Text of the determination
Determination
Case number 689834
Financial firm AAI Limited
Determination | Case number: 689834 Page 1 of 9
Case number: 689834 3 April 2020
1 Determination overview
1.1 Complaint
The insured is a body corporate that holds an insurance policy with the financial firm
(insurer). The insured property is comprised of six residential units located in
Mundingburra, Queensland.
The complainant s’ representative (N) has provided authorities from all unit holders to
act on their behalf in relation to this complaint.
Given the signed authorities, this determination relates to the damage and insurance
for all six units.
A claim was lodged under the policy after the insured property was inundated with
water on or about 3 February 2019.
The insurer maintains the bulk of the inundation was caused by flood, which is
excluded from cover under the terms of the policy.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
Based on the available material, the panel is not satisfied that the insurer has met its
onus to establish that the initial inundation was caused by flood as defined in the
policy.
The panel is satisfied that the remaining damage was caused by flood.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is required to meet its liability for loss and damage sustained because of
water discharging or overflowing from toilets, drainage and/or sewerage systems and
inundation caused by stormwater runoff in accordance with the policy and as set out
under section 2.1 of this determination.
The insurer is otherwise entitled to rely upon the policy flood exclusion to refuse
payment of the balance of the complainants ’ claim.
Determination | Case number: 689834 Page 2 of 9
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The body corporate’s strata policy with the insurer is an accidental damage policy
which provides cover for physical loss or destruction of or damage to buildings and
common contents occurring during the period of insurance.
However, the policy specifically excludes loss or damage caused by or arising directly
or indirectly from flood, unless the policy schedule specifies that optional flood cover
is included.
Flood is defined on page 9 of the product disclosure statement (PDS) as:
Flood
The covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a) a lake (whether or not it has been altered or modified);
b) a river (whether or not it has been altered or modified);
c) a creek (whether or not it has been altered or modified);
d) another natural watercourse (whether or not it has been altered or modified);
e) a reservoir;
f) a canal;
g) a dam.
The policy schedule states that the body corporate was not insured for flood.
Representative says lot owners were unaware they did not have flood cover
The policy was incepted through a broker.
The representative for this complaint (who is a broker but was not the body
corporate’s broker at the time of inception and renewal) says the lot owners have
advised they were not aware they did not have flood cover.
The representative says the policy documentation at the time of inception and
renewal would have been provided by the body corporate’s previous broker to the
body corporate’s strata manager and they are not privy to the exchange of information
that occurred at that time.
However, the panel is satisfied that both the PDS and policy schedule are clear in that
damage caused by flood is excluded from coverage under the policy.
It is accepted insurance law that the insurer carries the onus to establish the
application of its policy exclusion for damage caused by flood.
Determination | Case number: 689834 Page 3 of 9
Insurer accepted damage for water inundation of garages
The insurer agreed to cover damage caused by water inundation of the garages at
the insured property, as this was deemed to be caused by stormwater runoff.
The body corporate has confirmed that the damage resulting from the inundation of
the garages has been settled and that this aspect of the complaint is not in dispute.
Accordingly, this determination relates to the water inundation that occurred in the six
units of the insured property.
Insurer says inundation of units due to flood
In late January and early February 2019, the city of Townsville and surrounding areas
of north Queensland experienced a significant weather event.
Heavy rainfall occurred over the Townsville catchment for several days and at or
about the complainants ’ property.
The insured property comprises three buildings housing the six residential units. The
insured property is located on the corner of C and W Streets. The insured property
can also be accessed from W Street. The driveway to the units is located between the
buildings on the property.
The insurer has provided a report from its hydrologist (WR) dated 29 March 2019,
which was prepared following a site inspection on 8 March 2019.
WR says the ground levels of the driveway opposite entrances to various units range
from about 6.15 to 6.3 mAHD, with the C Street end of the driveway (opposite units 1
and 6) at a lower level than the W Street end (opposite units 4 and 5). The minimum
floor levels of the units are estimated at 6.30 to 6.45 mAHD.
The six residential units at the property were inundated to varying depths of between
approximately 0.07 m and 0.22 m above floor level.
Following the site inspection and review of data from the Bureau of Meteorology and
Townsville City Council, WR considered that above floor inundation from Ross River
floodwaters would have commenced after about 6.00pm on Sunday 3 February 2019.
At this time, the Ross River would have overflowed and drained towards the insured
property via C and W Streets .
WR concluded the initial and maximum above floor inundation of the units was
caused by floodwater overflowing from the Ross River.
In additional commentary dated 12 November 2019, WR stated that if any above f loor
level inundation occurred between 5.00pm and 6.00pm on 3 February 2019, it would
have been due to a combination of Ross River floodwaters backing up via the
stormwater drainage system and local stormwater that could not drain away due to
elevated Ross River water levels.
