Home / Allianz Australia / Determination 692202

Determination 692202

Cash settlement amount for movement damage from leaking pipe

FirmAllianz Australia
Decided2020-05-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$30,899
Non-financial loss—
Amount claimed$261,858
SourceAFCA PDF

Summary

The complainants disputed the insurer's cash settlement for movement damage caused by a leaking pipe and sought a further $261,858. AFCA found the insurer's scope and quote adequate but required a 20% contingency allowance, ordering a further $30,898.56.

A cash settlement under a prior determination should be based on a detailed scope of works limited to the insured event, with a fair contingency allowance added.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 692202 Financial firm Allianz Australia Insurance Limited Determination | Case number: 692202 Page 2 of 28 Case number: 692202 15 May 2020 1 Determination overview 1.1 Complaint The policy holders’ son, (TG) is one of the complainants and has provided submissions in this complaint. For ease and clarity in this determination, the complainants and policyholders, will be hereafter be referred to as “the complainants” . AFCA issued determination 542676 (the previous determination) dated 31 July 2019. This related to the 2018 claim lodged with the financial firm (the insurer) for movement damage to the insured property because of a pipe which leaked under the property in 2013. The terms of the determination are set out in supporting section 3 of this determination. Following receipt of the previous determination, the insurer obtained a scope of works and estimates for the cost of repairs. Based on these documents, the insurer has offered to settle its liability pursuant to the previous determination by a cash settlement of $108,757. The complainants dispute the insurer’s assessment of its liability. They provide two estimates for repairs in the amounts of $456,000 (plus GST) and $499,500. They have deposited an amount already paid by the insurer ($82,587) and seek an additional $261,858 plus interest. 1.2 Issues and key findings Does the insurer’s offer fulfil its obligations under the previous determination? The available information establishes the insurer has complied with its obligations under the claim and the previous determination and obtained the required scope of works and quotes for all movement related repairs. The available information also establishes the offer made by the insurer is fair save that it is to include a contingency allowance of 20%. To satisfy its liability under the claim and the previous determination, the insurer is to pay to the complainants a further $30,898.56. Determination | Case number: 692202 Page 3 of 28 1.3 Determination This determination is substantially in favour of the insurer. Should be complainants accept this determination, then within seven days of notification of acceptance, the insurer is to pay to the complainants a further $30,898.56 in full settlement of its liability pursuant to the claim and pursuant to the previous determination. Otherwise, the insurer is not required to take any further action in relation to the claim, the previous determination or the complaint. Determination | Case number: 692202 Page 4 of 28 2 Reasons for determination 2.1 Does the insurer’s offer fulfil its obligations under the previous determination? Insurer has complied with the previous determination The p anel notes that the insurer’s liability to the complainants was set out in the previous determination. At that time, neither party had provided any information concerning the quantum of the claim. The parties have now obtained material relating to quantum. This complaint addresses quantum and whether the insurer has fulfilled its obligations under the claim and under the previous determination. Following notification of acceptance of the previous determination, the insurer arranged a building inspection, and provided a scope of works and quotes to repair the movement related damage. The complainants raised concerns with the insurer as to their adequacy and provided their own scopes/estimates of works for the insurer’s consideration. The material relied on by the parties is summarised and set out in supporting section 3 of this determination. Insurer’s scope and quotes sufficiently address the movement related repairs The insurer obtained a building report and scope of works dated 24 October 2019 from a builder (SW) and a quote from SW prepared by a quantity surveyor and dated 1 November 2019. The insurer also obtained an additional quote from TS dated 27 March 2020. SW inspected and photographed the damage with the complainant on 7 October 2019 and provided a scope of works for all movement related damage and maintenance scope of works. SW noted:  varying degrees of internal cracking to the plasterboard wall and ceiling linings throughout most rooms of the residence  subsidence to the floor level and a significant crack to the floor tiles in the rear family room  varying degrees of external cracking to the brick veneer walls on the northern, eastern and western aspects  cracking and movement related damage to the rear concrete landing and the concrete driveway and paving. The report included photographs detailing the various areas of damage which report has been used to prepare the scope of works. The report also provides the Determination | Case number: 692202 Page 5 of 28 complainants with details of maintenance related works which fall outside the insurer’s liability. The panel accepts SW’s scope of works is sufficiently detailed and addresses all movement related damage and repairs for which the insurer is liable. This is because the scope methodically addresses each section of the insured property that has sustained damage due to the leaking pipe and provides a break down as to how the repair works, supply of new material and reinstallation of existing undamaged fixtures will be managed. Of significance, the insurer is to restump the northern section affected by the leaking pipe and replace the makeshift stumps previously installed. It also includes installing a tree root barrier to mitigate any further ground movement from the trees to the north of the property. Having made this provision, and based on the floor level survey, SW says no underpinning works are necessary. The quotes provided by SW and TS were based on SW’s detailed scope of works and make allowance for contingencies and builder’s margins. Complainants’ quotes outside the sco pe of the previous determination In response to the insurer’s scope of works and quotes, the complainants have provided two scopes/estimates for repairs from AC and DD. As with the insurer’s scope of works and quotes, the complainants’ material is summarised in section 3 of this determination. AC submits a price for repairs resulting from water leaking under the house causing the foundations to shift and heave, leaving major damage to the external brickwork and damage throughout the house internally. AC’s estimate, while itemised, lacks sufficient details such as quantity and unit amounts and the only cost it notes is the total cost of $456,000 (plus GST). Further it provides no rationale for how many, if not all the items listed are required to be undertaken and it also seeks to replace items which are not damaged such as the kitchen cabinetry. DD’s quote is like AC’s in that it lacks detail and is not itemi sed. It also includes extra rectification work such as demolishing the entire house back to frame stage, new electrical fit out throughout the house, new cabinetry in the bathrooms, kitchen and laundry as well as new kitchen bench tops, new flooring, a concrete path around the entire house, rendering the whole house and temporary accommodation for 12 months. Determination | Case number: 692202 Page 6 of 28 The panel considers these scopes/estimates detail work which is well outside the scope of the previous