Home / Suncorp Group / Determination 689565
Determination 689565
Insurer limited equipment breakdown claim to circuit board repair
Summary
A bakery's ducted air-conditioning unit failed and was replaced before the insurer's assessor could inspect it. AFCA required the insurer to pay $2,260.88 for circuit board repairs only and the broker to pay $500 for failing to notify the complainant of the assessor's appointment.
Equipment breakdown cover pays the lesser of repair or replacement cost, and the complainant did not establish that both motors and the whole unit were damaged.
Issues
- Claim denial primary · not upheld“The insurer is entitled to limit its liability to the cost to repair the circuit board only. It is not liable for the two motors or full replacement of the unit.”
- Delay secondary · not upheld“I do not consider the evidence shows the insurer unreasonably delayed the processing or progress of the claim.”
- Poor communication secondary · upheld“the broker should have promptly let the complainant know of that appointment ... a breach of the broker's duty”
Subjects and remedies
small businesspay claimpay non financial loss
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number s 684276 & 689565
Financial firm AAI Limited & Resilium Pty Limited
Determination | Case numbers: 684276 & 684276 Page 2 of 7
Case numbers: 684276 & 689565 29 June 2020
1 Determination overview
1.1 Complaint
On 23 January 2019, the ducted air- conditioning unit (the unit) at the complainant’s
business premises broke down. Shortly after that the complainant authorised its
refrigerator technician (CH) to replace the unit.
The complainant lodged a claim under its business insurance policy held with the first
financial firm (insurer), for the cost to replace the unit. The claim was lodged with the
assistance of the second financial firm (broker).
The insurer’s loss adjuster (JB) wa s unable to inspect the unit and did not agree with
CH’s findings that the entire unit was damaged and needed replacement (that is, the
printed circuit board and both motors).
The insurer only accepted the damage to the unit’s circuit board, and offered $ 1,500
(less the applicable excess $500) for the circuit board parts and labour. The
complainant is disputing the insurer’s claim decision and the broker’s handling of the
claim.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the insurer and broker.
The complainant rejected the recommendation.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. I agree with the outcome of the case analyst’s recommendation and the
reasons for it.
Is the insurer entitled to limit its liability under the policy?
The available evidence does not establish, on balance, that both motors were
damaged or that the unit required full replacement. The insurer is entitled to limit its
liability to the cost to repair the circuit board only.
Determination | Case numbers: 684276 & 684276 Page 3 of 7
Has the broker breached its duty to the complainant?
The broker had a duty to act for the complainant in lodging and progressing the claim
with the insurer. It failed to notify the complainant of the appointment of the insurer’s
loss adjuster. In the meantime, the complainant proceeded with replacement and
disposal of the damaged unit. $500 compensation for non-financial loss is warranted
for the upset and inconvenience that caused. However, this failure by the broker is not
responsible for the complainant incurring the cost of the replacement unit, or any
other financial loss. The evidence shows it is more likely than not the complainant
would have proceeded with the replacement of the unit regardless. As well, the
complainant’s disposal of the damaged unit before it was assessed by the insurer did
not prejudice its position since the technical evidence that was available was, on
balance, sufficient for the insurer to make a fair claims decision.
1.3 Determination
This determination is substantially in favour of the insurer and the broker.
The insurer is required to pay the complainant $2,260.88 (less the policy excess if
that has not already been paid), being the cost of repairing the circuit board.
The broker is required to pay the complainant $500 as compensation for non-financial
loss.
The insurer and broker are not required to take any further action.
Determination | Case numbers: 684276 & 684276 Page 4 of 7
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues arising from the information exchanged.
I have decided this case based on what is fair in the circumstances, having regard to
the relevant law, good industry practice, codes of practice and previous AFCA
decisions. I have taken into account all the material submitted by the parties, both
before and after the recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
I am satisfied that the case analyst’s recommendation contains an accurate summary
of the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
2.2 Is the insurer entitled to limit its liability under the policy?
Insurer entitled to limit liability to damaged circuit board only
The complainant’s business insurance p olicy covers the breakdown of insured
equipment and direct loss or damage to insured property as a result of an equipment
breakdown. The onus is on the complainant to show, on balance, a loss occurred
which is covered under the policy.
In settling such a claim, the insurer is only required at the time of the breakdown to
pay the lesser of the cost to repair the damaged property; or replace the damaged
property with similar property of like kind, capacity, size, quality.
