Settlement of storm damage repair claims across four events, temporary accommodation, removal costs and compensation
Text of the determination
Determination
Case number 690602
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 690602 Page 1 of 18
Case number: 690602 19 October 2021
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
They have lodged a complaint with AFCA following an ongoing process since 2013. This
involved four claims lodged under the policy. This process has not yielded a mutually
accepted resolution for all of the claims to date.
The original claim was lodged in 2013 for storm related damage to the complainants’
property. A second claim for storm damage on 21 March 2015 was lodged. Claim three was
lodged for an event which occurred on 3-4 June 2016. This involved a tree striking the south-
east corner of the complainants’ house. The final claim w as lodged for an event on 11
December 2019. This resulted in further water ingress damage to the complainants’ house.
The complainants have said they are seeking a total of $1,478,021.20 for repairs to the
house. This is based on SB’s quote, which was in turn based on a scope of works provided
by expert MB in 2019 (2019 MB scope). They are also seeking $191,100.00 for temporary
accommodation, $84,044.00 for contents removal and storage, $64,818.68 for legal and
expert fees and $176,400.00 compensation for non-financial loss.
The insurer disputes whether the complaint falls within AFCA’s jurisdiction. This is despite
several AFCA Rules team reviews which determined the complaint falls within AFCA’s
jurisdiction. The insurer says the complainants’ current cla ims are related to the original 2013
event. This is because they are due to defective works completed by the insurer’s previous
builders engaged to complete the repairs, along with pre-existing maintenance issues and
design defects.
Additionally, the insurer says that even if AFCA can consider the complaint, it considers the
cash settlement of $361,842.20 paid to the complainants is sufficient to cover the remaining
outstanding insurance works. The insurer says the remaining works the complainants are
seeking cover for beyond this are maintenance related and/or private works that constitute
betterment of the existing property. The insurer further says the building quote obtained by
the complainants significantly overquotes the amount required to cover the repairs to the
storm-related damage.
The complainants are dissatisfied with the insurer’s settlement and are seeking the amounts
referred to above in order to resolve the complaint. They say the insurer engaged its quantity
surveyor to ‘arbitrarily’ reduce t he scope of works to which it previously agreed. They further
say the quote they obtained is an accurate reflection of the cost for the insurer to discharge its
onus to them.
1.2 Issues and key findings
Can AFCA consider the complaint?
Yes. The panel is satisfied there are four separate claims and none of them exceed the
relevant monetary limit.
Determination | Case number: 690602 Page 2 of 18
What is a fair settlement for the insurance related repairs?
The panel considers it fair in all the circumstances the insurer settles the claim based on SQ’s
estimate of the 2019 MB scope with a 15% contingency (as opposed to 5% that was allowed).
This means the insurer should pay a total sum of $566,432.85 towards the cost of repairs
minus any amounts already paid. The insurer is also to pay interest on the outstanding sum
as set out in section 2.2.
Are the complainants entitled to further temporary accommodation?
Yes. The 2019 MB scope would likely require the property to be vacated. Therefore, the
insurer should pay $39,648 towards temporary accommodation. However, any payment is
subject to the complainants providing evidence to show they have spent the monies
previously paid to them by the insurer for temporary accommodation. More specific details of
this is set out in section 2.3.
Are the complainants entitled to further settlement for removal costs?
No. The cash settlement proposed in section 2.2 provides sufficient allowance for this.
Are the complainants entitled to compensation?
Yes. The panel considers it fair the insurer cash settles the complainants $5,000 for the
expert costs. The complainants are not entitled to non-financial loss.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer can settle this dispute in the following way:
cash settle the complainants for the repairs as set out in section 2.2
settle the costs for temporary accommodation as set out in section 2.3
pay $5,000 for the professional costs incurred.
Determination | Case number: 690602 Page 3 of 18
2 Reasons for determination
2.1 Can AFCA consider the complaint?
Complainants say there are four separate claims, insurer disputes this
The original claim was lodged in 2013 for storm related damage. The insurer accepted liability
for this claim and engaged IB to complete the works. It is reported that following completion of
the repairs, the complainants moved back into the property for three weeks in September
2013. However, they moved back out for rectification of repairs to the timber floors.
From the available information, it appears the complainants were in temporary
accommodation again for a significant period of time while they remained dissatisfied with the
standard of repairs. The insurer also approved further painting works in the amount of $6,732
at the complainants’ request in March 2015.
On or around this time, further damage occurred from another storm event on 21 March 2015.
This caused further damage (claim two). Water entry to the garage ceiling was again reported
at this time. The insurer noted the damage reported ‘reflected similar circumstances’ to those
of the first claim. This time it engaged building expert MB to provide an opinion on the cause
and the extent of the damage. At this time the complainants advised of significant
dissatisfaction with the work undertaken by IB during the first claim. They did not want IB to
be engaged for further works.
