The insurer declined a home claim for building damage, attributing it to ground movement in reactive clay. AFCA found the leaking pipes caused damage to the rear of the home, so the decline was rejected and the insurer must reassess the repair cost, reimburse the complainant's engineer report and pay statutory interest on it.

The insurer's engineering evidence did not establish on the balance of probabilities that an excluded cause such as subsidence or settlement was the proximate cause of the damage.

Issues

Subjects and remedies

pay compensationpay interestreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 693870 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 693870 Page 1 of 15 Case number: 693870 13 January 2021 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). The complainant lodged a claim for damage to property caused by water pipe leaks. The insurer has declined the claim and says:  the damage is caused by ground movement which is a result of seasonal and environmental wetting and drying influence on the reactive clay foundation soil  the claimed water leaks are not the cause of the damage. The complainant disputes this and wants the insurer to accept the claim. 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. The insurer is not entitled to decline the claim because the available information shows on the balance of probabilities the leaking pipes in the sub floor area are the proximate cause of the damage in the rear half of the property (described in the determination as the accepted damage). What is the extent of the insurer’s liability to the complainant? The available information from the insurer‟s builder and the engineers establishes the leaking pipes caused damage to the rear half of the property from the bathroom, WC and laundry through to the rear veranda and garage (the accepted damage). The insurer is also liable for the cost of the complainant‟s engineer‟s report. 1.3 Determination This determination is in favour of the complainant. Should the complainant accept this determination then the claim and complaint are to be resolved as set out in paragraph 2.2 of the determination. Otherwise the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 693870 Page 2 of 15 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Complainant has established a valid claim The complainant is represented. For the sake of brevity, references to the complainant i nclude references to and submissions by the complainant‟s representative. The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Extracts from the relevant parts of the policy are set out in supporting section 3.4 of this determination. The complainant says water pipes burst under his house some years ago on two separate occasions. He says the flooding weakened the foundations and caused substantial damage when the soil re -settled. It is not in dispute the insured property is damaged. The dispute is about the cause of damage. The complainant holds a home insurance policy which provides cover for damage to the property caused by water leaking or escaping from pipes. The complainant relies on his representative who is a retired builder and, on an engineer (RB), who inspected the property in May 2020. The insurer relies on reports from a plumber, a builder and an engineer. The reports relied on by the parties are summarised in supporting section 3.3 of this determination. The plumber identified issues with the stormwater drainage system. He says they are not likely to be allowing large amounts of water leaking from the drains into the soils. The insurer‟s builder reports no evidence of water ingress or staining. RB says two copper water lines burst beneath the floor at the rear of the house about five years ago. He notes the complainant recorded about 150 – 300mm of water under the floor. RB identifies a photograph which he says shows the clay soil under the house „shrunk and moved because of having water over it, soaking in and then drying out‟. Determination | Case number: 693870 Page 3 of 15 RB refers to the plumber‟s report and photographs taken by the insurer‟s builder. He says the photographs of the s teps into the laundry indicate „ large amounts of movement of (stet) occurred because of water ingress most likely from the s tormwater and/or sewer line‟. Having reviewed the available material from the insurer, RB concludes that although the plumber and builder talk about minor leakage, he is „ reasonably convinced that the stormwater had some substantial leakage and may still h ave leaks‟. The panel is not sufficiently persuaded by the insurer‟s plumber and builder as it is not clear they are reporting on the situation at the time of the leaks. Rather, their observations appear to address the state of the site when they inspected it years after the leak events. Further, the panel considers RB‟s report is more persuasive in view of his expertise, the tests he undertook and the coherent and comprehensive exploration of and explanation of the mechanism of damage. The panel notes the insurer‟s engineer (IE) did not review water consumption records (because different dates were provided for the pipe leaks) but says if they showed a significant