Determination 686882

Cost of rectifying storm and defective repair damage; cash settlement

FirmIAG
Decided2020-12-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$145,330
Non-financial loss$3,500
Amount claimed$165,530
SourceAFCA PDF

Summary

A homeowner rejected the insurer's cash settlement offer for storm damage and defective prior repairs and sought settlement based on his quotes. AFCA ordered a cash settlement with a 10% uplift, temporary accommodation, expert report costs, non-financial loss compensation, and interest on the report costs, but rejected the rent claim and indirect financial loss.

Where the insurer cash settles, the amount must reflect the full claim-related damage and be based on an actionable quote, with a contingency allowance; temporary accommodation is payable where the home is uninhabitable during repairs.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 686882 Financial firm Insurance Australia Limited Determination | Case number: 686882 Page 1 of 15 Case number: 686882 3 December 2020 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim on 25 April 2015 after his property was water damaged on that day. The insurer accepted the claim and undertook repairs to the property. The complainant raised concerns regarding the adequacy of repairs after noticing visible cracking sometime after the repairs were completed. The insurer assessed the damage and found that the repairs were not undertaken correctly and offered to cash settle the cost of the required repair rectification. The complainant says the amount offered to repair the storm related damage and the inadequate repairs by the insurer’s builder is insufficient. To resolve the complaint, he requests the insurer provides settlement based on the repair quotes he has obtained. 1.2 Issues and key findings What is the extent of the insurer’s liability for rectification repairs? The complainant provided a recent quote which he says accurately reflects the rectification repair work required. This quote and email was exchanged with the insurer on 25 September 2020. The insurer has not disputed the complainant’s quote or provided a quote of its own. Therefore, on balance, the panel is satisfied the quote provided by the complainant is an accurate assessment of rectification works required as it is not challenged by the insurer and it is based on the insurer’s own scope of works. The insurer must cash settle the complainant the amount of $127,000 plus a contingency of 10% to allow for potential variations and the transfer of risk. Is the insurer required to make other payments to the complainant? Yes: the insurer is required to provide temporary accommodation costs from the date of repairs commencing until the date of completion. As the home is undergoing extensive repairs, the panel is satisfied the home will be uninhabitable during this period. Upon satisfactory proof, the insurer is to indemnify the complainant for the cost to remove and store contents and then return them to the home after repairs. Determination | Case number: 686882 Page 2 of 15 The available information establishes it is fair the insurer contributes to expert report costs because the claim was complex and the complainant needed expert opinion to make his case. While the panel accepts the property cannot be lived in while it is being repaired, the panel does not accept the property is presently unliveable so the insurer is not required to pay the complainant any amount for rent paid by the complainant. Is the complainant entitled to compensation? Yes: the available information establishes there has been an unusual degree or extent of physical inconvenience and time taken to resolve the complaint which would have interfered with the complainant’s expectation of enjoyment or peace of mind. The complainant has not provided sufficient evidence to show the handling of the claim by the insurer has caused him indirect financial loss and so the complainant is not entitled to compensation for indirect financial loss due to the handling of his claim by the insurer. 1.3 Determination This determination is mainly in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance, the insurer is required to pay the complainant the following:  $139,700 for rectification repairs  $3,760 for temporary accommodation during repairs  $1,870 for expert report fees  $3,500 compensation for non-financial loss. If the complainant has paid for the expert reports, the insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act on $1,870 from the date of payment for the reports until the date of settlement. Should the complainant accept this determination then within seven days of notification of acceptance, the complainant is to provide the insurer with a quotation for the cost to remove and store contents and then return them to the home during the rectification repairs. Upon receipt, the insurer is to assess this aspect of the claim and cash settle the complainant. Determination | Case number: 686882 Page 3 of 15 2 Reasons for determination 2.1 What is the extent of the insurer’s liability for rectification repairs? Valid claim has been established This has been some lack of clarity as to the exact