MB identified that water had again entered from the bi-fold doors and flowed down, causing
damage to the garage ceiling located directly below. MB said that if this water ingress issue
had been properly addressed as part of the last claim, then this ongoing issue would be
prevented. Additionally, MB found there were multiple causes for the water ingress, including
defective construction and installation of the doors and the original tiling and waterproofing of
the balcony (which is directly outside the lounge area).
At this time (2015) MB prepared a scope of works for the required repairs. The insurer
accepted this scope. The insurer says this was done in error and it should not have accepted
the 2015 MB scope. This is because it included works to remediate the defective
waterproofing and door installation which it says it was not responsible for. Nevertheless, the
2015 scope was accepted by the insurer and multiple quotes were obtained for repairs to the
property. The insurer says it ultimately authorised the complainants’ choice of builder (TB) to
undertake the repairs. At the same time, the complainants also engaged TB to undertake
various private works to the property.
It is reported by the insurer that multiple disputes and issues arose between TB and the
complainants throughout the repair process. The insurer says it made further errors during
this time. This included accepting additional repair work for which it was not actually liable for
under the policy.
Later on, the contract with TB was terminated. The parties dispute which party initiated this.
The insurer also notes the complainants took action with the Queensland Building and
Construction Commission in relation to some of TB’s works.
The insurer subsequently engaged MB again to review the work completed by TB and
provide a scope of works regarding completion of the works and remediation of any defective
insurance-related works. This culminated in MB providing a scope of works dated 31 January
2019 (2019 MB scope). While acknowledging it had accepted the 2019 MB scope, the insurer
Determination | Case number: 690602 Page 4 of 18
also says this scope includes remediation of private works, or works not related to its
obligations under the policy.
The insurer elected not to obtain quotes from its own panel builders. Instead, the insurer
provided the 2019 MB scope to the complainants for them to seek a quote from their
preferred builder. The complainants obtained a quote from building expert SB dated 13
September 2019 totalling $1,478,021.28. The insurer then engaged quantity surveyor SQ to
provide a costing of the insurance-related works contained within the 2019 MB scope. During
this process, SQ determined that a number of works contained in the 2019 MB scope were
not related to rectification of the storm damage and further, the amounts quoted by SB for the
storm-related repairs were excessive. This resulted in the insurer providing the complainants
with a cash settlement of $361,842.80 in December 2019. This was based on SQ’s costing on
an adjusted scope of works.
The insurer says the third claim was lodged in December 2019. This involved another storm
event with further water ingress and a corner on the southern side of the house being struck
by a tree branch.
For the fourth and final claim, the complainants reported further damage to the garage ceiling.
The complainants say these four claims are separate from one another and therefore the
complaint falls within AFCA’s jurisdiction (as the overall amount in dispute is spread across
the four claims). The insurer disputes this. The insurer is of the view claims two, three and
four relate to the defective building works undertaken for claim one. Accordingly, as the
complainants are seeking $1,478,021.20 for building repairs plus further amounts for
accommodation, removal costs, legal and expert costs and compensation, the complaint falls
outside of AFCA’s jurisdiction.
On balance there are four claims
The complaint was referred to AFCA’s Rules team on several occasions. Both parties made
numerous submissions regarding jurisdiction. On each occasion, the AFCA Rules team
determined the complaint falls within AFCA’s jurisdiction. Nevertheless, the insurer continues
to dispute jurisdiction.
On 30 April 2021, the insurer provided a more detailed submission regarding jurisdiction and
raised some issues with AFCA that it had not previously highlighted. For instance, the insurer
argued the complainants have not established that a storm occurred on 11 December 2019
and that further resultant damage occurred. The insurer therefore argues that claim four has
not been established by the complainants.
The panel notes that as reported by the insurer, repairs from claim one were nearly complete
when the second storm occurred on 21 March 2015. This caused further internal water
damage which led to claim two. Claim three in 2016 also involved further water ingress
damage and, significantly, some impact damage from a tree branch. While the insurer argues
this damage was relatively minor, this is nevertheless new damage and distinct from the
previous claims.
With regard to claim four, the insurer has now argued that it obtained rainfall data from a
weather station only 1.6km from the complainants’ property and that this shows 0mm of
rainfall on 11 December 2019.
The complainants provided a link to the bureau of meteorology website which shows there
was a large amount of rainfall recorded on 11 December 2019. Further, the panel notes
rainfall can sometimes be localised and it can be entirely possible for it to be raining more
Determination | Case number: 690602 Page 5 of 18
significantly in one location compared to a nearby weather station. Additionally, the panel has
reviewed rainfall data from the weather station in question and while there was 0mm of
rainfall recorded on 11 December 2019, there was 72mm of rainfall recorded on 12
December 2019. It is not clear which 24-hour period this data was taken from.
On balance, the panel is satisfied that a storm event did occur on 11 or 12 December 2019 in
the Brisbane area and that this caused some further internal water damage.
This is consistent with a loss adjuster’s report dated 15 December 2019 (report number 64).
