Home / NAB / Determination 692445
Determination 692445
Failure to register mortgage delayed subdivision and sale of rear lot
Summary
The complainants said the bank's failure to register its mortgage delayed their subdivision and forced a sale of the rear lot for $190,000, and claimed about $124,225 in loss. AFCA accepted the bank had made an error but found the loss was too remote and not caused by it, and ordered no further compensation.
Compensation requires the loss to flow from the breach and not be too remote, and the new lender's consent and the complainants' failure to disclose the mortgage to their advisers broke the causal chain.
Issues
- Administrative error primary · upheld“The bank acknowledges it made an error when it did not register its mortgage over the property.”
- Misleading conduct secondary · not upheld“The available information does not establish the bank made a misrepresentation in the TCC that it would pay financial loss compensation once the rear lot was sold.”
Subjects and remedies
no remedy
Related
Text of the determination
Determination
Case number 692445
Financial firm National Australia Bank Limited
Determination | Case number: 692445 Page 2 of 7
Case number: 692445 11 September 2020
1 Determination overview
1.1 Complaint
In September 2015, the complainants obtained a loan from the financial firm (bank).
The loan was secured by three properties, including the L Street property (property).
While the loan contract disclosed the property secured the loan, the bank failed to
register its mortgage on the property‟s title. This meant the property was
unencumbered. It was the complainants‟ intention to sub -divide the property and sell
the rear block.
In October and November 2016, the complainants refinanced all the loans they held
with the bank to another financial firm (new lender). On 12 October 2016, the new
lender registered its mortgage over the property.
The complainants say because the bank failed to register its mortgage in 2015, the
sub-division of the property was delayed. The complainants say in February 2017,
they received a verbal offer from a prospective purchaser to buy the rear block for
$290,000. However, they were unable to accept this offer because the sub-division
was not complete.
In August 2018, the complainants lodged a complaint about these issues with
Financial Ombudsman Service (FOS) (FOS complaint), a predecessor scheme to the
Australian Financial Complaints Authority (AFCA). During the FOS complaint, the
parties attended a telephone conciliation conference (TCC), after which the bank paid
the complainants $4,000 for their claim experience and agreed to consider a claim for
financial loss when the loss crystallised.
Following the FOS complaint, the complainants sold the rear lot for $190,000 in
October 2019. The complainants say the bank caused them financial loss of
approximately $125,000.
On 30 April 2020, an AFCA case manager issued a recommendation on the issues in
dispute. The recommendation was in favour of the bank and a copy of it has been
attached to this determination. The complainants have rejected the recommendation.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination.
Determination | Case number: 692445 Page 3 of 7
Do the complainants’ further submissions change the outcome?
The complainants‟ further submissions do not change the outcome. The available
information does not support that the bank told the complainants to sell the property
or agreed that it would pay compensation.
1.3 Determination
This determination is in favour of the bank. The bank is not required to pay any
compensation to the complainants.
Determination | Case number: 692445 Page 4 of 7
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The findings in the recommendation were correct
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before a nd after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the complaint, the issues to be determined, and the relevant law. As I
agree with the reasoning in the recommendation and its findings, I adopt it into this
decision.
The recommendation was in the bank’s favour
The key findings in the attached recommendation include:
the bank acknowledges it made an error when it did not register its mortgage over
the property in 2015
the complainants have not established that except for the bank‟s error they would
have sold the rear lot of the property for $290,000 in or around February 2017
the complainants‟ refinanced the loan for the property before the subdivision
process was complete, which meant the new lender‟s consent to the subdivision
would have been required from early October 2016
the new lender took 16 months to provide its consent to the subdivision, of which
only three months can be attributed to the subdivision process, therefore it is
unlikely the complainants could have sold the property in February 2017
the complainants‟ loss does not flow directly from the bank‟s error, and the loss is
removed from the error because of the actions or omissions of other parties
between the error and the loss claimed
the complainants and their conveyancer knew the bank had not registered the
mortgage over the property before the commencement of the subdivision process,
a nd it is reasonable to expect they should have been aware a mortgagee‟s consent
to the subdivision was required, and
the loss is too remote from the bank‟s error.
After reviewing all the available information from both parties, I am satisfied the
findings in the recommendation are correct. I agree with findings in the
recommendation and adopt them as part of this determination. As I have attached
the recommendation to this determination, I have not repeated all of those findings in
this determination.
Determination | Case number: 692445 Page 5 of 7
However, I do have the following additional comments to make on the issues the
complainants have raised which I hope will assist them further understand the
reasons why I have not upheld their complaint.
