Determination 698854
Floor raised in ensuite and bathroom during flood repairs without consultation
Summary
After flood damage, the insurer raised the bathroom and ensuite floors to grade them to floor wastes as required by building codes, without consulting the complainants. AFCA found the work compliant but ordered a further $1,000 for non-financial loss.
The insurer was required under the policy to meet building codes, but good industry practice required communication with the insured during repairs, causing unusual inconvenience.
Issues
- Repairs or contractors primary · not upheld“I am satisfied that the insurer has completed the work in accordance with the terms and conditions of the policy.”
- Poor communication secondary · upheld“by failing to contact the complainants before completing this aspect of the work, the complainants have not been able to explore the other avenues.”
Subjects and remedies
natural disasterpay non financial loss
Related
Text of the determination
Determination
Case number 698854
Financial firm Westpac General Insurance Limited
Determination | Case number: 698854 Page 2 of 6
Case number: 698854 13 August 2020
1 Determination overview
1.1 Complaint
The complainants held a home building policy with the financial firm (insurer) and
lodged a claim after the property was damaged during the February 2019 Townsville
floods.
The insurer accepted liability and authorised the repairs through its contractor (AJG).
Several issues arose during the repair process, but this complaint relates to the
raising of the floors in the ensuite and bathroom creating a small step up into those
rooms to provide a fall to the floor wastes in the rooms.
The insurer says this was necessary to to comply with the relevant building codes.
The complainants acknowledge the need to comply with the building codes, but say
the work was unauthorised and has now created a tripping hazard. The complainants
believe the insurer should have notified them prior to commencing the work and
looked at alternative arrangements.
1.2 Issues and key findings
Has the insurer failed to complete the repairs in accordance with the terms of
the policy?
I am satisfied, based on the available information, that the insurer was required to
complete the repairs by raising the floor level to comply with the relevant building
codes. I am satisfied that the insurer has completed the work in accordance with the
terms and conditions of the policy.
Are the complainants entitled to compensation for non-financial loss?
The insurer’s failure to consult with the complainants prior to completing the repairs
has caused an unusual degree of physical inconvenience and time taken to resolve
the situation. It is fair in the circumstances that the insurer pays, in addition to the
$1,000 goodwill payment already paid, a further $1,000 compensation for non-
financial loss.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is to pay the complainants an additional $1,000, pursuant to rule 3.3 of
the AFCA Rules, as compensation for non-financial loss. Otherwise the insurer has
met its liabilities in accordance with the terms and conditions of the policy.
Determination | Case number: 698854 Page 3 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
The complainants in the matter are represented by their son. Reference to the
complainants includes submissions made on their behalf by their son.
A preliminary assessment was provided in this dispute in favour of the insurer. The
complainants, in rejecting the preliminary assessment, acknowledge that raising the
level of the floors in the bathroom and ensuite was one response to meet the relevant
building codes. They say however that it was not the only method available and that
the insurer failed to properly consult. They say the insurer made its decision to raise
the level of the floors without proper consideration of the complainants’ position.
This determination follows consideration of all the information, including further
submissions provided after the preliminary assessment. It is based on what is fair in
all the circumstances, having regard to the relevant legal principles, terms of the
policy, good industry practice, including codes of practice and prior determinations
where applicable.
2.1 Has the insurer complied with the terms and conditions of the policy?
Complainants ’ claim falls within the terms of the policy
There is no dispute that the complainants have established a valid claim within the
terms of the policy.
The policy is an insured events policy that provides cover for a series of listed events,
subject to several conditions and exclusions. Included amongst insured events is the
event of ‘flood’. There is no dispute that the complainants’ property was damaged
during the floods in Townsville in February 2019.
The policy gives the insurer a discretion when settling the claim. Included within the
additional benefits of the policy as part of the building’s sum insured, is that the
insurer will cover the cost incurred to comply with local or state government building
laws, by-laws, regulations and standards.
The insurer accepted liability and agreed to cover the cost of the repair of the building.
I accept that the insurer, when completing repairs, are required under the policy to
meet the relevant building codes.
Building codes require a fall towards the floor waste
There is no dispute that, as originally constructed, the bathroom and ensuite
contained floor wastes, but no fall was built-in to the construction to the floor wastes.
Determination | Case number: 698854 Page 4 of 6
There is no dispute that the insurer, when repairing the floor and repairing the
bathroom and ensuite, raised the floor, creating a small lip to grade the floor to the
floor wastes.
Both parties have referred to the relevant building codes. The complainant has
referred to a 2004 report, noting that a floor waste is not required in a class 1 building.
There is no dispute that the complainants ’ home is a class 1 building. According to the
report, a floor waste gully is not required in class 1 buildings and, if there is floor
waste, grading is not required to provide a fall to the floor waste.
