Home / Suncorp Group / Determination 696457

Determination 696457

Cyclone damage claim: defective repairs, poor management and settlement adequacy

FirmSuncorp Group
Decided2020-12-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$797,305
Non-financial loss$5,000
Amount claimed$123,524
SourceAFCA PDF

Summary

After Cyclone Debbie damage, the insurer's builders carried out defective repairs and the claim was poorly managed. The panel accepted the $731,500 rebuild quote and ordered further payments for outbuildings, contents, temporary accommodation, storage, travel and engineering costs, plus $5,000 non-financial loss.

The insurer is liable for loss caused by its builders' defective works beyond the policy sum insured, and its poor claim management justified indirect loss and non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 696457 Financial firm AAI Limited Determination | Case number: 696457 Page 2 of 14 Case number: 696457 23 November 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim under her home and contents insurance policy held with the financial firm (insurer) for damage caused by Tropical Cyclone Debbie in March 2017. A dispute arose over delays and inadequate repairs, and the insurer has since offered $754,300 to settle the claim. It says the offer is more than the sum insured and includes costs and contingencies (although it does not allow for the complainant’s indirect losses). The complainant made a counter-offer, saying she would accept a further $101,724.28 (on top of the $754,300) to settle the claim, even though that still does not reflect all her additional losses , which she calculates to be $123,524.20. She also says the insurer’s management of the claim has caused financial difficulty and significant stress and upset. This complaint is over the difference between the insurer’s settlement offer of $754,300 and the complainant’s estimate of her overall loss. 1.2 Issues and key findings Is the insurer liable for further costs? The component of the insurer’s settlement offer specifically for rebuilding the home ($731,500) is fair and reasonable. However, it is fair in the circumstances that it also pays the complainant a further $35,005 for damaged outbuildings and damaged and missing contents, on the basis those further losses were, on balance, either from the insured event or the actions of the insurer’s repairers. As well, the insurer is required to continue to pay contents storage costs, at the increased rate of $100 per week from 31 July 2020; together with temporary accommodation/loss of rent at $550 per week from 6 June 2020 - both for a further 32 weeks from the date of this determination. Is the complainant entitled to other compensation? The complainant is entitled to $5,000 compensation for non-financial loss, $5,000 for indirect financial loss (travel), and $5,000 toward the cost of her engineering reports. 1.3 Determination This determination is partly in favour of the complainant. The insurer is required to settle the claim as set out in section 2 of this determination. Determination | Case number: 696457 Page 3 of 14 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature of/complexities involved in this dispute, it has been referred to a Panel for determination. This determination follows consideration of all the information exchanged, and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. While both parties have made numerous submissions, for the purposes of this determination, commentary has been restricted to those issues which have a direct bearing on the outcome of the complaint. 2.1 Is the insurer liable for further costs? Insurer has agreed to pay the cost of rebuilding the home The complainant lodged a claim for damage to her building caused by Cyclone Debbie in March 2017. The insurer accepted the claim and engaged builder DK in April 2017 for repairs. Soon after DK commenced repairs, the complainant reported concerns with the standard of work. The complainant submitted that repairs were of a poor standard, and rectification was regularly required. As well, the complainant identified damage to contents and additional damage to the building caused by DK. The evidence indicates the complainant was heavily involved in the claim. Her co ntact with the insurer regarding repair issues was regular, and the issues identified were numerous. The insurer does not dispute this. By July 2018, with the rectification work completed by DK requiring yet further rectification, the complainant requested the insurer engage a new builder. On assessing the condition of the building, the insurer agreed to engage builder AB to repair damage caused by DK, as well as the remaining cyclone damage. Unfortunately, the complainant says the claim experience did not improve after AB was appointed. The home is still unrepaired, and the complainant says the insurer’s builders damaged a house which was in pristine condition before the cyclone . She says the actual cyclone damage was moderate compared to that caused by the insurer’s builders. Determination | Case number: 696457 Page 4 of 14 Certain complications