Home / QBE / Determination 688425
Determination 688425
Strata building claim settlement for leak damage, awnings and claim delay
Summary
A strata policy beneficiary claimed for leak damage after a ten-month delay in lodging. AFCA ordered the insurer to pay for awnings and a cancellation fee, plus $2,500 for non-financial loss, and rejected the remaining claimed losses.
Settlement is assessed against costs actually incurred, and the insurer is liable for unusual claim delay but not for delays caused by the independent OCM or broker.
Issues
- Claim amount dispute primary · upheld“The insurer should therefore pay the complainant the sum of $25,053 for the awnings.”
- Delay secondary · upheld“The panel is satisfied, however, the insurer took an unusual amount of time to assess the claim.”
- Third-party or outsourcing failure secondary · not upheld“The insurer cannot be held liable for the broker's actions or the OCM as they operate independently.”
Subjects and remedies
home or building damagepay claimpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 688425
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 688425 Page 2 of 8
Case number: 688425 25 February 2021
1 Determination overview
1.1 Complaint
The complainant was a beneficiary under a residential strata plan insurance policy
held with the financial firm (insurer). The complainant lodged a claim for damage
following a leak.
The insurer says the complainant prejudiced its ability to assess the damage by
commencing repairs prior to lodging the claim. The insurer partially accepted the
claim but reduced settlement for damages it could not assess or attribute to the loss.
The complainant says the claim was lodged late due to actions of the insurer’s
agents. She says all the claimed damage is a result of the leak. She also seeks
compensation for the insurer’s poor management of the claim.
1.2 Issues and key findings
Is the insurer’s settlement of the claim fair and reasonable?
The insurer should increase its settlement regarding the air-conditioner and a
cancellation fee.
Is the insurer liable for damaged awnings?
Yes. There is no dispute the awnings are damaged. The insurer should therefore pay
the complainant the sum of $25,053 for the awnings.
Is the insurer liable for compensation?
The insurer’s handling of the claim was delayed. This caused considerable stress and
disruption for the complainant. It should pay the complainant $2,500 compensation for
non-financial loss. It is not liable for other costs and losses being sought.
1.3 Determination
This determination is partly in favour of the complainant.
The insurer is required to settle the claim as set out in section 2 of this determination.
Determination | Case number: 688425 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer’s settlement of the claim fair and reasonable?
Claim was lodged with insurer ten months after the loss
The complainant noticed the leak on 8 December 2017. She sought to lodge a claim
with the assistance of the owners corporation manager (OCM). The complainant says
the OCM was obstructive and sought to undermine her efforts to lodge a claim.
The submissions show the complainant devoted conservable efforts to pursuing a
claim via the OCM over the next ten months, yet was unsuccessful. The complainant
says she tried lodging directly with the insurer on 20 December 2017 but was advised
to lodge it through a broker or the OCM.
The complaint was eventually successful in lodging the claim directly with the insurer
on 3 October 2018. By this time, she had carried out some of the repairs.
The insurer says in carrying out repairs prior to lodging the claim, the complainant has
prejudiced its ability to inspect the damage and determine what could be considered
claim related. It also says the complainant repaired undamaged parts of the building,
including an entire bathroom. The insurer says its offer of $20,269.04 less the $500
excess is fair and reasonable.
Insurer not liable for delays caused by broker or OCM
The complainant says the insurer’s claim processes have allowed the situation to
develop, and it is either liable or should take responsibility for the current situation.
The insurer says it cannot be held liable for the broker’s actions or the OCM as they
operate independently.
The information does not show the broker acts under a binder. This means it is not
authorised to act on behalf of the insurer. Therefore, the insurer is not liable for the
broker’s actions. Similarly, the information does not show the OCM is the insurer’s
agent. As such, the insurer cannot be held liable for their actions, including any
delays.
The panel notes the complainant has alleged the OCM and the broker are a known
problem to the insurer. While this allegation is concerning, the information on file does
not establish the insurer is aware of any ongoing misconduct, collusion between the
two, or any other inappropriate activity.
Complainant was entitled to lodge a claim directly with the insurer
The complainant eventually lodged a claim directly with the insurer in October 2018.
The insurer confirms this was her right as a beneficiary under the policy.
Determination | Case number: 688425 Page 4 of 8
Prior to this, the complainant says she called the insurer on 20 December 2017 to
lodge the claim directly. However, the complainant was advised the claim must be
lodged through the OCM, or the broker. The insurer says at no point did it refuse to
accept a claim made by the complainant directly, and says there are no call
recordings or contact notes. It has not explained the means via which it established
no call recordings exist, or processes which stipulate when and how contact notes are
entered.
The complainant has provided a diary note confirming she called the insurer on 20
December 2017. In an email of 10 January 2018, the complainant informed the OCM
she had called the insurer directly to claim on 20 December 2017. The submissions
also show the complainant was already dissatisfied with the OCM by 20 December
2017.
