Text of the determination
Determination
Case number 696154
Financial firm AAI Limited
Determination | Case number: 696154 Page 2 of 8
Case number: 696154 23 April 2021
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy (policy) with the financial firm
(insurer). On 19 May 2017, a claim was lodged seeking cover for damage to the insured
building said to be caused by inadequate stormwater drainage of the neighbour’s property.
The insurer has partially accepted the claim but limited liability to replacement of the moisture
damaged carpets. It says the remaining cracking damage to the walls, cornices, wall and floor
tiles is not due to an insured event specified in the product disclosure statement (PDS). The
insurer says the damage is because of ground movement which is excluded from cover.
The complainant disputes the insurer’s assessment of its liability and believes the damage is
the result of circumstances covered under the policy. The complainant is dissatisfied with the
insurer’s management of his claim and the delays experienced.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the claim reasonable ?
Yes. The insurer’s overall assessment of its liability under the complainant’s claim subject of
this complaint is reasonable.
Subject to the complainant lodging a new claim, he is entitled to cover for the cost to repair
the damage to the one-meter square external paved area identi fied by engineers ‘CR’, as
being the result of a leak.
Is the complainant entitled to non-financial loss compensation?
The insurer’s claims management has caused an unusual degree of stress and anxiety for
the complainant as well as unreasonable delays. It is fair in the circumstances that the insurer
pays the complainant $2,000 in non-financial loss compensation in line with the AFCA Rules.
1.3 Determination
This Determination is significantly in favour of the insurer.
The insurer is entitled to decline cover for the cost to repair the damaged insured building.
Subject to the complainant lodging a new claim, he is entitled to cover for the cost to repair
the damage to the one-meter square paving area identified by engineers as being the result
of a leak.
The insurer is to pay the complainant $2,000 in non-financial loss compensation.
Determination | Case number: 696154 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability reasonable ?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events, including ‘Storm’ and ‘Escape of liquid’. Cover under these benefits is
subject to the conditions, limitations and exclusions specified in the PDS.
The insurer is entitled to rely on the policy provisions
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
The information shows two insured events occurred at the insured property
The insurer originally declined the complainant’s claim on the basis a valid claim had not
been established under the policy i.e. the damage was not the result of an insured event.
However, further investigations into the claim established, on balance, there was moisture
damage to carpets consistent with storm damage. The insurer accepted a valid claim had
been established and paid the complainant $3,939.38, to cover this loss.
The insurer declined to cover a majority of the building damage on the basis it was not due to
storm or escape of liquid events. Rather, the damage to the insured building is due to ground
movement over an extended period of time, which is excluded from cover under the policy.
I note, as part of these investigations, engineers CR noted damage to the insured property
from a leaking stormwater pipe. However, this damage is very limited and localised to an
external paved area, approximately one-meter square, near the south east corner of the
property.
There is an absence of any persuasive information from the insurer to show this located
damaged because of the leaking pipe is excluded from cover under the policy. I am satisfied
an escape of liquid from the pipe is an insured event, although separate to storm damage for
which this claim was lodged under the policy.
Therefore, subject to the complainant lodging a new claim for this limited localised external
paving damaged, the insurer is obliged to cover him for the cost to repair this in line with the
policy provision.
In the interest of clarity, the reason for a separate claim is because this damage is the result
of a separate insured event (escape of liquid) and is not covered under the storm damage
claim subject of this complaint.
The insurer is entitled to limit its liability in line with the policy
Given there exist two insured events to which the insured property has been subject to, the
onus rests with the insurer to show, on balance, an entitlement to limit its liability for damage
to the insured building claimed by the complainant.
Having considered the available information, I am satisfied it establishes the following:
from around 2008, if not earlier, the insured property began experiencing pooling of large
volumes of stormwater runoff, said to be due to stormwater drainage issues relating to the
neighbouring property to the east
Determination | Case number: 696154 Page 4 of 8
this occurred on many occasions over the time the complainant attempted for the
neighbours (property changed ownership over this time) to rectify the issues with no
success
the complaint appointed engineers ‘TK’ to provide a report in December 2016 and took
legal action, which ended in his favour. The neighbour was required to and arranged works
to improve the stormwater drainage for their property
the complainant lodged the claim with the opinion the cracking damage noted in various
areas inside the home and external pavers was because of this issue with the
neighbouring property
the insurer appointed engineers ‘IM’ to attend and investigate the cause for the damage.
