Home / IAG / Determination 686145
Determination 686145
Full denial of rear-of-home damage and underpinning as excluded subsidence
Summary
The complainants claimed for rear-of-home cracking and underpinning after escape of water from broken pipes, and the insurer declined the rear damage as excluded subsidence. AFCA found the insurer could not establish an exclusion for a full denial, made it liable for 75% of the rear damage, and ordered $3,000 for non-financial loss.
The insurer must show an exclusion applies, and the proximate cause of most rear damage was the covered escape of water events from broken pipes and sewers.
Issues
- Claim denial primary · upheld“The insurer's decision to decline cover in full for the work to the rear of the property was not, in any case, fair in the circumstances.”
- Inadequate claim investigation secondary · upheld“The insurer appears to be overlooking the effect of the broken sewers identified by IL in 2015.”
- Delay secondary · upheld“There were delays caused by the insurer due to miscommunications about obtaining scopes of works, quotes and providing updates between 2016 and 2019.”
- Poor communication secondary · upheld“The complainants do not appear to have been informed clearly, definitively or in a timely manner that the rear underpinning would not be covered.”
Subjects and remedies
home or building damagepay claimpay non financial loss
Related
Text of the determination
Determination
Case number 686145
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 686145 Page 1 of 14
Case number: 686145 23 July 2020
1 Determination overview
1.1 Complaint
The complainants lodged a claim under their home insurance policy held with the
financial firm (insurer) for damage to their property in 2013, which was found to be
from a burst water pipe.
Some repairs were undertaken following a dry-out period after the pipe was fixed.
However, in 2017 the complainants informed the insurer that all claim-related repairs
had still not been completed, including underpinning the rear of the house, and they
also claimed for cracking in the external brickwork, cracks around the window frames
and expansion joints.
The complainant believed the insurer had accepted this further claim in July 2018,
and internal repairs were completed in late August 2018, however the rear of the
property was not repaired. The insurer indicated in May 2019 that the rear external
repairs and underpinning of the house would be covered under the claim, only to later
say it was excluded.
The insurer denied the claim for damage to the rear of the property as it says the
damage did not occur from a single listed event covered under the policy, but rather
was from long-term issues with the property, leading to subsidence, movement and
settlement over time. The complainant disputes the insurer’s decision and wants the
work to the rear of the property to be completed, as well as other accepted repairs.
1.2 Issues and key findings
Is the insurer liable for repairs at rear of the property, including underpinning?
The insurer is liable for a proportion of the damage to the rear of the property (as
explained in section 2.1 below), as it has not shown, on balance, the proximate cause
was factors which are excluded under the policy. Instead, the evidence indicates it is
more likely than not the escape of water events from broken/blocked water pipes and
sewer lines over several years were largely responsible.
The complainant is entitled to compensation because of the significant upset and
inconvenience resulting from the insurer’s handling of the claims , including delays and
poor communication.
1.3 Determination
This determination is substantially in favour of the complainant. The insurer is
required to settle the claim for repairs as set out in section 2.1 below, and also pay
the complainants $3,000 as compensation for non-financial loss.
Determination | Case number: 686145 Page 2 of 14
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous AFCA decisions.
I have taken into account all the material submitted by the parties. I am satisfied that
the documentation I have relied on has been provided to both parties. For the
purposes of this determination, I will deal with only those points considered relevant.
2.1 Is insurer liable for repairs at rear of property, including underpinning?
Complainant needs to establish a claim that falls within policy cover
The onus is on the complainant to establish on the balance of probabilities, they have
suffered as loss caused by an event covered under the policy. This is known as a
valid ( prima facie ) claim.
The onus then shifts to the insurer to establish, on balance, it can rely on a policy
condition or exclusion, or is otherwise entitled to decline the claim.