determination. Due to the significant lack of detail in both quotations and the inclusion of items that do not form part of the insurer’s liabili ty, the panel is not persuaded that either AC or DD’s scopes of works/estimates should be preferred to the insurer’s material. Further, the panel notes the relevant Certificate of Insurance for the period 28 January 2018 to 28 January 2019 details the building sum insured at $319,780. Therefore, even if the insurer was required to total loss the property, the scopes of works and estimates provided by the complainants, far exceed the building sum insured. Evidence does not support the complainants’ request to underpin the property The complainants submit the scope of works provided by SW was incorrect and inconclusive. The complainants also say the contractor at SW advised underpinning was required throughout the house. However, this is not reflected in SW’ s reports. The insurer sought comment from SW who in summary says:  neither AC nor DD scopes are in line with its scope of works  it has allowed for the installation of a tree root barrier and restumping of the northern aspect of the property only based on the floor level survey conducted on 19 July 2018. Such survey noted no other significant floor alignment issues  based on the results of the floor survey no underpinning works were deemed necessary  the damage to the external pavements is maintenance related and not a result of the below subfloor leak  the scope of works/quotation from AC did not have an ABN or a Victorian Builders registration number as required by the Victorian Building Authority. The panel finds the detailed material provided by SW comprehensive and considers it provides sufficient analysis in terms of whether the entire property requires re- stumping and underpinning. The panel considers the reports provided by the complainants are insufficiently persuasive as they do not provide any commentary or analysis as to how they concluded the property required this work. Insurer to increase its cash settlement offer by $30,898.56 The panel is satisfied the insurer has complied with its obligations pursuant to the claim and the previous determination. The panel also acknowledges the parties have raised concerns with their respective scopes of works which is not uncommon in complaints relating to extensive building works. Determination | Case number: 692202 Page 7 of 28 Before this complaint came to AFCA, the insurer made an offer to settle the claim by paying to the complainants the net sum of $82,587. This offer included six weeks temporary accommodation paid at $470 per week. After the complaint came to AFCA, the insurer obtained another quotation for the cost of repairs from TS. The insurer increased its offer by $26,170 based on the higher quote provided by TS. The insurer says this offer is made on a without prejudice and goodwill basis. The insurer’s offer was increased to $108,757 less $82,587 already paid to the complainants. The offer was calculated as follows: TS Quote $176,922.60 Temp Accommodation @ 26 weeks $470 x 26 $12,200.00 Subtotal $189,142.60 15% Contingency Allowance $28,371.39 Total $217,513.99 Less 50% $108, 757 .00 The panel considers the offer made in relation to temporary accommodation is fair. This is because the insurer has allowed the higher amount noting SW allowed 20 weeks. A lthough the complainants’ builders allowed six months and 12 months, these allowances were not based on the time taken to do work for which the insurer is liable. The complainants recently submitted building costs in Victoria will increase by 10 to 20% in the short to medium term because of COVID- 19. The complainants’ builder said he was experiencing contractors requesting they will only perform work in isolation of other trades, and this will lengthen the time contracts are completed and increase costs. The builder also indicated building materials will increase due to import restrictions. The panel accepts COVID-19 will bring about many changes. However, the panel notes changes may include more competitive tendering because of insufficient available building work. When a claim is cash settled, the panel considers it is fair that an insurer makes an allowance to consider variations and contingencies which may arise when repairs are undertaken. Determination | Case number: 692202 Page 8 of 28 In all the circumstances of this matter, the panel considers it is fair if an allowance of 20% is made for contingencies and variations. Therefore, the panel considers it is fair to vary the insurer’s offer as follows: TS Quote $176,922.60 Temp Accommodation @ 26 weeks $470 x 26 $12,200.00 Subtotal $189,142.60 20 % Contingency Allowance $ 37,828.52 Total $2 26 , 971 . 12 Less 50% $1 13,485.56 Less $82,587 already paid Amount due $30,898.56 Should the complainants accept this determination, then within seven days of notification of acceptance, the insurer is to pay to the complainants a further $30,898.56 in full settlement of its liability pursuant to the claim and pursuant to the previous determination. The panel notes the previous determination said the complainants were to provide the insurer with a copy of the invoice evidencing the cost of an expert report. The panel notes the available information establishes this invoice has been provided and the insurer has paid the complainants for the expert report. Determination | Case number: 692202 Page 9 of 28 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response in determination 542676. Both the policy document and the Notice have been exchanged with the complainants. 3.3 Determination 542676 Key findings The available material establishes there was a leaking pipe under the home in 2013, during the period of insurance. On this basis, the complainant has established a valid claim. Considering all the available evidence, it is fair in the circumstances the insurer makes a 50% contribution towards repairs. Determination | Case number: 692202 Page 10 of 28 Determination This determination is partially in favour of the complainant. Should the complainant accept this determination, then within 14 days of notification of acceptance:  the insurer is to obtain a scope of works and quote for all movement related repairs, and cash settle the complainant its 50% liability, including an allowance for 50% of alternative accommodation (if alternative accommodation is required)  the complainant is to provide the insurer with a copy of the invoice evidencing the cost of the expert report. Upon receipt of the invoice, the insurer is to reimburse the complainant for the cost of the report, up to $3,000. The insurer is also to pay statutory interest, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act), on the report cost, from the payment date until the date of settlement. 3.4 Expert Evidence Record Key points Insurer’s Consultant Engineer’s Domestic Building inspection (SW) Report 24 October 2019  inspected and photographed wit h complainant 7 October 2019 and provided scope of work for all movement relat ed damage and maintenance scope of works  varying degrees of internal cracking to the plasterboard wall and ceiling linings throughout most rooms of the residence  noticeable subsidence to the floor level and a significant crack to the floor tiles in the rear family room  varying degrees of external cracking to the brick veneer walls on the northern, eastern and western elevations of the building.  