Home / Suncorp Group / Determination 690494
Determination 690494
Claim for further storm and repair damage denied for unassessed repairs
Summary
The complainant claimed $34,721.50 for further storm and repair damage after completing repairs without the insurer's assessment. AFCA upheld the claim denial but ordered statutory interest on a previously cash-settled ceiling payment.
The policy and PDS required inspection and consent before repairs, and the complainants did not meet these obligations, so the insurer could deny the unassessed repair claim.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim on the basis that the complainants did not allow the insurer to inspect the damage and carried out repairs without consent.”
- Delay secondary · upheld“The insurer is to pay interest under section 57 of the Insurance Contracts Act 1984 on $2,502.36 from 30 August 2017 until 10 February 2020.”
Subjects and remedies
home or building damagenatural disasterpay interest
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 690494
Financial firm AAI Limited
Determination | Case number: 690494 Page 2 of 8
Case number: 690494 21 August 2020
1 Determination overview
1.1 Complaint
The complainants held a home and contents policy. For this determination the
complainants will be referred to as C1 and C2.
C2 lodged home building claims in 2014 and 2017. These were accepted by the
financial firm (insurer). The C2 notified the insurer, in 2017, that there was further
damage to the bedroom, hallway and bathroom and he considered it was caused by
storms or the insurer’s repairs. The insurer denied the claim on the basis that C2 had
undertaken the repairs without the insurer being able to assess them.
The claim was the subject of a recommendation partially in favour of the insurer. The
complainants dispute the recommendation.
1.2 Issues and key findings
Is the insurer liable for repairs?
The insurer is not liable for the claim of $34,721.50 because:
no confirmation of payment of this amount has been provided
no invoices or bank statements have been provided to show payment
the quote provided was prepared after the work was completed.
Are the complainants entitled to contents claim?
I am not satisfied that the complainants are entitled, on the information provided to
me, to maintain a contents claim.
The insurer did cash settle a sum of $2,502.36 for kitchen and dining room ceiling
repairs in 2020. The insurer is to pay interest under section 57 of the Insurance
Contracts Act 1984 (the Act) from 30 August 2017 until 10 February 2020. Half of this
amount is to be paid to C1 and half to C2.
Are the complainants entitled to non-financial loss?
On the information provided, I am not satisfied the insurer’s actio ns warrant a
payment of non-financial loss.
Determination | Case number: 690494 Page 3 of 8
1.3 Determination
This determination is partially in favour of the complainants.
Upon acceptance of this determination, the insurer is required to pay statutory interest
on $2,502.36 under the Act, from 30 August 2017 until 10 February 2020. The insurer
is to pay half to each complainant.
The insurer is not required to undertake any further action.
Determination | Case number: 690494 Page 4 of 8
2 Reasons for determination
I have decided this case on what is fair in all the circumstances, having regard to the
relevant legal principles, good industry practice, industry codes of practice and
previous relevant decisions of AFCA and predecessor schemes. I have considered all
of the material submitted by the parties. I am satisfied the documentation I have relied
on has been provided to both parties.
2.1 Is the insurer liable for repairs?
Onus on complainant
The onus is on the complainant to establish, on the balance of probabilities, that they
have suffered a loss caused by an event to which the policy responds. This is known
as a prima facie or valid claim. If the complainant is able to establish a valid claim, the
onus shifts to the insurer to prove, on the balance of probabilities, that an exclusion
applies if it seeks to deny or limit its liability for the loss. The insurer must establish
that all or some of the claimed loss was caused by an exclusion. The insurer
accepted claims in 2014 and 2017. As this claim relates to those repairs the
complaints have established a valid claim.
Previous claims accepted by insurer
The insurer has previously cash settled a claim for hail damage to a shredded pergola
in 2014. In March 2017, C2 lodged a claim for storm damage to the roof and internal
areas of the property. The insurer accepted the claim and cash settled it. During the
assessment, the insurer’s expert found damage to the roof which they attributed to
the 2014 storm damage. The insurer agreed to cover this.
The cash settlement included:
roof replacement - $34,942.60
mold remediation - $5,847
repairs to external bedroom wall and garage - $2,643.85
temporary accommodation - $23,100
ex gratia payment - $4,950.
Further, in February 2020, the insurer paid C2 $2,502.36 for kitchen/dining ceiling
damage.
C2 has provided a further builder’s quote in the sum of $34,721.50 for works to
bathroom, two bedrooms and a hallway which he says are because of the storm
damage or the actions of the insurer.
Insurer declines building quote
The insurer has declined to pay the further sum of $34,721.50 because:
Determination | Case number: 690494 Page 5 of 8
C2 completed the repairs without allowing the insurer to assess the further damage
the quoting builder confirmed he did not carry out the quoted repairs
the policy allows an insurer to decline in these circumstances.
The insurer had previously agreed to substantial repairs following a storm. The
majority of the claim which is the subject of this determination is in relation to the
storm which the insurer had accepted liability for.
C2 has confirmed that what he is currently seeking is for the insurer to provide a
settlement for alleged damage to two other bedrooms, a bathroom, a kitchen and
dining room.
The complainants arranged for a builder to provide a quote for repairs to the house.
This was provided by FZ. It was noted in this quotation that most of the mold was
removed and cleaned by the owner prior to construction commencing on site. The
total quote was for $34,721.50. The quote was provided after the work had been
completed.