mechanism leading to the initial damage, however, irrespective of this the panel is satisfied that the complainant’s property suffered water damage on 25 April 2015. The claim was accepted, and repairs we re undertaken by the insurer’s builder (M). Sometime after the repairs were completed, the complainant raised concerns regarding the adequacy of these repairs upon noticing cracking and gaps in the ceiling. After further investigation by the insurer, it accepted the works undertaken by M were inadequate and required rectification. On the available information, the panel is satisfied a valid claim has been established as the insurer has accepted the claim and confirmed rectification issues are evident based on its post repair inspection. Complainant says insurer’s offer insufficient to rectify repairs The claim file was reopened in January 2018. The insurer arranged for an inspection by a builder (AG) and an engineer (CD). Both agreed rectification work was required. The insurer consulted with M. As the roof is under pitched, M was not willing to warrant the repairs and said a cash settlement of $14,037.27 was adequate. Relying on repair quotations obtained from KG ($74,250), AH ($120,000 plus GST) and PP ($111,692.76) the complainant said the offer was inadequate. In its final decision letter on 23 September 2019 the insurer agreed the repair work conducted by M was insufficient and rectification work was required. It said a further assessment would be carried out to report on additional repairs required. Due to a miscommunication no builder was allocated. By letter dated 21 February 2020 the insurer said an independent engineering company (CFT) was allocated to the claim. CFT finally inspected the property on 12 August 2020. Upon the complainant receiving an updated scope of works from CFT the complainant provided quotes from his nominated trades (KP) ($127,000 including GST) and (EW) ($142,000 including GST). The quotes for rectification repairs were provided to the insurer. A summary of the material relied on by the parties is set out in supporting section 3.3 of this determination. Determination | Case number: 686882 Page 4 of 15 In view of the large discrepancy between the amount offered by the insurer and the quotations obtained by the complainant, the complainant rejected the offer made by the insurer. The complainant requested the insurer provide settlement for the amount quoted by his experts. Insurer has not disputed the complainant’s costings The complainant provided the quote from KP on 22 September 2020 for the rectification works. The quote, along with the complainant’s email was exchanged with the insurer on 25 September 2020. The complainant provided the quote from EW on 6 October 2020. The quote was exchanged with the insurer on 12 October 2020. On 14 October 2020, the complainant advised the case manager his builder advised him it would take about 6 to 8 weeks for repairs to be undertaken. This information was exchanged with the insurer in a letter dated 18 November 2020. By letter dated 27 November 2020 the insurer said it had no further information to add. The insurer confirmed through discussions with AFCA it would provide a quote from its nominated trades on or by 14 September 2020. In its further notice of response of 8 September 2020, the insurer said it had requested a quotation for the rectification costs based on CFT’s scope of works. On receipt of the quotation it said it would provide a cash settlement offer based on the quotation with a 10% variation. To date the insurer has not provided any further submissions disputing the complainant’s quotes nor has it provided a quote of its own. It is fair the claim is cash settled The insurer’s policy states it can choose to settle a claim by either arranging for repairers to repair the home or by paying the reasonable cost to repair the home. The insurer has confirmed it wishes to cash settle this claim on the basis that there are maintenance and defects issues which are likely to affect the rectification works. The panel generally prefers for rectification repairs to be undertaken by the insurer, but in all the circumstances of this claim, the panel is satisfied it is fair for the insurer to cash settle the claim. This is because considerable time has passed since the initial repairs by M, the available evidence shows there are some maintenance and defects issues with the property and because of the state of the relationship which are now exists between the parties. The panel has considered the quotations provided by the complainant. Both quotations appear to include items which were not on the CFT scope of works. The Determination | Case number: 686882 Page 5 of 15 panel prefers the quotation provided by KP as it is clearly sets out the reasons why these extra items have been included. The panel finds the quotation provided b y EW lacks the same particularity. The insurer has not commented on the quotations provided by the complainant. The insurer has not provided its own quotation of the cost of rectification based on CFT’s scope of work. Insurer to pay to the complainant $139,700 for rectification repairs Based on the information provided and in the