This referred to a significant thunderstorm which moved through the Brisbane metropolitan
area on 11 December 2019. This report also confirmed that the complainants raised further
damage to the garage ceiling at this time. However, the loss adjuster simply noted the garage
ceiling was already listed for replacement in the SB quote (which the panel notes the insurer
has not accepted).
On balance, the panel is satisfied there was a fourth event and this caused damage. This
means the panel is satisfied that there were four separate events leading to the four claims.
Further, the insurer’s submission that it is all related to the original event is inconsiste nt. This
is because it has said on multiple occasions that it agreed to repair areas after the second
storm event that it was never liable to pay or was not caused by the first event. If this is to be
accepted, then its decision to repair these areas, whic h are now subject to MB’s 2019 scope,
could not be said to have been caused by the original claim or repairs. Instead, it was caused
by its incorrect decision to accept areas that it is now responsible to rectify.
In addition, it is clear the tree damage from the third event cannot be attributed to the original
claim or the insurer’s alleged incorrect decisions to accept areas it was never liable to pay.
The panel also notes that as part of its most recent submission on 30 April 2021, the insurer
obtained a costing from building quantity surveying experts CM. CM provided a cost
breakdown as to what it considers a fair apportionment of costs for each of the four claims. All
of the total amounts for each event was below $1 million. This supports the complaina nts’
position that the remedies they are seeking can be legitimately apportioned across four
claims and each are under the $1 million figure, albeit the figures differ between the parties.
The panel is therefore satisfied this complaint falls within the j urisdiction of AFCA’s Rules.
2.2 What is a fair settlement for the insurance related repairs?
Complainants are seeking settlement for full amount of SB quote
The complainants are seeking full payment of the SB quote for repairs totalling
$1,478,021.20. They note the insurer initially accepted the 2019 MB scope and elected not to
obtain quotes from its own panel builders. The insurer instead chose to provide the 2019 MB
scope to the complainants and requested them to obtain a quote from their preferred builder.
The complainants did this. They note it was only after SB’s quote for $1,478,021.20 was
received that the insurer engaged a quantity surveyor to reduce the scope and therefore the
cash settlement that they received. The insurer has raised concern the 2019 MB scope
includes various works which involve rectifying pre-existing issues with the property (such as
the waterproofing on the balcony and bi-fold door installation), along with rectification of
private works.
In the complainants’ view, the insurer and its quantity surveyor have taken this approach in
order to reduce the amount the insurer would be required to settle the complainants for. They
Determination | Case number: 690602 Page 6 of 18
say that the insurer has not had an expert builder attend and quote on the cost of repairs at
any point. Further , the quantity surveyor ‘arbitrarily’ reduced the scope even though it had
previously acknowledged it was not a construction expert and would defer to building experts
with regard to these matters. The complainants are of the view the only actionable quote for
all of the repairs the insurer is liable for is their quote from SB.
Insurer says it has already adequately compensated the complainants
The insurer has acknowledged in its submission dated 30 April 2021 that the 2019 MB scope
was initially ‘accepted’ by both itself and the complainants and described it as providing
‘comprehensive detail on the work required to remediate the property’. Nevertheless, the
insurer says it made an error in accepting the 2015 MB scope. This is because it primarily
related to undertaking remediation works to defective construction. This was further
compounded by the 2019 MB scope which included remediation works not covered by the
policy and related to private works previously undertaken by TB for the complainants. To this
end, the insurer acknowledges it made a number of errors during the course of the claims in
accepting various works which were not directly related to rectification of the storm-related
damage.
The insurer reports that the original contract with TB that it accepted in 2015 for claim two
totalled $190,996.60. However, due to it subsequently accepting various further works and
variations in error (relating to works it says it was not required to cover under the policy), it
ultimately agreed to further costs of $71,604. This brings the total for the claim two works to
be completed by TB to $262,570.60. The insurer notes the damage subsequently incurred in
claims three and four was comparatively minor and largely to the same areas of the property
(with the exception of the tree branch impact in claim three).
The insurer further says the complainants’ quote from SB went above and beyond even the
2019 MB scope. It included further repairs for maintenance and defect related issues that
would constitute improvements and betterment of the existing property. Additionally, the
insurer says the amounts quoted by SB even for the repairs to the storm-related damage are
exorbitant. As such, the insurer considered it necessary to have its quantity surveyor go over
the 2019 MB scope and determine which aspects of the repairs the insurer was actually liable
for under the policy to rectify the storm-related damage, and what the fair and reasonable
cost of these works would be. As noted above, this process culminated in the insurer issuing
a cash settlement to the complainants in December 2019 totalling $361,842.80.
The insurer has since obtained a further cost breakdown from building quantity surveying
experts CM as part of its most recent AFCA submission. This totalled $261,704.00 before any
builder’s margin or contingencies, and $348,327.00 when all margins and contingencies are
allowed for. This was based on the 2019 MB scope.