also arose which led to the insurer engaging engineers and considering whether the building was constructed in line with relevant standards. These enquiries were justified, and the panel is not persuaded associated delays are unreasonable. However, overall the panel is satisfied the current situation is primarily a result of the insurer’s builder s work/failings and the insurer’s later management of the claim. The insurer does not dispute the claim was poorly managed or that its builders ’ actions unreasonably delayed the claim. It is of the view it could continue with repairs, however accepts the complainant has lost faith in its ability to properly repair her home. To resolve the claim, the insurer invited the complainant to obtain quotes for rebuild and repair. The insurer made a settlement offer based on the higher of these quotes, this being the rebuild quote. However, the complainant has rejected that offer, saying it does not also allow for the additional costs she incurred as a result of the insurer’s actions, or address the poor claim experience. The parties do not dispute the claim was not well managed, or that repairs failed. The insurer’s offer remains open, however the issue in dispute is whether the insurer should be required t o increase its settlement offer to cater for the complainant’s remaining concerns. Complainant’s quote is the only estimate of cost to repair or rebuild The complainant obtained a quote for repairing the home, and another for demolishing and rebuilding, from builder BD. BD quoted $609,405.20 to repair the building. The quote states the repairs are extensive and could result in more damage being identified and more variations being needed. It does not include an allowance for margins. On 19 March 2020, BD also quoted $731,500 to demolish and rebuild the house ‘ to same high quality with all finishings ’ included. That includes a concrete slab under the house. The quote (valid until 20 April 2020) is identified as an estimate only until plans are drawn up and approved. Both quotes exceed the policy sum insured. However, the insurer has willingly made an offer above the sum insured. It is important to note that liability for damage caused by the insurer’s builders, as opposed to the insured event itself, is not limited to the policy sum insured. No evidence quotes are excessive The complainant’s quotes lack the detail typically seen in quotes for extensive repairs or the construction of an entire home. It is difficult to ascertain how closely they reflect likely expected costs. However, the insurer has not sought or supplied any alternative comparative quotes for either repairs or rebuild, or provided any other information to Determination | Case number: 696457 Page 5 of 14 suggest the complainant’s quotes are inappr opriate or unreasonable in the circumstances. In its letter to the complainant of 31 July 2020, the insurer acknowledges the cost of rebuilding is likely to exceed the cost of repairs and is far in excess of the sum insured. It says its decision to settle based on the higher quote was in acknowledgement of the overall claims experience. The complainant, in her summary dated 26 August 2020, accepts $731,500 is an accurate assessment of the cost of rebuilding her house. However, she notes the quote is an estimate only which does not include an allowance for contingencies. Her concern is she could be exposed to additional costs once she commences rebuilding or repairing the home. The complainant also says the quote does not cover other damaged and missing items. The available evidence does not show the complainant’s quotes were unreasonably high or excessive in the circumstances. Insurer not required to pay more than the quote for the re-build Where an insurer elects to cash settle a complainant for claimed damage, AFCA typically requires it to include an amount to cover contingencies and other unforeseen issues. However this is dependent on the circumstances of each complaint. The complainant has supplied copies of the original building plans, including approved floor plans and site surveys. The panel understands the builder who drafted floor plans is still in business. Presumably, a quote from this builder would be a reasonable and accurate estimate. The panel also notes the policy sum insured is significantly less than the amount quoted by BD to rebuild or repair the home. Despite the lack of precision in the quote, the panel considers it is likely on the higher end of the scale of anticipated costs. In the circumstances the panel is satisfied BD’s quote of $731,500 is, on balance, a fair to generous reflection of the likely rebuild cost, and is appropriate in the circumstances. That base figure does not need to be increased. However, the panel notes this amount is solely for the demolition and rebuild of the home, and does not account for other damaged or missing property, nor does it address other compensation being claimed by the complainant. Complainant says insurer is liable for other damage The complainant says the insurer is liable for additional damage caused by its builders. She