leak then he agrees this would be responsible for cracking damage close to the leaks. The panel considers IE did not take sufficient account of the complainant‟s observations about the amount of water under the house at the time of the leaks as noted by RB and the photograph RB refers to in his report. Having considered the reports and photographs, the panel is satisfied on the balance of probabilities the property was damaged by water escaping from leaking pipes some years ago. The panel is satisfied the complainant has established a valid claim. Insurer must establish exclusion(s) apply The onus now shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The exclusions relied on are set out in supporting section 3.4 of this determination. Parties’ reports and material considered Principally, the insurer relies on two reports from its engineer (IE). The insurer‟s builder mostly ceded discussion of causation issues to the engineer. IE first inspected the property in October 2019. He says because of the nature of the foundation soil (reactive clay), it expands with moisture and shrinks in dryness. He reports that soil moisture is influenced by rain, the plumbing leaks, pavements and surrounding trees – both their proximity and removal. Determination | Case number: 693870 Page 4 of 15 He says the ceiling has collapsed in the lounge and family rooms and the wall tiles have popped from the wall in the bathroom because of inadequate adhesive. RB inspected and photographed the property and undertook level surveys and soil tests in May 2020. He also considered material provided by the insurer. He concluded a vast amount of the recent damage to the property was caused by the leaking pipes. IE inspected the property again in June and July 2020, undertook a survey of the perimeter brick course levels and reviewed RB‟s report and RB‟s soil test. He continues to maintain the leaks have not contributed to the damage but says the settlement and cracking is because of soil drying induced shrinkage. IE also reiterated the ceiling collapse was because of progressive failure resulting from the defects in the original construction of the ceiling. Panel prefers the complainant’s expert opinion To establish the policy exclusions relied on, the insurer must establish the proximate cause (or the dominant, effective or operative cause) of the damage was the excluded events of gradual deterioration, subsidence, settling or faulty design. The panel has carefully considered the available i nformation including the numerous photographs, the soil test and the level surveys conducted by both engineers. The panel prefers the expert advice of RB because RB has conducted relevant tests and then persuasively and comprehensively addressed the conclusions drawn by IE. In his first report, IE did not conduct a level survey and yet concluded (with insufficient explanation) that the proximity of trees (and their removal) caused the damage. The panel prefers the explanation of RB about the influence of the trees particularly in view of the bore moisture readings. Further, having undertaken a level survey, inspected the property and considered other photographs, the panel finds RB‟s explanation about the cause of the damage more persuasive. RB provides a coherent explanation as to why he says there was a massive amount of water under the floor, the site of the leaks relative to the claimed damage and how the damage to the paving and steps outside the laundry indicate the soil swelled and pushed at this site as a result of the leaking water under the house and how the water affected the soil at that time. While RB agrees there has been a background of long term movement, he says it has not had any structural significance pointing out the front half of the house has mostly gone through the same conditions as the rear half with the only exception being the leaks. The panel accepts RB‟s level survey shows the front half of the house moved about the same amount as the rear half of the house supporting RB‟s conc lusion that the building heaved along the north and east sides resulting in dislocation to the ceiling and some separation in the floor system, because of the plumbing failure. Determination | Case number: 693870 Page 5 of 15 In his second report, IE says RB‟s level survey methodology is less reliable bu t does not persuasively say why. He relies on his perimeter brickwork level survey which he says indicates the north eastern side of the building has settled downwards. He says if the burst pipes affected the moisture content in the reactive clay soil then he would expect upward heaving movement. While IE concludes any previous heaving caused by leaking pipes has now receded, the panel considers IE has not adequately explained how his level survey and his findings are impacted by the fact the leaks occurred several years ago and the heave in the soil has now dissipated at the site of the leaks as evidenced by RB‟s level survey. IE does not persuasively rebut the findings of RB in relation to the effect of the trees. Nor does he persuasively rebut the findings of RB about the present condition of the soil at the site of the leaks, the likelihood of a large leak(s) at