The complainant rejected the case an alyst’s recommendation, which was in part that
the insurer was entitled to limit its liability for the claim to the damaged circuit board,
since the two motors had not been shown to have been damaged, and the whole unit
did not need replacing.
Because the unit itself had been disposed of by the complainant before the insurer
had arranged an inspection of it, the insurer was prejudiced in its ability to further
investigate the damage. However, that also meant the complainant lost the
opportunity to provide physical evidence which might have assisted its claim.
The evidence indicates repairer CH presented the complainant with the option of
repairing or replacing the unit, but recommended replacement given its age. The
complainant proceeded on that basis. However, there is nothing to show that full
replacement was necessary. While it might have been the practical long-term solution
for the complainant, that does not mean the insurer should be liable under the policy
for the full cost of replacing the unit if the nature and extent of the actual damage was
limited and repairable.
Determination | Case numbers: 684276 & 684276 Page 5 of 7
Having reviewed the available technical evidence from both CH and JB, I am satisfied
that JB’s is more persuasive, comprehensive and consistent. In summary, CH was
not able to explain how a low voltage event happened in this particular case, so as to
seriously damage both motors as well as the circuit board. JB, on the other hand,
clarified that based on the electrical configuration of the unit, it was not possible for a
printed circuit board to create low-voltage conditions and then cause the failure of all
the motors. In its further submission after the recommendation, the complainant does
not dispute the technical reports or evidence provided by CH and JB.
I am satisfied that the insurer was entitled to limit its liability to the damaged circuit
board only. It is not liable for the two motors or full replacement of the unit.
The insurer accepted the recommendation which, however, stated that it was to
adjust its settlement offer for the circuit board damage. I am satisfied the calculation
for a revised settlement of $2,260.88 (less the policy excess) is fair, as it takes
account of the work reasonably required to complete the claim-related repairs.
For completeness, I do not consider the evidence shows the insurer unreasonably
delayed the processing or progress of the claim.
2.3 Has the broker breached its duty to the complainant?
Broker has a duty to complainant
An insurance broker enters into a professional relationship with a client and so has a
duty of care when acting on behalf of that client. That relationship requires the broker
to exercise reasonable care and skill in performing its duties. The relevant standard is
described as what is expected of a competent and experienced insurance broker.
However, the extent of the broker’s duties will be contingent on the arrangement
between the parties.
The complainant has said the broker has been acting for them since 2007, and
whenever they had to lodge claims, the broker would do so on their behalf.
Further detail of the arrangement between the broker and complainant has not been
provided. I accept, on that basis, that the extent of the broker’s duty (in the context of
the current dispute) was to assist the complainant in lodging a nd progressing the
claim, by liaising with/communicating between the complainant and insurer and
related parties (such as repairer and assessor), as necessary.
On balance, broker did not communicate appointment of assessor
The complainant’s post -recommen dation submission focuses on the broker’s handling
of the claim and its failure to notify the complainant of the appointment of the insurer’s
loss adjuster/assessor on 30 January 2019.
Determination | Case numbers: 684276 & 684276 Page 6 of 7
The claim was lodged through the broker on 24 January 2019. The comp lainant
authorised CH to proceed with the replacement of the unit on 29 January 2019. The
appointment of assessor JB was a day after those instructions to CH, but 5 - 12 days
(the information on this timeframe varies) before CH disposed of the damaged unit.
The complainant has not shown it made any specific enquiries with the broker about
the disposal of the unit in the meantime, nor indeed of the advisability of replacing it.
The complainant stresses it was relying on the broker to provide advice on how to
proceed with the claim and was inexperienced in dealing with claims involving an
assessor. In particular, the complainant said the broker did not advise it not to
proceed with replacing the unit. The complainant states that had it been notified of
JB’s appointment on 30 January 2019, it would have checked with the broker if there
was any issue with the claim and potentially would have stopped the installation of the
new unit.
However, in the circumstances, I do not consider it reasonable to expect the broker to
have advised against replacing the unit, since that was a decision the complainant
was entitled to make in consultation with, and based on the advice of its repairer. I
consider, in any case, the issue is not so much the replacement but the disposal of
the damaged unit, which meant it was not inspected by the insurer.