absence of any further responses from the insurer, the panel is satisfied the quote provided by KP is fair and is actionable. KP’s quote addr esses concerns raised by the complainant including issues with asbestos and electrical issues. In circumstances where a cash settlement takes place an insurer should consider any contingencies and variations which may occur once repairs commence. Additio nally, the insurer’s policy provides a lifetime guarantee if the insurer undertakes repairs and it is fair the complainant is compensated for giving up this lifetime guarantee on repairs. In view of the earlier comments made about KP’s quote and that it is actionable and relatively recent, the panel is satisfied an uplift of 10% is fair in all the circumstances and that no interest is payable. The insurer is therefore required to pay to the complainant for rectification repairs in the sum of $127,000 plus a 10% contingency for transfer of risk and potential variations. Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainant $139,700 for rectification repairs. 2.2 Is the insurer required to make other payments to the complainant? Upon proof, the insurer is to pay the cost to remove and store contents The complainant claims for the cost of relocation of household items during repairs. Although EW refers to this item in his quotation the amount allocated is not specified. The insurer has not addressed this issue. Included in the cover under building insurance is the cost to remove and store contents and then return them to the home. Should the complainant accept this determination then within seven days of notification of acceptance, the complainant is to provide the insurer with a quotation to remove and store contents and then return them to the home during the rectification Determination | Case number: 686882 Page 6 of 15 repairs. Upon receipt, the insurer is to assess this aspect of the claim and cash settle the complainant. The insurer is to pay $3,760 for temporary accommodation during repairs The complainant’s policy provides cover for temporary accommodation when the home has been damaged because of an insured event and the insurer agrees the insured cannot live in the home whilst these repairs are being undertaken. The policy confirms this amount is paid over and above the sum insured noted on the certificate of insurance (COI). The insurer’s policy does not defin e the concept of the property being unliveable nor does it set out the criteria required for the premises to be considered unliveable. AFCA generally considers that consideration of the fitness of the premises for habitation is usually limited to factors such as being secure to the elements, access to electricity, gas and water at the premises, as well as kitchen and bathroom facilities, and the absence of contaminants or other safety hazards. The repairs required to the property include damage to the ceili ngs in multiple areas. In some areas of the property, ceilings require complete replacement. Upon review of the scope of works, the panel is satisfied works required are extensive as the home requires major works to be undertaken. The panel has considered all the available material and is satisfied, on balance, the property could not reasonably be considered liveable whilst the rectification works are undertaken. The complainant has confirmed the repair timeframe will be approximately 6 to 8 weeks. The insurer has not challenged this assertion. The complainant says he is living in rented accommodation paying $470 a week. While he has provided no proof of this outgoing, the panel is satisfied this is a reasonable amount for temporary accommodation in the co mplainant’s area. Should the complainant accept this determination then within seven days of acceptance of the determination, the insurer is to pay to the complainant 8 weeks temporary accommodation in the amount of $470 per week ($3,760). The insurer is to pay $1,870 for expert reports The complainant claims for the cost of reports from his expert engineer (PP). The panel has considered the reports provided by PP and PP’s invoices which total $1,870. Pursuant to AFCA Rules (D5) AFCA may decide an insurer is to contribute to the complainant’s costs. The panel is satisfied it is fair the insurer contributes to these costs because the claim was complex, and the complainant needed expert opinion to make his case. Determination | Case number: 686882 Page 7 of 15 Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainant $1,870 for the reports. If the complainant has paid for the reports, the insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act on $1,870 from the date of payment for the reports until settlement. The insurer is not required to pay the complainant for rent The complainant claims around $36,660 for rent. Due to serious health and safety hazards present in the property (especially for his young daughter who has high care needs) he says he had to rent elsewhere since November 2019. He also says due to the marriage breakdown since November 2018, his wife and daughter have lived elsewhere. The complainant says the property has many health and safety issues, like mould and dust and pests invading