that site some years ago and RB‟s explanation about how heaving caused the damage in the laundry area. As for the damage to the bathroom wall tiles and ceiling, the panel prefers the coherent and comprehensive explanation by RB. The panel notes RB has particular expertise in relation to this type of ceiling construction. RB describes the ceiling space and notes there was an error in construction. However, RB then points out the construction defect existed for nearly 50 years and only failed after movement of the strip footings and foundations along the northern and eastern side of the building at the site of the leaks. RB describes the mechanism whereby the excess water from the leaks took time to dry which dropped the solid brick wall in the middle of the building, upsetting the supporting system to the building and caused the claimed ceiling damage. In view of these comprehensive observations, the panel is not sufficiently persuaded by IE‟s opinion which merely refers to „insufficient adhesive‟. The panel considers IE‟s opinion is insufficiently persuasive to meet the insurer‟s burden to establish the damage was caused by an excluded cause(s). Insurer not entitled to decline the claim In conclusion, although there is long-term movement, subsidence/shrinkage and faulty design, for the reasons stated, the panel is not satisfied the available information establishes on the balance of probabilities that these issues are the proximate cause of the claimed damage. Rather, the panel is satisfied the available information establishes on the balance of probabilities the proximate cause of the claimed damage is the leaking pipes. In the circumstances, the insurer is not entitled to decline the claim. Determination | Case number: 693870 Page 6 of 15 2.2 What is the extent of the insurer’s liability to the complainant? Builder’s scope is only a preliminary scope The complainant provided no information about the cost of repairs. The insurer‟s builder has provided a quote in the sum of $77,358.21 which includes the cost of homeowner‟s warranty, builder‟s margin and GST. The quote is undated. In view of the contents of the first builder‟s assessment report the panel assumes it was prepared about the time of the report in March 2019. In the report the builder refers to resultant damage including cracking to external and internal walls, cracking to eaves, movement to external stairs and tiling, undulating ceilings internally, partial collapse of lounge ceiling, internal doors sticking, bathroom wall tiles delaminating, overall foundation settlement and roof frame movement. The quote addresses the resultant damage as described, including external work, underpinning and re-stumping, retiling of the entire bathroom, reinstatement of all plumbing and removal and replacement of the cracked and undulating plasterboard ceiling, internal painting of affected walls and ceilings and removal of all associated debris. The quote is described as a „trade breakdown‟. The quo te also says, „ please note this is a preliminary scope of works.‟ The builder‟s report refers to the quote as a „ budge t estimate overview for damages‟ . The builder says an engineer will need to attend to provide a scope that will return the property to pre-loss condition. The builder notes a significant variation of repair costs is likely depending on the extent of foundation repairs. RB describes the purpose of his visit was to review the cracking, damage and dislocation at the rear of the property. RB agrees the photographs taken by the insurer‟s plumber and builder are representative of the damage RB observed. RB says IE‟s photographs also match his observations about the cracking, dislocation, movement and the location and the descriptions matched up well with RB‟s observations. RB agrees the building heaved along the north and east sides resulting in dislocation to the ceiling and some separation in the floor system all of which require correction. RB attached 12 photographs to his report and the site investigation diagram indicates where these photographs were taken. Insurer liable for the accepted damage The panel accepts not all the damage in the house was caused by the leaking pipes. The available evidence establishes cracking damage at the front of the house is probably not caused by the leaking pipes. Determination | Case number: 693870 Page 7 of 15 The panel is satisfied the available information from the insurer‟s builder and engineer and from RB establishes the leaking pipes caused damage to the rear half of the property from the bathroom, WC and laundry through to the rear veranda and garage (the accepted damage). The panel prefers to provide a determination which finalises the complaint, but in the circumstances, is unable to do so in view of the builder‟s comments about the likelihood of significant variations. Mechanism for a fair resolution The panel is satisfied a fair resolution is as follows. Should the complainant accept this determination, then within 14 days of notification of acceptance, at its expense, the insurer is to arrange for RB (or an engineer agreed by the parties) to re-attend the property and provide a scope of works to determine the reasonable