A unit owner claimed $76,187.30 for water ingress and mould damage under a strata policy after the insurer paid $9,200.14 for flooring. AFCA found the wider loss was not established and ordered a further 10% of the amount previously paid for damaged floors.
The insured bears the onus to prove the loss falls within cover, and the complainant's delay in lodging the claim prejudiced the insurer's assessment.
Issues
- Claim denial primary · not upheld
“I am not satisfied the complainant has established the damage extends beyond the two small patches visible in sale listing photographs.”
- Delay secondary · not upheld
“Delays in assessing damage were reasonable in the circumstances.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case number 689877
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 689877 Page 2 of 9
Case number: 689877 18 August 2020
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a Residential Strata Insurance policy held the
Body Corporate with the Financial firm (the Insurer). A claim was lodged by the Body
Corporate on behalf of the complainant on 22 August 2019 for damage arising from
water ingress into his unit first noticed after he purchased the unit 2 February 2018.
The complainant had renovated the unit prior to the claim being lodged. The insurer
says the delay in lodging the claim has prejudiced its ability to assess the extent of
the loss. Further it says most of the claimed loss is excluded from cover, there is no
evidence the leak caused significant damage, and the repairs claimed consist of
unnecessary renovations to upgrade the property to a superior condition.
The complainant says water ingress contaminated the entire unit with mould,
requiring replacement of all furnishings and fittings. He seeks lost rental income for
the period repairs were undertaken, and the full cost of repairs. The complainant also
says the insurer caused unreasonable delays.
1.2 Issues and key findings
Has the insurer been prejudiced by the complainant’s conduct?
The insurer has been prejudiced by the delay of nearly 18 months in the lodgement of
the claim and the completion of repairs prior to lodgement of the claim. The
complainant has not established all the loss falls within cover under the policy.
Is the insurer entitled to limit its liability?
The insurer has acted fairly and reasonably in assessing the damage. The insurer is
not liable for lost rental income as any such loss was caused by the renovations
which were not claim related. I am satisfied the insurer is entitled to limit its liability
and settle the claim for $9,200.14 less any applicable excess based on the quotation
obtained from EBS.
Is the complainant entitled to compensation for delays?
The delay in lodging the claim created difficulties for the insurer in assessing the loss.
Delays in assessing damage were reasonable in the circumstances.
1.3 Determination
This determination is substantially in favour of the insurer. The insurer is entitled to
rely on the terms and conditions of the policy to limit its liability and settle the claim for
$9,200.14 as per the quote from EBS, less any applicable excess.
Determination | Case number: 689877 Page 3 of 9
2 Reasons for determination
There has been a full exchange of information between the parties and each party
has had the opportunity of addressing the issues arising in this dispute.
This determination follows consideration of all the information exchanged. It is based
on what is fair in all the circumstances, having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 Is the insurer required to increase its settlement offer?
Complainant has onus to establish a loss
It is established Insurance law that an insured has the onus to establish, on the
balance of probabilities (that is more likely than not) that the loss claimed falls within
the terms of cover under the policy.
The complainant, as a unit owner, is a beneficiary of a residential Strata building
insurance policy held by the Body corporate with the insurer. The policy provides
cover for loss or damage to the insured property, that occurs during the period of
insurance subject to a number of conditions and exclusions . The policy defines „loss
or damage‟ as „ direct physical loss of, destruction of, or damage to property from any
sudden and accidental cause not otherwise excluded‟.
The complainant is claiming for the repair costs for water and mould damage to his
unit, and lost rental income. He says the damage was first observed when he entered
the unit after it was purchased on 2 February 2018.
The cover afforded by the policy is broad and it is not in dispute there is some
claimable damage to the home. However, it is necessary to establish the extent of the
loss.
Complainant delayed lodging the claim for various reasons
The complainant purchased the unit on 2 February 2018 and immediately started
renovations. On the 6 February 2018 he was instructed by the strata manager to
cease renovation work. A dispute arose between the complainant and body corporate
over liability for repairs. A conciliation agreement dated 30 August 2018 shows the
dispute was resolved, with the body corporate deemed liable.
The complainant emailed his broker on 20 August 2019 requesting it lodge a claim
with the body corporate insurance as it is liable for repairs. The complainant says the
delay is a result of the dispute as he could not lodge a c laim where liability is in
question. It is unclear why no claim was lodged by the body corporate.
I accept the insurers view that the complainant (or indeed the Body Corporate) should
have lodged the claim in February 2018 when the damage was first noticed.
