Home / Suncorp Group / Determination 685980

Determination 685980

Storm damage settlement excluding structural upgrade costs to comply with building codes

FirmSuncorp Group
Decided2020-09-09
ProductGeneral Insurance · Motor
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$459,007
SourceAFCA PDF

Summary

The insurer paid $48,644.59 for storm damage to business premises after Cyclone Debbie and later offered a further $7,417.06, and the complainant sought demolition and rebuild costs. AFCA found the structural members must be included in the settlement, rejected the demolition quote, and ordered the insurer to recalculate and cash settle the claim based on an actionable quote plus 10%.

Where structural members are intrinsically linked to damaged roof sheets they form part of the damaged portion of the building, so extra code-compliance costs for them are covered under the policy's extra costs clause.

Issues

Subjects and remedies

home or building damagenatural disastersmall businesspay claimreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 685980 Financial firm AAI Limited Determination | Case number: 685980 Page 2 of 5 Case number: 685980 1 September 2020 1 Determination overview 1.1 Complaint The complainant held a motor trade insurance policy with the financial firm (insurer). This covered the business premises for ‘Fire and defined events’. On 3 April 2017, the complainant lodged a claim for damage to his business premises (the property) following a severe storm event related to Cyclone Debbie, on or around 27 March 2017. The insurer accepted the claim and paid the complainant $48,644.59 for repairs to the damaged areas. In further reviewing its liability during the dispute, the insurer offered an additional $7,417.06. This included a 10% uplift for contingencies. The complainant has disputed the insurer’s position. The complainant says the property needs to be demolished and rebuilt to make it compliant to construction codes. The insurer disagrees and says it is only required to cover the loss of the damaged sections, not the extra costs to make the building compliant. 1.2 Issues and key findings Is the insurer’s offer fair in the circumstances ? No. The insurer’s liability should include upgrading the structural members to the affected areas. Therefore, the insurer should increase its settlement as set out in section 2.1. 1.3 Determination This determination is in favour of the complainant. The insurer is to settle the claim as set out in section 2.1. Determination | Case number: 685980 Page 3 of 5 2 Reasons for determination 2.1 Is the insurer required to increase its offer of settlement? Complainant disputes the insurer’s position The insurer offered a settlement of $48,644.59 on 18 December 2017 . This was based on a structural report from engineer P and a quote from R. The complainant initially accepted this. However, he now disputes that the amount is sufficient to repair the damage. The complainant engaged an engineer (GW). GW made the following relevant comment regarding the main shed: This is an area where existing portal frames had suffered previous damage to Cyclone Debbie. The roof replacement would require structural members brought up to code, which should include the portals. The wall sheeting on the main shed requires replacement and structural members brought up to code The complainant has submitted a quote from builder P for the cost of demolishing and replacing the building totalling $459,007. Policy has a limitation about the extra costs of reinstatement GW does not say that the building needs to be demolished. On this point, the complainant’s quote is not persuasive. However, a dispute has arisen between the parties as to whether the insurer is required to upgrade the structural members to bring them up to current standards. I note the information does not show they were damaged by the storm, but the sheeting attached to them were. The insurer has relied on this policy provision to say it is not required to upgrade the structural members given they were not damaged in the storm: 3. Extra costs of reinstatement: Building is not a heritage building If you are insured under this section on a reinstatement or replacement basis, we will also pay the extra cost of reinstatement or replacement of buildings which are necessarily incurred to comply with the requirements of any Act of Parliament or regulation or any by-law or regulation of any municipal or other statutory authority, other than those relating to heritage status of the building. … If the cost of reinstatement of the building insured is less than 50% of what would have been the cost of reinstatement if that building had been totally destroyed, then the amount we will pay will: Determination | Case number: 685980 Page 4 of 5 (a) be limited to the extra cost necessarily incurred in reinstating the damaged portion of the building only; (b) not include any extra cost in relation to any portion of the building which is not damaged; and (c) will not exceed, in any event, the amount that we would have paid if that building had been totally destroyed. Insurer is required to increase its settlement I do not agree with the insurer’s position on this. The structural members and the roof sheets are intrinsically linked to form the roof. I do not accept they can be separated so that the roof sheets and the structural members can be considered different portions of the building. Instead, given they are intrinsically linked to form part of the roof, they form ‘the damaged portion of the building’ for this claim. The situation may have been different if the extra costs involved other parts of the building that were not damaged and required upgrading. For instance, if undamaged walls also needed to be brought up to code. This is not the case here. The sheets and the structural members are connected. They form part of the roof. You cannot replace the sheets without using the structural members. Therefore, they cannot be considered different portions of the building. Further, and in the alternative, I consider this is fair in all the circumstances for similar reasons. Claim should be settled in this way There is no evidence as to what a fair settlement should be. For reasons explained, I am not persuaded the complainant’s quote is reasonable. Given this, the insurer must recalculate its settlement to include upgrading any structural members relevant to the damaged areas. In doing so, the insurer should consider GW’s evidence about the additional items required to add to the current scope of works. This may require engaging GW to settle on a final scope of works. Once a scope of works is settled, the insurer is to do the following:  obtain an actionable quote based on this scope of works  cash settle the complainant based on this actionable quote p lus 10% to account for any potential variances  the insurer is entitled to deduct from this any amounts it has already paid or allowed  this is subject to any other applicable policy conditions (e.g. sums insured) Determination | Case number: 685980 Page 5 of 5 The insurer is not required to pay interest because the settlement should be based on current rates.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.