crack ing and movement related damage to the rear concrete landing and the conc rete driveway and paving Insurer’s Consultant Engineer Scope of Works (SW) Report 24 October 2019 1.1. Remove and dispose of the stamped concrete driveway from between the carport and the garage. [18.6m²] (Concreter) 1.2. Supply and install a stamped concrete driveway between the carport and the garage. [18.6m²] (Concret er) 1.3. Remove and dispose of concrete pedestrian paving adjacent to the western end of the rear nort hern elevation of the building. [7.0m²] (Concreter) 1.4. Supply and install new concret e pedestrian paving adjacent to the western end of the rear nort hern elevation of the building. [7.0m²] (Concreter) 1.5. Remove and dispose of the cracked stamped concret e Determination | Case number: 692202 Page 11 of 28 Record Key points pedestrian paving complete wi t h raised garden edging from adjacent to the kitchen, dining and family room areas. [15.0m²] (Concreter) 1.6. Supply and install new stamped concrete pedestrian paving complete wit h raised garden edging adjacent to the kitchen, dining and family room areas. [15.0m²] (Concret er) 1.7. Remove and dispose of the 1070mm wide x 3 treads tiled concret e steps from adjacent to the external sliding doors to the dining and family rooms. [2 units] Concret er) 1.8. Supply and install new 1070mm wide x 3 treads concrete steps adjacent to the external sliding doors to the dining and family rooms. [2 units] Concreter) 1.9. Supply and install new terra cotta tiles to the concrete steps adjacent to the external sliding doors to the dining and family rooms. [4.0m²] (Tiler) Insurer’s Consultant Engineer Scope of Works (SW) Report 24 October 2019 SCAFFOLD and/or ROOF RAIL 1.1. Supply and install scaffolding with an average height of 1.2m. x approximately 26.0m long. NOTE: When pricing, the tendering Builder is to ensure that the proposed methodology is achievable and complies with the required H&S requirements. Builders are to familiarise themselves with the site and any pot ential constraints. As an alternative to the scaff old, the Builder can detail and price, in his tender, an alternative method to gain access and to undertak e the required work s set out in the main body of this document . [31.2m²] (Scaffolder) SCOPE: 2. EXTERNAL - Allow to: 2.1. Remove and dispose of th e concrete stumps and associated concrete pad footings from beneath the rear northern end of the building. [61.5m²] (Carpenter) 2.2. Supply and install new concret e stump/s and associated concrete pad footings approximately 1.5m long (founded 1200mm into the ground) to beneath the rear northern end of the building. [61.5m²] (Carpenter) 2.3. Remove and set aside for reinstallation and clean the face bricks to the base brick walls from the nort hern - western corner of the third bedroom to the northern side of the dining room aluminium sliding door. [12.4m²] (Bricklayer) 2.4. Reinstall the face b ricks to the base brick walls from the northern - western corner of the third bedroom to the northern side of the dining room aluminium sliding door. [12.4m²] (Bricklayer) 2.5. Remove and set aside for reinstallation and clean the face bricks to the brick v eneer and base brick walls from the northern - western corner of the third bedroom to the nort hern side of the dining room aluminium sliding door. [42.4m²] (Bricklayer) 2.6. Reinstall the face bricks to the brick veneer and base brick walls from the norther n - western corner of the third bedroom to the northern side of the dining room aluminium sliding door. [42.4m²] (Bricklayer) Determination | Case number: 692202 Page 12 of 28 Record Key points 2.7. Supply and install new face bricks to the northern end of the building. Note: Allowance of 10% for breakages. [4.3m²] (Brickla yer) 2.8. Supply and install articulation joints to the new brick veneer walls in accordance with a Structural Engineer’s design and detail. [4 units] (Bricklayer) 2.9. Remove and set aside for reinstallation and clean the face bricks to cracked sections of the brick veneer walls on the western elevation (ensuit e, bathroom and WC) of the building. [5.5m²] (Bricklayer) 2.10. Reinstall the face bricks western elevation (ensuite, bathroom and WC) of the building. [5.5m²] (Bricklayer) 2.11. Re - grout the cra cked sections of mortar to the brick veneer wall beneath the LHS of the ens uite window, above the top left - hand side of the laundry door and adjacent to the north - western corner of the lounge room. [3.0 Linear m] (Bricklayer) 2.12. Remove and dispose of t he cracked face bricks wall below the ensuite window on the western elevation of the building. [10 units] (Bricklayer) 2.13. Supply and install new face bricks wall below the ensuite window on the western elevation of the building. [10 units] (Bricklayer) 2.14. Professionally wash down and clean the face bricks to the repaired sections of the brick veneer walls of the building. [61.0m²] (Bricklayer) 2.15. Remove and dispose of the timber trap door and door frame. [ 1unit] (Carpenter) 2.16. Supply and install a new timber trap door and door frame. [1unit] (Carpenter) 2.17. Prepare and paint the timber trap door and door frame. [1unit] (Painter) 2.18. Remove and set aside for reinstallation the external sunblinds to the affected windows and doors of the building. [2 units] (Carpenter) 2.19. Reinstall the sunblinds external sunblinds to the affected windows and doors of the buil ding. [2 units] (Carpenter) 2.20. Remove and set aside for reinstallation the roller blinds to the affected windows of the building. [2 units] (Carpenter) 2.21. Reinstall the roller blinds to the affected windows of the building. [2 units] (Carpenter) 2 .22. Remove and dispose of the 450mm wide cement sheet eaves linings from above the affected areas of the building. [23.2 Linear m] (Carpenter) 2.23. Supply and install 450mm wide fibrous cement sheet eaves linings to the affected areas of the building. [23.2 Linear m] (Carpenter) 2.24. Prepare and paint the new 450mm wide fibrous cement sheet eaves linings in a similar colour and paint finish to the e xisting. [10.5m²] (Painter) 2.25. Remove and dispose of the batten holder light point fitting adjacent to the dining room. [1 unit] (Electrician) 2.26. Supply and install a new batten holder light point fitting adjacent to the dining room. [1 unit] (Elec trician) 2.27. Remove and set aside for reinstallation the gas hot wat er unit on the western elevation of the building. [1 unit] (Plumber) 2.28. Reinstall the gas hot water unit to the western elevation of the building. [1 unit] (Plumber) Determination | Case number: 692202 Page 13 of 28 Record Key points 2.29. Remove a nd dispose of the 12mm copper water pipe from adjacent to the ensuite window. [3.5 Linear m] (Plumber) 2.30. Supply and install a new 12mm copper water pipe adjacent to the ensuite window. [3.5 Linear m] (Plumber) 2.31. Remove and set aside for reinstall ation the satellite dish to the rear of the building. [1 unit] (Other) 2.32. Reinstall the satellite dish to the rear of the building. [1 unit] (Other) 2.33. Remove and set aside for reinstallation the sub - floor heating ducts to facilitate the re - stumpin g of the rear northern end of the building. [1 unit] (Plumber) 2.34. Reinstall the sub - floor heating ducts to the rear northern end of the building. [1 unit] (Plumber) 2.35. Remove and dispose of the PVC waste water drainage pipes to facilitate the re - st umping to the rear northern end of the building. [1 unit] (Plumber) 2.36. Supply and install PVC waste wat er drainage pipes to the rear northern end of the building. [1 unit] (Plumber) 2.37. The Builder is to allow to remove all building rectification / reinstatement related debris from the site. [1 unit] (Labourer) 3. INTERNAL - Allow to: 3.1. Remove and dispose of the 100mm x 38mm hardwood floor joists from rear northern end of the building to facilitate the restumping works. [125.0 Linear m] (Carpe nter) 3.2. Supply and install new 100mm x 38mm hardwood floor joists from rear northern end of the building to facilitate the restumping works. [125.0 Linear m] (Carpenter) 4. ENTRY / HALLWAY (3. 08m long x 2.5m wide & 0.97m long x 0.84m wide x 2.7m high ) - Allow to: 4.1. Prepare and patch the cracked sections of plasterboard wall linings in the room. [2.0 Linear m] (Plasterer) 4.2. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [31.5m²] (Painter) 4.3. Prepare and patch the cracked sections of plasterboard ceiling linings in the room. [2.2 Linear m] (Plasterer) 4.4. Prepare and patch the cracked section of cornice/ceiling/ wall joints to the room. [0.5 Linear m] (Plasterer) 4.5. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finish to the exi sting. [8.5m²] (Painter) 4.6. Remove and dispose of the 67mm x 19mm Hardwood Bullnose skirting from the entire room. [10.0 Linear m] (Carpenter) 4.7. Supply and install new 67mm x 19mm Hardwood Bullnose skirting to the entire room. [10.0 Linear m] (Carpe nter) 4.8. Prepare and paint the 67mm x 19mm Hardwood Bullnos e skirting in a similar colour and paint finish to the existing. [10.0 Linear m] (Paint er) 4.9. Remove and dispose of the irregular shaped floor tiles from the entire room. [8.5m²] (Tiler) 4.1 0. Supply and install new floor tiles of a similar size and style to the existing to the entire room. [8.5m²] (Tiler) 4.11. Remove and dispose of the 7mm floor tile underlay from the Determination | Case number: 692202 Page 14 of 28 Record Key points entire room. [8.5m²] (Tiler) 4.12. Supply and install new 7mm floor tile underlay to the entire room. [8.5m²] (Tiler) 4.13. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 4.14. Reinstall the existing ceiling mounted light fitti ng. [1 unit/s] (Electrician) 5. LOUNGE ROOM (5.47m long x 3.99m wide & 2.85m long x 2.82m wide x 2.7m high) - Allow to: 5.1. Prepare and patch the cracked sections of plasterboard wall linings in the room. [10.7 Linear m] (Plasterer) 5.2. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [66.3m²] (Painter) 5.3. Prepare and patch the cracked section of cornice/ceiling/ wall joints to the room. [0.5 Linear m] (Plasterer) 5.4. Resecure the plasterboard ceiling adjacent to the northern external wall elevation of the room. [2.9 Linear m] (Plasterer) 5.5. Remove and dispose of the 55mm "ornate" style cornice to the western and the northern external wall elevations of the room . [6.9 Linear m] (Plasterer) 5.6. Supply and install a new 55mm "ornate" style cornice to the to the western and the northern external wall elevations of the room. [6.9 Linear m] (Plasterer) 5.7. Prepare and paint the entire plasterboard ceiling lining a nd 55mm "ornate" style cornice in a similar colour and paint finish to the existing. [29.9m²] (Paint er) 5.8. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [2 unit/s] (Electrician) 5.9. Reinstall the existing ceiling mounted light fitting. [2 unit/s] (Electrician) 6. BEDROOM ONE (3.8m long x 3.68m wide x 2.7m high) - Allow to: 6.1. Prepare and patch the cracked sections of plasterboard ceiling lining in the room. [0.8 Linear m] (Plasterer) 6.2. Prepare and patch t he cracked section of cornice/ceiling/ wall joint adjacent the ceiling vent. [0.3 Linear m] (Plasterer) 6.3. Prepare and paint the plasterboard wall linings to eastern wall elevation of the ensuite in a similar colour and paint finish to the existing. [1.7 m²] (Painter) 6.4. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finish to the existing. [8.5m²] (Painter) 7. REAR HALLWAY (4.89m long x 0.95m wide & 0.9m long x 0.9m wide x 2.7m hig h) - Allow to: 7.1. Prepare and patch the cracked sections of plasterboard wall linings above the doors to the dining and WC to the room. [2.0 Linear m] (Plasterer) 7.2. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [36.4m²] (Painter) Determination | Case number: 692202 Page 15 of 28 Record Key points 7.3. Prepare and patch the cracked section of the butt join to the cornice on the eastern wall elevation of the roo m. [1 unit] (Plasterer) 7.4. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finish to the existing. [5.5m²] (Painter) 7.5. Realign the 2040mm x 820mm flush panel, hollow core door to t he existing door frame. [1 unit] (Carpenter) 7.6. Prepare and paint the door and door frame in in a similar colour and paint finish to the existing. [1 unit] (Painter) 7.7. Remove and dispose of the 67mm x 19mm Hardwood Bullnose skirting from the entire room. [8.6 Linear m] (Carpenter) 7.8. Supply and install new 67mm x 19mm Hardwood Bullnose skirting to the entire room. [8.6 Linear m] (Carpent er) 7.9. Prepare and paint the 67mm x 19mm Hardwood Bullnos e entire skirting and the architraves to the doors c ommon to the dining, bathroom, WC and third bedroom in a similar colour and paint finish to the existing. [30.2 Linear m] (Painter) 7.10. Remove and dispose of the particleboard sheet flooring from the northern end of the room. [2.8m²] (Carpenter) 7.11. Supply and install new particleboard sheet flooring to the northern end of the room. [2.8m²] (Carpenter) 7.12. Remove and dispose of the irregular shaped floor tiles from the entire room. [5.5m²] (Tiler) 7.13. Supply and install new floor tiles of a simi lar size and style to the existing to the entire room. [5.5m²] (Tiler) 7.14. Remove and dispose of the 7mm floor tile underlay from the entire room. [5.5m²] (Tiler) 7.15. Supply and install new 7mm floor tile underlay to the entire room. [5.5m²] (Tiler) 7.16. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 7.17. Reinstall the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 8. BEDROOM TWO / RETREAT (3.67m long x 2.97m wide x 2.7m high) - Allow to: 8.1. Prepare and patch the cracked section of cornice/ceiling/ wall joint above the door to the room. [1.1 Linear m] (Plasterer) 8.2. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a simil ar colour and paint finish to the existing. [10.9m²] (Paint er) 8.3. Prepare and paint the plasterboard wall linings to the nort hern wall elevation of the room in a similar colour and paint finish to the existing. [10.9m²] (Paint er) 8.4. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 8.5. Reinstall the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 9. BEDROOM THREE (3.67m long x 2.95m wide & 0.95m long x 0.6 m wide x 2.7m high) - Allow to: 9.1. Prepare and patch the cracked sections of plasterboard wall linings to the room. [9.3 Linear m] (Plasterer) 9.2. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [39.0m²] Determination | Case number: 692202 Page 16 of 28 Record Key points (Painter) 9.3. Prepare and patch the cracked sections of plasterboard ceiling lining to the room. [1.3 Linear m] (Plasterer) 9.4. Remove and dispose of the 55mm "cove" style cornice from above the built - in - robe and the north - eastern corner of the room. [2.0 Linear m] (Plasterer) 9.5. Supply and install a new 55mm "cove" style cornice above the built - in - robe and the north - easte rn corner of the room. [2.0 Linear m] (Plasterer) 9.6. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finish to the existing. [11.4m²] (Paint er) 9.7. Realign the 2040mm x 820mm flush p anel, hollow core door to the existing door frame. [1 unit] (Carpenter) 9.8. Prepare and paint the door and door frame in in a similar colour and paint finish to the existing. [1 unit] (Painter) 9.9. Realign the 2040mm x 820mm flush panel, hollow core do or to the existing door frame. [1 unit] (Carpenter) 9.10. Prepare and paint the door and door frame in in a similar colour and paint finish to the existing. [1 unit] (Painter) 9.11. Realign the 3 x 2040mm x 820mm flush panel, hollow core doors to the exi sting built - in - robe door frame. [1 unit] (Carpenter) 9.12. Prepare and paint the 3 doors and door frame in in a similar colour and paint finish to the existing. [1 unit] (Painter) 9.13. Remove and dispose of the 67mm x 19mm Hardwood Bullnose skirting fro m the entire room. [14.4 Linear m] (Carpenter) 9.14. Supply and install new 67mm x 19mm Hardwood Bullnose skirting to the entire room. [14.4 Linear m] (Carpenter) 9.15. Prepare and paint the 67mm x 19mm Hardwood Bullnose skirting in a similar colour and paint finish to the existing. [14.4 Linear m] (Paint er) 9.16. Prepare and paint the Hardwood 67mm x 19mm Hardwood Bullnose architraves to the access and built - in - robe doo rs to the room in a similar colour and paint finish to the existing. [12.1 Linear m] (Painter) 9.17. Remove and dispose of the particleboard sheet flooring from the entire room. [11.4m²] (Carpenter) 9.18. Supply and install new particleboard sheet floori ng to the entire room. [11.4m²] (Carpenter) 9.19. Remove and set aside for reinstallation the existing carpet to the entire room. [11.4m²] (Carpet Layer) 9.20. Reinstall the existing carpet to the entire room. [11.4m²] (Carpet Layer) 9.21. Remove and se t aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 9.22. Reinstall the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 10. FAMILY ROOM (7.09m long x 4.0m wide x 2.7m high) - Allow to: 10.1 . Prepare and patch the cracked sections of plasterboard wall linings to the room. [7.6 Linear m] (Plasterer) 10.2. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [60.0m²] (Painter) Determination | Case number: 692202 Page 17 of 28 Record Key points 10.3. Prepare and patch the cracked section of cornice/ceiling joint in the north - western corner of the room. [0.3 Linear m] (Plasterer) 10.4. Remove and dispose of the 55mm "cove" style cornice from above the external sliding door. [2.7 Linear m] (Plas terer) 10.5. Supply and install a new 55mm "cove" style cornice above the external sliding door. [2.7 Linear m] (Plasterer) 10.6. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finish to the existing. [28.4m²] (Paint er) 10.7. Remove and dispose of the 67mm x 19mm Hardwood Bullnose skirting from the entire room. [15.5 Linear m] (Carpenter) 10.8. Supply and install new 67mm x 19mm Hardwood Bullnose skirting to the entire room. [15.5 Lin ear m] (Carpenter) 10.9. Prepare and paint the 67mm x 19mm Hardwood Bullnose skirting in a similar colour and paint finish to the existing. [15.5 Linear m] (Paint er) 10.10. Remove and dispose of the particleboard sheet flooring from the entire room to fa cilitate restumping. [28.4m²] (Carpenter) 10.11. Supply and install new particleboard sheet flooring to the entire room. [28. 4m²] (Carpenter) 10.12. Remove and dispose of the irregular shaped floor tiles from the entire room. [28.4m²] (Tiler) 10.13. Supply and install new floor tiles of a similar size and style to the existing to the entire room. [28.4m²] (Tiler) 10.14. Remove and dispose of the 7mm floor tile underlay from the entire room. [28. 4m²] (Tiler) 10.15. Supply and install new 7mm floor ti le underlay to the entire room. [28.4m²] (Tiler) 10.16. Remove and set aside for reinstallation the existing ceiling fan. [1 unit/s] (Electrician) 10.17. Reinstall the existing ceiling fan. [1 unit/s] (Electrician) 11. POWDER ROOM (2.7m long x 1.39m wide x 2.7m high) - Allow to: 11.1. Prepare and patch the cracked sections of plasterboard wall linings in the room. [0.9 Linear m] (Plasterer) 11.2. Prepare and paint the plasterboard wall linings to the entire room i n a similar colour and paint finish to the existing. [19.4m²] (Painter) 11.3. Prepare and patch the cracked sections of plasterboard ceiling linings in the room. [1.0 Linear m] (Plasterer) 11.4. Prepare and paint the entire plasterboard ceiling lining an d 55mm "cove" style cornice in a similar colour and paint finish to the existing. [3.7m²] (Painter) 11.5. Remove and dispose of the 200mm x 150mm wall tiles to the vanity cabinet splashback of the room. [0.9m²] (Tiler) 11.6. Supply and install new wall t iles to the vanity cabinet splashback of the room. [0.9m²] (Tiler) 11.7. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 11.8. Reinstall the existing ceiling mounted light fitting. [1 unit/s] ( Electrician) 12. ENSUITE BATHROOM (2.69m long x 0.87m wide x 2.7m high) - Allow to: Determination | Case number: 692202 Page 18 of 28 Record Key points 12.1. Prepare and patch the cracked sections of plasterboard wall linings to the room. [3.2 Linear m] (Plasterer) 12.2. Prepare and patch the cracked section of cornice/ceiling joint above the shower recess to the room. [0.2 Linear m] (Plasterer) 12.3. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finis h to the existing. [4.7m²] (Painter) 12.4. Remove and dispose of the 10mm plasterboard wall linings from the entire lower half and shower recess of the room. [7.3m²] (Plasterer) 12.5. Supply and install new 6mm fibrous cement sheet wall linings to the en tire lower half and shower rec ess of the room. [7.3m²] (Plasterer) 12.6. Prepare and paint the plasterboard wall linings to the entire upper half of the room in a similar colour and paint finish to the existing. [11.9m²] (Paint er) 12.7. Realign the 2040m m x 820mm flush panel, hollow core, cavity sliding door to the existing door frame. [1 unit] (Carpenter) 12.8. Remove and dispose of the irregular shaped floor tiles from the entire room. [1.6m²] (Tiler) 12.9. Supply and install new floor tiles of a simi lar size and style to the existing to the entire room. [1.6m²] (Tiler) 12.10. Remove and dispose of the 7mm floor tile underlay from the entire room. [1.6m²] (Tiler) 12.11. Supply and install new 7mm floor tile underlay to the entire room. [1.6m²] (Tiler ) 12.12. Remove and dispose of the 200mm x 150mm wall tiles and associated cement sheet substrate (installed to a height of 1.0m high external to the shower recess) from the entire room. [7.3m²] (Tiler) 12.13. Supply and install new 250mm x 200mm wall ti les (installed to a height of 1.27m high external to the shower recess) to the entire room. [7.3m²] (Tiler) 12.14. Remove and set aside for reinstallation the polished chrome shower tap and shower ros e set. [1 unit/s] (Plumber) 12.15. Reinstall the polis hed chrome shower tap and shower rose set. [1 unit/s] (Plumber) 12.16. Remove and set aside for reinstallation the plastic towel ring. [2 unit/s] (Carpenter) 12.17. Reinstall the plastic towel ring. [2 unit/s] (Carpenter) 12.18. Remove and set aside for reinstallation the plastic soap holder. [1 unit/s] (Carpenter) 12.19. Reinstall the plastic soap holder. [1 unit/s] (Carpenter) 12.20. Remove and set aside for reinstallation the ceramic bidet. [1 unit] (Plumber) 12.21. Reinstall the ceramic bidet. [1 unit] (Plumber) 12.22. Remove and set aside for reinstallation the polished chrome bidet tap set. [1 unit/s] (Plumber) 12.23. Reinstall the polished chrome bidet tap set. [1 unit/s] (Plumber) 12.24. Remove and dispose of the 800mm wide x 1800mm high, "3 Part Sliding", polished chrome shower screen. [1 unit] (Glazier) 12.25. Supply and install a new 800mm wide x 1800mm high, "3 Part Sliding", polished chrome shower screen with fixed 800mm wide x 1800mm high glazed panel. [ 1 unit] (Glazier) 12.26. Remove and dispose of the 820mm x 820mm pre - moulded shower base. [1 unit] (Plumber) Determination | Case number: 692202 Page 19 of 28 Record Key points 12.27. Supply and install a new 820mm x 820mm pre - moulded shower base. [1 unit] (Plumber) 12.28. Remove and dispose of the 200mm x 150mm ceramic soap holder. [1 unit/s] (Carpenter) 12.29. Supply and install a new 200mm x 150mm ceramic holder. [1 unit/s] (Carpent er) 12.30. Supply and install a new wat erproof membrane to the entire room. Please Note: The waterproof membrane is to be installed and certified by a licensed professional waterproofing contractor. [4.0m²] (Waterproofer) 13. BATHROOM (2.97m long x 1.97m wide x 2.7m high) - Allow to: 13.1. Prepare and patch the cracked sections of plasterboard wall linings to the upper western end of t he room. [1.9 Linear m] (Plasterer) 13.2. Remove and dispose of the 10mm plasterboard wall linings from the entire lower half and shower recess of the room. [14.5m²] (Plasterer) 13.3. Supply and install new 6mm fibrous cement sheet wall linings to the entire lower half and shower rec ess of the room. [14.5m²] (Plasterer) 13.4. Prepare and paint the plasterboard wall linings to the entire upper half of the room in a similar colour and pa int finish to the existing. [13.2m²] (Paint er) 13.5. Realign the 2040mm x 820mm flush panel, hollow core door to the existing door frame. [1 unit] (Carpenter) 13.6. Prepare and paint the door and door frame in in a similar colour and paint finish to the existing. [1 unit] (Painter) 13.7. Prepare and paint the 67mm x 19mm Hardwood Bullnose architraves to the door of the room in a similar colour and paint finish to the existing. [5.4 Linear m] (Painter) 13.8. Remove and dispose of the particleboard sheet flooring from the entire room. [5.6m²] (Carpenter) 13.9. Supply and install new particleboard sheet flooring to the entire room. [5.6m²] (Carpenter) 13.10. Remove and dispose of the irregular shaped floor tiles from the entire room. [3.8m²] (Tiler) 13.11. Supply and install new floor tiles of a similar size and style to the existing to the entire room. [3.8m²] (Tiler) 13.12. Remove and dispose of the 7mm floor tile underlay from the entire room. [3.8m²] (Tiler) 13.13. Supply and install new 7mm flo or tile underlay to the entire room. [3.8m²] (Tiler) 13.14. Remove and dispose of the 200mm x 150mm wall tiles and associated cement sheet substrate (installed to a height of 1.27m high external to the shower recess) from the entire room. [11. 