Given all this, the panel is persuaded by the complainant’s evidence that she did call
the insurer on 20 December 2017. It is supported by a contemporaneous email and a
diary note. The insurer has not provided sufficient evidence to rebut this.
The purpose of the call is relevant as the insurer says the complainant has prejudiced
its position by carrying out repairs before the claim was lodged. If the claim had been
lodged on 20 December 2017, it is likely the insurer would have had the opportunity to
inspect the property in its damaged condition. This view is supported by submissions
which show the complainant repeatedly sought the OCM to arrange an assessment of
the damaged property before she commenced repairs.
As such, the panel does not consider it is reasonable to place responsibility for the
insurer’s inability to assess damages on the complainant.
Insurer’s li ability is not dependent on verbal offer made by the assessor
The damages were assessed by different assessors from the same assessing firm
(AG). The first assessment report is dated 22 November 2018. This notes most of the
works had been completed, so the full extent of damage could not be assessed. No
concerns were raised with the legitimacy of the claim.
The complainant says a verbal agreement was reached with the first assessor for
settlement of $33,833.90. Therefore, the insurer is liable for at least this amount.
However, this amount is simply listed in the first report as a reserve for the potential
cost of reinstatement works, not a recommended settlement figure.
The complainant also says the insurer should be liable for a further $5,000 listed in
the report for touch-up works, and $12,000 for replacement of two awnings. The panel
also notes these amounts are listed as a reserve.
There is no information to show any formal agreement or verbal offer was made by
the first assessor. Given this, the panel cannot accept any such offer was made.
Determination | Case number: 688425 Page 5 of 8
Insurer is to increase settlement for items complainant repaired or replaced
The insurer has provided a final schedule of the claim and validated costs. This
shows the complainant seeking about $77,330.62 with the insurer allowing
$20,269.04.
The complainant queries whether this is final costing noting it was never agreed to.
However, she has not explained what specific aspects are missing regarding her
claim for the property damage. It appears this schedule addresses the invoices and
amounts the complainant is mainly seeking.
Therefore, the panel considers it fair to refer to this document as setting out her claim
for the property damage. This shows what costs the insurer has agreed to pay. To the
extent the insurer has not agreed to some of the claimed costs, the panel notes the
following.
Part of the costs include the awnings. This will be addressed separately.
The insurer is not required to cover the cost of replacing carpets and floating flooring.
They are not considered part of the building and thus not insured under the policy.
The insurer is also not required to increase its settlement for plumbing investigation
and repair, having already settled all costs which are unrelated to maintenance. It is
not liable for maintenance issues under the policy.
For the bathroom, the panel notes it does not appear the complainant incurred this
cost. Further, there is minimal evidence to show why the damage required such
extensive works due to water entry. No report has been provided to confirm these
repairs were required due to the claimed event. It is unclear how water entry into the
bathroom, which is a wet area, could cause such extensive damages.
Given all this, the panel is not persuaded the insurer is liable for this cost.
The insurer is liable for the full cost of a split system air-conditioner. LM says this was
overpriced. LM supplied no information to support this beyond an advertisement of an
item which the complainant says was a lesser model. LM declined the complai nant’s
invitation to attend and view the location where the previous system was installed to
give an indication of its size and capacity.
The insurer has refused to pay mould remediation costs as these were not incurred.
Given no costs were incurred, the panel accepts these should not be allowed.
The complainant incurred a cancellation fee as she had arranged a repairer to attend,
yet works could not be complete until a window had been replaced. The panel
considers this type of error is not unusual when managing extensive repairs and
rectification, and would not have been incurred by the complainant if the insurer had
managed the claim more actively. Thus, it should reimburse the complainant $550.00
for this fee.
Determination | Case number: 688425 Page 6 of 8
The insurer had reduced the costs associated with ‘Man with a Van’ by one quarter.
This appears associated with delivering her contents on site. This is presumably the
cost to deliver contents when moving into the property. The complainant does not
appear to dispute this. Given this, the panel consi ders the insurer’s adjustment to be
fair.
2.2 Is the insurer liable for damaged awnings?
Awnings were damaged
There is no dispute the awnings were damaged.
The correspondence showed the insurer initially agreed to settle this. The
complainant has provided reports to support her position the awnings were damaged.
The issue became complicated with the fact the unit was sold before the insurer cash
settled the complainant. However, there is no information to show the insurer has paid
the new owners for the value of the damaged awning.
The information also shows the property was sold for $30,000 less than what the
complainant paid for it. This supports her position that the damaged awnings likely
diminished its sale value and resulted in a loss.
Insurer is liable for market value of replacement awning
Given this, the panel considers it fair in all the circumstances the insurer settles the
complainant the value of the awning.
The sole quote on file is for a Markilux 600 awning totalling $18,359, and a
replacement side blind at $6,694. No alternative quote has been provided. The
complainant referred to the cost of a crane but the quotes make no reference to this.