Determination | Case number: 689834 Page 4 of 9
The body corporate disputed WR’s findings and requested that a second hydrologist
be appointed. The insurer subsequently engaged MC to report on the damage to the
insured property. MC conducted a site inspection on 29 May 2019 and produced
three reports dated 20 June 2019, 6 August 2019 and 11 November 2019.
In its first report, MC considered that water inundation at the insured property could
have occurred from several sources, either individually, or in combination. These
include:
ponding of stormwater which was unable to discharge into the Ross River, or Ross
Creek, or backflow along stormwater drainage infrastructure ,
overbank flooding from Ross River,
tidal flooding exacerbated by storm surge.
However, MC ultimately concluded in its initial report that there was insufficient
information available from which to conclude that overbank riverine flooding occurred
at the insured property and if this did occur it would have been only around the flood
peak.
MC considered the most likely explanation is that the initial over-floor inundation
resulted from a combination of backed-up local stormwater runoff unable to discharge
via the piped drainage system due to high river levels and backflow surcharge of river
water through the piped drainage system.
Because of queries raised by the insurer regarding the drainage systems servicing
the area, MC conducted a further site inspection on 30 July 2019. MC subsequently
varied its conclusions in respect of the inundation at the insured property in its second
report.
MC concluded that the primary cause of over floor inundation at the insured property
was overflow from the Anderson Park Drain, which is part of the Aitkenvale Drain and
a tributary of Ross Creek.
MC also concluded that it is likely that surcharging of the local stormwater drainage
system resulting from a combination of local stormwater runoff unable to discharge
into the Anderson Park Drain and backflow surcharge from that drain resulted in
external inundation rising close to the floor level of the property. However, this would
not have contributed greatly to the over-floor inundation, which would have
commenced between about 3.00pm and 6.00pm on 3 February 2019.
Following receipt of several witness statements from the occupants of the units,
together with a response from the body corporate, MC provided a third report
regarding the proximate cause of water inundation of the units.
MC determined in its third report that it was unlikely that there was any contribution to
the inundation from direct overflow from either the Ross River or the Minden Park
Determination | Case number: 689834 Page 5 of 9
Drain. MC stated the proximate cause of the internal inundation was from flood water
in the Ross River and Minden Park drain delivered to the property via the stormwater
drainage system.
Complainants say water entered units through internal drains
The complainants have provided extensive submissions in support of their position.
All the exchanged material has been considered by the panel, but only that material
relevant to the outcome, will be referred to in this determination.
Essentially, the complainants say that the units were initially inundated by stormwater
backing up late afternoon/early evening on 3 February 2019, prior to the arrival of
floodwaters following the main dam release. They say the stormwater drainage
system was essentially not functioning by Sunday morning, 3 February 2019.
The complainants say that above floor inundation to the units occurred between
5.00pm and 6.00pm on 3 February 2019 to a depth of 100mm. The complainants
have provided several witness statements including from two people living at unit 2,
who were at the unit on 3 February 2019, up until the evacuation and were the last
residents to leave.
An excerpt of a statement dated 7 September 2019 provided by Ms W of unit 2 is as
follows:
SUNDAY 3/2/19
…
At 3.00pm Family arrived with sandbags to place around all doorways also left
extra bags.
At 4.00pm Heavy rainfall I noticed the water level fluctuate externally along the
concrete blocks at rear fence after each heavy rainfall event.
At 5.00pm-6pm Clear water started coming up through the drains in my laundry
and bathroom unit.
At 6.00pm Water now ankle deep in my unit
At 6-6:30pm Family arrived to evacuate myself and a friend [Mr D ]… Water now
knee/thigh deep in [W] Street entrance of driveway …
Similarly, in a statement dated 23 November 2019, Mr D stated:
SUNDAY 3/2/19
…
I remember that the sandbags at the front door formed a barrier 3 centimeters
higher than the level of the entrance. Between 5-6pm on Sunday, the water from
the street had reached the absolute top of the sand bags and small streams of
water were seeping through, entering between the sandbags and flowing into the
living room and kitchen. Also, just before 6pm, clear water began emerging
upward from drains in the bathroom and laundry. l saw this clearly with my own
eyes and the water was fast rising. Soon after that, the water level was ankle
Determination | Case number: 689834 Page 6 of 9
deep in Unit 2. Somewhere before 6.30pm, [Ms W’s] family arrived to evacuate
[Ms W] and to a safe location. All surrounding streets were thigh deep in water. At
the time of our evacuation the water that had filled the streets, surrounded the
premises and entered the units was clear water …
Due to the daunting situation with which they were faced, the witnesses did not obtain
photos or video footage of the water initially entering the units
The complainants have raised numerous queries and concerns about the insurer’s
hydrology reports, which for the sake of brevity will not be repeated.