While I appreciate the complainant may have been inexperienced in dealing with
claims involving an assessor (as, it has said, all previous claims have been
straightforward), it does have a responsibility under the policy to retain damaged
property for inspection by the insurer. I consider it reasonable to expect an insured
would appreciate that an insurer would/may need to investigate claims for damage,
and that evidence of a claimed loss should be kept and made available for inspection
if required. At the same time, that is something the broker could and on balance
should have reminded the complainant about, particularly once the broker knew an
assessor had been appointed.
Up until that point however, I accept the complainant has said it had no reason to
assume this claim would be any different to previous ones. I consider it not
unreasonable for the broker to have also proceeded on the same basis, in that there
was damage to insured property, and a repairer had looked into it and recommended
certain action.
As it happened, in this case the insurer did decide to conduct further investigations as
it was entitled to do, and so appointed an assessor (although it is worth noting the
broker was not aware there were any particular concerns around the claim and the
damage until March 2019). However, the broker has been unable to show that it did
notify the complainant that an assessor had been appointed, even though it suggests
this was done verbally.
Determination | Case numbers: 684276 & 684276 Page 7 of 7
I consider the broker should have promptly let the complainant know of that
appointment. The complainant would then have had the opportunity to ask any
questions about how the claim might be expected to proceed from there, and could
have been advised about retaining evidence. I am satisfied the failure to let the
complainant know of the appointment did represent a breach of the broker’s duty to
the complainant.
The question then becomes whether the complainant has suffered any loss as a
result of that breach (specifically, the full cost of replacing the unit, or the balance of
the claim not otherwise covered by the insurer under the policy).
Complainant has not established it suffered a loss because of broker’s actions
Having reviewed the avail able information, I am not satisfied the broker’s failure to
notify the complainant of JB’s appointment caused the complainant to incur the cost
of the replacement unit, or to suffer any other financial loss.
The complainant has said CH reported the damaged unit was obsolete, it could not be
easily repaired, parts would be hard to find and would be non-genuine parts in any
case, and CH could only give a 3 month guarantee on work and parts. The evidence
shows that while also referring to the option of repa irs, CH’s recommendation was for
the replacement of the unit.
The complainant has stressed in its submissions ‘[it] was imperative for us to have an
operational air-conditioning unit, given the nature of our business [a bakery], the
building and the time of year the event occurred [mid- summer]’. In those
circumstances, and given the advice of his repairer, I do not consider it likely the
complainant would have put his business on hold to wait for further assessments of
the damage, or made a cost or time commitment likely to be of short-term effect in the
meantime.
I am satisfied, on balance, the complainant would not have acted differently even if it
had known the assessor had been appointed: it would still have proceeded to obtain a
replacement unit, and would have done so as soon as possible after the unit broke
down (which is what it did). That means, I do not consider the complainant has shown
it suffered a loss as a result of anything the broker did or failed to do, and so the
broker is not liable for any costs/losses incurred by the complainant in dealing with the
damaged unit.
At the same time, however, I agree the broker’s failure to let the complainant know
about the assessor’s appointment did cause the complainant’s representatives (the
small business-owners), avoidable upset and inconvenience at a time when they and
the business were already under considerable pressure. It is fair in the circumstances
that the broker pay the complainant $500 in non-financial loss compensation.
Recommendation
Case number 684276 & 689565
Financial firm s AAI Limited & Resilium Pty Limited
Recommendation | Case number: 684276 Page 2 of 13
Case numbers: 684276 & 689565 30 March 2020
3 Overview
3.1 Complaint
On 23 January 2019, the ducted air- conditioning unit (the unit) at the complainant’s
business premises broke down. The complainant’s regular refrigerator technician
(CH) attended and provided the repair and replacement options. The complainant
then authorised the replacement of the unit.
The complainant lodged a claim with the first financial firm (insurer), via the second
financial firm (broker), for the cost to replace the unit.
On 5 February 2019, the complainant disposed of the unit. Because of this, the
insurer’s loss adjuster did not inspect the unit and did not agree with CH’s finding the
entire unit was damaged (the printed circuit board and both motors).
The insurer accepted damage of the unit’s circuit board only and offered $1,500 (less
the applicable excess $500) for the circuit board parts and labour.
The complainant is disputing the insurer’s claim decision and the broker’s handling of
the claim. The complainant is seeking the amount of $11,070 to recover the
replacement of the unit.
3.2 Issues and key findings
Has the insurer correctly settled the claim under the policy terms?
I agree with the insurer’s decision to indemnify the cost to repair the damaged circuit
board. However, based on the available information, I am not satisfied both motors
were damaged. The insurer is not liable to indemnify the complainant for the loss of
the motors.