the interiors through cracks in the ceilings and walls and electrical safety concerns. The panel notes some of these issues were raised when the file was reopened in 2018. The claim file notes show the insurer conducted a minor make safe at the complainant’s request at this time. The panel has carefully reviewed all the material provided including recent photographs and PP’s report which refers to these issues. Taking all matters into account and particularly the recent photographs, while the panel accepts the property cannot be lived in while it is being repaired, the panel does not accept the property is presently unliveable. In the circumstances, on the available information, the panel is satisfied the insurer is not required to pay the complainant any amount for rent paid by the complainant. 2.3 Is the complainant entitled to compensation? Compensation paid in some circumstances. The complainant makes several complaints about the way the claim was handled, and delays occasioned by the insurer. AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal Determination | Case number: 686882 Page 8 of 15 degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Insurer to pay to the complainant $3,500 compensation for non-financial loss Having reviewed the available information, the panel is satisfied that the complainant is entitled to compensation for non-financial loss. The complainant has shown the wor ks undertaken by the insurer’s builder in the first instance were inadequate. This is not disputed by the insurer and it accepts the home requires rectification works. The complainant’s claim has also experienced multiple delays of many months at a time due to the insurer failing to arrange the attendance of trades and provide a quote for rectification works. The insurer was also followed up by AFCA on several instances for an updated quote and significant delays were experienced in obtaining this information. The panel notes the insurer’s apology. The panel accepts the insurer’s claims handling was untimely and caused significant stress and inconvenience to the complainant. Taking all matters into account the panel is satisfied it is fair the insurer pays to the complainant $3,500 compensation for non-financial loss. Complainant is not entitled to compensation for indirect financial loss The complainant claims his take-home earnings have dropped significantly because he has been unable to take up overtime shifts or attend to call for certain assignments. AFCA may award compensation for indirect financial loss up to a maximum of $5,000. Where a general insurance policy excludes liability for consequential (indirect financial) loss, AFCA may still make such an award of compensation if indirect financial loss has been caused by the unreasonable handling of the claim by the insurer. On the available information, the panel is not satisfied the complainant has provided sufficient evidence to show the handling of the claim by the insurer has caused him indirect financial loss. In the circumstances, on the available information, the panel is not satisfied the complainant is entitled to compensation for indirect financial loss due to the handling of his claim by the insurer. Determination | Case number: 686882 Page 9 of 15 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms Relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response . Both the policy document and the Notice have been exchanged with the complainant. Page Key points Page 35 Temporary accommodation for home owners If a listed event causes loss or damage to your home and we agree you can’t live in it and you need to move out so it can be repaired or rebuilt. Covered under Buildings Insurance costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site any additional living expenses that we agree are Determination | Case number: 686882 Page 10 of 15 Page Key points appropriate costs to remove and store your cont ents and then return them to your home. Page 53 What we don't cover […]  compens ation for distress, inconvenience or ot her non - financial loss, except if covered under liability cover  consequential financial loss - for example, loss of profits, except if covered under liability cover. Page 58 How we settle your buildings claim […] 2. Pay you the reasonable cost to repair or rebuild your home. We can choose to:  pay you  pay your nominated repairer, supplier or builder, or  provide you with store credits from one of our nominat ed suppliers. 3.3 Extracts from material relied on by the parties Date Action Scope of repair works by insurer’s builder (M) 25 May 2015  Scope describes work to be done in bedroom1, garage, living room, and roof. Note from complainant regarding scope of works  Required amendment of scope and confirmation i n sul ation will be removed and replace d as became wet during and after the storm.  Has weakened the integrity of the existing ceiling s . Water coming through damag i ng carpet and bedding .  Conc erned further storm damage to rear perimeter of property. Insurer’s report (AG) 18 January 2018  Inspected and photographed as since repairs were completed storm damage cracks appeared in ceilings in the hall, kitchen, lounge ro om and garage.  