The panel notes the insurer also recently obtained a quote from building experts NP to quote
on all of the works contained within the 2019 MB scope (including both insurance-related
repairs and maintenance/private building works the insurer says it is not required to cover).
This quote totalled $360,667.69. This is exceptionally close to the cash settlement of
$361,842.80 the insurer paid to the complainants.
Further refinishing of timber floorboards not necessitated by storm damage
During the course of the claims, there had been much debate between the parties as to
whether the floors had been repaired to an acceptable standard. This had been a point of
contention with some of the previous contractors. Concerns were later raised by the
Determination | Case number: 690602 Page 7 of 18
complainants that the floors had been sanded and refinished a number of times and that the
floors may no longer have sufficient thickness to allow for further sanding.
The available information does not indicate that any further water damage has occurred, or
additional work is required. The 2019 MB scope does not provide an allowance for further
repairs to the timber floors or identify any issue with them. No further damage to the floor
occurred during claim four in December 2019 that was noted in the loss adjuster’s report
dated 15 December 2019 (report 64). The panel also notes the complainants have indicated
they want ‘reinstatement’ based on the 2019 MB scope.
The complainants say they have been advised the floors could be affected during the repairs.
They provided a report from timber flooring experts HW dated 21 June 2019 in which HW
says ‘removal of doors is likely to disturb the cork expansion joints… replacement of those
elements will therefore be a likely requirement’. HW goes on to say that depending on
humidity conditions during the works, it is possible some trimming of the floorboards may be
required due to expansion. HW also says that if flooring has to be replaced in any locations
adjacent to repairs that re-sanding and recoating would be required, it would be unlikely that
the current finish could be duplicated.
SB’s quote says that it is likely the existing timbe r floors will separate during removal of the bi-
fold doors to the living areas. As such SB has included an allowance for re-sanding and re-
coating of the floors. SB acknowledges this is over and above the 2019 MB scope.
The insurer’s loss adjuster report n umber 64 dated 15 December 2019 says that as the floor
was completely replaced by TB previously, each board was nailed into place and should not
move and that the complainants were seeking cover for ‘possible potential damage’.
The panel does not consider the available information shows these works should be added to
the 2019 MB scope. This scope was agreed to between the parties. HW discusses the
possibility of further damage. It is not clear this is inevitable or required. The panel is not
persuaded the insurer should include the cost of re-sanding and recoating of the timber floors
in the scope on the basis that it might be required. However, the panel does consider an
overall contingency amount on the repairs should be allowed to cover potential unforeseen
costs such as this. This is discussed below under the heading ‘Insurer is required to pay a
further 10 % contingency on previous settlement’.
Rendering work sought by the complainants is not reasonable
CM’s report describes a large difference in the sco pe for rendering.
The complainants say the rendering required will be extensive. They have provided advice
from independent painting and rendering experts DC and CH in support.
DC says the patching would be obvious as blending the render with sand and cem ent render
would be very difficult and adhesion to the painted surface would be poor. Further, the age
and type of render would make it difficult to match. DC recommenced the existing render
would need to be removed from corner to corner. CH’s report is re latively consistent with this.
CH believes a more viable repair method is to grind and mill the render and replace it with a
new product. CH does not believe a painter would paint the render in other circumstances
due to the ‘ unsatisfactory condition and uninformed and patched look ’ .
The insurer has provided technical advice from a building consultant who said such extensive
works are not necessary. The panel notes the 2019 MB scope does not set out such
extensive rendering works. The other quotes provided from CM and NP do not include these
works.
Determination | Case number: 690602 Page 8 of 18
The panel is not persuaded the proposed works provided by the complainants are consistent
with the 2019 MB scope. Neither is the panel persuaded it is fair the insurer be liable for such
extensive rendering proposed.
SB’s proposed method appears to apply acrylic render to the areas being replaced. The
insurer’s loss adjuster notes this is a far better quality than what originally existed. Whilst the
complainants did not dispute this, they note the original finish 20 years ago is a very high
quality. However, the policy notes that when repairing the damaged part of the building, they
put it to the same condition as ‘when it was new’. When it was new, the building had sand
render, not acrylic. The proposed outcome by the complainants is inconsistent with this.
Regarding the complainants’ experts, the panel notes the following.
DC does not say that the proposed works would be defective or breach any standards. DC
instead says it would be difficult to blend and the painted surface would be poor. The
reference to ‘very difficult’ does not mean it cannot be done. The insurer’s experts accept it
can be done.
CH is more forceful that such a process would lead to defective outcomes. However, other
views and reports are not consistent with this. Whilst difficult, it seems possible that the
proposed method in the 2019 MB scope is feasible.
Given all this, the panel is not persuaded the available information shows the scope should
be adjusted to the degree proposed by the complainants.
Retaining wall replacement not required as a result of storm damage
CM also noted the repairs to the external northern retaining wall was one of the major areas
of difference in costing between the insurer’s experts and SB’s quote.
