Storm and escape of liquid claims: cash settlement amount disputed, and delay in processing
Text of the determination
Determination
Case number 690328
Financial firm AAI Limited
Determination | Case number: 690328 Page 2 of 8
Case number: 690328 14 September 2020
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer). He noticed rain water had entered his home and garage in October 2018
and lodged a claim against his policy. The assessor who attended the property
identified two separate causes for the damage: storm (for the home and part of the
garage) and escape of liquid (for the concrete garage floor). The insurer created two
separate claims and asked the complainant to pay two excesses ($500 each) , but the
complainant believes it should be a single claim with one excess only.
The insurer’s builder has provided a final quote ($25,394.69) for the storm damage
repairs and is prepared to carry out the repairs for that amount. However, the
complainant does not want that builder to do the work. He wants to use his own
builder, who quoted $44,489.28, and he believes the insurer should settle the storm
damage claim for that amount. The insurer said it will cash settle the storm claim, but
based on its own builder’s quote.
The complainant is also dissatisfied with the length of time the claims process is
taking and says it has caused him undue stress. However, the insurer says the
complainant still needs to carry out some maintenance for the liquid escape claim,
before repairs can be carried out. The insurer says it will cash settle for the resultant
damage for this claim as well.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the insurer. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. I agree with the case manager’s reasons for the recommendation and
broadly with the recommended outcome.
Has the insurer dealt correctly with the matter as two separate claims?
There were two separate insured events which caused damage: storm and an escape
of liquid. The insurer was entitled to treat them as separate claims and charge an
excess for each.
Determination | Case number: 690328 Page 3 of 8
The insurer is entitled to cash settle the claim for storm-related damage. However, the
cash settlement needs to be increased by a further 20% from its builder’s latest
quote, as set out in section 2.2 of this determination; together with allowances for
furniture storage, the kitchen window repair and temporary toilet. As well, the insurer
is to conduct a mould assessment. If mould is found and is attributable to the storm
event, the insurer is required to further increase the cash settlement by the amount it
would cost the complainant to complete the mould remediation (or, if the complainant
prefers and it is practicable to do so, the insurer is to carry out the remediation).
The insurer is also entitled to cash settle the escape of liquid claim, as set out in
section 2.2 below.
Is compensation warranted?
The insurer could have progressed the claims more efficiently. The time taken has
caused the complainant avoidable upset and inconvenience. Compensation for non-
financial loss is warranted in the circumstances.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to cash settle the storm claim by paying $30,473.63
($25,394.69 plus 20%), together with the cost of the kitchen window repair, furniture
storage and temporary toilet for builders.
The insurer is required to have a mould inspection conducted at its cost. If there is
mould which is reasonably attributable to the storm event, the insurer is required to
obtain a mould remediation scope of works and quote actionable by the complainant,
and pay the complainant the quoted amount, unless the complainant prefers the
insurer to carry out that work using an appropriately qualified party.
The insurer is required to cash settle the liquid escape claim, based on a scope of
works and actionable quote to be obtained and provided to the complainant. A further
10% of the quoted amount is to be added to the cash settlement to cater for
contingencies and transfer of risk.
The insurer is also required to pay the complainant $750 compensation for non-
financial loss.
Determination | Case number: 690328 Page 4 of 8
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case based on what is fair in the circumstances, having regard to
the relevant law, good industry practice, codes of practice and previous AFCA
decisions. I have taken into account all the material submitted by the parties, both
before and after the recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
I am satisfied that the case manager’s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
2.2 Has the insurer dealt correctly with the matter as two separate claims?
Two separate insured events caused damage
The policy covers certain specified insured events, including ‘storm’ and ‘escape of
liquid’. An insured event under the policy is ‘a single event, accident or occurrence
which you did not intend or expect to happen’.
The complainant made a claim when he noticed rainwater entering the house and
garage during a storm. After an initial assessment of the damage, the complainant
subsequently noticed water was still coming up through the garage floor.
Further investigations identified a collapsed stormwater pipe under the garage floor.
That was unrelated to the storm and the damage from that event.
I am satisfied the evidence shows there were two areas and two causes of damage.
The insurer is entitled to treat them as two separate claims and to charge an excess
for each.
Insurer accepted storm damage to property
The insurer accepted and assessed the storm-related damage in the house and
garage. Two water entry locations were found, but maintenance-related issues were
also identified, and it was the complainant’s responsibility to fix those so that internal
resultant damage (for which the insurer was responsible) could be properly repaired.