The policy covers damage caused by the insured events listed in the policy, which
includes escape of liquid. However, that cover is subject to exclusions, including
subsidence, the settling, shrinkage or expansion in buildings, foundations, walls or
pavements, and faulty design or workmanship.
I am satisfied, on the evidence, the complainants have established a valid claim for
escape of liquid from at least two events (the broken water pipes identified in 2013
and the broken sewer lines found in 2015).
Broken/blocked stormwater pipes found in 2013
In November 2013, the insurer engaged engineer IL to report on internal and external
cracking and movement to the dwelling, which the complainants had first thought
might be from an earthquake in June 2012.
IL noted that hydrostatic measurements confirmed floor levels varied significantly
throughout the dwelling. The floor levels to the east entry and master bedroom area
were found to be lower than the rest of the dwelling. CCTV investigation carried out
also identified blocked drains to the rear of the south elevation of the structure. Floor
levels taken during the inspection did not show significant soil heaving, and on that
basis water escape from the south elevation stormwater drain was deemed not
significant.
IL’s 31 November 2013 report says, in summary:
the damage is not attributed to an earthquake
Determination | Case number: 686145 Page 3 of 14
broken stormwater drains towards the west of the north elevation have contributed
to the damage locally, however are not the primary cause of cracking and
movement to the structure
incorrectly graded and uncapped perimeter soils as well as vegetation in close
proximity to the footings are deemed to be the primary cause, with further
contribution by the prolonged drought period and natural movement of clay
founding soils
cracking to the kitchen area is attributed to hea ving of the soil caused by the
broken underground drains
cracking to the rear living area (north-west) is partially (approximately 50%)
attributed to the broken drains, with uncapped soils and vegetation also
contributing
cracking to the front (south-east) part of the dwelling is not attributed to escape of
water from the stormwater.
However, in December 2013, IL confirmed that after a review of the relevant water
authority records, the broken main in the south-east corner had in fact discharged a
large amount of water, and 70% of the damage was attributable to that.
In May 2014, the complainant completed repairs to the stormwater drains to the north
side of the property (since the policy did not require the insurer to repair the damaged
pipes themselves), and a 12-month dry out period commenced from this point.
The 12-month drying out period concluded in May 2015. The underpinning of the front
south-east corner of the property commenced, as well as repairs to the kitchen,
lounge and hallway of the property caused by the broken stormwater drains.
Broken sewer pipes found in 2015
Further movement to the property was then reported and the insurer engaged IL to re-
attend on 20 May 2015.
IL found that the stormwater drains were not contributing to the further movement and
damage. However, it conducted a CCTV inspection of the sewer, and found two
breaks in the junction from kitchen to main sewer branch (hallway) as well as a break
at the junction near the laundry and hallway (toward the rear of the property).
It also noted again that the south side of the property had uncapped soil.
The complainants completed repairs to the sewer mains in August 2015 and a further
12-month drying out period commenced.
New scope of works provided in December 2016
In September 2016, the insurer engaged IL to re-inspect the property after the 12-
month drying out period after repairs to the sewer junctions. IL noted some internal
Determination | Case number: 686145 Page 4 of 14
cosmetic repair works had already been carried out throughout the property, as part
of the original insurance claim for defective stormwater drains.
Another floor level survey was completed and compared to the one from September
2014 (obtained after the initial 12 month dry-out period from the escape of water
event in 2013). IL reported that the hydrostatic floor measurements showed the floor
levels had not varied greatly from those recorded in September 2014, which
suggested the founding soils were relatively stable, with no further internal cracking or
distress to any of the repaired plasterboards. It is relevant to note, however, that this
finding about floor level variance was refuted by engineer TG in 2019 (as set out in
more detail below).
The builders (UB) attended in December 2016 to provide a scope of works for the as
yet unrepaired internal damage to the front lounge, entry, en-suite and front elevation
brickwork; as well as the external southern wall brickwork, although that was only
from the front of the property to the first expansion joint (approximately 10m).