Did the insurer delay in processing the claim causing the complainant to incur
a loss?
Based on the available information, I am satisfied there was no unreasonable delay
by the insurer in its claim handling. Therefore, no award of compensation is
appropriate.
Has the broker breached an obligation it owed to the complainant during the
claim process?
The broker failed to notify the complainant of the loss adj uster’s appointment. The
broker is to pay the complainant $500 in non-financial loss compensation for the
Recommendation | Case number: 684276 Page 3 of 13
stress and inconvenience this caused. However, I am not satisfied this led to the loss
of the two damaged motors the complainant is seeking indemnity for.
3.3 Recommendation
This recommendation is substantially in favour of the insurer and the broker.
If the parties (insurer, broker and complainant) accept the recommendation:
the insurer is to pay the complainant $2,260.88 (less the excess), and
the broker is to pay the complainant $500 for non-financial loss compensation.
Recommendation | Case number: 684276 Page 4 of 13
4 Reasons for recommendation
4.1 Has the insurer correctly settled the claim under the policy terms?
Complainant to establish a valid claim
When lodging a claim for consideration, the onus is on the complainant to establish
the claimed damage or loss arose form an event covered under the policy. This is
known as establishing a valid (or prima facie ) claim.
If the complainant establishes a valid claim, then the onus shifts to the insurer to
show, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny
the claim.
The business insurance policy covers loss or damage for equipment breakdown,
which includes an air conditioner unit.
The insurer does not dispute damage occurred to the unit’s circuit board. Given this, I
am satisfied this aspect of the damage falls within the equipment breakdown insured
event. The complainant has established a valid claim.
However, a dispu te arose regarding the extent of the unit’s damage and what the
insurer should provide indemnity for.
The loss adjuster was unable to inspect the unit
The unit was removed from the complainant’s business premises and disposed of on
or about 5 February 2019. Unfortunately, when the loss adjuster requested an
inspection of the damaged unit, it had already been disposed of.
The complainant authorised CH to commence with the replacement of the unit. The
insurer does not dispute this decision given the compl ainant’s explanation the working
conditions for its employees were highly uncomfortable without an air-conditioner unit.
However, under the policy terms, if an insured event occurs giving rise to a claim, the
complainant is required to retain the damaged property for inspection.
The insurer asserts that because the unit has been disposed of, it is unable to assess
whether the entire unit was damaged and determine the cause of damage.
Conflicting opinions on cause and extent of damage
JB, the insurer’s loss adjuster representative, raised concerns regarding CH’s
explanation of damage.
Below is a summary of CH’s explanation of the likely cause of damage to the unit:
Recommendation | Case number: 684276 Page 5 of 13
CH initially stated the cause of damage was motor fusion resulting from the circuit
board sending a low voltage to the motors, leading to circuit board and motor
failures.
CH refers to printed circuit boards in the indoor and outdoor unit. When JB
questioned this based on the wiring diagram of the unit model, CH later confirmed
there was no circuit board to the outdoor unit.
CH later acknowledges it was incorrect in its previous explanation the circuit board
sent low-voltage to the motors, because this was not possible for the particular unit
model.
Despite this, CH concludes a low voltage eve nt did happen. However, CH cannot
clarify how the low-voltage event happened, only confirming the motors and circuit
board had ceased to function.
CH says whether or not the motors were wired and controlled separately has no
relevance when the low-voltage event occurs.
In response, JB concluded the following:
Based on the electrical configuration of the unit’s model, it is not possible for a
printed circuit board to create low-voltage conditions and then cause the failure of
all the motors.
The only possible way for a single event to cause both motor failures is an over-
voltage event on the common incoming power supply (power surge) such as a
lightning strike, or power incident report.
The motors are not intrinsically linked and it is electronically impossible for the
failure of one motor to cause the failure of other motors.
He is unable to determine if there was an over-voltage event at the time. Bureau of
Meteorology reports no lightning/thunderstorm event.
Considering JB’s explanation, the insurer took the view no over-voltage event
occurred which would have caused both motors to fail. Therefore, the insurer only
accepted damage to the circuit board.
Available information does not demonstrate the unit’s motors were damaged
Based on th e complainant’s employee statements on their recollection in
January/February 2019, I acknowledge there was a breakdown in the unit. However, I
requested further information from the complainant to determine the extent of
damage. In particular, this was to consider which parts of the unit were damaged in
light of the differing likely causes of damage provided by CH and JB.