CM said SB quoted for disposing of the gravel and replacing it with new. SB have also
allowed for the removal of the retaining wall and replacing it with new. These are different to
the 2019 MB scope. CM said SB’s value of the replacement costs are also very high. The
corefill concrete in the schedule equates to 6.5m3 which is about 40m2. The retaining wall
described in the report does not exceed 4m2.
The complainants say the works in the 2019 MB scope allow for excavation behind the
retaining wall in order to install new waterproofing. They say the site has restricted access
and the removal and replacement of the retaining wall proposed by SB constitutes a more
cost-effective method of undertaking this work.
The panel is not persuaded by the complainants’ view on this. The 2019 MB scope, which
was apparently agreed to by the parties, does not allow for this. CM’s evidence refutes the
position that SB’s quote provides a more cost -effective method.
SB’s quote is excessive
CM’s report also raised other issues about SB’s qu ote.
CM said the amount allowed in the preliminary costs included a timeframe of 39 weeks. CM
considered this is significantly long. No structural work is being done. A lot of work tasks can
be run concurrently. No structural or design works were noted in the 2019 MB scope. It also
included $32,538 for about 540 hours of cleaning and equipment hire. This would be 22 full
days, which is excessive. The scaffolding budget is also high and would suit a 4-storey
building.
Determination | Case number: 690602 Page 9 of 18
For demolition, CM said the works described in the 2019 MB scope was for minor carpentry
demolition such as removing doors, windows, timber mouldings and linings. Other demolition
comprised of removing render, tiles and plasterboard linings with no major structural
demolition. The amount SB quoted is sufficient to demolish three single storey dwellings in
Queensland.
For the bricklayer, CM said the 2019 MB scope should be sufficient for about 6 hours. SB’s
quote allowed $13,673, which was excessive.
The complainants raised various arguments about CM’ s report in general. This includes the
fact they did not visit the site, did not engage with SB, did not account for site conditions, has
not provided an actionable quote and did not consider the insurer’s obligations under the
policy.
The panel is not pe rsuaded by this. CM made legitimate points about SB’s scope of works
and quotes on numerous factors. For example, on the face of CM’s arguments, the amounts
allowed for the preliminaries and demolition are high in context of the 2019 MB scope.
Regarding th e render and the retaining wall, the panel was persuaded on the insurer’s
position on these points.
CM’s estimate is also relatively close to another contractor.
The panel also notes that SQ’s estimate based on the 2019 MB scope came to a total of
$517,771, inclusive of GST. This shows that at least three contractors have quoted figures on
the 2019 MB scope that are significantly lower than SB.
Garage ceiling repairs already allowed for in insurer’s cash settlement
The complainants say the damage following the fourth claim has not been fully included in the
2019 MB scope. This event occurred after that scope was completed. They say the damage
is far more extensive than when MB last inspected the property. They say SB’s quote allows it
to completely investigate and remove water damaged ceilings, plasterboards and other
elements.
It is unclear how SB’s quote included claim four damage. The quote was dated 13 September
2019. This was several months before that event.
No clear evidence has been presented to show that additional works are required. If they are,
it is not clear that they require a significant adjustment. The panel considers the contingency
allowed later on should be sufficient to address this.
Fair for a cash settlement to be based on SQ’s quote on the 2019 MB scope
Given all of the above, the panel notes the following.
The panel considers it is fair to base any cash settlement on the 2019 MB scope. This is for
several reasons.
The parties agreed to engage MB for this purpose. When this scope was completed, there
were no concerns raised by either party about its scope. Both agreed this scope fairly
reflected the extent of works required. The issue became how best to give it effect. In this
regard, the insurer allowed the complainants to obtain their own builder quote. It was only
after this was obtained, and the quote reviewed, the insurer has then sought to adjust the
2019 MB scope.
Determination | Case number: 690602 Page 10 of 18
SQ’s report has not been reviewed by MB. It reduces the scopes in several regards. At some
points, it refers to betterment. This includes installing new stainless grates and new drainage
systems for the front elevation and entry stairs. However, it is not clear if these are necessary
to complete the rectification works. If they are, then they should form part of the required cost
of repairs or rectification.
The panel acknowledges the insurer’s position that it accepted works it should not have in the
first place. Even if that is correct, it does not change the fact it must now guarantee those
works it agreed to authorise.
Therefore, the panel does not accept it is fair for the insurer to base a cash settlement on a
reduced scope of works.
However, the panel is also not persuaded SB’s quote reflects a fair amount of the 2019 MB
scope. This is due to several reasons.
The quote totals close to $1.5 million. This, on the face of it, is excessive. These are to rectify
the works done by TB which totalled just over $260,000. It is difficult to accept that the cost of
rectification would be 5.5 times the amount of the quoted works.
There are also other concerns.
The insurer has provided three other estimates from different experts based on the 2019 MB
scope. All of them arrived at figures substantively less than SB. The highest was SQ’s
estimate of $516,951. This was still aroun d 35% of SB’s quote.