cost of repairs for the accepted damage. Within 14 days of provision of the scope of works, the parties are to obtain quotations for the cost of repairs as per the engineer‟s scope of works. Within a further 14 days of obtaining quotations, the parties are to agree the cost of repairs. Pursuant to the policy, the insurer is entitled to settle the claim by arranging for its preferred repairers/builders to repair the home or the insurer can choose to pay the reasonable cost to repair the home. Within seven days of agreement of the cost of repairs the insurer is to elect whether it will repair the home or cash settle the complainant. Should the insurer elect to repair the home, the complainant is to ensure there are no further leaks (as posited by RB) and (at his expense) repair further leaks (if any). Should the insurer elect to cash settle the complainant, the panel considers it is fair in the circumstance that the insurer cash settle the complainant for the agreed cost of repairs plus a further 20% for any unforeseen contingencies which may occur during repairs and to compensate the complainant for the transfer of risk to the complainant in undertaking the repairs. The parties are encouraged to work together to resolve the quantum of the claim, but if they are unable to do so, they can return to AFCA for a further determination on the quantum of the claim. Insurer lia ble for the cost of RB’s report AFCA may decide the insurer is to contribute to the professional costs (capped at $5,000) incurred by the complainant during the complaint. Determination | Case number: 693870 Page 8 of 15 Correspondence between the parties indicated a willingness by the insurer (at one stage) to pay for the costs of RB‟s report. When considering whether to require an insurer to make a costs contribution, AFCA considers the complexity of the complaint and whether the complainant needed to incur the costs to understand or establish their claim. The panel considers it is fair the insurer reimburses the complainant for the cost of RB‟s report. This is because the complaint raised technical issues about which the complainant genuinely needed advice and to counteract IE‟s opinion. Further, as evidenced by the reasons for the determination, the panel found RB‟s report extremely useful in making the determination. Should the complainant accept this determination then within seven days of acceptance, the complainant is to provide to the insurer the invoice for RB‟s report. The insurer is to forthwith pay for the report. If the complainant has already paid for RB‟s report then the insurer is to forthwith reimburse the complainant for the cost of the report. The insurer is to also pay statutory interest pursuant to section 57 of the Insurance Contracts Act on the cost of the report from the time the complainant paid for the report until the insurer reimburses the complainant. Determination | Case number: 693870 Page 9 of 15 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the operational guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause. 3.3 Extracts from material relied on by the parties Date Action Determination | Case number: 693870 Page 10 of 15 Date Action In surer’s builder’ s report and photos (JP) 19 March 2019  Described damage including ceiling in lounge room started to collapse and a make safe was completed.  Complainant said there is cracking to most internal and external walls: wall tiles delaminating in the bathroom.  Complainant had plumbing issues about 6/10 years ago and 6 years ago plumbing re - routed  Cracking worsened over the years.  Upon inspection found damages consistent with long - term settlement of the foundations. No evidence of water ingress or staining.  Due to complainant‟s statement and previous attempts at patching exterior cracks, say settlement has been occurring for many years.  Settlement in the area is common due to highly reactive clay soils.  Delamination of the tiles is consistent with m ovement to the walls resulting from foundation settlement.  Engineer should review which may require cctv of sewer and drainage to determine if escape of liquid affect it.  Engineer will also need to inspect the roof framing to determine causation. Plumber ’s report 31 May 2019  CCTV sections to stormwater and sewer drains.  Complainant said there were two burst copper water lines in the subfloor within the past 5 to 6 years which saw the subfloor flooded in 6 to 12 inches of water.  Below ground stormwater d rainage system had some defects including misalignment affecting the rear right - hand side of the property, a fracture affecting the front left - hand side, two blockages affecting the rear right - hand side and a leaking gutter at the front left - hand side.  Def ects in the stormwater drain aren‟t likely to be allowing large amounts of water coming from the drain into the sub surface soils.  No defects seen in the sewer water drainage system.  Not currently leakage concerns. Further report from JP  Plumber inspected pipes. Stormwater drainage system was misaligned at the right - hand side of the property with fractures and blockages affecting the right hand and left - hand side of the property.  