CH states its technician tested and confirmed the faulty components. When AFCA
requested a further explanation of CH’s testing and how it formed the conclusion the
circuit board and motors were damaged, the complainant was unable to provide any
further information.
Recommendation | Case number: 684276 Page 6 of 13
I understand it may have been difficult for the complainant to seek further information
from CH regarding the incident. This is particularly given CH’s previous explanations
on the matter. However, without further information about CH’s process in concluding
the circuit board and motors were damaged, it is difficult to conclude both motors
were damaged.
Based on the available information, I am not satisfied both unit motors were
damaged. I formed this view by considering and weighing the below factors:
CH’s previous inconsistent information regarding the specifications of the unit and
likely cause of damage.
CH was unable to clarify how a low voltage event happened and how this caused
serious damage to the circuit board and two motors.
Importantly, CH has not clarified its testing and diagnostic process when its
technician inspected the unit on 23 January 2019.
CH has not clarified the experience and skill of its technician that he/she had at the
time of the unit inspection.
I find JB’s report to be more persuasive given the level of analysis and information
he provided.
I find JB’s experience and skill to be sufficient for providing the findings in his
report. The insurer has clarified JB’s qualifications and work experience in
refrigeration industry over many years.
Since the available information does not indicate what type of voltage event occurred
and how it caused dam age to both motors, I agree with the insurer’s decision to
accept the loss of the circuit board only.
The complainant has not established loss or damage for the unit’s two motors. As
such, the complainant has not established a valid claim for this aspect of the claim.
Insurer’s offer to be adjusted to reflect cost of repair
The insurer says the $1,500 offer consists of the cost of the circuit board part
($390.88) and four hours of labour. Meanwhile, the complainant submitted a
retrospective repair quotation from CH dated 3 February 2020. This included all work
relating to the repair/replacement of the circuit board and both motors.
I have reviewed both quotations and the photographs of the replacement air-
conditioner unit which is located in a similar place to the old unit.
I am of the view that the insurer’s offer should be adjusted to $2,260.88, based on the
below breakdown, to properly reflect the likely cost of repair:
$390.88 (circuit board part as quoted by insurer)
$1,320 for 8 hours of labour for indoor unit works
Recommendation | Case number: 684276 Page 7 of 13
$110 for duct life hire to lift indoor unit down from ceiling and lift back up
$385 for gyprock ceiling work by a contractor
$55 for sundry
This value is based on the circuit board being contained indoors in the ceiling of the
business premises, which would involve cutting into the gyprock to property access it.
4.2 Did the insurer delay in processing the claim causing the complainant
to incur a loss?
AFCA approach to alleged delays in claim handling
There are no standard timeframes set down for the processing of claims. However,
insurers are required to operate in accordance with the General Insurance Code of
Practice. AFCA takes the Code of Practice into consideration.
When considering if an insurer delayed processing an insurance claim, AFCA will look
at whether:
the insurer acted fairly and promptly to resolve the claim
there has been an unreasonable delay
there were factors which were outside the control of the insurer or otherwise
unavoidable
the insured’s actions caused or contrib uted to the delay.
If we decide the insurer unreasonably handled or delayed the claim, we will look at
what loss (if any) stemmed from that conduct.
The insurer substantially managed the claim reasonably
I refer to the Code of Practice and make the following references:
if the insurer requires further information, it will notify the insured within ten
business days of receiving the claim,
if the insurer appoints a loss adjuster, it will notify the insured within five business
days of this appointment.
the insurer will keep the insured informed about the progress of the claim at least
every 20 business days,
if the insurer engages an external expert to provide a report, the insurer will ask
them to provide this within 12 weeks, and
the insurer will make its decision within four months of receiving the claim unless
exceptional circumstances apply.
One of the complainant’s key concerns is the insurer had approximately 12 days (23
January 2019 to 5 February 2019) to inspect the unit and argues it should have do ne
Recommendation | Case number: 684276 Page 8 of 13
so within this time. I note in this period, there were approximately seven to eight
business days (taking in weekends and a public holiday).
I refer to the timeline in section 3.2. Following claim lodgement on 23 January 2019,
the insurer appointed a loss adjuster on 30 January 2019. The insurer notified the
broker who had lodged the claim on the complainant’s behalf.