Insurer provided several different quotes
The insurer has offered to cash settle the storm damage claim, because it says the
complainant has not completed the maintenance work needed, and without which it
cannot guarantee its own repairs. The first cash settlement offer was for $8,647.76,
based on its builder’s quote and scope of works. That was then increased to
$9,486.62, then $20,695.64, and finally $25,394.69 . The final offer was based on a
quote which expired at the end of May 2020.
Determination | Case number: 690328 Page 5 of 8
Complainant ’s own quote appears excessive
The complainant obtained a quote from his builder for $44,489.28. He says that
covers all the storm-related damage. Many elements of the quote were considerably
more expensive than the insurer’s builder’s quote for the same items; they also
appeared to cover more than the accepted damaged areas.
The complainant also said more damage has occurred since the storm, and he said
there might be mould, although that has not been confirmed.
However, I am not satisfied the complainant has justified the full extent of his quote.
Insurer may cash settle the claims
The policy sets out how the insurer may settle claims. It has the option of repairing or
cash settling. In situations such as this, where the complainant has lost confidence in
the insurer’s builder and wants to use his own, and where the re is related
maintenance work which also needs to be carried out by the complainant, it is fair and
appropriate that the claim be cash settled.
However, any cash settlement needs to be based on a quote which is actionable by
the complainant as a retail customer. It also needs to take account of the transfer of
risk for the work to the complainant, and allow for contingencies.
Storm damage claim cash settlement to be increased
In the case of the storm damage claim , it is not clear that the insurer’s buil der would
have been prepared to do all the work for the complainant at the cost quoted to the
insurer ($25,394.69). As well, that quote is now out of date; it does not include the
cost of furniture storage (which the insurer said needed to be added); nor does it
allow for a mould assessment and any necessary mould remediation work (although
the insurer indicated on 19 June 2020 that it had arranged for a mould inspection, but
it is not clear that has been done). The quote also fails to take account of the damage
to the kitchen window , as noted by its assessor on 1 May 2020, and the complainant’s
suggestion of a temporary toilet for the use of builders (which I consider is
reasonable, given the current public health concerns).
I am satisfied it is fair and appropriate that the insurer cash settle the claim for storm
damage, using its most recent quote as a starting point. However, the $25,394.69 is
to be increased by 20% to cater for contingencies and the transfer of risk – taking it to
$30, 473.63.
In addition, the insurer is required to obtain quotes for and add:
the cost of a temporary toilet for builders
the cost to the complainant of repairing water damage to the kitchen window
the cost of furniture storage during repairs.
Determination | Case number: 690328 Page 6 of 8
The insurer is also required to arrange for a mould inspection. If mould is found and
is, on balance, attributable to the storm event, the insurer is liable for the necessary
mould remediation. The insurer is required to provide the complainant with full details
of the inspection report, scope of works (if any) and quoted costs of remediation. The
complainant may choose either to be cash settled for that, or to have that carried out
by the insurer using an appropriately qualified party, as long as it is practicable for the
insurer to do the work, having regard to any overlap with other associated repairs
which are the responsibility of the complainant.
Insurer not liable for some damage identified by complainant
In their May 2020 report, the insurer’s engineer H concluded the ‘hump’ in the flooring
in the eating area was not related to the leaking stormwater pipe, since the damage
was too localised and too far away from the leak site. H indicated the installation of
the flooring was likely to have been inadequate, resulting in the timber flooring
delaminating. I am not satisfied the complainant has shown the issue with that
isolated part of the flooring was the result of either of the insured events.
Similarly, neither the broader areas of cracking and undulation in the ceiling lining
throughout the house, nor the cornice crushing on the second storey have been
shown to be the result of an insured event. H indicated the problems with the ceiling
lining were from inadequate fixing of the plasterboard; and differential settlement of
the footings caused the cornice crushing. The insurer is not liable for these issues.
Insurer accepted escape of liquid claim in garage floor
The initial plumbing investigation in the garage found a collapsed stormwater pipe.
Work was carried out on that, but water continued to come up through the floor. The
inspecting engineers recommended certain drainage/maintenance work which
needed to be carried out by the complainant before the damage from the escape of
liquid could be repaired by the insurer.
While the complainant has said he has carried out the necessary work, the problems
continue, and a recent assessment report from the insurer indicates high moisture
levels persist.
Engineer H said cracking of the concrete garage floor was due to concrete shrinkage
and not the water leak.