The panel also notes SB’s quote included works that went beyond the 2019 MB scope. This
included the render and the retaining wall. For reasons explained, the panel was not
persuaded on these points. There were also parts of the quote the panel considers excessive.
This included the amounts quoted for preliminaries, bricklaying and demolition.
Therefore, the panel does not accept that a cash settlement should be based on SB’s quote.
Of the remaining quotes, there are variances. Two were relatively consistent, being CM and
NB. SQ’s amount was more substantive. However, the panel notes the insurer had sought to
rely on SQ’s estimates for the works when cash settling the claim, albeit it did so on an
adjusted scope.
The panel considers i t fair that SQ’s estimate for the 2019 MB scope should form the basis of
the cash settlement. It is clear SQ has spent an extensive amount of time estimating this work
and researching it. The insurer has not raised any concerns that SQ’s estimates are not
reasonably based. It is not clear, to what extent, the other contractors have undertaken a
similar amount of research. This is also a complicated claim with an extensive history. The
panel is conscious of ensuring any cash settlement is based on the fairest amount.
Therefore, the panel considers it fair in all the circumstances that SQ’s estimate of $517,177
form the basis of a cash settlement.
Insurer is required to pay a further 10% contingency on previous settlement
Given the exceptionally complex nature of these ongoing claims, and the potential for
unforeseen costs such as those discussed above, the panel considers a 15% contingency
allowance is fair in all the circumstances. This is an increase to the 5% that was included in
SQ’s estimate.
Determination | Case number: 690602 Page 11 of 18
This means the total amount allowed should be $566,432.85 in full and final settlement of the
cost of repairs. Therefore, the insurer should pay the remaining balance owing. The insurer is
also to pay interest on any additional amount it is required to pay. Interest is payable pursuant
to section 57 of the Insurance Contracts Act 1984 from 24 December 2019, being two weeks
after SQ completed its quote, until the remaining amount is paid.
2.3 Are the complainants entitled to further temporary
accommodation?
Complainants are seeking $191,100 temporary accommodation
In their response to AFCA dated 10 June 2020, the complainants have indicated they are
seeking accommodation costs of $191,100. This is based on a rate of $700 per night for 39
weeks.
The complainants note the insurer approved accommodation at a rate of $700 per night
previously. They say this should be maintained.
The 39 weeks period is based on SB’s estimate of the works.
Temporary accommodation should be paid
The insurer’s main submission dated 30 April 2021 does not specifically address whether an
allowance for temporary accommodation should be included.
The panel notes that no allowance was provided in the insurer’s settlement based on SQ’s
adjusted scope. However, for reasons explained, the panel does not accept this adjusted
scope is fair. Further, the panel notes that SQ’s quote based on the 2019 MB scope included
the removal and storage of furniture.
In such a context, it is reasonable to accept that temporary accommodation is required under
the 2019 MB scope. Given this, the panel accepts an allowance for temporary
accommodation should be included.
For reasons explained, the panel has not accepted SB’s quote is a fair reflection of the 2019
MB scope. Therefore, the panel does not accept it is fair to allow 39 weeks for temporary
accommodation based on SB’s estimate. Instead, the panel considers it fair to allow for 24
weeks. This is based on SQ’s estimate.
Insurer should pay $39,648 for temporary accommodation
The panel notes the policy wording says the insurer will pay temporary accommodation costs
(where they are warranted) at a rate based on the rental value of the property. The insurer’s
loss adjuster, in a report dated 30 November 2015, estimating the likely rental value of the
property is $1,400 per week.
The complainants have maintained $700 per day should be paid. They have referred to the
principle of estoppel applied in several Court cases involving insurance.
The panel is not persuaded by this. The policy does not entitle them to such a rate. The fact
the insurer agreed to pay such a rate previously does not mean they are bound to do so in all
future circumstances. None of the Court cases referred to by the complainants apply estoppel
in such circumstances.
Determination | Case number: 690602 Page 12 of 18
In the absence of any information establishing the rental value of the property, the panel
considers it is fair to refer to the rate in the loss adjuster’s report. However, given this was
estimated almost six years ago, the panel considers a further adjustment should be made for
inflation. The panel has allowed an annual rate of 3%. This totals $1,652 per week ($1,400 x
18%) with an overall total of $39,648 for temporary accommodation ($1,652 x 24 weeks).
However, the panel also notes the following.
The insurer, in its submission dated 30 April 2021, said it paid $633,845 in temporary
accommodation at a daily rate of $700. The insurer also noted the complainants have not
provided evidence to show they incurred all these costs.
Given the significant amount paid already, the panel considers it fair in all the circumstances
the insurer is only required to pay $39,648 if the complainants can show the amounts
previously paid by the insurer were all spent on temporary accommodation.
If the complainants can show they spent more than $594,197 of the previous benefits but less
than $633,845, then the insurer can deduct the amount that was not spent from the figure of
$39,648 in settlement of this. For example, if the complainants showed they spent $610,000
of the previous benefits, then the insurer should pay $15,623 ($610,000 + $39,468 -
$633,845).