5m²] (Tiler) 13.15. Supply and install new 200mm x 150mm wall tiles (installed to a height of 1.27m high external to the shower recess) to the entire room. [11.5m²] (Tiler) 13.16. Remove and set aside for reinstallation the 760mm x 1.6m metal bath. [1 unit] (Plumber ) 13.17. Reinstall the 760mm x 1.6m metal bath. [1 unit] (Plumber) 13.18. Remove and set aside for reinstallation the 1200mm long x 450mm wide x 800mm high, 2 door, 8 drawer vanity unit/s complete Determination | Case number: 692202 Page 20 of 28 Record Key points with moulded benchtop and basin. [1 unit/s] (Carpent er) 13.19. Reinstall the1200mm long x 450mm wide x 800mm high, 2 door, 8 drawer vanity unit/s complete with moulded benchtop and basin. [1 unit/s] (Carpenter) 13.20. Remove and set aside for reinstallation the polished chrome basin and spout tap set. [1 unit/ s] (Plumber) 13.21. Reinstall polis hed chrome basin and spout tap set. [1 unit/s] (Plumber) 13.22. Remove and set aside for reinstallation the polished chrome shower tap and shower ros e set. [1 unit/s] (Plumber) 13.23. Reinstall the polished chrome show er tap and shower rose set. [1 unit/s] (Plumber) 13.24. Remove and set aside for reinstallation the polished chrome bath and spout tap set. [1 unit/s] (Plumber) 13.25. Reinstall the polished chrome bath and spout tap set. [1 unit] (Plumber) 13.26. Remov e and set aside for reinstallation the plastic towel rail/s. [2 unit/s] (Carpenter) 13.27. Reinstall the plastic towel rail/s. [2 unit/s] (Carpenter) 13.28. Remove and set aside for reinstallation the plastic towel ring. [1 unit/s] (Carpenter) 13.29. Re install the plastic towel ring. [1 unit/s] (Carpenter) 13.30. Remove and set aside for reinstallation the plastic framed 500mm diameter wall mounted mirror. [1 unit/s] (Carpenter) 13.31. Reinstall the plastic framed 500mm diameter wall mounted mirror. [1 unit/s] (Carpenter) 13.32. Reinstall the plastic framed 500mm diameter wall mounted mirror. [1 unit/s] (Carpenter) 13.33. Remove and set aside for reinstallation the 550mm x 100mm wall mounted plastic shelf. [1 unit/s] (Carpenter) 13.34. Reinstall the 550mm x 100mm wall mounted plastic shelf. [1 unit/s] (Carpent er) 13.35. Remove and set aside for reinstallation the plastic wall mounted plastic toothbrush and cup holder. [1 unit/s] (Carpenter) 13.36. Reinstall the wall mounted plastic too thbrush and cup holder. [1 unit/s] (Carpenter) 13.37. Remove and dispose of the 800mm wide x 1800mm high, "Pivotal' hinged, polished chrome shower screen with fixed 800mm wide x 1800mm high glazed panel. [1 unit] (Glazier) 13.38. Supply and install a new the 800mm wide x 1800mm high, "Pivotal' hinged, polished chrome shower screen with fixed 800mm wide x 1800mm high glazed panel. [1 unit] (Glazier) 13.39. Remove and dispose of the 820mm x 820mm pre - moulded shower base. [1 unit] (Plumber) 13.40. Supply a nd install a new 820mm x 820mm pre - moulded shower base. [1 unit] (Plumber) 13.41. Remove and dispose of the 300mm x 100mm ceramic soap holder. [1 unit/s] (Carpenter) 13.42. Supply and install a new 300mm x 100mm ceramic holder. [1 unit/s] (Carpent er) 13 .43. Supply and install a new wat erproof membrane to the entire room. Please Note: The waterproof membrane is to be installed and certified by a licensed professional waterproofing contractor. [4.0m²] (Waterproofer) 14. LAUNDRY (2.61m long x 1.8m wide x 2.7m high) - Allow to: Determination | Case number: 692202 Page 21 of 28 Record Key points 14.1. Prepare and patch the cracked sections 14.2. Prepare and paint the plasterboard wall linings to the western wall elevation of the room in a similar colour and paint finish to the existing. [4.9m²] (Painter) 14.3. Prepare and patch the cracked section of cornice/ceiling joint above the external door to the room. [0.8 Linear m] (Plasterer) 14.4. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finis h to the existing. [4.7m²] (Painter) 14.5. Remove and dispose of the wall tiles to the laundry tub splashback of the room. [0.25m²] (Tiler) 14.6. Supply and install new wall tiles to the laundry tub splashback of the room. [0.25m²] (Tiler) 14.7. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 14.8. Reinstall the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 15. SEPARATE WC (1. 67m long x 0.91m wide x 2.7m high) - Allow to: 15.1. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [13.9m²] (Painter) 15.2. Realign the 2040mm x 820mm flush panel, hollow core door to the existing door frame. [1 unit] (Carpen ter) 15.3. Prepare and paint the door and door frame in in a similar colour and paint finish to the existing. [1 unit] (Painter) 15.4. Remove and dispose of the 67mm x 19mm Hardwood Bullnose skirting from the entire room. [4.4 Linear m] (Carpenter) 15.5 . Supply and install new 67mm x 19mm Hardwood Bullnose skirting to the entire room. [4.4 Linear m] (Carpent er) 15.6. Prepare and paint the 67mm x 19mm Hardwood Bullnose skirting and the architraves to the door in a similar colour and paint finish to the e xisting. [9.8 Linear m] (Painter) 15.7. Remove and dispose of the irregular shaped floor tiles from the entire room. [1.5m²] (Tiler) 15.8. Supply and install new floor tiles of a similar size and style to the existing to the entire room. [1.5m²] (Tiler) 15.9. Remove and dispose of the particleboard sheet flooring from the entire room. [1.5m²] (Carpenter) 15.10. Supply and install new particleboard sheet flooring to the entire room. [1.5m²] (Carpenter) 15.11. Remove and dispose of the 7mm floor tile und erlay from the entire room. [1.5m²] (Tiler) 15.12. Supply and install new 7mm floor tile underlay to the entire room. [1.5m²] (Tiler) 15.13. Remove and set aside for reinstallation the ceramic toilet pan and single flush wall mount ed plastic toilet suite cistern. [1 unit] (Plumber) 15.14. Reinstall the single the ceramic toilet pan and flush wall mounted plastic toilet suite cistern. [1 unit] (Plumber) 15.15. Remove and set aside for reinstallation the plastic toilet roll holder. [1 unit] (Carpent er) 1 5.16. Reinstall the plastic toilet roll holder. [1 unit] (Carpenter) 15.17. Supply and install a new wat erproof membrane to the entire perimeter of the room. Please Not e: The waterproof membrane is to Determination | Case number: 692202 Page 22 of 28 Record Key points be installed and certified by a licensed professional waterproofing contractor. [0.5m²] (Waterproofer) 16. KITCHEN / DINING ROOM (5.13m long x 2.39m wide & 5.54m long x 3.27m wide x 2.7m high) - Allow to: 16.1. Prepare and patch the cracked sections of plasterboard wall linings in the room. [4.2 Linear m] (Plasterer) 16.2. Prepare and paint the plasterboard wall linings to the entire room in a similar colour and paint finish to the existing. [50.8m²] (Painter) 16.3. Prepare and patch the cracked section of cornice/ceiling/wall joints to the room. [9.7 Linear m] (Plasterer) 16.4. Prepare and paint the entire plasterboard ceiling lining and 55mm "cove" style cornice in a similar colour and paint finish to the exi sting. [30.4m²] (Paint er) 16.5. Remove and dispose of the 67mm x 19mm Hardwood Bullnose skirting from the entire room [12.0 Linear m] (Carpenter) 16.6. Supply and install new 67mm x 19mm Hardwood Bullnose skirting to the entire room. [12.0 Linear m] (Car penter) 16.7. Prepare and paint the 67mm x 19mm Hardwood Bullnose skirting in a similar colour and paint finish to the existing. [12.0 Linear m] (Paint er) 16.8. Remove and dispose of the irregular shaped floor tiles from the entire room. [27.0m²] (Tiler) 16.9. Supply and install new floor tiles of a similar size and style to the existing to the entire room. [27.0m²] (Tiler) 16.10. Remove and dispose of the 7mm floor tile underlay from the entire room. [27. 