D amage to the ceiling in the hall, kitchen & lounge (small impact area) was related to the event.  C racks in the ceiling of the garage is faulty workmanship and the cornic e repair was overlooked.  M ajority of the ceiling in the lounge room ap pears to be within tolerance but further investigation would be required to confirm due to the extent of insulation required to be moved to inspect.  Estimated cost of repairs $5,319.78. Determination | Case number: 686882 Page 11 of 15 Date Action Insurer’s report (CD) 8 May 2018  Inspected and photographed 27 April 2018 with complainant.  Ceiling to the garage has been repaired and the joints are visible and of a poor finish with joints easily visible. The joints to the plasterboard ceiling of the garage have also cracked due to poor workmanship.  1.2 The mark to the cornice in the living room is due to the bottom cord of the truss slightly bowing down over the wall plate and causing the cornice to deflect.  1.3 The cracks to the living room ceiling around the fan is due to the ceil ing being repaired there previously and as a result of additional weight and moisture to the ceiling. The Insulation to the ceilings in the living room, the hallway and the main bedroom were not replaced at the time of the repairs and the moisture to the c eiling and insulation would have been trapped.  1.4 This is also the cause of the fixings to the ceilings to have bled through the paint work.  1.5 The caus e of the cracking to the ceiling in the hallway is also a combination of moisture to the ceiling being left and the gradual time for the plasterboard timber and insulation to dry out would have been at different rate causing added stress to the plasterboard and expansion and shrinkage to the timber roof trusses.  1.6 The plasterboard to the hallway has also had wat er ingress through the tiles and the valleys caused by heavy debris and this has also contributed to the cracking of the ceilings.  1.7 The roof pitch to the front balcony roof is under pitched at 11 degrees with the minimum pitch for tiles being 15 degrees. This section of the roof is sarked but the sarking is breaking down due to age and this would have been a contributing factor for the wat er ingress during the hailstorm due to then flat pitch allowing water to ingress into the roof cavity. We also witnessed watermarks to the battens and the insulation at the time of the inspection but we are unable to determine if they are from the event or more recent due to the insulation not being replaced.  1.8 The water damages to the cornice to the front of th e garage are due to the single skin brick work and the barge pointing breaking down allowing water to enter the wall and flow through the flashing to the internal of the wall and out on to the cornice below. Due to the cornices being blackened and deterior ated this has been happening for a period of time before the hail event.  1.9 Cracking to the ceiling in hallway is a combination of not replacing the insulation and the debris to the Determination | Case number: 686882 Page 12 of 15 Date Action roof allowing moisture to penetrate the ceiling cavity.  1.10 Downlights h ave stopped working due to them being covered by the insulation and overheating.  Recommended complainant clean the roof and re - point roof tiles.  Recommended repairer return and replace the insulation to the front section of the roof and repair the cracked and uneven finish to the garage plasterboard. Complainant’s repair costs (KG) 26 February 2019  Removing and placing ceiling, insulation and wiring, replacing timber wall, wall lining in lounge and hallway main room wall lining, bathroom timber wall damage, painting, pest control: $74,250 including GST. Complainant’s repair costs (AH) 3 March 2019  Repairs to ceiling, external walls, internal walls, work in bathroom, pest control, painting: $120,000 plus GST.  Some work excluded.  Duration of project minimum six weeks from practical start. Complainant’s structural engineer’s report (PP) 12 April 2019  On 16 March 2019, over 2 hours, this structural engineer inspected the property with the complainant to assess its integrity and adequacy after recent cracks, movements, defects found resulting from the hail storm which occurred April 2015 and failure to rectify by insurer’s builder.  Provided supporting documents including photographs and a diagram of defects.  1. I nspection revealed several defects at the properly resulting from the non - standard repair works of the insurer’s contractor after the hail storm in April 2015.  2. Insurer’s repairer had not been taking care enough for the remedial works that they had carried out. Th ere had not been any method to strengthen the roof structure implement ed from the hailstorm impact. The roof has been deformed and the integrity of the roof structure (or truss system) has additional deflection of minimum 10mm in compared to the original s tate.  3. A ‘Band Aid’ solution was implemented to the repair works carried out by the repairer such that the ceiling was cut and joint out of the cornices which were supposed to be replaced as a whole.  