2.2 Do the complainants’ further submissions change the outcome?
The complainants rejected the recommendation
The complainants rejected the recommendation because:
it failed to address that in the TCC for the FOS complaint, the bank had admitted
liability and told the complainants that it could not assess the compensation
amount until the loss crystallised. The complainants took the TCC as a win
the bank told them that to access compensation they would need to crystallise their
loss and sell the rear lot of the property
they acted on this advice and could only sell it for $190,000. They believed the
bank would pay them compensation, and would not have sold it for this price if they
had known the bank would challenge their compensation claim
they should not have been told to sell the property. They were paying
minimal/affordable repayments and could have easily kept the rear lot and created
value from it.
The complainants have not provided any contemporaneous notes or records of the
TCC. AFCA has been unable to obtain a statement from the bank officer at the TCC
or the conciliator as they are no longer in their roles at the bank or AFCA.
The conciliator‟s notes of the TCC and a letter AFCA sent to the complainants on 17
December 2018 have been exchanged with the parties.
The bank did not undertake to pay compensation once the rear lot sold
The complainants say the bank told them they would need to crystallize their loss (by
selling the rear lot) to access financial loss compensation. They say the bank officer
said that it could not quantify the complainants‟ loss at that time, as it was possible
property prices might go up or down by the time the lot was sold.
The TCC notes show that in its opening statement the bank did outline that a concern
was that the loss had not yet crystallised. This statement by the bank was true. At the
time of the TCC the complainants had not sold the property, the issues in the
complaint had not been investigated, and any claim for financial loss was
unsubstantiated.
Even if the bank provided an example of why the loss amount was unkno wn at that
stage, and said that the loss had not yet crystallised, this is not of itself a direction to
sell the property and a promise compensation would be paid.
It is usual for there to be a general discussion on loss during a conciliation
conference, which is what occurred here. The available information shows that no
Determination | Case number: 692445 Page 6 of 7
details or terms regarding the sale of the property, and payment of compensation
were referred to or specified.
The notes of the TCC do not establish the bank told the complainants to se ll the
property and agreed to pay financial loss compensation to the complainants once a
shortfall was established.
If the bank had admitted liability and agreed to pay financial loss compensation once
the amount of such loss was ascertained, this would have been documented in an
agreement after the TCC or set out in AFCA‟s letter. Rather, AFCA‟s letter told the
complainant to contact the bank if the property was sold, and then to lodge a
complaint with AFCA if the parties could not resolve the matter themselves.
The bank admitted it had made an error but did not accept liability for loss
Even if the complainants misunderstood what the bank told them, it was not
reasonable for them to believe the bank had agreed to compensate the difference
between the 2017 value and what he sold it for, without some formal agreement in
place.
The bank admitted that it had made a mistake when it failed to register its mortgage,
but it did not admit liability for the loss the complainants believed flowed from that
error. There was no investigation done on the issue of causation, rather an agreement
was made to close the complaint and open a new one if the complainants crystallised
their loss.
As set out in the recommendation, for compensation to be payable, an error must
cause the loss claimed. There is no information to show the bank accepted that its
failure to register the mortgage in 2015 meant the sub-division was delayed to the
extent claimed by the complainants.
Accordingly, for the reasons set out above, the availab le information does not
establish the bank made a misrepresentation in the TCC that it would pay financial
loss compensation once the rear lot was sold. As the complainants have not
established the bank made a misrepresentation, it is not necessary for me to assess
whether they relied on it when selling the rear lot for $190,000.
The new lender’s consent would have been required even if the bank had
registered its mortgage
The attached recommendation sets out in detail why the bank‟s error did not cause
the delay in the sub-division. In my view, I consider even if the bank had registered its
mortgage on the property title, the new lender‟s consent to the easement would still
have been required and the sub-division still delayed.
The information shows that in February 2016, the electricity company prepared the
relevant easement document to lodge at the titles office. No allowance was made for
the mortgagee‟s consent, because no mortgage was registered on title. While these
Determination | Case number: 692445 Page 7 of 7
documents were prepared in February 2016, the complainants were not in a position
to lodge them to complete the sub-division.
In this complaint, the complainants say they were not in a position to lodge the
documents until “early October 2016” . In the FOS complaint, the complainants said
they were in a position to lodge the documents “In late November early December
2016 when our subdivision had been complete” . In my view, the complainants were
not in a position to lodge the documents until after they had refinanced with the new
lender. This occurred on 11 October 2016. On the following day, the new lender
registered its mortgage on the property.