has provided a list of items and the corresponding replacement values, and her submissions also refer to other damage for which she has not claimed. Determination | Case number: 696457 Page 6 of 14 The list includes damage to a spa, sheds, a water tank, a fence, the garden and grounds, a ceramic stove top, an ironing cupboard, a pool light and contents stored at the building. Additionally, the complainant says a wooden bar is missing from the site. The basis on which the complainant believes the insurer is liable for these costs varies: she says certain items were damaged again by DK after being replaced; others were not replaced as agreed by the insurer’s builder. There is no dispute the claimed items have been damaged, and the insurer does not deny its builder was responsible for damage. In rejecting the complainant’s counter offer, however, the insurer advised it had already settled the complainant for some of the damaged items. In response, the complainant noted the insurer’s builder had damaged the items again. She said the insurer’s assessor attended her property in March 2020 and viewed the damaged items. The submissions show the complainant had notified the insurer of this in July 2019. While there is some lack of clarity about the extent of the full list of items and the exact circumstances of damage, the panel considers it fair in this situation that the insurer be responsible for the items identified as damaged/missing by the complainant. Insurer is not liable to pay more for fixed items which form part of the building However, since the $731,500 component of the insurer’s settlement offer is based on a total rebuild of the home, the question is whether at least some of those separate items claimed by the complainant already fall within the scope of the rebuild quote. The rebuild quote is not detailed or specific as to all inclusions; it refers simply to rebuilding the ‘house’ , and it clearly excludes the shed. The panel considers it is reasonable to accept that any fixed item, or item which forms part of the structure, would already be catered for in the complainant’s builder’s quote to rebuild the home. That would include the spa built into the upper level veranda, and the surrounding glass fence, along with the ceramic stovetop and ironing cupboard. The panel has considered the complainant’s view that as BD relied on a square metr e estimate to rebuild, the spa would not be included. However, the panel is satisfied it is reasonable to accept the rebuild quote as being, on balance, sufficient to rebuild to home to its pre-loss condition, including the spa. So, the panel accepts the quote to rebuild the home accounts for fixed items which form part of the building, and the rebuild amount does not need to be increased on that basis. Insurer is liable for damaged outbuildings and contents On the other hand, however, the panel does not consider that outbuildings or structures such as a water tank, fence, garden shed, and the surrounding grounds, would typically be included in a quote to build a home, unless specifically identified; and as noted, BD confirmed the shed is not included in the rebuild quote. Determination | Case number: 696457 Page 7 of 14 The complainant informed the insurer by email in July 2019 that the shed and water tank had been damaged. The insurer does not dispute its builders caused this damage. The panel is satisfied the insurer is liable for the shed and attached water tank. The complainant’s counter offer lists other items for which she says the insurer is liable ; these are broadly a combination of ‘ contents ’ and other components of the property. She says the insurer’s senior management, when attending her property in March 2020, observed a dishwasher, fridge and stovetop which had been damaged by exposure and the insurer’s repairers. She reported her bar missing in July 2019. Damage to the lawn and driveway were reported in late 2018, and photographs supplied. Quotes for replacing fruit trees which died after a bore was damaged were included in engineer scopes. The insurer has accepted liability for some of these items. For others, it has not offered a submission refuting liability. On that basis, the panel is satisfied it is fair in the circumstances that the insurer be held liable for them. The complainant has supplied quotes to replace these items (which are listed, together with her claimed values, in section 3.2 of this determination). These are either taken from the BD quote to repair the building, or sourced from retailers. The insurer has not supplied information showing these amounts are inaccurate or unreasonable, and so the panel considers settlement should be based on the complainant’s figures. The panel acknowledges there may be some items not included in the list, and some for which the insurer suggests payment has already been made. However, in the interests of providing finality to this claim and complaint, the panel is satisfied it is fair that th e insurer’s liability for remaining damaged contents and property items be set at $35,005.00. Complainant entitled to temporary accommodation/loss