4. Wall plasterboards and stud wall had not been inves tigated carefully in such that moisture was trapped inside the stud walls and the plasterboards have been absorbing and swollen causing cracking and loosen joints.  5. Moisture had also trapped in roof space causing smell and damages to anti - insect barrier of the ceiling. We found dust, moisturized insulation, insects, Determination | Case number: 686882 Page 13 of 15 Date Action cockroaches, spiders, ... within roof space. Apparently, the insects, mouldy dusts invading the rooms through cracks have put threats to health and safety of the occupants.  6. The roof pitch f ound 11 degrees that is non - standard for this kind of tile roof to the front area of the property should have been rectified or suggested to rectified after the hail storm as a call of builder’s and insurer’s due diligence.  7. Electrical hazards including blown - out downlights and broken - down electricity have raised a big concern to the owner. Light tube was blown out and felt over head of the owner wife. The insurer had not investigated the whole system after the hail storm as required. Wiring was found eve ry where within the roof cavity.  8. The whole building was put into dangerous situation due to the unthorough repair works of the contractor that have developed the hazards and threatened health and life of the occupants.  9. We are of the opinion that thoro ugh rectification should be carried out by the insurer. This includes but not limited to 9.1. Repair/ replace ceilings of the Living rooms, Garage, Bedroom 1, Hallway, Kitchen, Dining Room, Family Room, Bathroom and Toilet. Check other ceiling areas. 9.2. Check/ Measure moisture, structural integrity of roof trusses and rectify for long term capacity. 9.3. Replace thorough insulations of the entire ceiling 9.4. Replace wall plasterboards of Living room, Kitchen, Hallway, Bedroom 1. 9.5. Replace cornices and all left over compromised ceilings 9.6. Seal leakages to ceiling, Bay windows and windows 9.7. Check and rectify stud walls.9.8. Check and rectify/ replace the whole building electrical system. 9.9. Carry out all necessary checking/rectification works to reinstate habit ability to the building Complainant’s rectification quote (PP) 3 May 2019  Provided a cost estimate as per its defects report in the sum of $111,692.76 including GST. Insurer’ s building inspection report (CFT) 21 August 2020  After an inspection and review of earlier reports from the insurer, the report details information to determine causation and identified damage as a result of the storm in 2015 and building defects and maintenance related issues.  Inspection took place 12 August 2020 with the complainant.  Described the storm related damage and work required in the garage, laundry, living room, hallway, Determination | Case number: 686882 Page 14 of 15 Date Action bedroom 1, kitchen, family room and painting and replacement of light fittings.  Described some maintenance relat ed work a nd a building defect in relation to the under pitched skillion roof to the front of the house.  Highly probable materials containing asbestos at site and this should be attended to before repairs.  Concluded the initial damage to the ceilings in 2015 was d ue to water ingress caused by the low roof pitch and the choking of valley gutters with debris but these issues were not identified as the cause of the water ingress, nor were they attended to and repaired prior to the ceiling repairs been complet ed.  Damp ceiling insulation was never removed and a combination of the damp ceiling insulation and ongoing water ingress due to the low roof pitch and choked valley gutters continues to contribut e to the ongoing water damage to the internal area of the house.  Ini tial water damage due to the storm in 2015 was not repaired in compliance with relevant Australian standards.  Provided a scope of works for the repair of the resultant damage. Insurer’s scope of works storm (CFT) 21 August 2020  Scope compiled following a site inspection by insurer’s licensed qualified builder following information provided on site by the complainant for the purpose of reinstating the building to a condition similar to that prior to the event.  Provided a scope which included comments in relation to electrical works and asbestos. The scope describes work required to be done generally, in bedroom 1, living room, family/kitchen, hallway, garage/laundry, and general prot ection and clean - up. Complainant’s rectification quote (KP) 21 September 2020  KP quote (applicable for 30 days) based on scope of works developed by CFT, discussion with complainant and site inspection.  Describes work to carpentry and roof exterior, plaster and paint work and electrical: $127,000 including GST.  E xcludes any unforeseen circumstances throughout building. Complainant’s rectification quote (EW) 3 October 2020  Quote to correct defective repair consequences – scope comprises engineers list and on - site inspection evaluation $142,000 GST included. 3.4 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails. Determination | Case number: 686882 Page 15 of 15  Parties’ expert reports.  Photographs, invoices and quotations  Claim file notes.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.