Cash settlement amount for storm roof and mould damage

FirmYoui
Decided2020-06-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$69,813
Non-financial loss—
Amount claimed$128,000
SourceAFCA PDF

Summary

After a storm damaged the roof, the complainant sought $128,000 for repairs while the insurer offered a cash settlement of $55,850.32. AFCA accepted the insurer's scope, increased the offer by 25% to $69,812.88 and ordered cash settlement.

The insurer may choose the settlement method but must act reasonably, and the engineers' reports were more persuasive than the preliminary builder report.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 686682 Financial firm Youi Pty Ltd Determination | Case number: 686682 Page 1 of 5 Case number: 686682 12 June 2020 1 Determination overview 1.1 Complaint The complainant holds a buildings accidental damage policy with the financial firm (insurer). He lodged a claim on 20 December 2017 following a storm event. The insurer accepted the claim however the complainant does not accept the scope of works provided by the insurer is adequate to restore the property to its pre-loss condition. The complainant says the upper level of the property needs to be removed and rebuilt and the insurer’s proposed method to remediate the mould damage to the property is not acceptable. The insurer relying on its expert reports says the upper level does not need to be replaced. As the complainant rejected its offer to restore the property, the insurer offered a cash settlement of $55,850.30 for all repairs. The complainant rejected the offer and submitted a quote for $128,000. The insurer has offered to have the property re-assessed. The complainant has refused this offer and wants to be cash settled his quote amount. 1.2 Issues and key findings Is the insurers offer fair in the circumstances? The panel is satisfied the scope of works obtained by the insurer is fair and can be relied on to settle the claim. As the claim is to be cash settled (and to cover possible contingencies) the panel considers it fair that the offer of settlement should be increased by 25% to $69,812.88 1.3 Determination This determination is in favour of the insurer. The Insurer is to cash settle the complainant ’ s claim for $69,812.88 based on the insurer ’ s scope of works and including a 25% allowance as set out under section 2.1 of this determination. Determination | Case number: 686682 Page 2 of 5 2 Reasons for determination We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. This determination is made by a panel consisting of the panel chair ombudsman, together with a panel member with extensive experience in the insurance i ndustry and a panel member with extensive experience in consumer claims. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address the issues raised. This determination follows consideration of all the available material. It is based on what is fair in all the circumstances having regard to the relevant law, terms of the policy, good industry practice including codes of practice and prior determinations, where appropriate. 2.1 Is the insurer required to increase its offer of settlement? Damage falls within terms of the policy The policy is an insured events policy that provides cover for a series of insured events including storm. There is no dispute the property sustained damage with heavy winds causing the metal roof sheet blow off, and contents of the roof cavity to fall into the rooms below. The damage clearly falls within the terms of the policy. Complainant disputes the scope of works On acceptance of the claim the insurer appointed a builder (J) to carry out a make safe to the roof. The insurer’s intern al home assessor (L) then appointed a structural engineering consultant (JM) to advise on the engineering requirements to rectify the roof, and to provide a scope of works. This was done on 19 January 2018. The complainant was not satisfied with the scope of works provided by JM. He also stated there were mould issues which had not been addressed by either J or JM. L agreed to appoint a hygienist (E) to provide advice on the mould remediation. On receipt of this report restorer (R) provided a quote for remediation. The complainant disputed the method of remediation proposed. He says decades worth of rodent excrement and putrid water drenched the rooms below, and the original report provided by J recommended the entire second storey be removed. The report from JM makes no such recommendation. Determination | Case number: 686682 Page 3 of 5 The experts have established the method of remediation The panel acknowledges the first report from J does recommend the second storey (upper level) should be removed, ‘ as mould is already starting to spread through the flooring of the second storey ’ , however, the report also states this (course of action) ‘ will need to be confirmed by an engineer to provide a SOW (scope of works) to quote from ’. The panel is satisfied the report from J was preliminary in nature, and not a confirmed or final decision on behalf the insurer as to the method of repairs, or mould remediation The insurer appointed another engineer (L) to attend and provide a report. In summary it found the first-floor structure appeared to be in very good condition, and the first-floor flooring structure did not appear to have been affected by the storm. It recommended removal of the wall lining to allow drying to be conducted and therefore facilitate roof repairs. The complainant had the opportunity to provide an independent engineering report to dispute the scope of works and support the quote from PD of $128,000. As an engineer himself he would have understood the importance of such a report. On balance the panel is satisfied the two engineer reports are consistent in recommending repairs to the upper level as opposed to removal and