However, H also believed there was a failure in the damp-proof membrane under the
slab and that led to the efflorescence which occurred after the initial water leak event,
but also again since the leaking pipe was capped off. H stated that in order to confirm
the exact cause of the efflorescence in the slab, the damp proof membrane
underneath would need to be exposed for signs of failure or inadequate installation,
but such investigations are not practical due to the extensive construction works that
would be required. H noted that the most important areas to be covered by such an
investigation, given the location of the efflorescence, would be the internal beams of
the slab.
Determination | Case number: 690328 Page 7 of 8
H also explained that the damp proof membrane was not intended to be waterproof,
but was a preventative measure intended for normal moisture conditions. H said if
moisture extremes occur – such as the leaking pipe – then the excess water will be
forced up through the joints in the membrane, causing it to fail and water to be
absorbed into the slab.
While H has suggested the cause of the continuing water/efflorescence might be due
to inadequate construction, there is no evidence of that. Instead, H notes the
complainant had not reported efflorescence before the stormwater leak, and states:
… in our opinion it is possible that this once off leak has resulted in a failure occurring
within the damp-proof membrane beneath the internal beams of the garage slab,
resulting in ongoing efflorescence problems …
I acknowledge the insurer has said the complainant did not carry out all the
maintenance and other work that was recommended, and for which he was
responsible, after the water leak. At the same time however, I am satisfied on the
available evidence, that it is more likely than not that the insured water leak was
responsible for the failed damp proof membrane. That means the insurer is liable for
the necessary repairs to the concrete slab.
Insurer entitled to cash settle this claim
The insurer is entitled to cash settle the complainant for the damage resulting from
the leak in the garage. That is because a further drying out period has been
recommended by H, once all other recommended steps have been taken by the
complainant. I note no scope of works or quote has been provided to date, and there
has been no specific acknowledgement by the insurer of exactly what work it was
responsible for, although H has indicated the steps to be taken.
The insurer is required to provide a clear itemised quote for the repairs, actionable by
the complainant. The quote is required to include an extra 10% allowance for
contingencies and to account for the transfer of risk. The insurer is then required to
cash settle the claim by paying the complainant the amount of the quote plus 10%.
2.3 Is compensation warranted?
The complainant is unhappy with the time taken by the insurer in processing the
claims. I consider the insurer should and could have been able to provide the
complainant with a fairer and more realistic quote/cash settlement for repairs much
sooner in the claims process.
As well, it appears the mould investigation the insurer said would be undertaken has
still not occurred.
In the meantime, the complainant has experienced avoidable worry and uncertainty,
together with concerns about the possible impact of mould on the health of his family.
Determination | Case number: 690328 Page 8 of 8
I am satisfied an award of $750 compensation for non-financial loss is fair in the
circumstances.
Recommendation
Case number 690328
Financial firm AAI Limited
Recommendation | Case number: 690328 Page 2 of 11
Case number: 690328 22 July 2020
3 Overview
3.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer). He noticed rain water had entered his home and garage in October 2018
and lodged a claim against his policy. The assessor who attended the property
believed there were two separate causes for the damage: storm (for the home and
part of the garage) and escape of liquid (for the concrete garage floor). The insurer
created two separate claims and asked the complainant to pay two separate
excesses ($500 each).
The insurer’s builder has provided an amended quote ($25,394.69) for the storm
damage repairs and is prepared to carry out the repairs for that amount. However, the
complainant does not want that builder to carry out the repairs. He prefers his own
builder, who quoted $44,489.28. The complainant also believes the insurer should
settle the storm damage claim for this amount. Given this situation, the insurer said it
will cash settle based on its builder’s quote.
The complainant also believes there should only be one claim because he says all
damage resulted from the storm and is also seeking the refund of $500. The
complainant is dissatisfied with the length of time the claims process is taking and
says it has caused him undue stress. He also says there is mould in one of the
rooms.
The insurer says the complainant still needs to carry out some maintenance for the
liquid escape claim. Since the complainant has had sufficient time to carry out these
tasks, the insurer says it will cash settle for the resultant damage. The complainant
contends he has carried out all necessary mainte nance work.
3.2 Issues and key findings
Whether there are two claims or one?
The information shows there were two separate causes (storm and liquid escape) of
the damage suffered. As such, there are two separate claims and two excesses
payable.
Whether insurer correctly processed storm claim?
The insurer has correctly processed the claim for storm related damage. It is entitled
to cash settle this claim based on its most recent quote. The insurer is to assess
whether there is any mould present.