2.4 Are the complainants entitled to further settlement for
removal costs?
Complainants are seeking $84,044.00 for removal costs
The complainants are seeking $84,044.00 for removal costs. This is based on the assumption
that the complainants will be required to vacate the property for 39 weeks while repairs are
completed.
The complainants have provided a quote from removalists C for the amount of $84,044.00.
They advise that C are the same removalists that moved them in and out of their property on
several previous occasions during the course of the claims.
SQ’s estimate already includes this cost and is fair
SQ’s estimate already provides an allowance of $27,960 for the removal and storage of
contents. This excludes GST, builder’s margin, material handling and the contingencies that
would be added on top. When you factor those amounts, the total is about $45,000.
There is no evidence to show this is an unreasonable allowance.
The complainants’ quote is, on th e face of it, high. The fact the insurer may have paid such
high rates previously are not, of itself, a basis to compel the insurer to pay this amount again.
The panel also notes it is based on 39 weeks which, for reasons already expressed, is not
reasonable.
Given this, the panel accepts no further allowance for this item is required given it is already
included in the cash settlement proposed in section 2.2.
Determination | Case number: 690602 Page 13 of 18
2.5 Are the complainants entitled to compensation?
Complainants seek compensation
In their correspondence dated 10 June 2020, the complainants have indicated they are
seeking legal and expert reporting costs totalling $64,818.68. This is based on the total of
expenses they incurred in obtaining numerous expert reports, consulting with various experts,
and legal fees during the course of the four claims.
Additionally, the complainants are seeking compensation for non-financial loss totalling
$176,400. They have based this on $10,000 per year for loss of amenity and enjoyment, and
a management time component of 80 hours per year at $190 per hour for 7 years.
Insurer should pay $5,000 for professional costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
Regarding the complainants’ claim for professional costs, the panel notes the follo wing.
The panel is not satisfied all these costs were necessary or reasonably incurred. For
instance:
the panel was not persuaded by the complainants’ position regarding the rendering and
painting
the legal costs are high (over $22,500) and do not appear to have been incurred during the
AFCA complaint – therefore, it is unclear how they assisted the complainants in
establishing their claim
it is not clear if other costs would be considered professional costs (e.g. office
management fee, account keeping fee)
some reports were issued after the 2019 MB scope and did not add much value
the panel was not persuaded the complainants’ quote for the repairs was fair
the main evidence which supported the complainants’ position was the 2019 MB scope
which was paid for by the insurer.
The panel does accept certain expert fees were incurred to demonstrate that TB’s works
required extensive rectification. To this extent, the panel considers it is fair to allow $5,000
given these costs exceeded that amount.
In terms of whether exceptional circumstances apply, the panel is not persuaded it does.
Whilst the claims are complex, the panel was not persuaded all of these costs were
reasonably incurred. The complainants engaged numerous experts throughout the claim.
Many of these were not done with the insurer’s consent. Further, the key evidence was the
2019 MB scope, which the insurer paid for and has substantially assisted in arriving at a fair
outcome.
The panel also does not accept these costs can be split across the four claims. This is
because these reports were incurred for the purpose of rectifying TB’s works. They were not
incurred for other claims or events.
Given all this, the panel considers it is fair the insurer contributes $5,000 towards the
complainants’ professiona l costs.
Determination | Case number: 690602 Page 14 of 18
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a
normal degree of inconvenience during a claim.
Insurer not required to pay non-financial loss
The amounts the complainants are seeking for non-financial loss are significant and go
beyond what AFCA can award under its Rules.
The panel considers there have been various circumstances involving both the insurer and
the complainants that have contributed and further complicated matters. This included having
private related works done in the first set of rectification that made the claims more
complicated to separate.
However, the panel accepts there were substantive rectification works required for the
insurer’s works. To this extent, this has led to an unusual degree of inconvenience and
interference. Further, such stress and inconvenience was over and above what would be
expected as part of a normal insurance claim or claims.
Despite this, the panel notes the following.
There have been several examples where the insurer provided benefits well in excess of the
policy entitlements. The main one is temporary accommodation. According to the insurer’s
submission dated 30 April 2021, the insurer paid $633,845 in temporary accommodation at a
daily rate of $700. This was well beyond what it was required to pay under the policy. The
insurer also noted the complainants have not provided evidence to show they incurred all
these costs.
The insurer has also made various submissions showing that it agreed to pay for repairs with
TB it was not required to do under the policy. This included remediating the cause of the
water ingress in the first claim. There is merit to this given M B’s report in 2015 appears to say
the cause of the water ingress were pre- existing factors associated with the property’s
construction. Whilst the complainants dispute this, the available information indicates the
insurer’s position may be correct.
Therefo re, the insurer’s decision to repair these items, and to now be bound to their
rectification, is an example where the insurer’s incorrect handling of the claim further
benefited the complainants.