They have also provided extracts of hydrology reports for three other claims regarding
the break out point at Sherriff Park, which they say were accepted by the insurer.
The complainants concede that the peak depth of inundation was the result of
floodwaters following the full release of the spillway gates at the Ross River Dam.
Initial inundation covered under the policy
The panel is not persuaded by the conclusions from MC, given its failure to maintain a
consistent position.
Whilst WR’s report is more compelling, the panel does not consider that floodwater
was the source of the initial inundation.
The panel notes that the policy definition of flood refers to ‘…water that has escaped
or been released from the normal confines of any…river…natural watercourse…’.
The panel notes that the most intense rainfall occurred between 4.00pm and 5.00pm
on 3 February 2019.
Th e panel accepts the witnesses’ description of events. The panel does not accept
that water which cannot enter the Ross River through drains and other infrastructure
due to the amount of water already in that river, is water which has escaped or is
released from the Ross River. In other words, the panel does not consider that water
which could not enter the river because the river level was high meets the definition of
flood.
Further, the panel notes that WR’s timing as to when the Ross River started to
overtop its northern bank and when the Ross River overflowed and drained towards
the insured property is after the initial inundation of the property.
Accordingly, the panel is not satisfied that the insurer has established that the water
out of the internal drains had mixed with floodwater.
The result is that the panel is not satisfied that the insurer has met its onus to
establish the application of its policy exclusion for damage caused by flood.
Determination | Case number: 689834 Page 7 of 9
Accordingly, insofar as there was inundation as a result of water discharging or
overflowing from toilets, drainage and/or sewerage systems within the units, the panel
is satisfied that this has occurred prior to the inundation of the property by floodwaters
and is covered under the terms of the policy as that water discharging or overflowing
from the toilets, drainage and/or sewerage systems within the property was not
floodwater as defined.
Conclusions
The insurer is liable for the initial inundation because of water discharging or
overflowing from toilets, drainage and/or sewerage systems within the property and in
addition the likely inundation above floor level by stormwater runoff, prior to t he arrival
of floodwater which had escaped from the Ross River, for which the insurer has
already accepted above garage floor level.
Without precise information on which to determine the level of the initial inundation by
such water, the panel can only do what is fair in all the circumstances.
The panel notes that the six residential units were inundated to varying depths of
between approximately 0.07 m and 0.22 m above floor level, given the varying floor
levels within each unit.
There is insufficient information available for the panel to determine the precise level
of initial inundation in the case of individual units.
In the absence of precise measurements, the panel is satisfied it is fair in the
circumstances to allow for the initial inundation to a level of 200mm above floor level
throughout those units with the lowest floor level.
As there are reported differences of up to 150mm between the highest and lowest
floor levels between the units, this would translate through to a level of 50mm above
floor level in those units with the highest floor levels.
Liability for those units with floor levels between the highest and lowest level, noted
above, is to be determined by comparing the floor level of each unit to the lowest level
and reducing liability from 200mm by 1mm for each 1mm the relevant floor level is
above the lowest level.
In the absence of agreement between the parties as to the floor levels of each unit the
complainants are to provide access to the insurer’s representatives to enable them to
measure the various levels.
The panel notes that the complainants provided an estimate of $500,000 worth of
damage for above floor inundation to the units. T he insurer’s builder (R) provided a
scope of works for all the units dated 16 April 2019.
Determination | Case number: 689834 Page 8 of 9
Subject to acceptance of this determination by the complainants, the parties are
asked to work cooperatively together to establish the extent of the loss and damage
because of the covered inundation and in accordance with the terms of the policy.
If the insurer cash settles this portion of the complainants’ claim, then the insurer is to
pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 (the
Act) from 11 September 2019 (date of insurer’s final decision letter) to the date of
payment of the claim.
If the complainants have already completed the repairs, the insurer is to pay interest
from the date the complainant paid for the repairs.
If the parties are unable to reach agreement as to any cash settlement, then the
parties may return the matter to the Authority for determination as to quantum.
Peak inundation caused by flood
As noted above, the complainants do not dispute that the peak depth of inundation
was the result of floodwaters.
WR says the peak depth of inundation at the insured property would have occurred
after 11.30pm on Sunday 3 February 2019, as the water level in the Ross River at
Sherriff Park reached its peak.
The panel is satisfied, on balance, the maximum above floor inundation of the units
was caused by floodwater overflowing from the Ross River.
The insurer is otherwise entitled to rely upon its policy exclusion for flood to refuse
payment of the balance of the complainants ’ claim.
3 Supporting information
3.1 AFCA approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determination.
The determination is made by a panel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the ins urance industry.
The Ombudsman, who has had extensive experience with flood complaints, viewed
the general area in November 2019.
Determination | Case number: 689834 Page 9 of 9
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether
there was any rainwater runoff damage before the flood water arrived at the insured
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.