0m²] (Tiler) 16.11. Supply and install new 7mm floor tile underlay to the entire room. [27.0m²] (Tiler) 16.12. Remove and dispose of the 600mm wide ceramic tiled bench top complete with 42mm x 19mm hardwood fascia trim on the northern side of the kitchen. [1.9 Linear m] (Joiner) 16.13. Supply and ins tall a 600mm wide ceramic tiled bench top complete wit h 42mm x 19mm hardwood fascia trim on the northern side of the kitchen. [1.9 Linear m] (Joiner) 16.14. Remove and dispose of the 850mm wide ceramic tiled bench top complete with 42mm x 19mm hardwood fa scia trim on the northern side of the kitchen. [2.0 Linear m] (Joiner) 16.15. Supply and install flexible sealant to the tiled benchtop and splashback on the southern side of the kitchen. [2.4 Linear m] (Tiler) 16.16. Supply and install a new 850mm wide ceramic tiled bench top complete wit h 42mm x 19mm hardwood fascia trim on the northern side of the kitchen. [2.0 Linear m] (Joiner) 16.17. Remove and set aside for reinstallation the one and a half "top mount" bowl stainless steel sink and stainless steel “flick - mixer” style tap. [1 unit] (Plumber) 16.18. Reinstall the one and a half "top mount" bowl stainless steel sink and stainless steel “flick - mixer” style tap. [1 unit] (Plumber) 16.19. Remove and dispose of the 400mm high ceramic tiled splash back to the kitchen cupboard bench top area. [2.7 Linear m] (Tiler) 16.20. Supply and install a new 400mm high ceramic tiled splash back to the kitchen cupboard bench top area. [2.7 Linear m] (Tile r) 16.21. Remove and dispose of the general purpose double power outlet/s. [1 unit/s] (Electrician) 16.22. Supply and install new general purpose double power Determination | Case number: 692202 Page 23 of 28 Record Key points outlet/s. [1 unit/s] (Electrician) 16.23. Remove and set aside for reinstallation the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 16.24. Reinstall the existing ceiling mounted light fitting. [1 unit/s] (Electrician) 17. EXTERNAL INFRASTRUCTURE – Allow to: 17.1. Supply and install a 2.5 m deep root barrier across the rear northern yard area in accordanc e with a Structural Engineer’s design and detail. [20.0 Linear m] (Landscaper) 17.2. Remove and dispose of the concrete pedestrian paving adjacent to the rear landing and ga rage. [35.0m²] (Concreter) 17.3. Supply and install new concrete pedestrian paving adjacent to the rear landing and garage. [35.0m²] (Concret er) REAR LANDING (4.3m long x 3.1m wide x 0.55m high) - Allow to: 18.1. Remove and dispose of the concrete str ip footings. [10.5 Linear m] (Concreter) 18.2. Supply and install 300mm wide x 600mm deep conc rete strip footings founded at 1.0m deep. [10.5 Linear m] (Concreter) 18.3. Remove and set aside for reinstallation the face bricks complete wit h engaged piers to the external perimeter of the landing. [6.0m²] (Bricklayer) 18.4. Reinstall the face bricks complete wit h engaged piers to the external perimeter of the landing. [6.0m²] (Bricklayer) 18.5. Supply and install new face bricks to the northern end of the building. Note: Allowance of 10% for breakages. [0.6m²] (Bricklayer) 18.6. Professionally wash down and clean the face bricks to the external perimeter of the landing. [6.0m²] (Professional Cleaner) 18.7. Remove and dispose of the tiled 100mm concrete slab floor from the landing. [13.4m²] (Concreter) 18.8. Supply and install a 100mm conc rete slab floor to the landing. [13.4m²] (Concreter) 18.9. Supply and install new terra cotta tiles to the concrete slab floor of the landing. [14.5m²] (Tiler) 18.10. Remove and dispose of the 1000mm wide x 3 treads tiled concrete steps from the landing. [1 unit] Concreter) 18.11. Supply and install new 1000mm wide x 3 treads concrete steps to the landing. [1 unit] Concre ter) 18.12. Supply and install new terra cotta tiles to the concrete steps to the landing. [1.4m²] (Tiler) 18.13. Remove and dispose of the wrought iron balustrade from the landing. [9.0m²] (Carpenter) 18.14. Supply and install wrought iron balustrade f rom the landing. [9.0m²] (Carpent er) 18.15. Prepare and paint the wrought iron balustrade in a similar colour and paint finish to the existing. [9.0 Linear m] (Painter) 19. ATTACHED GARAGE (6. 0m long x 4.1m wide x 3.0m high) - Allow to: 19.1. Remove a nd set aside for reinstallation the cracked sections of the single skin brick face brick walls at the northern end of the building. [7.4m²] (Bricklayer) Determination | Case number: 692202 Page 24 of 28 Record Key points 19.2. Reinstall the face bricks to the single skin face brick walls at the northern end of the buildin g. [7.4m²] (Bricklayer) 19.3. Supply and install new face bricks to the northern end of the building. Note: Allowance of 10% for breakages. [0.8m²] (Bricklayer) 19.4. Professionally wash down and clean the face bricks to the northern end of the building. [7.4m²] (Bricklayer) 19.5. Remove and dispose of the 290mm x 32mm timber fascia board on the northern elevation of the building. [4.1 Linear m] (Carpenter) 19.6. Supply and install 290mm x 32mm timber fascia boards on the northern elevation of the build ing. [4.1 Linear m] (Carpent er) 19.7. Prepare and paint the 290mm x 32mm timber fascia board on the northern end of the building in a similar colour and paint finish to the existing. [4.1 Linear m] (Painter) 19.8. Remove and set aside for reinstallation the 125mm ZINCALUME® stormwater guttering from the northern elevation of the building. [4.1 Linear m] (Roof Plumber) 19.9. Reinstall the 125mm ZINCALUME® stormwater guttering to the northern elevation of the building. [4.1 Linear m] (Roof Plumber) 19.10. Remove and set aside for reinstallation the 100mm x 50mm ZINCALUME® stormwater downpipe from the northern elevation of the building. [3.0 Linear m] (Roof Plumber) 19.11. Reinstall the 100mm x 50mm ZINCALUME® stormwater downpipe to the northern elevation of the building. [3.0 Linear m] (Roof Plumber) 19.12. Re - connect the downpipe to the existing stormwater drainage system. [1 unit/s] (Plumber) 20. EASTERN SIDE PERGOLA ( 5.15m long x 4.8m wide x 3.0m high) - Allow to: 20.1. Remove and dispose of the 190mm x 45mm timber roof beams. [31.0 Linear m] (Carpenter) 20.2. Supply and install new 190mm x 45mm Treated Pine timber roof beams. [31.0 Linear m] (Carpenter) 20.3. Prepare and paint the 190mm x 45mm Treated Pine timber roof beams. [31.0 Linear m] (Painter) 20.4. Remove and dispose of the shade cloth to the entire pergola. [24.8m²] (Carpenter) 20.5. Supply and install new shade cloth to the entire pergola. [24.8m²] (Carpenter) Insurer’s cost e stimate (SW) 1 November 2020  Prepared by quantity survey or.  Detailed cost estimates to rectify defects or undertake maintenance and remediation of damage total rectification costs including GST $163,754.  Includes builder’s overheads and provisional sum allowances and prime cost allowanc es  Estimate contains a contingency allowance of 5% of the total estimated repair cost.  Allowed for a construction period of 20 weeks. Insurer’s quotation (TBS) 27 March 2020  Estimated time o f repair 26 weeks.  Allowed 20% builder’s margin and home owners warranty insurance. Determination | Case number: 692202 Page 25 of 28 Record Key points  Total including GST $176,922. 