Given all this, the panel does not consider it fair in all the circumstances that any award of
non-financial loss be made.
Determination | Case number: 690602 Page 15 of 18
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as a in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 690602 Page 16 of 18
3.2 Policy wording
Product disclosure statement (PDS) page 10:
How we will settle your buildings claim
1. At our option, we will:
a. repair or rebuild the damaged part of your building to the same condition as when it was new; or
b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the
same condition as when it was new; or
c. pay you up to the amount of the sum insured.
If we pay you the reasonable cost of repair or rebuilding, this means the cost of repairing or
rebuilding less any discount available to us were we to repair or rebuild. We will adjust your claims
payment in accordance with the GST provision noted under ‘Conditions of cover’, ‘GST Notice’ on
page 52.
2. When it is not possible to use original materials during the repair or rebuilding process, the
nearest available equivalent to the original mat erials will be used. We will not pay to repair or
rebuild property which has not been physically damaged.
3. Unless we have agreed in writing, repair or rebuilding of your buildings must commence within
six months of the loss or damage. If repair or rebuilding of your buildings is not commenced within
six months of the loss or damage or any extended period to which we have previously agreed in
writing, we will not be liable for any costs beyond the repair or rebuilding costs as at the date the
loss or damage occurred.
4. If we have chosen to repair or rebuild your damaged buildings and you do not wish to repair or
rebuild them, we will at our option:
a. pay you the reasonable cost to repair or rebuild your damaged buildings less an amount for
depreciation based on the age and condition of the buildings; or
b. pay you the value of the land and buildings at the risk address immediately prior to the
occurrence of the loss or damage less the value of the land and buildings immediately after the
loss or damage occurred.
5. Rebuilding may be carried out on another site in the same vicinity provided that we agree in
writing.
6. If the claim relates to loss or damage to fixed wall, floor or ceiling coverings, repair or
replacement is limited to the room, hall or passage in which the loss or damage actually occurred.
7. If the claim relates to loss or damage to a dividing fence we will only pay half the cost of
repairing the fence.
8. If the claim is for gat es, fences or freestanding walls damaged or destroyed as a result of storm,
rainwater or run-off, we may deduct an amount from any claim settlement for depreciation bas ed
on their age and condition.
In no case will we pay more than the sum(s) insured shown in the current schedule (less any
excess[es] which may be payable) unless we have stated differently under the heading ‘Ins ured
events we will pay’ and ‘Ot her benefits we will provide’ on pa ges 18 to 41.
PDS page 18:
INSURED EVENTS WE WILL PAY
…
PDS page 20:
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
‘storm’ means violent wind (including cyclones and tornadoes), thunderstorms and hail which may
be accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground.
Determination | Case number: 690602 Page 17 of 18
‘run - off’ means rainwater that has collected or has flowed ac ross normally dry ground or has
overflowed from swimming pools or spas.
We will not pay for loss or damage:
…
PDS page 21:
d. to retaining walls;
…
f. to the external paintwork or other exterior coatings of the buildings caused by rainwater;
g. caused by wat er seeping, percolating or otherwise penetrating into the buildings as a result of:
structural defects,
faulty design of the buildings,
faulty workmanship in the construction of the buildings,
…
h. caused by wind, rainwat er, hail or snow entering the buildings through an open window or door
or any opening not made by the storm, unless the loss or damage is caused by run-off;
…
PDS page 24:
OTHER BENEFITS WE WILL PROVIDE
1. Additional cost of temporary accommodation
(Applicable only when you have contents cover)
‘additional costs’ mean those rental and other relat ed costs which you have to inc ur at the
location of your temporary accommodation which are in addition to the costs you would have
had to incur if you continued to live at your risk address.
If yo u normally live in the buildings, the amount we will pay will be based on the buildings’
rentable value.
We will reimburse the additional costs you have to pay for temporary accommodation where:
the buildings you live in are damaged by an insured event to such an extent that you
cannot live in them, and
you temporarily take accommodation at another address.
We will pay for temporary accommodation for:
the period which we agree is reasonably necessary, or
12 mont hs,
Whichever period of time is the lesser.
…
The maximum combined total amount we will pay under this benefit and ‘Removal of debris,
professional fees and extra costs’ on page 36 is 10% of the sum insured on your contents. Any
payment we make under this benefit will be in addition to any amount we pay on your contents.
We will not pay the additional cost of temporary accommodation under this section if:
you have insured your buildings with us and we have agreed to pay your claim for ‘Rent al
costs after an insured event’ on page 37, or
you are the landlord of the buildings.
PDS page 45:
PARTS A AND B
WHEN WE WILL NOT PAY A CLAIM UNDER YOUR POLICY
1. This policy does not cover loss, liability, injury or damage:
…
Determination | Case number: 690602 Page 18 of 18
f. Wear and tear
arising out of depreciation gradual deterioration, wear and tear;
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural defects or poor
workmanship;
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.