No new leaks found in late 2018, but damage consistent with earlier events
In August 2017 and then towards the end of 2018, the complainants pointed out that
not all repairs were completed, and the insurer arranged temporary accommodation
while internal repairs were attended to. The complainants reiterated specifically that
the external cracking and the rear underpinning was still not fixed.
In December 2018, the insurer engaged plumbers (TB) to conduct more leak
detection tests to investigate whether there were further leaks in the sewer or
stormwater pipework. There were no further leaks or breaks identified, and no signs
of tree root entry. However, on a diagram of the property, TB did identify footpath
movement along the rear of the property.
TB observed (as IL had previously done) that the perimeter of the property had no
signs of subsoil drainage or surface catchments, and that allowed water to pool and
congregate around the perimeter of the property slab. TB specifically recommended
the installation of surface water catchment pits or channels.
The insurer engaged another engineer (TG) to provide an engineering causation
report (dated 13 April 2019).
TG confirmed the previously identified broken sewerage pipes were servicing a large
portion of the dwelling (including the bath, laundry, W/C, kitchen, etc.), which meant
that a large amount of water would have entered beneath the dwelling.
TG was of the view that the movement and damage at the rear of the property was
consistent with the effects of the defective sewerage and stormwater lines as
identified by IL in November 2013 and again in 20 May 2015.
TG did also note that damage had been ‘ further contributed to ’ by the effects of
surface water runoff, trees within close proximity, ungraded soil/garden beds against
Determination | Case number: 686145 Page 5 of 14
the property and natural seasonal movement. They also suggested it was ‘unlikely’
that the footings were designed/deep enough to resist the added pressure of
surrounding trees, but did not provide clear evidence of that.
TG also completed a floor level survey. They stated the comparison of the floor levels
between the years of 2014 and 2016 undertaken by IL on 21 September 2016
revealed a large variance in levels in the dwelling, which they said was most likely the
result of the soil stabilising from the large amount of water that would have entered
beneath the dwelling. Significantly, TG believed that point had been overlooked by IL
who had indicated the floor levels had not varied greatly between the September
2014 and September 2016 readings.
Further inspections and reviews conducted in 2019
TB were engaged again in June 2019 to inspect the rear sewerage and storm water
pipes to check for leaks. No current leaks or defects were identified in those
pipes/drains, however it was again noted that there was no sign of subsoil drainage or
surface catchments, which therefore was allowing water to pool and congregate
around the perimeter of the property slab.
TB did note, however, that although the pipes/drains had now been repaired, the
period during which they were broken/blocked could have contributed to the building
movement.
As concerns remained about continued movement to the rear of the house despite no
recent leaks being identified, the insurer engaged a geotechnical engineer (SG) to
conduct a footing and moisture investigation.
SG attended on 12 September 2019 and reported that were abnormal moisture
conditions at the site. SG said they observed a number of features which ‘ may be
contributing to the soil moisture regime of the building ’ (my underlining), including up
to 300mm of filling over the site, the presence of proximate vegetation and of
uncapped soils (adjacent to the building there is a combination of concrete paving,
loosely placed pavers on sand and crushed rock).
IL then reviewed all the available information and reports taken from 2013 to 16
September 2019. IL attributed the continued movement and cracking in the west
(rear) half of the building to the combined effects of inadequate footings, presence of
large trees in close proximity to footings, inadequate surface water drainage
(uncapped soils) and natural seasonal movement of the highly reactive fill materials
across the site. This was because the drains and pipes had already been repaired a
number of years ago, and moisture levels in the ground continued to be abnormally
high, which IL said indicated the present abnormal moisture conditions were not
caused by water escape from underground drains.
Determination | Case number: 686145 Page 6 of 14
Issue of rear underpinning and repairs has been on-going
The question of whether or not the damage to the rear of the property, including the
underpinning, should be covered by the insurer has continued over the years since
damage and leaks were first identified. However, the evidence indicates the insurer
concluded as early as March 2015 that it would not be covered, without explicitly
informing the complainants.