IM provided four reports between July 2017 to November 2018, based on which the
insurer limited its liability to the damaged carpets only
the complainant dissatisfied with IM’s findings appointed engineers ‘SK’ to review IM’s
evidence, in particular, its level surveys
this information from SK did not alter the insurer’s posi tion and the complainant brought
the complaint to AFCA
the insurer has then accepted the information from IM was inconclusive and it appointed
engineers CR and plumbing specialist ‘AL’ to undertake further investigations
CR and AL after completing their investigations into the cause and extent of damage to the
insured building also provided their reports in March 2019. It is during these investigations
that two leaks, one significant and the other minute, were located in the stormwater
drainage pipes at the property
the insurer, having considered this additional information has maintained its position that
its liability is limited to the moisture damaged carpets and declines cover for the building
damage.
The information from consultants CR and AL is more persuasive
I have carefully considered the available information including the various engineers ’ and
other consultants’ reports listed in section 3.2 of this determination. I accept th is information
consistently confirms that the insured property was subject to large volumes of stormwater
runoff from the neighbouring property to the east, for several years.
There is no dispute this issue with the neighbour’s stormwater drainage, and possibly some
other minor contributing factors, resulted in numerous occasions of stormwater inundation
and pooling of stormwater water in the external areas of the insured property. This occurred
over a long period of time, until the neighbour was forced to make the needed changes.
I am of the opinion the investigations and associated reports from the engineers’ TM and IM
are limited in their assistance . TK’s report dated 16 December 2016, based on the
complainant’s instructions and concerns at the time , strongly focuses on the neighbour’s
stormwater drainage issues as opposed to the cause and extent of damage to the insured
building.
Similarly, although IM attended the insured property on several occasions and after which it
has provided several reports to the insurer, I believe the extent of its investigations were
limited and that this was because of the insurer’s actions of lack off. It is clear IM recognised
the instructions received from the insurer and associated authority provided by the insurer to
investigate the cause and extent of the damage was limited and did not allow IM to come to
an informed conclusion.
It is clear in IM’s reports that it identifies and recommends to the insurer that further
investigations were needed which it also offered to undertake or arrange. However, the
insurer chose to ignore and/or decline to authorise the recommended investigations. In saying
that, although inconclusive because of the limitations placed on IM, its investigations do, on
balance, assist in coming to an informed decision for this complaint.
Determination | Case number: 696154 Page 5 of 8
IM ’s findings in terms of the extent and locations of damage to the insured property are
consistent with those noted by the engineers CR, who’s report dated 28 March 2019 I find to
be the most persuasive. The level surveys completed by IM on two occasions have been very
helpful in understand the extent and nature of foundation clay movements and the limited
impact this has had on the insured building.
I am of the opinion IM’s investigations assist in determin ing the foundation soil type, which is
found to be classification ‘S’ and is a relatively low reactive clay/soil i.e. its reaction to the
increase or decrease in moisture levels is on the lower scale. I accept IM’s investigations
show, on balance, the damage to the insured building is not the result of a single insured
event nor is it related to the stormwater runoff issues discussed above.
It was on the advice of the IM that the insurer accepted to cover the damage to internal
carpets to the eastern side of the building, as elevated moisture levels were noted in the slab
these areas.
SK’s review of the IM’s information and associated report, is low on detail s and inconclusive.
SK refers to the IM’s findings regarding the level surveys being inaccurate, but it does not
persuasively show how and why. SK essentially concludes it would need more information
and data, in the absence of which it could not provide any conclusions.
Engineers TK, IM and SK alike, did not identify nor were they aware of underground leaks in
the stormwater drainage pipes at the time of providing their opinions and reports. IM had
indicated to such a possibility and offered to arrange investigations to this end, however, the
insurer chose not to authorise these investigations at the time. Therefore, I am of the opinion
their opinions are not based on all the relevant facts and remain inconclusive for the most
part.
I am of the opinion the investigations, findings and reports provided by engineers CR and
plumbing investigations by AL, to be the more accurate, complete and persuasive. I note AL
attended the insured property on 7 February 2019, 19 February 2019, 7 March 2019 and 13
March 2019 to complete its investigations into the insured buildings hot and cold-water
plumbing, sewerage drainage pipework and stormwater drainage pipework.
AL found all the plumbing and pipework services at the insured property were sound except
for the stormwater drainage pipework which was found to be damaged in locations. A
significant leak was found between downpipe 1 and the stormwater street (kerb) outlet, which
testing shows would leak at 10.5 litres a minute.
A second leak was found along the eastern side of the insured building, however, this was
noted to be a minute leak at approximately 50ml per 10 minutes. The consultants confirmed
the significant leak was away from the home and will not have damaged to the insured
building.
The minute leak, has been accepted to have caused limited localised damage to around one-
meter square of external paving. Subject to the complainant lodging a new claim, he is
entitled to cover for the cost to repair the damage to the one-meter square paving area
identified by engineers as being the result of the leak.