Because the complainants had refinanced with the new lender, the new lender‟s
consent would still have been required to register the easement – the new lender was
the mortgagee. I understand the complainants did not request the new lender‟s
consent to the easement until 24 February 2017 and that it was not until February
2018 that the two titles were obtained. In my view, this still would have occurred even
if the bank had registered its mortgage.
3 Supporting information
3.1 AFCA's approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All the provided material has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.
Recommendation
Case number 692445
Financial firm National Australia Bank Limited
Recommendation | Case number: 692445 Page 1 of 10
Case number: 692445 30 April 2020
4 Overview
4.1 Complaint
In September 2015, the complainants gave the financial firm (bank) a mortgage over
their L Street property (the property) as security for a $590,000 loan. The bank did not
register the mortgage deed during the period it was mortgagee. A timeline of events is
set out in section 3.1 below.
The complainants say the unregistered mortgage delayed the registration of a two -lot
subdivision of the property and caused them to miss out on a sale price of $290,000,
for the rear lot.
In August 2018, the complainants lodged a complaint about these issues with AFCA‟s
predecessor scheme. The complaint was partially resolved after a conciliation, with
the bank compensating the complainants $4,000 for their non-financial loss (see
section 3.3 below). The bank agreed to consider a claim for financial loss at a stage.
The complainants sold the rear lot for $190,000 in October 2019. The complainants
claim the bank‟s error caused them financial loss of approximately $125,000. This
represents the depreciation in the rear- lot‟s value and interest on the loan for the
property.
This complaint is about whether the bank‟s error, by not registering its mortgage when
it should have, caused the financial loss the complainants claim.
4.2 Issues and key findings
Did the bank make an error?
The bank acknowledges it did not register its mort gage on the property‟s title.
Did the error cause the complainants’ loss?
It is not established the bank‟s failure to register the mortgage caused the loss
claimed by the complainants. The loss claimed by the complainants is too remote
from the bank‟s err or for compensation to be payable by the bank.
4.3 Recommendation
This recommendation is in favour of the bank. It is not required to pay any further
compensation to the complainants.
Recommendation | Case number: 692445 Page 2 of 10
5 Reasons for recommendation
5.1 Did the bank make an error?
The bank acknowledged the error
The bank acknowledges that it did not register its mortgage over the property.
5.2 Did the error cause the complainants’ loss?
AFCA compensates for loss arising from a bank’s error
AFCA can compensate a complainant for:
direct financial loss u p to the amounts specified in AFCA‟s Rules, and
indirect loss up to $5,000 for each distinct event.
Direct loss is the loss that flows naturally from the breach without an intervening
cause and independently of special circumstances. These are losses caused directly
by a bank‟s conduct. Indirect losses are considered „indirect‟ as they do not flow
directly from the error, rather they are a step removed from the bank‟s error. Indirect
loss is considered on the circumstances of the complaint.
When assessing a claim for compensation for loss, AFCA has regard to legal
principles as to recoverability of loss. For example, we do not award compensation for
financial loss where the loss is too remote from the breach of contract. For
compensation to be paid for any loss (whether direct or indirect), the loss must have
been caused by the breach and not be too remote.
The parties have different views on the issue of loss
The complainants say that because of the bank‟s error they have incurred loss on the
sale of the rear lot of the property and from paying additional, unnecessary interest.
They say that the bank‟s error meant they could not sell the rear lot in February 2017,
when they had a potential purchaser willing to pay $290,000 for the lot.
They claim a financial loss of $124,225 which is the depreciation of the property‟s
value from February 2017 to October 2019 when they sold it for $190,000, and
interest on their loan for that period.
In support of their loss claim, they have provided:
a statement from the conveyancer they instructed for the subdivision (and earlier
purchase of the property), which says the title registration process was delayed
because the bank‟s mortgage was not registered on title in March 2016
a sales search report for vacant land in the same locality from July 2016 to
December 2016
Recommendation | Case number: 692445 Page 3 of 10
an exclusive agency agreement for the rear lot of the property, signed by the
complainants on 9 December 2016 with a listing price of $299,000, with an
authority to auction page signed on 1 March 2017
their recollection the agent told them in January or February 2017, that a party had
made an offer of $290,000
a comparative market analysis for the rear lot of the property with similar blocks
sold during the last six months of 2016, suggesting an early 2017 price of
$290,000.