It is also worth noting that the rear damage, when first reported by the complainants,
appears to have been initially treated as a separate claim; damage to the rear of the
property was not part of the original claim in 2013. That appears to have caused
some confusion and lack of clarity in the insurer’s handling of the claim.
I acknowledge t he insurer’s claim file notes do not necessarily reflect precisely the
content of experts’ reports. However, they are evidence of the way the insurer was
handling the claim(s) and of its understanding and interpretation of any such reports.
The notes record, amongst others, the following pertinent comments:
5 May 2014 - builder UB said the rear cracking is getting worse
3 June 2014 - the insurer’s assessor inspected and found ‘significant movement to
the rear bathroom and bedroom areas’
30 March 2015 - internal emails with the assessor who says ‘No we are not cove ring
the rear [underpinning]’, but with no further commentary or explanation provided
20 September 2016 - the engineer found no damage to the rear of the property
27 January 2017 - foundation repairs have stalled as more movement at the rear is
preventing foundation repairs at the front
November 2017 - UB advised the rear damage was not related to the claim but ‘it
wasn’t documented or advised as to why we were not covering the damage to the
rear of the house’
1 May 2019 - insurer would accept rear underpinning and internal repairs, and told the
complainant ‘underpinning is likely’, with the front and rear underpinning to match.
12 August 2019 - engineer was engaged to provide underpinning design and report
for the rear.
Then, after SG’s report in September 2019, the rear underpinning was declined, on
the basis that the insurer considered the abnormal moisture levels currently identified
(since the leaks were repaired) showed the previous leaks were not the cause of the
damage.
I am, however, not satisfied on the evidence that just because abnormal moisture
levels were found in late 2019, that abnormality was the proximate cause of damage
Determination | Case number: 686145 Page 7 of 14
to the rear of the building, which had already been developing, identified and
considered over the course of several years in the context of two significant water
leaks.
Proximate cause of the damage needs to be established
In order to determine if the insurer is entitled to decline that part of the claim relating
to the rear of the house, it is necessary to identify the proximate cause of that
damage, using a common-sense approach.
It is well-established law that a proximate cause is not necessarily the first or last or
the sole cause of the loss. It is the effective, dominant or operative cause. The courts
have said that if one cause would have resulted in the harm in any case, and the
other would not have done so in the absence of the first, then the first is the proximate
cause.
Where several causes operate at the same time, each cause must be examined for
the qualities of reality, predominance and efficiency as the active, efficient cause that
sets a relevant chain of events in action.
Insurer has not established exclusions apply to allow full denial of claim
The insurer states the evidence proves ‘conclusively’ that the damage to the rear of
the property is not from broken underground drains. Instead, the insurer says, the
cause was inadequate footings (which I do not consider has been clearly
established), the presence of large trees in close proximity to the footings, inadequate
surface water drainage (uncapped soils), and natural seasonal movement of highly
reactive fill materials across the site.
I acknowledge that the evidence from the numerous reports shows the issue of the
uncapped soil/inadequate surface water drainage was recognised very early in the
claim process. Although that does not appear to have been addressed/remedied by
the complainants in the meantime (and so might have contributed to some degree to
damage), I consider that would not necessarily have been practicable, given the need
to first rectify each of the broken pipe/sewer events, and allow for drying out and other
related repairs.
I acknowledge as well that there were some occasions/years when no new leaks or
issues were identified, but during which time damage was present. However over the
seven or so years since the claim was first made, there were also several extensive
drying out periods, which specifically allowed for and anticipated the possibility of
further movement/cracking and settlement. I consider it fair and reasonable to
attribute any such movement and additional damage in significant part to the leaks
which necessitated repairs and drying out in the first place.