Given this, and in the interests of finality, it is fair for the insurer to pay for these
quotes in settlement of the awning.
Interest is payable
In terms of any payments to be made to the complainant for this claim and following
this determination, interest is also payable pursuant to section 57 of the Insurance
Contracts Act 1984. Interest is payable from 1 May 2019, being when the insurer
made its offer, until payment is made.
2.3 Is the insurer liable for compensation?
Compensation for indirect financial loss and non-financial loss may be paid
Under its Rules, AFCA can award compensation (capped at $5,000) where the
insurer’s handling of a claim causes the complainant indirect financial loss.
Determination | Case number: 688425 Page 7 of 8
AFCA can also award the complainant compensation for non-financial loss (capped at
$5,000) under its Rules. This is usually considered where the insurer:
takes an unusual amount of time to resolve the complainant’s situation
causes her to experience unusual physical inconvenience
unusually interferes with her expectation of enjoyment or peace of mind.
AFCA does, however, generally expect complainants to be moderately robust and
bear the usual degree of stress and inconvenience experienced during an insurance
claim or in ordinary dealings with an insurer.
AFCA cannot award punitive, exemplary or aggravated damages.
AFCA can award costs of pursuing complaints in certain circumstances
AFCA can also award the complainant’s cost s of pursuing a complaint (such as legal
and other professional costs, and travel). However, it will not usually award more than
$5,000 unless special circumstances apply.
In determining whether to award such costs, AFCA takes account of the fact that
AFCA is free for consumers and parties do not usually need to be represented.
However, an award may be made, for example, if:
a complaint is of such complexity that a reasonable complainant is unlikely to be
able to put his or her case forward without assistance , or
a complainant is unable to put his or her case forward due to a particular disability
or vulnerability.
Claim resulted in stress and hardship for the complainant
The complainant has supplied numerous submissions outlining the toll the claim has
taken on both her, and her child. Opinions from medical professionals confirm the
complainant and her son have required medical assistance in relation to stress and
anxiety, and suggest the complainant’s housing situation contributed to this.
The complainant says her ex-partner died as a result of complications which arose
after he assisted in mould removal. She says a coronial report was inconclusive in
this regard, yet invited the insurer to look into these issues.
The policy provides cover for loss or damage to insured property. It also includes
cover where an insured party becomes legally liable to pay compensation for injury,
including death. However, it does not cover stress or harm to a n insured person.
The panel is satisfied, however, the insurer took an unusual amount of time to assess
the claim. This interfered with the complainant’s peace of mind. The assessment
process was carried out beyond reasonable timeframes, resulting in the current
situation regarding awnings. However, the panel does not accept the insurer is
responsible for all the delays. Part of this appears to be attributable to the OCM and
the broker, which the insurer is not responsible for.
Determination | Case number: 688425 Page 8 of 8
Given all this, the panel considers it is fair in all the circumstances that the insurer
pays the complainant $2,500 in compensation for non-financial loss.
Complainant’s legal fees are not payable
The complainant’s legal fees do not relate to requiring the insurer to lodge a claim
directly, or its subsequent management of the claim after it was lodged. As such, the
insurer is not liable for the complainant’s legal fees.
Insurer not liable for other losses being sought
The complainant has summarised a range of costs and expenses she incurred since
the loss. These include increased mortgage interest and debt, the costs of selling the
property, medical expenses, unpaid leave for time taken off work for repairs and
managing the claim. The complainant estimates her losses are considerable.
These costs are not covered under the policy.
AFCA may award financial losses that were caused by the insurer’s failure to meet its
obligations. Such losses must be reasonably foreseeable and caused by the insurer’s
conduct. However, the panel does not accept this applies to the costs being sought.
The complainant says she had to sell the property because it was not safe to live
there. However, this is at odds with the fact she found a purchaser. Also, there is no
evidence confirming the property is unsafe to inhabit.
The complainant referred to her partner passing away and this being due to the
property’s condition. She is seeking $200,000 under the ‘Voluntary Workers’ section.
This section only responds if the death is due to a bodily injury. No medical evidence
has been provided about her partner’s death. There is no basis to conclude his death
was due to the claim or falls within this policy coverage.
For the medical costs, the available information does not say they were i ncurred
because of the insurer’s handling of the claim. Whilst there is reference to the fact the
damage to the house was contributing to issues, this is not conclusive. Further, even
if the medical issues were associated with the damage, the panel notes the
complainant and the OCM had a difficult relationship. This clearly had an impact on
her. As stated previously, the insurer is not liable for the OCM’s conduct.
No evidence has been provided from the complainant’s employer to show she had to
take unpaid leave due to the claim. Even if she did, it is not clear if this was due to her
interactions with the OCM or the insurer. For the belongings, these are contents and
not covered.