Determination | Case number: 689877 Page 4 of 9
Complainant has limited evidence to establish extent of damage
The complainant says the damage was identified progressively as more and more
floor and wall coverings were removed.
He has supplied a report from a structural engineer, GMA. This report is a structural
report on the renovations, it does not address the extent of the internal damage
although it does identify the issues with the water ingress from the balcony as a cause
of mould.
There is an email from W confirming fluorescent staining from the failed waterproofing
in the balcony. It does not address the internal damage.
The insurer has provided images of the unit when listed for sale which indicate it was
well maintained overall. Small patches of damaged flooring in the living area and main
bedroom are visible, adjacent to the exterior balcony. The damage appears consistent
with water ingress and resulting rot.
The complainant says the damage extended beyond these patches and had impacted
the entire unit. In support, he supplied numerous photographs depicting various
stages of the renovation and balcony waterproofing works.
The photographs depicting the extent of damage due to water ingress are limited.
There is some indication of mould although it is difficult to determine the extent.
Photogr aphs which depict plaster spotted with mould are close ups and do not show
within which rooms they were taken.
The complainant has also supplied photographs he says shows other damage
attributable to water ingress. This includes images of damage to a kitc hen bench and
tiles, corrosion, and skirting which has pulled away from walls. However, the
complainant has not explained or shown how this damage is a result of the claimed
incident.
In the absence of photographs or reports which show the extent and severity of water
ingress issues, I am not satisfied the complainant has established the damage
extends beyond the two small patches visible in sale listing photographs.
Complainant has not established the extent of his loss
The complainant through the broker lodged a claim for $76,187.30 including:
Marmoker polished slabs 32,063.87 for.
Stone Tiles invoice dated 14 September 2018 in the amount of $6,039.00
Stone tiles dated 19 October 2018 in the amount of $22,000.00
installation of kitchen cabinets $2,950.00
$6,957.50 to supply and install kitchen benchtops.
Determination | Case number: 689877 Page 5 of 9
Bunnings quote dated 20 August 2019 in the amount of $6,176.93 for cabinets,
panels and door and hardware.
The insurer provided a number of reports from EX. EX obtained photographs of the
property from a real estate website taken in 2017. EX identified:
The first photograph sho ws what appears to be an inexpensive vinyl flooring in the
unit at the time the mould was identified in early February 2018. Sections of the
patterned vinyl covering are seen to be lifting.
We carried out a search for Unit 8D on realestate.com and found the
following link from when the unit was listed for sale in July 2017:
……
photographs show the flooring throughout the majority of the unit is
a vinyl material, refer Photographs 1, 3 and 4.
Furthermore, the kitchen cabinetry sho ws laminated compressed
timber bench tops, refer Photographs 2 and 3.
The insurer information is not consistent with the complainants claim that this flooring
was all tiles and solid timber. It is not consistent with the claim for the kitchen
cabinetry or the polished benchtops. I am not satisfied the complainant has
established either the extent of any damage to the unit or the need to remove and
replace the items as claimed.
Insurer has fairly settled damage attributable to water ingress
The insurer has settled the complainant for 45 square meters of direct stick vinyl
flooring for the entrance and lounge room, and 16 square meters timber flooring for a
bedroom. The sale listing photographs indicate this settlement is like for like.
It has paid an amount of $9,200.14 less the applicable excess based on a quote
obtained to complete the repairs. I accept this is reasonable in the circumstances.
To the extent that there may have been further damage, I accept the insurer has been
prejudiced to the full extent of any further loss by the complainant‟s failure to lodge
the claim within a reasonable time and by completing all renovations without giving
the insurer the opportunity to inspect the damage and assess the loss.
Property could not be tenanted due to extensive renovations
The complainant says the failure of the body corporate to maintain the property
resulted in the damage occurring, necessitating the need for renovations and repair.
He was unable to rent a property in this time, and says later delays exacerbated the
situation. He seeks cover for lost income during this period.
The policy provides for loss of rent where the property was leased out or would have
been leased out substantiated by a signed agreement and made unfit to be occupied
Determination | Case number: 689877 Page 6 of 9
due to a claimable loss. The property was not tenanted at the time of the claim and
the complainant has not provided a signed agreement for a future or planned tenancy.
Furthermore, it is evident the complainant has carried out a major renovation project,
significantly upgrading the entire unit. Should repairs have been limited to damaged
flooring, the property would likely have been in a condition to rent soon after
purchase. As such I am not persuaded the insurer, or any other party is liable for lost
income.
In my view the insurer has arranged settlement based on all damage attributable to
water ingress. It is required to pay the complainant an additional 10% based on the
amount previously paid for damaged floors. This is the extent of its liability under the
policy.