C2 says that the cause of the mold along the running hallway and subsequently to the
kitchen and dining room was due to build-up of hail and heavy stormwater backflow
through the adjoining roof running along the top of that hall. The complainants said
further the insurer only remedied the lounge and the ceiling of the hallway and left the
rest.
C2 has provided copies of photographs which he says show the damage prior to any
work on the premises.
The insurer has further reviewed this matter and has agreed that they accept the
damaged ceiling in the kitchen living area and that they have paid $2,506.36 to the
complainants for the accepted damage.
In relation to the balance of the repairs, the insurer contacted FZ to discuss the
damage and repairs that they had completed in the property, to determine whether
there was any liability.
FZ advised that he did not carry out the work and C2 had commissioned them to
provide a repair quote on repairs that the complainants have already completed.
The insurer says that the complainants have been unable to substantiate the financial
costs incurred because of repairing the alleged damage to the rooms.
C2 says that he has carried out all the repairs, however, has provided no information
nor any receipts or other proof of expenditures that one would expect to have
occurred in such substantial repair works.
Further, the fact that FZ did not view the property before the renovations were carried
out means that I do not consider that FZ’s quote is of any consequence.
Determination | Case number: 690494 Page 6 of 8
Product Disclosure Statement (PDS)
The PDS provides as follows:
To process the claim, you must
allow us to inspect the damaged building;
allow us to arrange for experts to assess the damaged building and to quote
on repair or replacement.
What you must not do
do not dispose of any damaged parts or items of the building without our
consent;
do not carry out or authorise repairs without our consent unless you cannot
contact us and need to make emergency repairs to protect the building.
C2 says that he did not realise that the damage that he was repairing was possibly
covered by his insurance policy.
Applying the principle of fairness, I have considered that this possibility may have
occurred. However, I am concerned with the fact that in December 2017, an assessor
was appointed by the insurer to inspect the property. It is noted that in the
commentary provided by the assessor, the following was stated:
- claimed notes stated that the customer found mold in the bathroom but
proceeded to remove it before it could be inspected by …
- when I was on site, I noted the entire bathroom had been gutted, renovated,
shower moved, toilet moved, walls installed, etc.
- these repairs, along with the two bedrooms and hallway, are listed as
additional damage that was done by the customer.
The complainants have not denied or provided any satisfactory explanation for this
statement.
On the information provided to me and on balance and considering the issue of
fairness, I am not satisfied that C2 would have gone ahead with the repairs, had he
considered that they were the responsibility of the insurer. Further, in relation to his
statement that he did not realise that they were repairs that were the responsibility of
the insurer, I am not satisfied with this. I consider that with his knowledge of the
previous damage to his property and the process that the insurers undertake, that he
would have been sufficiently informed to contact the insurer at any stage when he
believed the damage that he was repairing was as a result of the previous storm. No
other information has been provided that disputes this position.
Determination | Case number: 690494 Page 7 of 8
I am satisfied that the insurer has fully assessed the property and has found no
information that would show that the works being carried out by the complainants
were as the result of the previous damage or because of anything that the insurer did.
I am satisfied that C2 has not met his obligations under the PDS and that in the
current circumstances, the insurer is entitled to deny the claim on the basis that the
complainants:
did not contact the insurer in relation to these particular issues
did not allow the insurer to inspect the damage
did not allow the insurer to arrange for experts to assess the damage
disposed of damaged parts or items without the consent of the insurer
carried out authorised repairs without the consent of the insurer in circumstances
when it was not a need to make emergency repairs to protect the building.
Nothing has been provided by the complainants that disputes these matters. I also
note that the building has been previously assessed and that when further damage
was found, the assessor informed the insurer, which settled the claim. The
complainants have not provided any information that convinces me, on balance, that
the previous assessment by the representatives of the insurer was inadequate or that
it failed to find the damage that had been caused in the insurable event.
Insurer did not mislead complainants
C2 provided photographs of the building works as he was carrying out the repairs. I
am unable to obtain any information from these photos that convinces me that these
were repairs that were being carried out as a result of the original damage. I am also
not convinced that they are being carried out because of an insurable event.
I am also concerned that the quote from FZ turned out to have been acquired after
works had been completed.
I note that the insurer has agreed to and paid the sum of $2,502.36. This amount was
paid on 10 February 2020.
In the circumstances, the complainants are entitled to interest on this sum, under
section 57 of the Act. The interest is to be paid from 30 August 2017 until 10 February
2020.
In view of the current position between the complainants, I direct that half of the sum
be paid to each complainant.
Contents claim
C2 says that there was a claim for contents and that this was ignored by the insurer.
The complainants have not provided any information to show what the contents that
were damaged were or how the damage occurred. C2 is entitled to lodge a claim and
allow the insurer to assess this claim.
Determination | Case number: 690494 Page 8 of 8
Non-financial loss not required
I am not satisfied that the conduct of the insurer in these circumstances was of a
nature that requires the complainants to be compensated.
AFCA only awards compensation in circumstances where the conduct of the insurer
has interfered with the wellbeing of the complainants. Nothing has been provided to
me in these circumstances that would indicate that the insurer has done anything that
requires them to compensate the complainants for non-financial loss. The insurer is
not required to undertake any further action except for that set out above.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.