I have also examined the information from the HIA, in particular, the reference to the
Building Code of Australia (BCA) and the AS-2010 Waterproofing of Domestic Wet
Areas guide. According to that information, there are several things to consider in
determining if a floor waste needs to be installed. While it is not necessary to install a
floor waste in all of class 1 buildings, if one is provided, the bathroom floor must be
graded to that floor waste and other compliance requirements should be met in
relation to the installation of the floor waste.
I accept both the ensuite and bathroom had floor wastes installed prior to the flood. I
accept, based on the relevant building codes and supported by the HIA information,
that the insurer was required to grade the floor to the floor waste.
Insurer acted reasonably and in accordance with the terms of the policy
The insurer has provided advice from its builders , that has not been disputed by the
complainants, that it was necessary to raise the floors in both the bathroom and
ensuite to allow for the fall into the waste.
The insurer has provided advice from its builder AJG to the effect that, if it had
removed concrete from the slab to allow for the fall to the floor waste, this would have
affected the integrity of the slab. The raising of the floor by 40mm was the minimum
possible to ensure the tiles would not become drummy.
The insurer has provided comments from:
The state manager of AJG which note the original concrete slab was poured
completely flat, with no allowance for the fall required by the code.
An internal building consultant (ZA) who concluded that AJG were correct in saying
the floor tiles need to fall towards the existing floor waste as per Australian
standards and building codes.
ZA noted the original floor tiles around the floor wastes were not cut to create fall
into the floor waste.
I accept, in the circumstances, the insurer has acted in accordance with the terms and
conditions of the policy and, in completing the repairs, has done so in accordance
with the relevant building codes.
Determination | Case number: 698854 Page 5 of 6
2.2 Are the complainants entitled to compensation for non-financial loss?
AFCA can award compensation for non-financial loss
Under Rule D 3.3 of the AFCA Rules, AFCA may award compensation of up to
$5,000 for non-financial loss where a complainant has suffered an unusual degree or
extent of physical inconvenience, time taken to resolve the situation, or interference
with the expectation of enjoyment or peace of mind.
AFCA takes a conservative approach when awarding compensation for non-financial
loss and accepts complainants be remotely robust and bear a normal degree of
inconvenience when a problem occurs and to take reasonable steps to manage the
situation.
No indication in scope of works that floor would be raised
I have looked at the scope of works quoted by AJG. Whilst it includes the repairs to
the ensuite and bathroom, it does not mention that the floor would need to be raised
in order to be graded towards the floor waste.
According to the complainant and not disputed by the insurer, no discussion was held
with the complainants about the need to raise the floor. In my view, such a
conversation should have occurred, although this would not have changed the
requirement on the insurer to raise the floor to allow for the grading of the waste.
Information has been provided, which indicates that there were several issues with
the repairs, leading to delays. Those issues are not subject of this current dispute
Based on the available information, the insurer acknowledged these delays and
offered the complainant $1,000 by way of ex-gratia payment because of the
inconvenience. I accept that payment was not in relation to the work performed to the
bathroom and ensuite.
The complainants suffered an unusual degree of physical inconvenience and
time taken to resolve the situation.
The complainants maintain that they were not aware that the work was being
performed to raise the floors and, if made aware, would have sought to enter into
some other arrangement to avoid the lip being created. The complainants maintain
the step/lip into the bathroom has caused a tripping hazard.
I accept that the insurer would have been aware of the possibility of a small step
causing a tripping hazard. Although the insurer was acting in accordance with the
relevant building regulations, by failing to contact the complainants before completing
this aspect of the work, the complainants have not been able to explore the other
avenues to resolve this aspect of the claim. It does not appear the insurer has
considered the complainants circumstances.
In my view, it would have been fair for the insurer to give the complainants the
opportunity to explore alternative methods that may have been able to resolve the
Determination | Case number: 698854 Page 6 of 6
situation. Having said that, no information has been provided by the complainants or
insurer to suggest that there were any viable alternative arrangements that could be
made to comply with the relevant building codes.
Part of good industry practice is to communicate and maintain communication with an
insured person, in particular during a repair process, to ensure the repairs are suitable
and to keep the insured persons informed.
The failure to do this in this case has, in my view, resulted in an unusual degree of
physical inconvenience or time taken to resolve the situation. There has been an
interference with the complainants’ expectation of enjoyment or peace of mind. It is
fair, in the circumstances, that the insurer pays the complainants an additional $1,000
by way of compensation for non-financial loss, pursuant to Rule D 3.3. of the AFCA
Rules. This payment is additional to the ex-gratia payment of $1,000 already paid.