Advised defects to the stormwater pipes are not likely to b e allowing large amounts of wat er into the subsurface soil.  No defects in the sewer pipes.  Settlement cracking at the property is not relat ed to an escape of water from the sewer or stormwater pipes but is due to soil movement and subsidenc e. Determination | Case number: 693870 Page 11 of 15 Date Action JP trade br eakdown  Costs including plans and permits, homeowners warranty, bricklayer, carpenter, painter, underpinning and re - stumping and rubbish removal plus homeowners‟ warranty, margin and GST $77, 358. 21. Insurer’s engineer report (IE) 17 October 2019  Inspec ted and photographed property 10 October 2019.  Insured lived in the house since 1985 and images show the trees in the reserve at the rear and front of the property have matured in that time.  In or about 2009 insured noticed leakage in the underfloor copper water supply pipe which inundated the subfloor and pipe was repaired.  In 2011 noticed another leak in the copper water supply pipe beneath the rear veranda which was rerouted.  First noticed cracking in 2012 which worsened.  Engineer describes and photogra phs cracking.  Foundation soil includes reactive clay which expands with moisture and shrinks in dryness.  Cracking caused by differential footing movement because of the reactive nat ure of the soil which responds to changes in the moisture content by swelli ng when wet and shrinking when dry.  Moisture content influenced by rain, plumbing leaks, pavement, trees and vegetation.  Building cracking gradual and long - standing.  Removal of trees near that building can cause swelling and rebound heave to the reactive soil and the maturity of the trees can cause shrinkage to the soil.  Ceiling collapse in the lounge and family rooms caused by inadequat e adhesive bet ween the cornice and the brick wall and the ceiling batons.  No water leakage, water ent ry or moisture damag e in the roof or on the ceiling to suggest ceiling failure caused by storm.  Wall tiles have popped from the wall because of inadequate tile adhesive coverage and distribution.  Storm, stormwat er pipe blockage or leakage or the like has not contributed to the building cracking, ceiling collapse, wall tile delamination and damage. Complainant’s engineer’s report (RB) 4 June 2020  Inspected, photographed and undert ook level surveys 18 May 2020 to review cracking, damage and dislocation at the rear of the pr operty.  Took a borehole near the south west corner of the house. Moisture levels average in this area.  Describes the property and its surrounds. Notes the trees at the front and back and says (citing the bore moisture readings) trees not likely to have had a great influence on the levels. Determination | Case number: 693870 Page 12 of 15 Date Action  Describes how he undertook his survey and says it appears all intern al stumps are dropping.  Describes the ceiling space and says there is an error in construction and this area needs to be properly designed to replace/correct the use of the flexi trusses.  In addition to the two leaks, considered a plumbing leak was presen t under the small dining area next to the kitchen.  Photographs under the floor show there was water – a massive amount of water even for a short period.  Also says there is a gap bet ween the paving and the brick wall on the blind side of the property indic ating the soil has swelled and pushed the paving and dislocated the concrete steps that lead to the laundry.  Sewer and stormwater exist at the back and all the services come from the front.  Two burst copper water lines occurred wit hin the subfloor about f ive years ago primarily located in and under the small dining area next to the kitchen. Says his photograph 4 supports and the water would have evaporated slowly.  Taking both the insurer‟s plumber and builder‟s photographs into account says the steps into the laundry indicate large movement because of water ingress most likely from the stormwater and sewer lines. No relative levels were taken.  Disagrees there was minor leakage and says he is reasonably convinced the stormwat er had substantial leakage and m ay still leak.  Disagrees there is long - term settlement in the laundry/WC/bathroom and kitchen and says there is sufficient movement in the paving and rotation of the steps to indicate a severe amount of moisture in the ground at this location.  As for the insurer‟s engineer, notes no levels were taken and no soil tests were done and says the statements made were “generic”.  Disagrees with the insurer‟s engineer‟s findings about the ceiling defect and says the defect (undersize roof construction) has existed for nearly 50 years and only failed onc e movement of the strip footings and foundations occurred along the northern side of the building and to a lesser extent to the eastern side when the leaks occurred.  Agrees some of the movement in the building has be en long - term and gradual but says the reason for the ceiling collapse and dislocation of the paving and the entrance to the laundry are recent and relat e to a failure in one of the hydraulic systems on the site (most likely the stormwater/sewage on the nor thern side) and the excess water getting in some five years ago which has taken time to dry dropping the solid Determination | Case number: 693870 Page 13 of 15 Date Action brick wall in the middle of the property and ups etting the support system to the ceiling and delaminating the ceiling members.  