Centre heave of the insured building slab is not the cause of damage
CR’s level survey testing found variations between 0mm to 6mm on the eastern side of the
building, which is considered very moderate. It confirms the site classification is of slightly
reactive soil of S classification. CR concludes the building damage noted is not the result of
an isolated flooding event at the site from the neighbouring property to the east.
The cracking damage observed is within the normal expected damage for buildings of this
age, type and founded on such clay soils. The cracking was also noted to appear historic in
nature i.e. has been developing over an extended period of time and was not recent. CR
Determination | Case number: 696154 Page 6 of 8
notes the cracking was measured to be less than 1mm wide, which is considered Category 1
damage, consistent with normal foundation movement due to seasonal moisture changes in a
home of this age and type.
I acknowledge the complainant ’s concern s about CR’s investigations identifying the 70mm
vertical differential footing movement across the entire floor plan, which is much higher than
would normally be acceptable at up to 20mm. Also, CR’s reference to noticing a doming
pattern of the footing system, which means floor levels in the central region were elevated
(Centre heave).
However, I am satisfied CR has adequately addressed these findings and provided its opinion
that these findings, although higher than expected, have not caused or contributed to the
damage found to the insured building. Centre heave is a response to natural seasonal
moisture changes and does not relate to the leaks found in the stormwater pipes.
In CR’s opinion, resultant damage from leaking pipes was limited to the localised pavement
subsidence of an area approximately one-meter square. The cracking damage observed was
within normal expected damage limits and unrelated to the stormwater runoff events and the
stormwater pipe leaks.
Without persuasive evidence to the contrary, I accept the available information supports the
insurer’s entitlement to limit its liability under the claim to the moisture damaged c arpets.
2.2 Is the complainant entitled to compensation?
Insurer is to pay the complainant $2,000 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,000 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
I acknowledge the complainant raises various concerns relating the insurer’s management of
the claim and the unreasonable amount of time it took the insurer to provide him a decision
on his claim.
I accept the evidence shows there did occur failures in the insurer’s management of the
claim, in particular the assessment process. This will have caused the complainant an
unusual extent or degree of stress, anxiety, inconvenience as well as contributed to delays
experienced in finalising the claim.
The evidence shows the insurer failed to authorise necessary and reasonable investigative
measures to assess its liability under the claim, despite repeated recommendations by its
consultants. The insurer chose to decline the claim based on inconclusive evidence, as
identified by its appointed consultants. It then later, after significant delay and because of the
complainant’s decision to dispute its decisions, elected to recommence these investigations
once the matter was referred to AFCA.
I accept the evidence shows the insurer’s poor management of the assessment process
under the claim has caused significant and unreasonable delays since the claim was lodged
on 19 May 2017. Accordingly, I determine the insurer is to pay the complainant $2,000 in non-
financial loss compensation in line with the AFCA Rules, within 14 days of the complainant
accepting this determination.
Determination | Case number: 696154 Page 7 of 8
Why is the outcome fair?
The outcome is fair in all the circumstances as the significant portion of the claimed damage
is not the result of an insured event, allowing the insurer to limit its liability under the claim.
The complainant is entitled to choose whether he wishes to lodge a new claim for the limited
damage to paving identified by CR to be associated with a leaking stormwater pipe. Finally,
given the poor management of the claim, it is fair in all the circumstances that the
complainant be compensated for the stress, anxiety and delays experienced by the insurer.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant expert evidence considered
In providing this determination, I have relieved on the below listed relevant expert evidence:
TM Engineer’s Report December 2016
IM Engineer’s Report July 2017
IM Engineer’s Report June 2018
SK Engineer Surveyors Reports November 2018
IM Engineer’ s Reports 16 and 21 November 2018
CRD Engineer Causation Report March 2019
AL Plumber’s evidence March 2019
Various communications between complainant and appointed consultants.
3.3 Relevant policy wording
What you are covered for – Insured Events
We cover the building for loss or damage at the insured address caused by an
insured event during the period of insurance. There are some things we do not
cover and these are shown in the ‘We do not cover’ section of the following tables
on pages 16 to 25 and in the ‘ What we do not cover – general exclusions’ on
pages 35 to 40.
Determination | Case number: 696154 Page 8 of 8
…
Insured event
means the insured events on pages 16 to 25. In addition, an insured event is
always a single event, accident or occurrence which you did not intend or expect
to happen.
…
Storm
We Cover
Damage to the building caused by a storm.
…
Escape of liquid
We cover
Loss or damage to the building caused by liquid leaking, overflowing or bursting
from any of the following:
• … ;
• any drain, fixed pipes, roof gutters or guttering and rainwate r downpipes,
drainage and sewage systems;
…
• water main, fir e hydrant or water supply pipe; …
…
General exclusions
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
‘Storm’;
‘Flood’ (but only if you have cover for insured event ‘Flood’);
‘Earthquake and Tsunami’;
‘Explosion’.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.