The bank does not accept that its error caused the complainants‟ financial loss. It
says it did not ask the complainants to hold off on their refinance so that it could
rectify its error. It never sought to register the mo rtgage, so it is unable to see how its
mistake has caused any delay in the complainants marketing campaign or eventual
sale of the lot.
It cannot be determined the bank’s error caused the claimed loss
For the complainants‟ financial loss claim to be succ essful, they must establish that
but for the bank‟s error, they would have sold the rear lot in or around February 2017
for $290,000.
The subdivision process is set out in section 3.2 of the recommendation. It is a
complicated process with many steps and parties involved. The exact timings
surrounding the complainants‟ subdivision process are not clear. However, the
timeline in section 3.1, shows there were intervening acts and omissions on the part
of parties, other than the bank, that contributed to the length of time it took to obtain
titles for the subdivision.
The bank made a mistake by failing to register its mortgage in September 2015.
However, on balance, this error has not directly caused the $124,225 loss the
complainants claim.
The new lender’s consent to the subdivision delayed the process
The available information shows the subdivision process was considerably delayed by
the complainants‟ decision to refinance with the new lender. This refinance occurred
before their conveyancer was able to apply for the new titles.
While the electricity easement had to be redone, it does not follow that if this had not
occurred, the subdivision process would have been completed in February 2017.
The new lender‟s consent to the subdivision was required once it became mortgagee
in early October 2016. The available information shows the new lender took 16
months to provide its consent to the subdivision. This means that even allowing for
the three months it took to get a replacement easement, the complainants could not
have sold the rear-lot in February 2017.
Recommendation | Case number: 692445 Page 4 of 10
It is therefore not possible to say that, but for the bank‟s error, the titles would have
been issued in February 2017, and the complainants would have sold the rear-lot for
$290,000.
The conveyancer had knowledge of the mortgage
The available information shows the complainants‟ conveyancer had knowledge of
the bank‟s mortgage over the property.
The conveyancer had acted for the complainants when they purchased the property
and received the loan from the bank. This was only five months before the
complainants instructed the same conveyancer in relation to the subdivision.
The timeline set out in section 3.1 below shows the conveyancer wrote to the bank
about the mortgage in September 2015. This indicates the conveyancer was aware
the complainants had given the bank a mortgage over the property.
When the conveyancer took instructions from the complainants he should have asked
whether the bank still had a mortgage over the property. Having knowledge of the
mortgage, a clear title search in March 2016 ought to have been a red flag for the
conveyancer, such that he sought further instructions from his clients.
These omissions on the part of the conveyancer contributed to the length of time it
took to complete the subdivision process. In my view, the actions of the bank are too
remote to have caused the claimed losses.
The complainants had a duty to mitigate
In reviewing claims for loss, AFCA considers the extent to which complainants have
contributed to their own loss. AFCA will not award compensation for loss which could
have reasonably been avoided by a customer. The duty to mitigate is a duty on the
complainants to avoid loss by doing what a reasonable person would do in the
complainants‟ circumstances.
In my view, a reasonable person in the complainants‟ situation would have told their
surveyor and their conveyancer they had given the bank a mortgage over the
property.
If the complainants had provided this information to their surveyor and conveyancer,
then:
the bank‟s failure to register the mortgage could have been identified in March
2016 when the conveyancer conducted a title search, and
the subdivision process could have proceeded on the b asis the mortgagee‟s
consent was required.
It is unclear why the complainants failed to tell their representatives they had given
the bank a mortgage over the property. However, the complainants could have
Recommendation | Case number: 692445 Page 5 of 10
mitigated and prevented claimed losses if they had properly instructed their
representatives.
The bank is not required to provide compensation
For the reasons set out above, it has not been established the bank‟s error directly or
indirectly caused the financial losses the complainants claim. I have formed this view
by considering the circumstances of the complaint and the intervening events. The
losses claimed are too remote from the bank‟s error, and the bank is not required to
compensate the complainants.
Recommendation | Case number: 692445 Page 6 of 10
6 Supporting information
6.1 Time line of events
Date What happened
July 2015 Ms complainant signs a contract of sale for the property. A
special condition of the sale is that the vendor provide all
documents relating to the subdivision.
August 2015 Complainants use a broker to apply for loans with the bank.
Three properties are to be used as security, including the
property.
25 August 2015 The bank values the property at $565,000.
2 September 2015 The notes between the broker and the bank provide the
conveyancer‟s name (Mr A.D) and contact details.