Additionally, in reaching its final conclusion in 2019 to decline the rear damage and
underpinning, the insurer appears to be overlooking the effect of the broken sewers
Determination | Case number: 686145 Page 8 of 14
identified by IL in 2015, and the proximity of one of the breaks to the laundry/hall area
towards the rear of the house.
The expert evidence acknowledges the fundamental impact of the leaks on the
property damage, and refers mostly to the other issues (above) relied on by the
insurer more in terms of them being further contributing factors . While SG in 2019
does report abnormally high moisture levels, despite the previously broken pipes
having been repaired, I am not satisfied that alone is sufficient to override the
contemporaneous and progressive evidence collected over the preceding years which
clearly recognises the impact of the leaks. I also note that in those preceding years,
specific moisture testing such as SG’s (b oth in areas affected and those not obviously
affected by the leaks) was not carried out, and so there is no useful point of
comparison between overall conditions then and those more recently.
I am not satisfied, on the available evidence, the insurer has established that
exclusions apply which entitle it to fully decline all rear damage. I am satisfied, on
balance, the proximate cause of most of the damage was the escape of water events
identified in 2013 and 2015.
Insurer is not entitled to fully deny the claim for rear damage and underpinning
When IL first found the broken pipes in 2013, they attributed 50% of the damage at
the rear of the house to that leak. That was before drying out, and the broken sewer
pipes which were found in 2015.
I consider it fair and appropriate in the circumstances that the insurer be liable for
75% of the damage to the rear of the property (that is, cracking in the external
brickwork, cracks around the window frames and expansion joints and the rear
underpinning).
The insurer is required to obtain a current scope of works and underpinning design
and report. Given the complainants are responsible in part for the repairs, as well as
the associated work for surface drainage, the parties may decide that it is appropriate
for the claim to be cash settled. If that is the case, the insurer is required to obtain two
quotes for all damage from appropriately qualified providers. The quotes should be
provided to the complainants for their consideration and should be actionable b y the
complainants as a retail customer. The cash settlement should be based on the
average of those quotes, but should also include an additional 15% of that amount to
allow for contingencies and to take account of the transfer of risk to the complainants.
If the parties agree the insurer is to complete or otherwise authorise actual repairs,
then that work should commence as soon as reasonably practicable, and the
complainants will need to contribute 25% of the reasonable repair costs, based on the
new scope of works and the quoted cost to the insurer (which is likely to be less than
the quoted cost to the complainants, since it is to be expected the insurer will have
access to trade discounts).
Determination | Case number: 686145 Page 9 of 14
The insurer is also required to cover the full costs of any additional benefits to which
the complainants are entitled under the policy (for example, temporary
accommodation), up to the applicable policy limits.
To be clear, the insurer is not required to pay more than the policy limits, if any, for
the claim-related repairs.
2.2 Is the complainant entitled to compensation for non-financial loss?
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-
financial loss (capped at $5,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear
a normal degree of inconvenience during a claim.
Insurer did not adequately inform the complainant of the excluded repairs
There were delays caused by the insurer due to miscommunications about obtaining
scopes of works, quotes and providing updates between 2016 and 2019. The
complainants had to return to AFCA’s predecessor scheme , Financial Ombudsman
Service (FOS) in 2017 to advise that the internal cosmetic repairs had not been
completed, at which point the insurer managed the complaint without further FOS
involvement.
The insurer has acknowledged delays. It also conceded it was unable to confirm
whether or not any ‘formal correspondence’ had been issued to the complainants to
advise the rear of the home would not be covered.
The complainants were informed in May 2019 that the underpinning on the rear of the
property and external brickwork repairs would likely be completed. However, they
were then later informed, after further investigations were undertaken, that would not
be covered under the policy.
In the meantime, the complainants say they have been wanting to sell their home but
were unable to do so until repairs were completed.
