Home / IAG / Determination 694820

Determination 694820

Dispute over hail claim settlement: total roof replacement sought, insurer offered tile repair and scope of works

FirmIAG
Decided2020-10-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants, through a representative, claimed hail damage to their home and sought a total roof replacement, while the insurer offered localised tile repairs. AFCA rejected the full roof replacement, accepted the insurer's scope with an added insulation allowance, and ordered the insurer to repair or cash settle additional damage from the complainants' quotes, with interest if cash settled; no dollar figure was stated.

Under the policy the insurer may choose repair or rebuild and need not match undamaged parts, so the expert evidence supported local tile repair, but the unaddressed additional hail damage had to be settled.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 694820 Financial firm Insurance Australia Limited Determination | Case number: 694820 Page 2 of 13 Case number: 694820 22 September 2020 1 Determination overview 1.1 Complaint The complainants are represented. For the sake of convenience, reference to the complainants will include their representative. The complainants have a Home and Contents insurance policy with the financial firm (insurer) for their property. On 21 December 2018, the complainants lodged a c laim for damage following a hail storm. After assessing the damage to the property‟s roof, the insurer accepted the claim. However, the insurer limited its liability to replacing the roof tiles that were damaged. The complainants dispute this and are seeking a total roof replacement. 1.2 Issues and key findings How should the claim be settled? The available information does not show the roof needs to be replaced. Therefore, the insurer can settle the roof damage as set out in section 2.1. For the other damage, the insurer should also settle this as set out in section 2.1. 1.3 Determination This determination is mostly in favour of the insurer. The insurer is to settle the claim as set out in section 2.1. Determination | Case number: 694820 Page 3 of 13 2 Reasons for determination 2.1 Does the insurer’s offer fulfil i ts obligations under the policy? Valid claim established The complainants lodged a claim on or about 21 December 2018 for damage to their property following a hail storm. The insurer does not dispute that this is covered by the policy. However, the parties dispute the extent of the insurer‟s liability. In particular, the complainant disputes the insurer‟s proposed settlement for the roof. Insurer’s experts found hail damage The insurer arranged for SG to inspect the property and report on the cause and ext ent of the damage to the tiled roof. In SG‟s report dated 5 August 2019, he noted:  at least 50 tiles have been replaced  when reviewing the property as a whole, some elevations of the home were more affected by the hail than others  with the tarps removed from all elevations, the remaining hail damaged tiles were minimal  there is no doubt large hail has struck the tiled roof in a random order SG concluded by stating that: my first impressions are that the roof maybe considered for a “retain and repair” method as suggested by others. But there are key points that will need to be considered if the roof is to be retained, being the tiles are 25 years old and not available as new from any supplier to the best of our knowledge after product research. Furthermore, any re-locating of tiles and installation of new to a certain elevation or building will result in a visual difference. This will not affect the required roof performance, rather it will be an aesthetic issue which the insurer will need to discuss with owner insured. Finally, and probably the most important to consider, is trying to identify where any damaged sarking directly from hail impact may still be present. From the inspection result so far, it appears that the overall occurrence of this type of damage is going to be in the lesser spectrum, but nether the less still likely. The only way to truly find that type of damage is to strip back roof elevation one (1) section at a time [sic]. Determination | Case number: 694820 Page 4 of 13 Insurer proposes to repair the existing roof As the roof tiles are no longer produced, contractor MS proposed to utilise the garage roof tiles to replace the damaged tiles on the house roof. For the garage, MS would use new tiles to replace the ones used for the house. Further, prior to replacing the tiles on the house roof, MS would lift them to identify whether any sarking had been damaged. If damage to the sarking was identified, this would be repaired. MS provided an allowance for this in its scope of works. Finally, any unbroken and unused roof tiles would be left following consultation with the complainants to use as spares. Complainants say the insurer’s repair method is not a viable option The complainants arranged for MW to undertake an inspection. MW prepared a report dated 