7 September 2015 The complainants‟ conveyancer writes to the bank with
reference to the mortgage loan over the property. The
conveyancer‟s letter says:
“With reference to the above, we enclose the following
documentation to assist you in preparation of the Mort gage
documentation:
Copy of Transfer of Land
Buyers Preliminary Settlement Statement…
15 September 2015 Trans fer of land amended to be in the names of both
complainants.
24 September 2015 The loan for the property settles.
The bank does not register its mortgage.
February 2016 The complainants say they instructed their conveyancer to
register the two - lot subdivision of the property.
It is unclear what conditions have been met at this stage.
Recommendation | Case number: 692445 Page 7 of 10
Date What happened
1 February 2016 The power company writes to the complainants‟ surveyor
with the easement document for the subdivision.
17 February 2016 The complainants sign easement documents. Mortgagee
details are not insert ed into page four.
24 March 2016 The conveyancer says a file was opened for the subdivision,
and instructions were most likely received by telephone.
The conveyancer orders a title search which shows title
clear (no mortgage registered by the bank).
18 May 2016 Bank‟s system notes show a call to complainants. Notes
say, “not interested and changing bank soon.”
September 2016 Complainants take steps to refinance away from the bank.
7 September 2016 The bank conducts a title search, and its sy stem notes say:
“7/09/ 2016 [Propert y]…CLEAR TITLE, NOT MORTGAGED
TO [bank ]”
11 October 2016 Loan settles with new lender.
12 October 2016 New lender registers mortgage.
Late October 2016 Convey ancer ready to begin process of obtaining titles for
the subdivision.
Convey ancer requests title from complainants and is
advis ed that title is not unencumbered and there is a
mortgage on it.
Mortgagee is now the new lender.
Late October 2016 Convey ancer requests a replacement easement from power
company.
Recommendation | Case number: 692445 Page 8 of 10
Date What happened
December 2016 Complainants sign an exclusive agency agreement for the
rear lot of the property with a listing price of $299, 000.
February 2017 Complainant says power company provides replacement
easement. No additional fee charged.
March 2017 Complainants sign an authority to sell the property by
auction as part of the exclusive agency agreement.
February 2017 to February 2018 New lender‟s consent to subdivision and execution of
easement sought.
February 2018 New titles registered. It took n ew lender some time to sign
the easement because the complainants had several loans
cross securitised with three properties (including the
property).
6.2 Western Australia subdivision process
The following information has been obtained from the power company‟s website, and
other Western Australian authorities.
Subdivi sion proce ss When this occurred
Land owner submits an application to the planning
commission (WAPC) to subdivide a parcel of land.
Previous owner did this.
WAPC refers application to power company, local
government and other service providers for
recommendations/conditions.
WAPC then issues a set of conditions for subdivision
to proceed (conditional approval).
Conditional approval obtained 9 March
2015. There were 11 conditions requi ring
clearance/written advice from:
1. the Water Company
2. the Power Company
3. the local government
Recommendation | Case number: 692445 Page 9 of 10
Subdivi sion proce ss When this occurred
Land owner is responsible for fulfilling the conditions
in the WAPC conditional approval.
Land owner is responsible for getting mortgagee‟s
consent.
When conditions have been met, the land owner
requests clearances from the relevant services.
Services provider a clearance certificat e and stamped
plan.
No information to show when all the
conditions were met.
No information to show when applications
were mad e for clearances.
The clearanc e(s) are submitted to WAPC (with a final
subdivision clearanc e form) for review and final
clearance.
No information to show when this
occurred.
The plan of subdivision is endorsed as “approved” by
WAPC.
No information to sho w when this
occurred.
Plan can then be deposited/lodged with Landgate and
placed in order for Dealings.
Titles cannot be obtained until the plan is in order for
Dealings.
No information to show exactly when this
occurred.
This occurred after the complai nants had
refinanced, as the conveyancer‟s title
search showed new lender as mortgagee.
Dealing can be lodged for registration (application for
new titles).
Landgate ex amines registration documents.
Titles issued by the registrar. February 2018.
Recommendation | Case number: 692445 Page 10 of 10
6.3 Previous complaint 540956
The complaint was closed on 17 December 2018.
AFCA wrote to the complainants on this date and said:
“As discussed, we are closing your dispute because:
the parties are agreed [the bank ] will compensate you $4,000 towards your claim
experience and so we will not consider this issue further
the property needs to sell so the actual loss suffered can be determined.
Once the propert y sells, if you have suffered a loss, please inform [the bank ]. If [the bank]
does not resolve your concerns within 21 days, please refer the matter back to AFCA and it
will continue as a new c omplaint (with a new number)…”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.