Insurer's settlement offer for restaurant water leak damage

FirmSuncorp Group
Decided2020-07-21
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$4,691
Non-financial loss—
Amount claimed$7,515
SourceAFCA PDF

Summary

Three underground water leaks damaged the complainant's restaurant, and the insurer offered $2,205.16 less the $750 excess based on its own estimate. AFCA preferred the plumber's breakdown and ordered settlement of $5,441.16 less the $750 excess, excluding the cost of repairing the leaks.

The policy excludes the cost of repairing defective pipes, but the insurer's own estimate was unreliable guesswork, so the plumber who did the work gave the better breakdown.

Issues

Subjects and remedies

small businesspay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 696765 Financial firm AAI Limited Determination | Case number: 696765 Page 1 of 6 Case number: 696765 20 July 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim on her business insurance policy for three underground water leaks, which caused damage to her restaurant. She had an expert attend to the necessary repairs prior to lodging a claim. The financial firm (insurer) agreed to cover the loss but noted its policy does not extend to the cost of repairing the originating leaks. The complainant submitted invoices for $7,514.66. The insurer agreed to cover $2,205.16 less the policy excess of $750. It did not cover the balance of the invoices as it says this related to the cost of repairing three leaks. The parties differ over what the extent of the repaired leak damage involves. The complainant says the insurer‟s offer is insufficient to cover her under the policy. 1.2 Issues and key findings Is the insurer’s offer for settlement fair? No. The insurer must pay the complainant based on the breakdown provided from the complainant‟s plumber, less the costs to repair the leaks. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is to settle the complainant for $5,441.16 less the policy excess of $750. Determination | Case number: 696765 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s offer for settlement fair? Complainant seeks cover for water damage in restaurant The complainant owns a restaurant, which was damaged by three identified water leaks under the flooring in December 2019. She arranged for a plumber („ST‟) to locate and repair the leaks and the subsequent damage caused to the restaurant. Once this was done, the complainant submitted a claim to the insurer for two invoices totalling $7,514.66. The parties differ over the extent to which the insurer is required to indemnify the complainant. Policy limits the extent of cover provided for water damage There is no dispute the insurer supplied the complainant with a copy of the policy documents. The policy provides cover for a series of events, including water damage. It also covers up to $25,000 for all “reasonable exploratory costs” to locate the source of water related loss or damage. In relation to this damage, the policy specifies it will not cover: the cost of repair, replacement or re-routing of the defective part or parts of the pipe or water system that caused the loss or damage . I am satisfied this means the insurer is not responsible to cove r the repair costs for the specific leaks. It otherwise should cover the reasonable remaining costs incurred. Investigations into the cause of the leaks ST attended to the repair work prior to the lodgement of the claim. It said it was contracted to investigate a leak in the kitchen area of the restaurant. This leak came from below the concrete and ST arranged for a subcontractor to find the source. ST had to access pipes below ground and this meant breaking through concrete. It located three leaks on three different pipes. These leaks were repaired and the resultant damage also. The work completed to locate and repair the leaks was extensive. ST provided evidence to show how this was calculated. However, some of his evidence and figures provided are inconsistent. There are several quotes and invoices for differing amounts. This makes identification of the exact amount incurred for the loss difficult. Determination | Case number: 696765 Page 3 of 6 Examination of the work completed by ST The parties initially experienced difficulties in obtaining a breakdown of the damage from ST. To address the issue, the insurer used its own internal expert („DM‟) to estimate a breakdown of damage. DM outlined an estimation of how the damage was calculated: Leak detection $ 825.16 (covered) Excavation $ 680.00 (covered) Repair $4,148.84 (not covered) Reinstatement $ 505.00 (not covered) Water metre upgrade $ 679.27 (not covered) Tile repairs $ 700.00 (covered) Total $7,538.27 ($2,205.16 covered) DM noted in his recommendation that: It is impossible to be able to provide an accurate assessment of the provided invoice with the limited information on the invoice, and with no photos available to view the stages of the damage and repair process. I consider the above statement limits the value of the estimate compiled by DM. It appears to be a “best guess” and was relied upon by the insurer in the absence of more definitive figures from the complainant‟s repairer. From any settlement offered, the insurer says it is entitled to deduct the excess of $750. This is not in dispute. ST‟s initial breakdown of the loss and attempt to explain it on 7 January 2020 was as follows: Material and equipment $3,598.00 Leak detection $ 770.00 Operational costs $1,372.60 Sub-total $5,740.60 Plus GST $ 574.06 Total $6,314.66 Determination | Case number: 696765 Page 4 of 6 This breakdown leaves out $1,200 from the final figure. It is not clear why this is the case or what this remaining amount refers to. ST later provided a report dated 9 December 2019, though this date does not appear to be correct. The report was received by AFCA on 9 June 2020. It provided a different breakdown of how ST says the work was done. The overall amount was for $7,371.66 (which is still less than the invoices). The breakdown includes: Leak detection and investigation $4,160.00 Jackhammering of concrete $ 585.00 Repair burst pipe and pressure limiting valve $1,885.00 Operational costs $ 26.96 Call out fee $ 44.55 Sub-total $6,701.51 Plus GST $ 670.15 Total $7,371.66 Based on the above, only the costs for the repair of the burst pipe (plus GST) would not be covered. This totals $2,073.50 (inclusive of the pressure limiting valve, although this may be the water metre upgrade, which is also not covered). The balance of the invoiced amount should be paid. Using the total amount invoiced, the insurer should be liable for $5,441.16 less the policy excess. The insurer questioned the veracity of ST‟s further breakdown. Previously, it says, the most expensive aspect of the work was the repair of the damaged pipes, which the policy excludes. The above breakdown indicates otherwise. The insurer maintains it should only have to pay $2,205.16 less the policy excess (based on the DM scope). Insurer to settle the complainant based on ST’s estimate of figures I acknowledge the imperfect nature of the exchanged evidence. This is particularly so with the differing amounts given for the estimates and breakdowns of damage. I accept the amount of work undertaken to ascertain the origin of the leaks was extensive. ST had to excavate through concrete and there were three individual leaks found. I accept the costs to find the leaks and repair the resultant damage should make up most of the loss. Whilst the insurer is not favourably disposed to ST‟s most recent estimate of the damage breakdown, there is no evidence to genuinely contest it. I do not prefer the insurer‟s earlier estimate as:  it was compiled without consultation with ST Determination | Case number: 696765 Page 5 of 6  DM noted he had no photos to review and limited information to work with  there was no inspection of the damage as it was completed prior to the claim, and  much of the estimate was educated guesswork. Given ST did the work at the property and is best placed to interpret how its resources were distributed, I am satisfied its breakdown should be relied upon. Whilst I accept what is provided is inexact (and differs from some of the earlier material in the invoices), I prefer ST‟s calculation to that from DM. I considered whether I should split the difference between the respective breakdowns. On balance, I do not consider this would be a fair outcome. This is because of the stated limitations of the DM estimate and the fact that ST did the work. On this basis, I think it is fair that the insurer should limit its settlement of the claim to $5,441.16 less the policy excess of $750. Determination | Case number: 696765 Page 6 of 6 3 Supporting information 3.1 AFCA approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respecti ve parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.