Recommendation | Case number: 690328 Page 3 of 11
Whether insurer correctly processed liquid escape claim?
The insurer is entitled to cash settle this claim because there are still maintenance
tasks the complainant needs to carry out.
Whether unnecessary delay in processing of claims?
There has been an unnecessary length of time taken to process the two claims. This
would have interfered with the complainant’s wellbeing and his expectation of peace
of mind. As such, the insurer is required to pay the complainant compensation for
non-financial loss.
3.3 Recommendation
This recommendation is substantially in favour of the insurer.
The insurer is entitled to cash settle the storm related claim for its renewed offer of
$25,394.69. The insurer is required to add the likely cost of furniture storage to this
amount and then apply 10 per cent to the total.
The insurer is entitled to cash settle the liquid escape claim for the identified resultant
damage.
If an assessor notes the presence of mould at the complainant’s property, the insurer
can arrange the appropriate remediation action or cash settle if the parties cannot
agree on the process to be followed.
The insurer is not required to undertake any further action with respect to the ‘hump’
in the floorboards in the eating area, the cornice crushing, or the cracking /
undulations of the ceiling linings throughout the house.
However, the insurer is required to pay the complainant $500 compensation for non-
financial loss.
Recommendation | Case number: 690328 Page 4 of 11
4 Reasons for recommendation
4.1 Whether there are two claims or one?
Compla inant’s home and garage suffers damage
The complainant noticed rainwater had entered his house (bedroom, garage and back
section of the home) during a storm and caused damage. He lodged a claim against
his policy. The insurer sent a builder to assess the p roperty damage.
The complainant later noticed (claim notes 22 October 2018) water was still coming
up through the garage floor, particularly after heavy rain. This was despite the builder
having previously advised him the water intrusion would subside.
Two separate events caused the damage
The policy provides cover for loss or damage due to specified events, such as a
storm. Another insured event is the escape of liquid. The policy also requires the
insured (in this case, the complainant) to pay an excess in relation to each claim.
The complainant contends the damage to his property arose from the storm. He
believes the insurer should treat the matter as one claim and only charge him one
excess ($500). Some of the damage resulted from the rain entering the house and
garage due to the storm.
However, the main issue with the garage was the water coming up through the
concrete floor, which continued to be a problem. An investigation of a stormwater pipe
under the garage showed it was damaged and allowed liquid to escape from it
through the garage floor.
The information shows two separate causes of the damage to the complainant’s
property. The policy provides cover for this damage, however the events causing the
damage are quite separate. Each requires a differe nt approach and, as such, the
insurer was entitled to treat the property damage as two separate claims with two
separate excesses.
4.2 Whether insurer correctly processed storm claim?
Insurer accepted storm damage to property
The insurer accepted there had b een storm related damage to the complainant’s
property. The complainant had issues with respect to the first builder the insurer sent
to assess the property damage and carry out a make-safe. Nevertheless, the original
builder provided a scope of works with respect to the storm related damage.
Recommendation | Case number: 690328 Page 5 of 11
The builder identified the following work was required in the upstairs bedroom: light
switch / fitting; roller shutter; ceiling plaster; ceiling insulation; wall linings; skirting
board; architraves; paint. The follo wing work was required for the garage: remove /
reinstate garage door and light fittings; water damaged ceiling; insulation; paint. The
builder also provided relevant measurements against these items.
Roofing report identified issues
A roofing contractor carried out a roof inspection. Their report (dated 26 November
2018) indicated they had discovered two leaks. One was on the upper storey at the
main front room. That area would cause rainwater entry during heavy rainfall. The
other area was where the downpipe from the upper storey roof met the garage roof,
near the rear access door. The downpipe would concentrate rainwater onto certain
roof tiles.
The roofer said there were two required maintenance issues the complainant needed
to deal with. The first problem required the placing of lead or wakaflex between the
soaker and ridge end. The other problem required the downpipe at the garage to be
extended or a lead saddle installed beneath the spreader. The roofer also
recommended the drilling of weep holes into the top ridge.
Insurer tried to cash settle storm damage claim
The insurer said the complainant had yet to carry out the required maintenance
before it could proceed with repairs. This is because the insurer would not be able to
provide a lifetime guarantee for the repair work without the completion of this
maintenance.
The insurer wrote to the complainant on 31 July 2019 offering the complainant
$8,647.76 to cash settle the claim. It also sent a copy of the scope of works and a
report. On 19 August 2019, the insurer increased this offer to $9,486.62. The
complainant did not accept either offer.