Agrees with the e ngineer‟s visual observation but disagrees with their conclusions.  Agrees there has been a background of long - term movement but says it has not had any structural significance.  Concludes present problems arise from the burst water main (twice) flooding un der the building. Also believes there is a leak in the stormwat er system.  Says this is consistent with movement of the steps leading into the laundry and the movement of the pavement and the gentle heaving locally and the dislocation of the ceiling area re sulting in localised collapse in that room adjacent to the kitchen and in part support ed by the spine brick wall.  Difficult to separate with certainty old and recent movement and notes the front half of the hous e has mostly gone through the same conditions as the rear half with the only exception being the plumbing failure.  Says front remains in quite good condition even though the level survey shows it moved at about the same amount which supports his contention the building heaved along the north and east side resulting in dislocation to the ceiling and some separation in the floor all of which require correction.  Concludes a vast amount of the recent damage to the property is caused by the plumbing failure. Insurer’s engineer’s report (I E) 20 July 2020  Further inspected in June and July 2020 after review of RB‟s report.  Soil samples by RB confirm reactive clay soils present.  Undertook a survey of the perimeter brick course levels to det ermine the extent and direction of movement.  Results of the perimete r brickwork level survey indicate the building‟s north eastern side has settled downwards relative to its original constructed position.  If the burst pipes affected the moisture content in the reactive clay soil, then would expect upward heaving movement but instead survey shows a downward movement.  Says the methodology of RB is less reliable but nonetheless indicate the overall building floor level has dropped towards the centre of the building.  Reiterates the ce iling collapse has been a progressive failure resulting from the defects in the original construction of the ceiling.  Refers to photographs of the laundry steps and says settlement is consistent with downward settlement due to drying shrinkage movements in the reactive clay soil Determination | Case number: 693870 Page 14 of 15 Date Action (not upward heaving movement) most likely due to seasonal, environmental and tree root drying influences. If leaking water, then expect upward heaving movement.  Surface run - off water from heavy rainfall event is unlikely to cause si gnific ant wat er ingress into the subfloor space.  Different dates provided for the pipe leaks so has not reviewed water consumption records but if water consumption shows a significant leak then would consider cosmetic crack repairs to the internal walls in the dining lounge and family rooms which are located close to the leak, but ceiling collaps e has not been caused by pipe leak.  Reviewed floor level surveys and says any previous heaving caused by a leaking water pipe have receded.  Continuous widening of cracking after the soil moisture content has recalibrated is not the result of any previous water supply pipe leaks.  Information provided, and confirmation of reactive foundation soil confirms opinion that leaks have not contribut ed to the damage rather t he downward settlement and cracking is because of soil drying induced shrinkage. 3.4 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Record Key points PDS Page 33 Water and oil leaks Buildings Insurance Contents Insurance If loss or damage is caused by water or oil leaking or escaping from an item shown here. Covered  water leaking or escaping from: > house gutters, drainpipes or pipes > sanitary fixtures – for example, baths or toilets > appliances – for example, washing machines or dishwashers > waterbeds > aquariums > water tanks > swimming pools Determination | Case number: 693870 Page 15 of 15 Record Key points PDS Page 63 - 64 The exclusions set out in this section apply to all covers and benefits under your policy. What we don’t cover Loss, damage, injury or death arising from:  rust, corrosion, gradual deterioration, depreciation, wear or tear  subsidence or landslide unless it happens immediatel y as a result of: > an earthquake or explosion > a storm > a flood > rainwater run - off > storm surge We do not cover  the settling, shrinkage or ex pansion in buildings, foundations, walls or pavements Maintaining and occupying your home We don't cover loss, damage, injury or deat h arising from:  faulty design or workmanship  you not maint aining your hom e in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained. 3.5 Other relevant material considered and relied on  Parties‟ submissions/emails and all attachments to all submissions/emails.  Parties‟ expert reports.  Level surveys.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.