Furthermore, according to the complainant, JB emailed CH on 6 February 2019 to
enquire about inspecting the unit. I have not seen a copy of this email. However,
given this information was provided by the complainant, I am satisfied JB contacted
CH on or around 6 February 2019. This was also within the ten business days Code
of Practice guideline referred to above.
On 20 February 2019, the broker requested an update from the insurer and was
informed JB was awaiting further information from CH to complete his report.
I acknowledge the insurer could have contacted the complainant or CH sooner.
However, I do not consider there was any unreasonable delay by the insurer in
processing the claim before the unit was disposed of on 5 February 2019.
Following this period, JB and CH were in correspondence in March 2019 and JB
provided his report to the insurer in early April 2019. A claim decision was later made
on 24 April 2019. These dates are also within the Code of Practice guidelines.
On 1 May 2019, the insurer later provided its revised claim decision to accept the
damage of the circuit board. Further dates are listed in the timeline in section 3.2.
Based on the available information provided, I am not satisfied there was
unreasonable delay by the insurer in its overall claim handling. Consequently, I do not
consider any award of compensation is appropriate with respect to the complainant’s
allegation of delay.
4.3 Has the broker breached an obligation it owed to the complainant
during the claim process?
The complainant is disputing the broker’s handling of the claim
The complainant raises the following concerns regarding t he broker’s conduct in
handling its claim with the insurer:
the broker should have better advised the complainant, including the broker never
told the complainant to hold off on proceeding with the replacement unit, and
importantly, broker did not inform the complainant about the appointment of the
loss adjuster on 30 January 2019,
In response the broker has stated the following:
Recommendation | Case number: 684276 Page 9 of 13
the broker did not authorise the replacement unit. It was the complainant’s decision
to replace the unit given the uncomfortable working conditions for its employees.
The broker lodged the claim on the complainant’s behalf and assisted with the
claim handling throughout.
The broker worked actively with the insurer, the complainant, CH and loss adjuster.
I refer to the timeline set out in section 3.2 and note the broker made regular enquiries
to the insurer regarding the claim and made multiple requests for a review of the claim
decision. Overall, I am satisfied the broker acted reasonably in assisting the
complainant with the claim.
Once again, I understand the complainant’s reasoning with authorising the
replacement of the unit. However, it does not appear the broker provided the
complainant with any incorrect information, given the information that was available to
the broker at the time.
CH’s initial diagnosis was motor fusion. If the motors were damaged because of
fusion, this would appear to be covered under the policy. However, further
explanations were required when CH’s initial explanations were inconsistent and
ultimately the cause of damage could not be determined.
The complainant also highlights that it was unaware of any issues with the claim until
March 2019. From the available information, it appears the broker was also unaware
of any issues until this time. Unfortunately, it is difficult to determine how a claim will
progress.
The broker did not cause the complainant to incur the loss for the claimed two
motors
The broker does not have any written record of notifying the complainant about the
loss adjuster’s ap pointment on or about 30 January 2019. The broker believes it may
have been communicated verbally to the complainant. Without further information, it
appears no notification was provided to the complainant. I am of the view the broker
should have done this.
However, I am not satisfied this error by the broker led to the complainant incurring
the loss of the two motors for which the insurer is declining indemnity. This is because
it is difficult to speculate what difference the notification of the appointment would
have made at the time. Also, importantly, it was the complainant’s responsibility under
the policy terms to retain the unit for the insurer’s potential request for inspection.
AFCA asked the complainant to clarify if it made any enquiries with the broker about
the disposal of the unit, before it was disposed of on 5 February 2019. The
complainant has not provided a specific response and it appears no enquiries were
made with the broker or insurer. Therefore, it was the complainant’s decision to
Recommendation | Case number: 684276 Page 10 of 13
di spose of the unit which unfortunately, then led to the insurer’s difficulty in assessing
the damage.
I am of the view the broker’s conduct in failing to notify the complainant of the loss
adjusters appointment did not cause the complainant to incur the loss of the two
motors. However, I am satisfied this error has caused the complainant to suffer stress
and inconvenience during this complaint process. The broker is to pay the
complainant $500 in non-financial loss compensation.