Complainant obtained his own quote
The complainant obtained his own quotes. One (dated 8 August 2019) quoted
$10,600, plus GST, was incomplete. The other quote (undated) was for $44,489.28.
The complainant sent both to the insurer. The complainant contends the latter quote
deals with all relevant aspects of the storm related claim.
Insurer contends its quote correctly covers all storm damage
The insurer checked the complainant’s quote against its builder’s quote. There were
differences which included: the complainant’s builder being much more expensive for
waste and cleaning, site supervision; the complainant’s builder allowing for greater
areas for plasterboard replacement in the garage, bedroom and painting the latter.
The complainant’s builder also provided for a temporary toilet, whereas the insurer’s
builder did not.
Recommendation | Case number: 690328 Page 6 of 11
The insurer reviewed the complainant’s builder’s quote against its original builder’s
scope of works. The claim notes indicate the insurer was waiting for other quotes from
the complainant before arranging an assessor to carry out the review. It does not look
as if the complainant provided any further quotes and, on 26 November 2019, the
insurer revised the settlement amount to $20,695.64.
The insurer indicated its original builder would be prepared to undertake the repairs
as outlined in its scope of works. However, the complainant expressed dissatisfaction
with that and advised he wanted his builder to complete the repairs for the amount
quoted ($44,489.28).
Policy outlines how insurer will settle claims
The policy outlines how the insurer will settle claims. Where the insurer accepts a
claim for damage to an insured’s (complainant’s) home, it will de cide whether it will:
repair the damage to the home
rebuild the home
pay the insured what it would cost the insurer to repair or rebuild the home
[the remaining two are irrelevant to this situation]
This means the insurer is entitled to select how it will settle the claim. The insurer said
the original builder was prepared to carry out the repairs for its revised quote of
$20,695.64. The insurer also said the cost of furniture storage would need to be
added, however the scope of works still covered the storm related damage.
Complainant not entitled to demand insurer settles on his terms
The insurer highlighted certain aspects of the complainant’s builder’s quote which
were more expensive or covered a greater area or covered matters which its
assessment did not consider necessary. Further, there is no indication whether the
complainant’s builder reviewed the scope of works or what the complainant’s brief
was.
The terms of the policy clearly outline how the insurer will settle the claim. It is the
insurer’s decision instead of the complainant’s choice. The available information
indicates the insurer has covered those matters which were damaged due to
rainwater intrusion into the home and garage.
The complainant has indicated he does not want the insurer’s builde r carrying out the
repairs. As such, the insurer is entitled to decide to cash settle.
Recommendation | Case number: 690328 Page 7 of 11
Insurer entitled to cash settle claim
The insurer subsequently increased its offer to $25,394.69 (email to the complainant
dated 15 May 2020) to settle the claim. The insurer said this amount was the result of
its builder’s recalculation of the items on the scope of works.
The amount required to cash settle should include the likely cost of furniture storage
(it is unclear whether this item was included in the recalculation) on top of the
$25,394.69.
Unlike the insurer, the complainant is unlikely to have the same ability to command
such a price in the market place. Therefore, the insurer is required to add a further ten
per cent to the total when it cash settles the co mplainant.
4.3 Whether insurer correctly processed liquid escape claim?
Water still coming through concrete garage floor
The complainant noticed water coming through the concrete garage floor. A plumbing
investigation on 10 November 2018 showed the stormwater pipe beneath the garage
had collapsed with sections of the pipe holding water. The pipe also had small holes
and kinks in it.
A plumber carried out work on this issue on 16 December 2018. However, the
problem with water coming up through the garage floor persisted. Various engineers
carried out investigations during 2019 to establish the cause. The engineers made
recommendations in relation to drainage requirements.
The complainant said he has carried out the necessary maintenance work, although
the issue remains unresolved.
Insurer arranged engineer to inspect site
The insurer arranged engineers (H) to inspect the complainant’s property to
determine the cause of damage to the garage slab and provide a scope of works for
the repairs. H provided a comprehensive report (19 May 2020) which briefly
summarised the previous plumbing repairs carried out, along with the previous
engineers’ findings.
H said the cracking of the concrete garage floor was due to concrete shrinkage
instead of a leaking stormwater pipe. H believed the original efflorescence in the
concrete slab which had occurred, was due to construction failure or the failure of the
waterproof membrane due to extreme moisture conditions.
H also said the ongoing efflorescence was likely due to a failure occurring within the
damp-proof membrane beneath the internal beams of the garage slab after the
original cause was rectified.