13 August 2019. MW said 200 tiles were affected. This did not include unseen damage, which could add another 30%. MW also noted damage to associated structures such as whirly bird, flashing and flues. MW recommended that the only way to restore the roof to its original condition was for a total roof replacement. The complainants also provided a report from a structural engineer, JC. JC said the damaged roof tiles can be locally replaced, using donor-tiles. With respect to the sarking, JC recommend replacing it locally and allow for overlapping where there has been damage. JC also said the insulation batts should be inspected with a moisture meter in order to determine if there is any damage. Finally, JC also recommended replacing all damaged gutters. In an email dated 7 July 2020, MW said there are not enough tiles in the garage to do the works proposed. MW noted it is cheaper to remove tiles and resark the whole area rather than pull up sections at a time and spot repair. MW said to inspect the insulation, the whole roof and sarking needs to be removed. MW would not provide any warranties as he would be dealing with suspect tiles that he knew were impacted by hail. Analysis of expert evidence Having carefully considered the available information the panel notes the following. SG‟s report is comprehensive. It provides a detailed inspection of the roof and comments in support. It is also mainly supported by JC. JC agreed the tiles can be locally replaced. Neither JC or SG agree with MW that the roof needs to be replaced. Determination | Case number: 694820 Page 5 of 13 MW‟s report is not p ersuasive for several reasons. In particular, it is not clear how MW identified 200 tiles affected. These were not detailed in its report. Such extensive damage was not identified or supported by either SG or JC. MW did raise concerns that there would not be enough tiles to replace the affected ones. However, this may be due to the fact he considered there were 200 tiles affected. MW also believes the whole roof and sarking would need to be removed to inspect the insulation. This is not evident in JC‟s rep ort. MW says it will be more expensive to do the repairs compared to replacing the roof. This is not apparent. For instance, JC said that if the roof was to be replaced, this may trigger more stringent requirements under current standards. This could substantively increase the cost of replacement. Claim should be settled in this way The policy allows the insurer the choice to either repair or rebuild the home or pay the reasonable cost to do so. In addition, the policy contains this provision regarding matching: we only repair the damaged part(s) of your home. We don‟t pay for materials to match the undamaged parts of your home to create a uniform appearance The available information does not show the roof needs to be replaced. The only expert who says this is necessary is not persuasive for the reasons stated. The insurer has provided a scope of works from MS. MS‟s scope of works is mostly consistent with SG and JC. One addition to this should be an allowance to inspect the insulation as recommended by JC and replace any affected. The insurer‟s scope of works also allows for using undamaged tiles from the garage to ensure the house roof tiles match. The evidence does not show there are insufficient tiles to achieve this. This is a fair outcome given:  the insurer is not required to replace undamaged parts to create a uniform appearance, and  this proposal would ensure the house roof tiles are at least consistent. Therefore, the panel accepts it is fair in all the circumstances for the insurer to base its lia bility on MS‟s scope of works subject to the additional allowance for the insulation in line with JC‟s recommendation. The insurer has advised that it is prepared to authorise the works and provide a lifetime guarantee. This is a fair outcome. The panel acknowledges the relationship between the complainants and the insurer may have broken down. If this is the case, and the insurer agrees to cash settle the claim, then the insurer should obtain an actionable quote based on MS‟s scope of Determination | Case number: 694820 Page 6 of 13 works (with the addition for insulation). The insurer is also to add 10% to this quote to allow for possible variances. Other damage The insurer has agreed to accept the other damages caused by the hail and provided a scope of works. During this dispute, the complainant has highlighted damage that has not been included by the insurer‟s scope of works. LC‟s report identified issues with the ceiling linings, the roof atrium, and to some external timberwork. The complainants also referred to additional water entry whilst the roof remained unrepaired and following SG‟s removal of the tarps. The complainant provided quotes to address this additional damage. The insurer has not addressed this in any submissions. The complainant‟s position is supported by LC and quotes. A ll of this appears consistent with the claimed event. Given this, the insurer should either ensure all these items are repaired or cash settled based on the complainant‟s quotes. If the insurer decides to cash settle the claim, it must pay interest pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from within 30 days of the quotes being issued until payment is made. Determination | Case number: 694820 Page 7 of 13 3 Supporting information 3.1 AFCA Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a Panel for determination, in line with the Operational Guidelines to the AFCA Rules. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only 3.2 Relevant Policy Terms Page Product Di sclosure Statement 29 – Storm rain, thunderstorm, hail, snow, violent wind, cyclone and tornado 51 – Accidental Damage Damage to your home and/or contents that is caused accidentally – that is, mishaps around your home that are caused unintentionally 73 – What we pay for – Buildings Insurance If we agree to cover your claim under Buildings Insurance, then we will: > pay the cost to repair or rebuild the part of your home that was damaged (whichever is lower) 73 – How we settle your buildings claim We will choose to settle your claim for loss or damage to your home and any „other benefits‟ in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your home If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home. We may enter into a cont ract with our selected repairer, builder and/or supplier on your behalf. Determination | Case number: 694820 Page 8 of 13 Page Product Di sclosure Statement 2. Pay you the reasonable cost to repair or rebuild your home We can c hoose to:  pay yo u  pay your nominated repairer, supplier or builder, or  provide you with store credits form one of our nominat ed suppliers For example, we may pay you directly when:  you decide not to repair or rebuild your home, or  you don‟t start repairing or rebuilding your home within 6 months from when the loss or damage takes place, or within any longer period when agreed to in writing. 78 – Matching Materials Under Buildings Insurance  we only repair the damaged part(s) of your home. We don‟t pay for materials to match the undamaged parts of your home to create a uniform appearance 3.3 Expert Reports Record Key points Insurer Inspection (MS) Report 10 April 2019  some damages during the hail storm  pool solar heating and solar power to the house has been affected  staining to stair well ceiling / walls that will require painted plaster  two small mosque tiles smashed off pool edge  damages to cedar feature beams  a roof inspection will be organis ed by an independent contractor outlining the cause of the damages along with a separate scope of works to deal with the hail damages  it is my opining that the damages seen at the time of inspection is consistent with hail storm damages Insurer Scope of Works (MS) Report 25 November 2019 Dwelling  Remove and replace quad guttering approx.. 55LM  Remove and replace gutter guard approx.. 55LM  Install a harness anchor point min 2 each  Allowance to supply and install edge rail scaffolding approx.. 120Lm  Remove and replace hail impacted lead flashing to the Dutch gable, approx, 7Lm  Note: Lift roof tiles to elevations and check to see if any sarking has bene punctured underneath as a result of any hail stones that Determination | Case number: 694820 Page 9 of 13 Record Key points may have punctured through roof tiles during the storm event  Remove and replace broken roof tiles – Note: When replac ing any broken roof tiles, please utilise undamaged tiles form the garage roof  Leave any unbroken remaining roof tiles for the insured as spares, discussions when repairs are underway as to how many tiles insured may wish to keep  Note: generous provisional allowance of 100m2 has been allowed within scope of works for replac ement of potential damage sarking from hail penetration and as a result inclusion of replacement battens  Rebed and point ridge capping approx., 40Lm, including gables ends approx., 90Lm  A ssociated specialist trade to remove and reinstall solar panel system panels, approx, 20 panels, PC Allowance due to nature of quote as per Signature Solar Garage  Allowance to supply and install edge rain scaffolding approx, 31 Lm  Supply and install new fl ashings to Dutch gables approx, 8Lm  Rebeding and pointing of ridge capping approx. 4Lm and gable ends approx. 8Lm to the free standing garage  Remove and replace Terracotta roof tiles (glazed), approx. 66m2 to the free - standing garage  Supply and install new sarking, approx. 66m2 to garage roof  Supply and install new roof battens, approx. 