I consider the insurer could have handled the matter better. This is because:
the complainants do not appear to have been informed clearly, definitively or in a
timely manner that the insurer had decided the underpinning of the rear of the
house and external brickwork damage would not be covered , with the claim
decision changing a number of times between 2016 to 2019
Determination | Case number: 686145 Page 10 of 14
the insurer’s decision to decline cover in full for the work to the rear of the property
was not, in any case, fair in the circumstances
the insurer apparently overlooked certain repairs it had agree to do, and only
proceeded after the complainants brought the matter to FOS
the time taken to resolve the claims (excluding the dry-out periods) has caused an
extended and unusual degree of the stress and inconvenience in the
circumstances.
I consider it fair and appropriate in the circumstances that the insurer pay the
complainant $3,000 compensation for the stress, upset and inconvenience caused.
Determination | Case number: 686145 Page 11 of 14
3 Supporting information
3.1 Relevant policy wording
Product Disclosure Statement
Pages Wording
23 - 33 The events we cover
We cover your home or contents when certain things happen. These
are k nown as 'listed events'. You can mak e a claim if a listed event
tak es place and causes loss or damage to your home or contents
during the policy period.
You can add options to your Home Ins urance polic y to cover you for
extra events. For more details, see Section 4.
We cover all of the listed events shown in Table 2.1 under:
Buildings Insurance
Cont ents Insurance
62 - 64 General exclusions for all covers and benefits
The exclusions set out in this section apply to all covers and benefits
under your polic y.
What we don’t cover
Loss, damage, injury or death arising from:
subsidence or landslide unless it happens immediately as a result
of:
an earthquak e or explosion
a storm
a flood
rainwat er run - off
storm surge
…….
tree roots
…….
the settling, shrink age or expansion in buildings, foundations, walls
or pavements
…….
Maintaining and occupying your home
We don't cover loss, damage, injury or deat h arising from:
faulty design or work manship
Determination | Case number: 686145 Page 12 of 14
3.2 Expert reports
Record Key Points
Insurer’s expert report (IL)
Engineers Report
31 November 2013
5.0 Summary
5.1 Is the recorded damage attributable to stormwater escape
from the underground drains?
Not all crack ing to the dwelling is attributable to stormwater
escape.
Crack ing to the k itchen area is attributed t o heaving of the soil
caused by the brok en underground drains.
Crack ing to t he rear living area is partially (approximat ely 50% )
attributed to the brok en drains with uncapped so ils and vegetation
also contributing.
Crack ing to the front (south - east) part of the dwelling is not
attributed to escape of water.
Insurer’s leak detection
report (TB)
7 December 2018
Cause of Damage:
No surfac e water catchment and previously brok en storm water and
sewer pipes.
Conclusion:
A visual inspection from the around the ext ernal of the propert y
revealed there to be no allowance for surface water catchment in
various areas.
CCTV of the storm water revealed the storm water had previously
been brok en and has been repaired on the north side of the
property.
CCTV of the sewer under the house slab revealed the pipe has been
relined in the laundry area which is within 2 metres of the building
movement on the south side of the property.
Recommend ations:
Install surface water catchment pits or channels.
Insurer’s engineering report
(TG)
13 April 2019
5.0 Conclusion
As a result of the inspection and information obtained to this point in
time, our assessment has found that the movement and damage
which has occurred to the rear of the dwelling is consistent with the
effects of defective sewerage and stormwater lines as identified
within plumbing report „5447 - CCTV - TD01‟ undert ak en by
„Independent Link ‟ on the 20th May, 2015 and also plumbing report
„IL03999 - CCTV - AH01‟ undertak en by „Independent Link ‟ on the 1st
November, 2013.
The defective sewerage pipes (as identified within plumbing report
„ 5447 - CCTV - TD01‟) are servicing a large portion of the dwelling
(including the bath, laundry, W/C, k itchen, etc.) meaning that a large
amount of water would have ent ered beneath the dwelling.
