounding areas
of north Queensland experienced a significant weather event.
Heavy rainfall occurred over the Townsville catchment for several days and at or
about the complainant’s property.
The insured property is a single level commercial building located on the eastern side
of C Road.
The insurer has provided a report from a hydrologist (WR) dated 7 March 2019, which
was prepared following a site inspection on 19 February 2019.
WR says the building was inundated to a maximum depth of about 1 m above floor
level. The floor level of the building is about 0.3 m above the adjacent footpath level.
The ground level at the insured property on the footpath along C Road is about 3.1
mAHD.
Determination | Case number: 699499 Page 4 of 8
Following the site inspection and review of data from the Bureau of Meteorology and
Townsville City Council, WR concluded that:
the initial inundation of the insured property was potentially caused by a
combination of overflows from the Hermit Park Drain and overflows from the Ross
River with the dominant source of water from the Hermit Park Drain. It would
appear that the initial inundation was due to bow waves caused by trucks driving
along C Road;
any inundation at the insured property from rainwater entering through the ceiling
was not due to water overflowing from any watercourse;
the maximum depth of inundation above floor level at the insured property was
caused by floodwater overflowing from the Ross River.
WR also provided a report dated 8 August 2019, on the characterisation of the Hermit
Park Drain as a modified natural watercourse.
Insurer has accepted damage caused by rainwater through the roof
The insurer has accepted damage caused by rainwater entering through the roof of
the insured property. The complainant has confirmed this damage was settled in the
amount of $52,073.77 and this aspect of the claim is not in dispute. Therefore, the
determination will not consider this issue further.
The complainant seeks the remainder of the damage including property damage and
business interruption.
Complainant says there was initial inundation by stormwater
The complainant disputes that the flood exclusion applies. The complainant says the
insured property was first inundated with water on 2 February 2019, prior to the arrival
of floodwaters from the Ross River and then again following the opening of the
spillway gates.
The complainant says that the initial inundation caused by the overflow of drains was
not the result of floodwaters and that the damage was clearly sustained prior to
floodwaters arriving from the Ross River. The complainant says that water did not
overflow from the drain technically, simply that the drain could not hold any more and
stormwater therefore backed up into adjacent streets and the complainant’s property.
The complainant agrees with the version of events contained in WR’s report as to the
timing of the initial inundation. That is, the complainant says:
he left the property at around 4.30pm on Friday, 1 February 2019. Water had not
entered the building at that time from any location during the heavy rainfall.
However, the toilets would not flush properly all week. Any time they flushed the
toilet bowl filled up, but it did not overflow;
Determination | Case number: 699499 Page 5 of 8
he received a phone call from a friend on the morning of 2 February 2019, who
advised him that water had surrounded the office and water had entered the
building due to army trucks driving along C Road;
he arrived at the office at around 12.30pm on 2 February 2019. Water had already
entered above floor level at this time. He tried to move the computer server to a
higher level (not high enough because it was inundated);
some volunteers helped him sandbag the entrances during the afternoon and then
he left and did not return until after the event.
Photos were provided to the insurer’s assessor (S) taken at approximately 1.38pm on
2 February 2019, of water overflowing the road gutters and entering the insured
property.
The complainant disputes that the Hermit Park Drain is a natural watercourse. The
complainant says the Hermit Park Drain overflowed at the section of the drain at R
Street and M Street. The insured property is located at the corner of R Street a nd C
Road, some distance away. The complainant says stormwater could not escape into
the drain because of the significant volume of rain over the period. Stormwater pooled
adjacent to the insured property particularly running off C Road and made significantly
worse by passing vehicles pushing that water into commercial properties including the
insured property.
The balance of the loss was caused by flood
WR considered that Ross River floodwater began overflowing into the Hermit Park
Drain from about 9.00am on 2 February 2019.
The panel notes that S raised the possibility that rainwater runoff entering the property
caused damage to the insured property prior to the overflow of water from the Ross
River.
Heavy rainfall was recorded in the hours prior to the initial inundation. The panel
accepts that stormwater may have been unable to freely drain away from the property
in the afternoon of 2 February 2019 and that there may have been bow waves caused
by trucks driving along C Road. However, this is most likely because the stormwater
was mixing with water from the Hermit Park Drain and the Ross River.
For the sake of completeness, the panel confirms that the Hermit Park Drain is a
watercourse for the purposes of the insurance definition of flood.
Given the height of the floor level above ground and the fact that overflows from the
Hermit Park Drain commenced several hours prior to the initial inundation, the panel
is satisfied, on balance, that stormwater runoff alone would not have reached the floor
level of the property before mixing with flood water.
It is well established in insurance law that water which has escaped (overflowed) from
a watercourse is flood water and when mixed with rainwater, all is floodwater. That is,
Determination | Case number: 699499 Page 6 of 8
the water that escaped from the Hermit Park Drain is flood water even if it originated
as stormwater.
Further, whilst the panel acknowledges the intensity of rain over numerous days, peak
rainfall did not occur until approximately 4.00pm on 3 February 2019, which is well
after the time of reported inundation.
Having reviewed the exchanged material and considered numerous flood complaints,
the panel is satisfied that both the initial above floor level and the peak inundation
were caused by water overflowing from the Hermit Park Drain and the Ross River.
This is flood, as defined by the policy.
The insurer is entitled to apply the policy exclusion for flood to deny the balance of the
complain ant’s claim.
2.2 What is the extent of the insurer’s liability regarding loss of rent?
Complainant seeks six months loss of rent
The policy schedule confirms that the complainant is insured for loss of rent under the
business interruption section of the policy totalling $57,350.
The panel notes that the insurer offered six weeks loss of rent (being $9,665.75) to
the complainant for the damage caused by rainwater entry through the roof. The
insurer says this was based on advice from its builder that the repairs would take
approximately four weeks to complete, with an additional two weeks being provided
for unexpected delays. The complainant rejected this offer and says the suggestion of
a six-week timeframe in which to complete the repairs is unacceptable given delays in
actions between the insurer and its assessor.
In a report dated 8 October 2019, the insurer’s assessor stated the main reason the
insured property is not able to be occupied is because of the damage caused by the
floodwaters and not from the rainwater entering through the roof.
The complainant seeks six months loss of rent in the amount of $46,014.50 , being
from the date of the loss to the date of commencement of the dispute. The
complainant says during this time the building was unable to be tenanted.
Insurer’s offer of six weeks loss of rent is fair and reasonable
The PDS outlines that to trigger cover for business interruption, the interruption or
interference must be caused by damage from an insured peril.
Given the panel has determined most of damage is caused by flood and the
complainant does not have flood cover, the policy does not respond to business
interruption in this regard.
Determination | Case number: 699499 Page 7 of 8
Based on the available material and in the absence of any compelling information to
the contrary, the panel considers the insurer’s offer of six weeks loss of rent is fair and
reasonable in the circumstances.
Determination | Case number: 699499 Page 8 of 8
3 Supporting information
3.1 AFCA approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determination.
The determination is made by a panel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
The Ombudsman, who has had extensive experience with flood complaints, viewed
the general area in November 2019.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether
there was any rainwater runoff damage before the flood water arrived at the insured
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.