66m2 to garage roof Insurer’s Consultant (SG) Report 5 August 2019  When viewing the property as a “whole” some elevations of the home were more affected by hail than others. This is due to large tree protection (proportionate), followed by the direction of hail and building height providing over - shadowing to lower roof elevations  A pile of broken tiles stacked in the garden depicting that a large proportion of tiles we re broken through as a “cracked tiled” along with some tiles with “large hole” formations. This broken stack was not large, and fairly consistent with the suggested amount of fifty (50) odd tiles being replaced in the first instance  With tarps removed to a ll roof elevations, what remained as hail damaged tiles was rather minimal and fixed during ins pection process with a make safe proc ess by gluing back together with silicone. This enabled the consultant to complete the inspection and not having to re - tarp the roof elevations. There is however 1 x roof elevation that stood out as being rather significantly damage by hail, and this is located to the far - right hand side above guest bedroom wing, right hand side Northern elevation.  There is no doubt that very l arge sized hail has struck the tiled roof elevations, in a random order. This is evident with not only tiles with holes straight through, but also with large sized impact dents to metal guttering.  If one was to ask, has the roof as a “whole” been complet e ly Determination | Case number: 694820 Page 10 of 13 Record Key points compromised with regards to operational performanc e levels due to the hail event ? my answer would be “no”.  Could the roof be considered as being in a condition for a “retain and repair” method? My answer would be “yes”, but with some limitations which will be stated in Section 4.  During the five (5) hour inspection process, which included make safe time, there was both hail relat ed damage found to roof elevations and pre - existing maintenance issues which are contributing towards the wat er ingress inter nally.  It shall be noted during the entire inspection process, no tiles actually broke under “foot load” or during the tile “lifting and jiggling” process. Garage  Firstly, the installed roof tiles are not readily available.  It is believed that this gara ge roof has been proposed for a complete re - roof so enough tiles can be salvaged for re - use to the main house.  Given it’s a separat e structure and the fact new replacement tiles are different in appearance, it does mak e sense to consider this.  However, t he number of reusable tiles once removed may not be enough for what is actually required, including ensuring enough tiles remain onsite as spares after all work s are completed, i.e. to replace the 50 odd that have already been used.  As the Six maps images show, this garage roof elevation is rather protected by established trees.  When inspecting this roof elevation, no tarps were found to be covering the roof.  In addition, there was no “clear indication” of recently replaced tiles. That‟s due to the fact all the tiles appear uniform in appearance, i.e. glaze and surface condition is as one. If tiles had been replaced it is not easy to find them.  No cracked tiles were found (tiles that have clear fresh – open cracks), other than quite a few with some form of sealant that is hard to tell if it is a make safe repair or repairs undert aken by others prior to the event. Dwelling  As previously mentioned, the installed roof tiles are not readily available.  In addition, there was no “clear indication” of recently replaced tiles. Due to the fact all the tiles appear uniform in appearance, i.e. glaze and surface condition is as one. If tiles had been replac ed it is not easy to find them.  Note – with exception to 1x location where a fresh tile was found, to right sid e of carport roof area near the Dutch gable end.  Evidence of make safe repairs, namely tarps and PVC builder‟s plastic plus black gaffer tape.  These make safes were removed, and silicone applied as a new make safe.  With tarps removed, random tiles were found to be broken and there is some sarking penetration. Determination | Case number: 694820 Page 11 of 13 Record Key points  In addition, a tile was found at the eave loc ation with a clear hail hole through it followed by damaged sarking.  PV Solar panels have no hail impact damage. Note it is believed 1x panel has already been replaced.  Note - Ceiling / roof void was n ot accessed due to roof design.  As previously mentioned, the installed roof tiles are not readily available.  In addition, there was no “clear indication” of recently r eplaced tiles. Due to the fact all the tiles appear uniform in appearance, i.e. glaze and surface condition is as one. If tiles had been replac ed it is not easy to find them.  Note – with exception to 2 x locations where fresh tiles were found, to front si de (Sout h) facing roof.  Evidence of make safe repairs, namely tarp plus black gaffer tape.  This make safe was remove and silicone applied as a new make safe.  With tarp removed, random tiles were found to be broken and there is some sarking penetration.  Note - Ceiling / roof void was not accessed due to roof design.  As previously mentioned, the installed roof tiles are not readily available.  In addition, there was no “clear indication” of recently replaced tiles. Due to the fact all the tiles appear un iform in appearance, i.e. glaze and surface condition is as one. If tiles had been replac ed it is not easy to find them.  