2.2 Is the complainant entitled to compensation?
AFCA has a conservative approach to compensation
AFCA can award compensation for non-financial loss of up to $5,000 if there has
been an unusual degree or extent of physical inconvenience or time taken to resolve
the situation or interference with the complainant ‟s expectation of enjoyment or peace
of mind. We will not award compensation for loss that a complainant may incur
because of pursuing a complaint or rectifying an insurer‟s error.
Insurer has managed the claim in line with reasonable expectations
The complainant says the insurer has not managed the claim in line with reasonable
expectations. He refers to initial delays in assessing the damage and has supplied
copies of corresponden ce with the insurer‟s assessor.
The insurer engaged an assessor on 27 August 2019, within a week of the claim
being lodged. An initial report was not received until 4 October 2019, with a final
report recommending partial settlement received on 4 March 2020.
Whether these timeframes are unreasonable depends on the specific circumstances
of this claim. In my view the complainant by delaying lodgement of the claim and
commencing repairs, has contributed to difficulty in assessing the loss.
At times communication may not have been consistent with the complainant ‟ s
expectations, however I do not consider the actions of insurer or its agents justify an
award of compensation for non-financial loss.
Determination | Case number: 689877 Page 7 of 9
3 Supporting information
3.1 Relevant policy provisions
Section 1 – Insured Property
Section 1 - Part A
You are covered for the following Events.
We will pay up to the Sum Insured shown on the Schedule for Section 1, against
Loss or Damage to Your Insured Property on the basis set out in “Claims - basis
of settlement”, including the cost of: ……
General definitions – the meaning of some words
Loss or Damage
means direct physical loss of, destruction of, or damage to property from any
sudden and accidental cause not otherwise excluded by this Policy.
Claims procedures
2. What You must not do
Whatever the circumstances You must not: ….…
d) dispose of any damaged items without first seeking Our approval.
3. How to make a claim
When you make a claim you must:
a) promptly inform Strata Community Insurance by telephone, in writing or in
person. If Your notification is late and results in higher costs for Us or
harms Our investigation opportunities Our liability may be reduced and it
may even be reduced to nil;
b) provide details of what has occurred and when requested complete and
return Our claim form promptly together with all letters, documents,
valuations, receipts or evidence of ownership that You have been asked to
provide;
…
Determination | Case number: 689877 Page 8 of 9
e) allow Us to inspect Your Insured Property and take possession of any
damaged item to deal with it in a reasonable way;
4. Approval needed for repairs
You are not authorised to commence repairs without Our approval except for
essential temporary repairs permitted under Event 1) h) of Part A of Section 1.
……
6. You must assist Us
Before We will pay anything under this Policy, You must:
a) comply with all the requirements of this Policy;
b) give Us all information and assistance which We reasonably require in
relation to the claim and any proceedings; and
…
3.2 Time Line of events leading to claim
6/2/18 Instructions to cease repairs renovations.
9/2/18 Notification of mould to body corporate.
8/3/18 Follow up mould issues.
8/3/18 Letter from body corporate solicitors to cease repairs/renovations.
9/3/18 Engagement of solicitors to respond to body corporate solicitors.
10/4/18 Engagement of Engineer, highlighting ingress issues and health risks.
17-29/5/18 Further examples of attempts by body corporate to continue delays requesting fire
certification that does not exist.
20/8/18 Notification that body corporate is finally organising water proofing inspector.
23/8/18 Email confirming body corporat e continuing delays.
29/8/18 Conciliation meeting between body corporate. Also contains timeline of delays by body
corporate.
31/8/18 Conciliation instructed body corporate they could not deny repairs/renovations.
4/9/18 email from waterproofing inspectors (W) that cause of ingress is from external wat er
penetration.
7-9/9/ 18 Repairs to balcony.
19/9/18 Request to body corporate to address the issue.
20/9/18 Email from BCS showing further delays until October.
15/10/ 18 Read receipt from BCS showing emails were ignored for a month.
9/11/18 Accusations made by body corporate that are false.
10/11/ 18 Response to false allegations made by body corporate.
4/12/18 Application lodge with body corporate ombudsman to find body corporate liable for water
ingress
17/6/19 Adjudicat ors decision that body corporate is liable for balcony repairs.
21/6/19 body Corporate now trying to dispute compliance of repairs/renovations.
Determination | Case number: 689877 Page 9 of 9
2/8/19 Body corporate finally accepting liability aft er receiving a summary judgement from Sout hport
Magistrates Court to pay for balcony repairs.