60. Complainant’s Scope of Works (AC) Report 24 September 2019  submit a price for the repairs due to water leaking under the house causing foundations to shift and heave leaving major damage to external brickwork and internals  lump sum $456,000+ GST.  provide accommodation for six months during construction works  prov ide storage for all furniture and household goods  remove external paving where underpinning works will occur  remove garden beds where underpinning will occur  excavate and underpin the existing foundations with bulk concrete pads  provide injection compound where necessary to correct & adjust levels back to a  true line  remove & dispose all spoil from site  remove & dispose all tiled floors & carpet  remove kitchen cupboards and dispose  remove timber skirtings and flooring and dispose  remove & replac e any water damaged subfloor timber members  re - stump the entire house internally  remove & dispose of spoil  repair all cracked plaster walls & ceilings  provide new kitchen cupboards  re - paint the entire house internally  replace paving which was removed where works occur red.  replace garden beds which were removed where works occurred  provide new flooring.  provide new tiled floors & carpet Complainant’s Scope of Works (DD) Report Undated  supply of site toilet, temp fence, signage and scaffolding as required  demolition of all inside the hous e back to frame stage and concrete around the house 1 meter only. Back veranda to be demoed as wel l  supply and install New stumps and underpin as required  supply and install new sub floor plumbing as required  supply and install new b earers, joists and flooring as required  supply and install new insulation to house walls and roof as required  supply and install new electrical thought out the house. 16 power points and 16 batten holders and 1 weather proof power point  supply and insta ll new walls if required, lock up, new eves and new facia  repoint and bed existing roof  supply and install new downpipes and spout  supply and install plaster thought out job with our builders range cornice  supply and install new skirting and arcs thoug ht out house Determination | Case number: 692202 Page 26 of 28 Record Key points  supply and install new cabinetry works in kitchen, bathroom, ensuite and laundry with lamenex bench tops  supply and install tiles to bathroom, laundry, ensuite and kitchen  supply and install of new mirrors and shower screens  supply and ins tall all new plumbing fixtures and fitting thought out picked from our builders range display  supply and install new paint thought out house inside and out 1 colour walls and 1 colour roof  supply and install new carpet to all bedrooms and front living ro om  supply and install floor tiles to hallways, kitchen, meals and family  supply and install new concrete plain 1 Meter path around the house and 1 x carport only next to house  supply and install 1 x new rear veranda with bricks and tiled floor  reinstat e heating and cooling to existing  supply accommodation for 2 people only for maximum of 12 months  supply furniture removal and reinstate to temporary residents and back to home once works have been completed  please note all fixtures and fittings are quoted in our builders range package  please note home owners warranty insurance, building permit and public liability is all including in this quotation  please note to render the whole house which is recommended by us is an extra cost of $23,000  things you get when choosing DD building services  registered unlimited domestic builder DBU - 21170  registered HIA member 867788  registered Master builder  a quality - built job.  trade certificates  all demolition and lef tover building materials will be removed from site including tipping fees  total Price is $499,500 Insurer’s Consultant Engineer (SW) Supplement ary Report 13 December 2019  reviewed material supplied by complainant.  neither of the scopes is in line with SW’s scope of works dated 24 October 2019  SW’s scope of works allows for restumping to the northern section of the property (i.e. replacement of the make - shift stumps).  this work will necessitate floor relevelling in the restumped region which has suffered significant long - term tree drying effect and (minor) subfloor drying effects.  we have allowed to restump up to the northern end of the dining room and bathroom regions, where the tree effects dissipate according to our floor level survey dated 19th July 2 018. It is noted that no other significant floor alignment issues were found in the floor level survey to nec essitate additional restumping works.  the floor relevelling works will necessitate the demolition and rebuilding of the external family room walls to match in with the Determination | Case number: 692202 Page 27 of 28 Record Key points realigned floor level (i.e. in lieu of underpinning and lifting the settled footing approximately 80mm).  subsequently to the works noted in (a) above, we will require to install a tree root barrier to isolate the ongoing drying effects of the northern trees on the subject property.  damaged floor tiling and works associated with the restumping noted above necessitated the inclusion of floor tile replacement throughout the open floor plan area of the residence including the dining room, k itchen, front hallway and entry. As there were architectural breaks to the powder room between the entry and the ensuite bathroom, the floor tiling was not included in the Scope of Works.  repair of all internal cracking to the wall and ceiling linings thro ughout the residenc e.  repair of all external brick veneer cracks which will include the rebuilding of a section of the western wall of the WC, Ensuite and Bathroom including all associated works  damage to external pavements was considered a maintenance rel ated issue and not related to the below subfloor leak event. However, the paving adjacent to the rear landing and garage required replacement to facilitate the installation of a root barrier and the replacement of the rear landing  according to the res ults of the floor level survey, significant long - term tree drying effects (from the nort hern trees) were identified to the northern section of the property. This existing environmental issue has been considered in our response via the installation of a tree roo t barrier. Based on the results of our floor level survey no underpinning works are deemed necessary  all other works scoped for in the quotations provided by the complainant are considered bey ond necessary for the practical repair of the resultant damage a s they are not related to the event  major difference in the value of the Scopes of Works is considered due to the inclusion of works in the Ins ured’s quot ations/scopes of works that are not related to the event.  inclusion of underpinning and associated wor ks to the entire residence in the Insured’s quotations/scopes of works as opposed to a root barrier would also be of a considerable additional cost to the value of the quotations  it was also noted that the scope of works/quotation from AC did not have an A BN or a Victorian Builders Registration number as required by the Victorian Building Authority.  a search of the Victorian Building Authority - Search for a Practitioner website stated that - ‘’No practitioner matching the search criteria’’ for AC  the Victor ian building aut hority states - “A builder must be registered with the Victorian Building Authority in Victoria to: Perform domestic building work that costs more than $10,000 (including labour and materials) Carry out re - block ing, re - stumping, demolition w ork or removal of a home, regardless of cost. Determination | Case number: 692202 Page 28 of 28 3.5 Other relevant material considered and relied upon  Parties’ submissions and emails and all attachments to all submissions and emails  Parties’ expert reports  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.