Evidence of make safe repairs, namely tarp plus black gaffer tape.  This make safe was removed and silicone applied as a new make safe .  With tarp removed, random tiles were found to be broken but no sarking penet ration below from hail.  As previously mentioned, the installed roof tiles are not readily available.  In addition, there was no “clear indication” of recently replaced tiles. T hat‟s due to the fact all the tiles appear uniform in appearance, i.e. glaze and surface condition is as one. If tiles had been replaced it is not easy to find them to these elevations.  Evidence of make safe repairs, namely tarp plus black gaffer tape.  T his make safe was removed, and silicone applied as a new make safe.  With tarp removed, random tiles were found to be broken and there is some sarking penetration.  The Sout hern face of this roof elevation has certainl y sustained severe hail damage.  If one was to question the amount of hail damage that occurred, then maybe this roof elevation could provide a clue.  Remove and replace damaged portions of sarking as required and as per typical installation methods.  Remove and replace valley gutter trays with a better design for discharge points taken into consideration when designing tray width. Determination | Case number: 694820 Page 12 of 13 Record Key points  My completed inspection of the areas of concern pointed out by the insured has found that hail related damage has occurred to the roof elevations as described. It is acknowledged that at least 50 x roof tiles have already been replaced.  However, as previo usly mentioned in section 3, my first impressions are that the roof maybe considered for a “retain and repair” method as suggested by others.  But there are key points that will need to be considered if the roof is to be retained, being the tiles are 25 ye ars old and not available as new from any supplier to the best of our knowledge aft er product research.  Furthermore, any re - locating of tiles and installation of new to a certain elevation or building will result in a visual difference. This will not affe ct the required roof performance, rather it will be an aesthetic issue which the insurer will need to discuss with owner insured.  Finally, and probably the most important to consider, is trying to identify where any damaged sarking directly from hail impa ct may still be present. From the inspection results so far, it appears that the overall occurrence of this type of damage is going to be in the lesser spectrum, but nether the less still likely. The only way to truly find that type of damage is to strip b ack roof elevations one (1) section at a time.  As for the chances of “sleeper tiles”, given no breakages occurred during the ins pection process, the likelihood of sleeper tiles is classed as being “low”. Complainants Roofing Expert (MW) Rep ort 13 August 2019  Clear evidence of hail damage still visible, roof with hail impact across the whole roof areas  Evidence of lead flas hing impacted and in some cases punctured  Evidence of damaged whirly bird  Evidence of punctured flashing to flues  Evidence of cement cracking & dislodgment form impact  Evidence of broken Capping & tiles  Evidence of broken water courses  Evidence of new silicone to tiles  Evidence of Torn and damaged sarking from broken tiles  Evidence of damaged lead flashing to skyligh t  Evidence of recent repairs carried out by others  The roof tiles breakages are consistent throughout the whole roof area. However the upper roof is the most affected  Visibly I counted 200 tiles to entire roof areas. However this does not include the dam age unseen. Such as water courses and hairline splits. There can be no actual figure bt a 30% allowance should be close. Brining the total close to 300 tile breakages  A large number of ridge caps have been smashed and or cracked, the cement fixing to the c apping and all gable ends has been demolished with the impact.  The hail damage to skylights, wall and penetrations has impacted Determination | Case number: 694820 Page 13 of 13 Record Key points all flashings  Its impossible to determine how many band aid repairs have been made by others, however the client gave them all his spare tiles & there are still many tiles awaiting more repairs. The band aid repairs have created more problems due to the unknown tile positions.  Clearly sarking would have been damaged by the smashed tiles and this has not been repaired, furthermore we cannot access the ceiling cavity to confirm damaged sarking position due to the cathedral ceiling style design  The only way forward to replace damaged sarking and to bring the roof back to its original condition is to completely reroof. It is not cost efficient to remove tiles, determine their condition and stack quality salvaged tile for reuse. The labour component would far outweigh the cost of new tiles. This would include replacement of all flashing.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.