of rent The policy does not strictly cover loss of rent (since, although intended to be rented out, the property was insured under a home and contents policy, rather than a landlord’s policy ). Despite that, the insurer has paid and continued to pay ‘loss of rent’ , although that term seems to have been used inconsistently, and interchangeably with ‘temporary accommodation’ (for example, as between the insurer’s offer letters of 13 May and 31 July 2020). In the particular circumstances, the panel considers it fair and appropriate that the insurer has made those payments already provided. That is because the available evidence indicates the complainant intended to utilise the property for short term holiday letting, and the panel accepts that it is because of the actions of the insurer and its repairers that she has suffered this protracted and ongoing loss. Determination | Case number: 696457 Page 8 of 14 The complainant has estimated her loss of rental income based on the unlikely event the property was fully occupied over a period of 3 years. This suggests to the panel the complainant did not intend to occupy the property herself. Evidence of booking enquires throughout 2017 support that understanding , although the evidence also shows that after the loss the property was occupied by the complainant for a time. So the panel does not accept that any entitlement of the complainant to ‘loss of rent’ can reasonably be based on an expectation of the property being fully booked for short term holiday rental for the relevant period. That would be inconsistent with the complainant’s subm issions which show the property was only irregularly let. At the same time, the evidence also does not show the property was the complainant’s principal place of residence. The policy cover for temporary accommodation is subject to certain conditions. It requires the home to be the insured’s principal place of residence at the time of loss, with the policy holder intending to reside in the property during the rebuild period. On that basis, an insured would be entitled under the policy terms to temporary accommodation for up to 12 months up to 10% of the home sum insured. That applies when an insured event damages the home to the extent the insured cannot live there, and is intended to cover reasonable temporary accommodation costs for the time it will take to repair or rebuild the home to a liveable condition. As noted above, the panel is not satisfied this was or was intended to be the complainant’s principal place of residence, and so strictly speaking the temporary accommodation benefit would not apply. In the particular circumstances, however – regardless of whether the issue is called ‘loss of rent’ or ‘temporary accommodation’ – the panel is satisfied that the complainant is entitled to be compensated for her loss, since the property has been effectively unusable for either rental or private purposes, as a result of a combination of the insured damage and that which was later caused by the insurer’s repairers. Insurer’s offer for temporary accommodation /loss of rent should be increased For temporary accommodation/loss of rent, the insurer had already paid $450 per week for 59 weeks; and it then agreed to pay an additional two weeks from the date its 31 July 2020 offer was made, and to increase the amount by $100 per week, backdated to include the entire period and the additional two weeks (which had already been paid up to 6 June 2020). This amounted to $550 per week for 61 weeks, or $33,550. The panel understands that has now been paid, and if it has not, then it is required to be paid in addition to the further awards set out below. The insurer’s settlement offer also includes payment for a further 26 weeks calculated at $550 per week (totalling $14,300) to allow for the time anticipated to rebuild the home (although the complainant does not accept that allows enough time, nor that it reflects market rates). This would bring the total the insurer has said it is prepared to pay for temporary accommodation/loss of rent to $47,850. Determination | Case number: 696457 Page 9 of 14 It is not clear from the currently available information exactly how long it will take to rebuild the home, although the insurer has suggested 26 weeks. There will also be a ‘lead’ time during which plans and other logistical arrangements will need to be made, and it is now already almost 6 months since that offer was made. The claim has already been ongoing for over three years. In the circumstances, the panel considers it fair that the insurer continues to pay the complainant for a further 32 weeks of temporary accommodation/loss of rent from the date of this determination, rather than just 26 weeks from 6 June 2020 as it has offered. To be clear, it is also required to pay for the interim period from 6 June 2020 to the date of this determination, at the rate of $550 per week. Insurer should pay complainant for storage of undamaged contents The information suggests the insurer has been paying for storage of contents at $371 per month since April 2019. In July 2020 it offered