Recommendation | Case number: 684276 Page 11 of 13
5 Supporting information
5.1 Key policy terms
General claim conditions
1. Claim notification
If any event occurs which gives rise or may give rise to a claim you are required
to:
…
j. retain and preserve all damaged property for our inspection prior to
authorisation of repairs unless alterations and repairs are immediately necessary,
for safety reasons or to minimise or prevent further loss , damage or injury. If
repairs are necessarily carried out without our prior approval, you are still required
where reasonably practical, to retain and preserve all damaged property for our
inspection
…
Policy Section 9: Equipment breakdown
About this policy section
This section covers breakdown of insured equipment at the situation and any
direct loss or damage to insured property as a result for the events set out
under the ‘we cover’ column.
Your insurance under this section
We cover Provided “Equipment breakdown’ is shown under ‘Sections
Insured’ in the schedule we will insure you for:
a. breakdown of insured equipment which occurs at the
situation ; and
b. any direct loss or damage to insured property as a result of
that breakdown where the breakdown , loss or damage occurs
during the period of insurance .
…
5.2 Timeline of events
Date Action
23 January 2019 Complainant’s employees report that the air - c onditioner unit was not working.
CH inspected the unit and informed the complainant that the burnt outdoor
printed circuit board sent low voltage to indoor fan motor windings which have
Recommendation | Case number: 684276 Page 12 of 13
Date Action
burnt out.
CH provided repair quote of ($3,500 - $4,00) or r eplac ement quote of $9,500 to
$10,500.
CH recommended replacing entire unit rather than repairing.
Broker lodges claim with insurer on behalf of the complainant.
Complainant provides CH with the claim details.
29 January 2019 The complainant instructs CH to proceed with the replacement job.
30 January 2019 Insurer notifies brok er that loss adjuster has been appointed.
5 February 2019 CH removes unit from the complainant’s premises and disposed of it.
6 February 2019 Complainant says JB emailed CH inquiring about the inspection of the old unit.
13 February 2019 Installation of new unit commenced. Completed end of February.
14 February 2019 Broker calls insurer requesting an update.
20 February 2019 Broker contacts insurer requesting an update.
Insurer advises the broker that it is waiting on a report from JB, who was waiting
on information from CH.
5 – 9 March 2019 Email exchange bet ween CH and JB initiat ed on 5 March 2019.
CH emails JB requesting when payment will be made for the quotation
provided.
JB notes it appears illogical for the circuit board and all motors to sustain
electrical damage, given the model of the unit. JB requested an explanation
from CH.
CH says its t echnician tested and confirmed faulty components. Likely cause of
damage was a circuit board failure sending low voltage to the motors.
20 March 2019 Broker calls insurer for an update. Insurer advises waiting for report from JB.
29 March 2019 Broker calls insurer for an update and insurer advises loss adjuster waiting on
report.
2 April 2019 Broker requests an update from insurer. The insurer contacts JB requesting
update.
3 April 2019 JB issues his report to the insurer. JB concludes there is insufficient evidence to
show an over - voltage event occurred and he is unable to inspect the unit. There
is insufficient evidence to show the loss claimed.
7 April 2019 Based on the claim notes, insurer logs receiving JB’s report for review.
24 April 2019 Insurer notifies brok er of the claim decision (claim declined).
30 April 2019 Broker requests a review of the claim decision.
Recommendation | Case number: 684276 Page 13 of 13
Date Action
1 May 2019 Insurer offers $1,500 (less the excess) for the damage to the circuit board only.
2 May 2019 Broker emails complainant enquiring if there were any recorded power surges
on the day of the breakdown.
7 May 2019 Broker follows up on its previous email to the complainant.
9 Mary 2019 Broker emails CH and requests some clarification.
16 May 2019 Broker emails complainant outlining his discussions with CH.
23 May 2019 CH emails the broker ex plaining possible reasons for breakdown of unit and its
recollection of events. CH says it provided the possible reason for the unit
breakdown to the complainant. If further extensive testing of the unit was carried
out, it may have concluded the cause with 100% certainty.
7 June 2019 Broker escalated the ins urer’s claim decision to internal dispute resolution.
12 June 2019 Broker notifies the complainant of the IDR escalation.
2 July 2019 Broker provided complainant with IDR res ponse dated 28 June 2019.
14 November 2019 Complainant lodges complaint against insurer with AFCA.
3 February 2020 Email from CH saying likely cause was an electrical event. CH acknowledges it
was incorrect on pr evious diagnosis that circuit board sent low voltage to the
motors destroying them, because it was not possible for the particular unit
model. However, CH concludes a low volt age event did happen leading to
circuit board and electric motor damage.
CH could not confirm how the low volt age event happened, but it confirms the
motors and circuit board ceased to function.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.