Comparison of the floor levels between the years of 2014 and 2016
as outlined within letter „9544 – LT – TY01‟ undertak en by
Determination | Case number: 686145 Page 13 of 14
Record Key Points
„Independent Link ‟ on the 21st of September, 2016 reveal that a
large variance in levels were recorded to the dwelling – most lik ely
the result of the soil stabilising f rom the large amount of water that
would have entered beneath the dwelling. This office believes that
this has been overlook ed by the previous engineer who stated within
their letter „ 9544 – LT – TY01‟ that “...floor levels had not varied
greatly from thos e recorded in September 2014.” Therefore, this
office is of the opinion that the defective sewerage pipes have
contributed to the movement and damage sighted to the dwelling.
In addition, as a result of the inspection and inf ormation obtained to
this poi nt in time, our assessment has found that the movement and
damage which has occurred to the dwelling has been further
contributed to by the effects of surface water runoff, trees within
close proximity, ungraded soil/garden beds against the dwelling and
na tural seasonal movement.
Insurer’s expert
G eotechnical report ( SG )
16 September 2019
Moisture analysi s:
The moisture content at shallow depths was greatest at test site two.
This is most lik ely due to it being in the deepest section of site cut
will seepage from behind the ret aining wall and rainfall ponding in
this area.
Test site three had the deepest consistently high moisture levels
suggesting minimal external influence in the area.
The drying of the Clays wit h depth at test site may be due to drying
effects of an olive tree in this area which has been rec ently removed.
During our investigations we observed the following features we may
be contributing to the soil moisture regime of the building:
The presenc e of existing and removed trees and vegetation
around the building.
There has been a 700mm retained site cut to the rear of the site
creating a situation where the building is sitting in a depression in
that area.
There does not appear to be drainage present in the above -
mentioned site cut to divert water away from the building.
There are areas around the rear of the building where here are
loosel y placed pavers on s and against the wall allowing water to
readily build up against the footings.
We encount ered scoria at test site here at footing level. This scoria
allows any free water to travel some distance from its source
through the scoria fill
We have been informed that there have been historical water
leak s on the propert y
Insurer’s expert report (IL)
Engineers Report
17 September 2019
5.0 Summary
5.1 What i s the primary cause for recorded damage?
Further on - going movement and crack ing to the west half of the
dwelling can be attributed to the combined effects of inadequate
footings, pres ence of large trees in close proximit y to footings,
Determination | Case number: 686145 Page 14 of 14
Record Key Points
inadequate surface water drainage (unc apped soils) and natural
seasonal movement of the highly reactive fill materials across the
site.
As underground stormwater drains had already been repaired
numerous years ago, moisture levels in the ground continue to be
abnormally high, indicating that the presence of abnormal moisture
conditions are not being caused by wa ter escape from the
underground drains.
Insurers leak detection
report ( T B)
Report
28 June 2019
Conclusion:
An inspection of the perimeter of the dwelling confirmed no signs of
subsoil drainage or surface catchments, allowing wat er to pool and
congregate around the perimeter of the dwelling slab. Speak ing with
the owner prior to my attendance a separate contractor has attended
and repaired brok en sections of the stormwater pipe and sewerage
drains.
A cctv inspection confirmed that the entire stormwater system is
clear and connected to the mains, the area of stormwater repairs
where conducted under the back yard pergola, as a result of the
drain being block ed and brok en this will have caused the stormwater
s ystem to back up and overflow.
A cctv inspection confirmed that the entire main sewer line is clear
with no signs of def ects, however repairs have been conducted to
the drain at the laundry and k itchen junctions which have been
relined and the lead off ju nction at the riser shaft has been dug up
and repaired the repairs were conducted due to brok en drains as per
insured advise.
The time that these drains had been brok en / block ed maybe a
contributing cause of the movement to the dwelling.
Recommendations :
Install adequate subsoil drainage and surface catchments around
perimeter of dwelling to catch surface water.