Recommendation | Case number: 690328 Page 8 of 11
H made recommendations about remedying this issue. These remedies are
maintenance matters which the complainant needs to address before the insurer can
repair the damage due to the escaping liquid.
Assessor said complainant has not carried out all maintenance
Despite the complainant saying he has carried out all necessary maintenance, the
insurer’s assessor disagrees. He pro vided comprehensive comments in a report
(dated 10 June 2020), indicating the complainant had not carried out all the identified
drainage and maintenance related matters of which he had been informed prior to H’s
report.
The assessor said the complainant had been sent a letter concerning the required
maintenance on 30 May 2020. However, the complainant has failed to commence the
necessary maintenance the various engineers had identified in their respective
reports.
Insurer entitled to cash settle this claim
This means the insurer is entitled to cash settle the complainant for the damage
resulting from the leaking liquid.
Other ancillary matters
The insurer was also arranging its contractor to check whether there was any mould
present where there had been storm related damage. Should there be a need to
remediate any mould, the insurer can arrange for remediation to be carried out.
However, if the parties cannot agree on the process, the insurer can add this cost to
its cash settlement.
H commented on the ‘hump’ in the flooring in the eating area. H said it was likely due
to inadequate construction. H recommended lifting the area concern to investigate it
more fully.
H said the cracking / undulations of the ceiling lining throughout the residence is the
result of inadequate fixing of the plasterboard ceiling lining and is unrelated to the
leaking stormwater pipe. Although it was not made clear in the report, this presumably
would not include any ceiling (and insulation) damaged due to the storm.
H further said the cornice crushing occurring of the second storey is the result of
differential settlement of the footings accentuated by tree root drying. The report alos
indicated the soil was highly reactive.
As such, the insurer is not required to cover the cost of rectifying these matters as the
information indicates the cause of their damage was not due to an insured event.
Recommendation | Case number: 690328 Page 9 of 11
4.4 Whether unnecessary delay in processing of claims?
The complainant expressed dissatisfaction about the length of time taken in
processing the claims. Although there is information which suggests a 12 month
drying period should apply, there are other areas within the claims process which
require explanation.
During the early stages of the claims process, there was mention about a make-safe
process. This did not appear to have proceeded with any promptness, as would
normally be the situation. However, it later transpired the complainant needed to
undertake repairs before the insurer could repair the resultant damage. There was
nothing to suggest this was clearly spelt out to the complainant early in the claims
process.
Further, there was a period during 2019 when the insurer reconsidered the
appropriate amount to cash settle the storm damage claim. The insurer held the offer
at the initial level, before increasing it. There was no explanation as to why it was
increased. The insurer subsequently increased the cash settlement offer by more
than a hundred per cent and more recently increased it to a further amount. This
occurred over many months, with no explanation as to why this could not have been
achieved at an earlier stage.
The complainant expressed his concern about the delay and the impact it was having
on his family and himself.
Compensation for non-financial loss may be awarded in certain circumstances
AFCA may award compensation for non-financial loss in certain circumstances.
Compensation is capped at $5,000. AFCA takes a conservative approach to awarding
compensation for non-financial loss.
Compensation is only provided where the complainant has suffered from an unusual
amount of physical inconvenience or stress, or the financial firm’s conduct has meant
the time taken to resolve the situation has been unusually excessive.
AFCA does not award non-financial loss compensation merely because the
complainant has suffered some inconvenience and anxiety. AFCA expects
complainants to bear the normal degree of inconvenience experienced when a
problem occurs and to take reasonable steps to manage the situation.
Recommendation | Case number: 690328 Page 10 of 11
Complainant entitled to compensation
There were parts of the claims process (as identified above) where it seemed to stall
for no apparent reason. This would have interfered with the complainant’s expectation
of peace of mind and wellbeing. There were aspects of the claims process where the
c omplainant contributed to the delay. Overall though, quite aside from the ‘drying
process’, there were unnecessary delays in the claims process.
It is appropriate in this complaint to make an award of compensation for non-financial
loss. As such, the insurer is required to pay the complainant $500 compensation.
Recommendation | Case number: 690328 Page 11 of 11
5 Supporting information
5.1 AFCA approach
A full exchange of the relevant information has taken place between the parties and
each party has had the opportunity of addressing any issue raised.
All the provided material has been read and considered. The parties raised numerous
issues in their submissions to AFCA. For this recommendation, commentary is
restricted to only those issues considered relevant.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.