replacement of it. Further, the panel finds the engineer’s repo rts more persuasive than the original building consultant’s report and recommendation. Insurer has agreed to change method of mould remediation The complainant disputed the method of mould remediation proposed by R. He renovated the upper level of the property in 2016 and used zero VOC (solvent) paint, flooring and finishings to ensure a healthy sleeping environment for his two sons, one of whom suffers from serious allergies. He says the report submitted by E recommended removal and replacement of visibly mould affected sections of timber and use of an abrasive media to blast the affected timber flooring, and removal of wall linings. Further it says ‘ source removal of mould contamination should always be the primary means of remediation. Indiscriminate use if antimicrobials, coatings, sealants, and cleaning chemicals is not recommended’ . R provided the complainant with a list of chemicals to be used. The complainant says the use of the chemicals proposed is unacceptable. He submitted his own research into the proposed chemicals. E was asked for comment in relation to these concerns and advised ‘ the way in which they would be used is not in any way indiscriminate ’. Further ‘The techniques described by R in the quote are part of a standard operating procedure used across the mould remediation industry’. Determination | Case number: 686682 Page 4 of 5 E also states ‘ The list of chemicals provided are permitted for use in Australia. However…the use of chemicals can be negotiated if any of the key stakeholders does not want them used’. The panel acknowledges t he complainant’s concerns but is satisfied the use of the chemicals and sealing of same at the end of the remediation process is in accordance with the required regulatory framework. There has been no loss suffered in this regard. The insurer offered to amend the method of blasting to any affected material, but this offer was refused by the complainant who maintained only complete removal of the materials would be acceptable. The complainant says the chemicals may be legal now but are on the way to being banned. The panel is satisfied the insurer has attempted to resolve to matter to the best of its ability. Insurer has made genuine attempts to resolve the dispute The complainant says the insurer and its contractors have been dishonest in its dealings, colluded and lied, and have been dismissive in their response when issues have been raised regarding the inadequate scope of works. The complainant has not provided any written form of evidence to substantiate his claims. The panel notes the complainant has not allowed the insurer to proceed with a proposed re-assessment of the property by an engineer and hygienist in an attempt to work through the dispute. On 18 June 2018 the complainant advised the insurer he would respond to the information provided by its dispute resolution area. Follow up contact was attempted by the insurer. The complainant did not respond until 12 September 2018, saying he would only allow the insurer’s assessor or contractors onsite where it was deemed necessary to mitigate any further damage. The insurer has expressed concern over the damage that may be occurring to the property given it has not been allowed to assess it. The insurer says it has repeatedly tried to engage with the complainant, but no response has been received. Its most recent contact with the complainant (prior to the complaint being lodged with AFCA in December 2019) was on 3 December 2018, when it advised him it was still committed to attempting to resolve the matter. Policy allows for cash settlement It is clear from the terms of the policy that the insurer has the discretion to decide which settlement method to adopt. However, AFCA expects an insurer to act Determination | Case number: 686682 Page 5 of 5 reasonably, fairly and consistent with utmost good faith in exercising its discretion, having regard to the circumstances of the claim. The panel accepts the insurer has acted fairly and reasonably in this matter. It was prepared to complete the mould remediation and repairs, but it is clear from the information exchanged that no agreement could be reached between the parties as to the scope of works. In the circumstances it is fair and reasonable for the insurer to cash settle the claim. The insurer’s quote s are the basis of a fair cash settlement The complainant provided his own scope of works and quote for repairs from PD (undated) for $128,000 as part of his submission to AFCA. This quote includes demolition of the upper level and does not address the findings of M’s or L’s reports. The panel does not consider this quote to be persuasive as it does not include findings or recommendations from a structural engineer or hygienist. The insurer initially proposed a cash settlement of $52,108.10, comprising of $36,514.50 (J’s building quote) and $15,593.60 for mould remediation (R’s quote). It later offered $55850.32 based on a revised quote from J of $47,121.80 and from R of $8728.50. The panel accepts the later offer is based on the scope of works obtained by the insurer. Insurer is entitled to cash settle the claim. The offer by the insurer was made in April 2018 and based on its position that it was prepared to complete the mould remediation, obtain a clearance and complete the repairs. Given the lapse of time, the variation in the cost of the mould remediation and the transfer of risk, the panel considers it fair that the offer of $55,850.32 be increased by 25% to $69,812.88 to allow for the contingencies. This increase includes any allowance for interest on the settlement amount. The insurer is to therefore cash settle the claim for $69,812.88 within 14 days of the complainant accepting this determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.