to pay a further $2,400.00 for storage hire costs at $100 per week (to cover up to 24 March 2021). The policy covers storage of undamaged contents up to 10% of the contents sum insured, which was $26,300 at the time of loss. This amounts to $2,630 and that policy limit has already been exceeded. However, as in the case of the temporary accommodation/loss of rent component of the claim, the insurer’s total liability is based not just on the insured event, but also on the rectification and repair of inadequate works by its repairers. So again the panel does not consider strictly applying policy limits for benefits such as storage costs is fair or appropriate in the circumstances. The settlement for storage costs should be increased. In the circumstances, the panel considers the insurer should continue to pay the complainant for a further 32 weeks of storage costs at the rate of $100 per week, from the date of this determination. To be clear, the insurer also remains liable for storage costs from April 2019 up to 31 July 2020 calculated at the rate of $371 per month; and then at the increased rate of $100 per week from 31 July 2020. 2.2 Is the complainant entitled to other compensation? Compensation for indirect financial loss and non-financial loss may be paid Under its Rules, AFCA can award compensation (capped at $5,000) where the insurer’s ha ndling of a claim causes the complainant indirect financial loss. That would include a financial loss (outside the normal insured loss) due to the insurer’s claims handling, and reasonably foreseeable if the insurer fails to handle the claim appropriately. AFCA can also award the complainant compensation for non-financial loss (capped at $5,000) under its Rules. This is usually considered where the insurer: Determination | Case number: 696457 Page 10 of 14  takes an unusual amount of time to resolve the complainant’s situation  causes her to experience unusual physical inconvenience  unusually interferes with her expectation of enjoyment or peace of mind. AFCA does, however, generally expect complainants to be moderately robust and bear the usual degree of stress and inconvenience experienced during an insurance claim or in ordinary dealings with an insurer. AFCA cannot award punitive, exemplary or aggravated damages. AFCA can award costs of pursuing complaints in certain circumstances AFCA can also award the complainant’s cost s of pursuing a complaint (such as legal and other professional costs, and travel), but will not usually award more than $5,000 unless special circumstances apply. In determining whether to award such costs, AFCA takes account of the fact that AFCA is free for consumers and parties do not usually need to be represented. However, an award may be made, for example, if:  a complaint is of such complexity that a reasonable complainant is unlikely able to put his or her case forward without assistance, or  a complainant is unable to put his or her case forward due to a particular disability or vulnerability. No dispute that repairs caused further damage and claim experience was poor There is no dispute that repairers engaged by the insurer carried out works which were defective and required rectification. This considerably delayed the claim, and the complainant understandably felt she needed to be heavily involved in the claim process. While consideration of whether building defects were covered contributed somewhat to delays, it is clear that issues relating to the insurer’s inability to repair the building is the primary cause. The complainant has described the impact this has had on her life. Her submissions convey her exasperation, stress and distress in having had to manage the claim for over three years. She says this is compounded by the financial hardship brought about as she has been unable to let the property in the meantime. It is clear the building remains unrepaired after an insured event which occurred over three years ago. The complainant ’ s submissions in support of the claim for non-financial loss are extensive. The insurer does not dispute the claim experience was poor, and has expressed its regret at the way in which the claim and the repair process impacted the complainant. Determination | Case number: 696457 Page 11 of 14 Insurer is required to pay compensation for non-financial loss The panel is satisfied the failure to repair what was initially only moderate damage within reasonable timeframes has caused significant disruption, stress and inconvenience to the complainant. The panel is satisfied an award of the maximum of $5,000 compensation for non-financial loss is fair and appropriate in the circumstances. Complainant says insurer is liable for expenses she incurred after the cyclone The complainant has summarised the range of costs and expenses she incurred since the cyclone. These include the costs of maintaining the property, rates, insurance premiums and interest on loans. Based on the complainant’s calculations, her losses are considerable. Irrespective of the actual individual amounts being claimed, the panel accepts the complainant’s losses exceed the $5,000 which AFCA is able to award for indirect financial loss. For AFCA to consider an insurer is liable for a loss, it must be a loss which results from the insurer’s actions. While the panel acknowledges lost rental income from a repaired property would likely have covered the other recurring costs (such as rates, body corporate levies etc), it remains the case that the complainant would be required to meet those costs regardless of the claim or its mis-management. The panel does not accept the insurer is liable for those recurring costs. Insurer is required to compensate the complainant for travel costs The panel does, however, consider it fair in the circumstances that the insurer contribute towards the significant travel costs the complainant incurred in the course of her trying to manage the claim, which was excessively protracted because of the insurer’s repairers’ failings. The complainant says she has spent $24,386.06 on airfares and other transport costs, and on accommodation and food while travelling to and from the property in relation to the claim. The insurer does not dispute these amounts, and acknowledges the complainant was required to attend various onsite meetings. The panel also considers the complainant’s justifiable concerns with repairs were sufficient to warrant her travelling to the property on other occasions. On that basis, the panel considers it fair that the complainant be awarded the maximum $5,000 compensation for this individual claim for costs incurred in her pursuing the claim. Complainant incurred fees for expert assistance during claim and complaint The complainant engaged a lawyer to assist in her complaint against the insurer. AFCA provides a service which is free for complainants. It is not usually necessary for Determination | Case number: 696457 Page 12 of 14 a party to engage a lawyer or other paid claims manager or representative. If a complainant chooses to engage a legal representative, the usual expectation is that they would cover those fees themselves. In the particular circumstances of this claim and complaint, the panel does not consider there were legal issues in the claim itself which reasonably required professional advice of that nature. However, the technical aspects of the dispute were more complex. The insurer engaged expert assistance to report on the structural integrity of the home . The decision of whether to accept the offer, rather than insist the insurer repair the home and offer a guarantee on repairs, necessitated careful consideration of the damage. The panel accepts the complainant had lost faith in the insurer, and likely the view of its engineers. That is understandable. On that basis, the panel considers it is fair in the circumstances the insurer contributes to the cost of the complainant’s engineering reports which were reasonably incurred in her pursuing the complaint, by paying $5,000 towards those costs, being the maximum provided for under our Rules. Determination | Case number: 696457 Page 13 of 14 3 Supporting information 3.1 Chronology of events Record Key points March 2017 Property damaged by Tropical Cyclone Debbi e April 2017 Assess ments of damage complete. Repair works commence. October 2017 Complainant rais es concerns that repairs are incomplete and three different builders have been involved in repair process . November 2017 Complainant moves into the home. Reports damaged tiles, incorrect timber used in repair, leaking downpipes, missing structural timber. January 2018 Repairs ongoin g, disput e raised over engineer report refuting certain damage caused by cyclone . July 2018 Repairs ongoing, additional rectification arranged . September 2018 Insurer’s engineer finds certain damage is a result of existing defects; roof and load b e aring walls not constructed in line with industry standards, are defective . October 2019 Complainant’s engineer finds property suffered average cyclone damage, subsequent defective repairs have far worsened condition of property . February 2020 Insu rer committed to rectification works, waits on engineer advic e to determine liability for alleged existing defects . March 2020 Insurer invites complainant to obtain quotes for rebuild / de molition . 3.2 Damaged contents and other parts of the property claimed  Water tank attached to complainant’s shed - $8,600.00  Defective shed guttering installed by builder - $200.00  Fence removed by builder and not replaced - $2,000.00 Determination | Case number: 696457 Page 14 of 14  Blinds allegedly damaged by builder - $5,500.00  Trees, plants and shrubs - died after builder damaged bore pump - $1,000.00  Driveway damaged by trucks - $1,900  Lawn damaged by trucks - $598  Side of shed and door damaged by vehicle - $3,000.00  Dishwasher damaged by builder - $1,799  Refrigerator damaged by builder - $3,399.00  Tupperware, damaged by rodents as left at vacant property - $460  Custom made timber bar – missing from vacant property - $6,000  Iron damaged by builder - $199  Pool light – defective light installed by builder light - $350

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.