Summary

A homeowner disputed the insurer's storm claim settlement, including replacement of a rear pergola and several other items. AFCA found the pergola needed repair rather than replacement and ordered an additional $18,193.97, but rejected the gates, walls, roof noise and fascia and column claims.

The insurer may limit its liability to the scope of works supported by its engineers, and exclusions for wind damage to gates and damage to retaining walls applied, so only the pergola settlement was increased.

Issues

Subjects and remedies

pay claim

Related

All RAA determinations · Find similar determinations

Text of the determination

Determination Case number 684949 Financial firm RAA Insurance Limited Determination | Case number: 684949 Page 2 of 7 Case number: 684949 27 July 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) in February 2014 for storm damage to his property. The insurer accepted the claim and organised repairs for some aspects and cash settled others. However, not all items were accepted. The compla inant is disputing the insurer’s decision to deny these items:  noise in roof void  complete replacement of the rear pergola  damage to gates and walls  repairs to the fascia boards and concrete columns at the front of the property  the 20% builder’s margin deducted from the settlement for the pergola repairs. 1.2 Issues and key findings Has the insurer settled the claim to its full extent of liability? The insurer is liable to pay an additional amount of $18,193.97 towards the rear pergola. The insurer is not liable to pay any other additional amount in settlement of this claim. 1.3 Determination This determination is partially in favour of the complainant. The insurer is liable to pay $18,193.97 in full and final settlement of this claim. The insurer should pay this amount within 14 days of receiving notification that the complainant accepts this determination. Determination | Case number: 684949 Page 3 of 7 2 Reasons for determination 2.1 Has the insurer settled the claim to its full extent of liability? Information does not show the pergola needs to be replaced The insurer engaged engineers (F) and (GP). They concluded the pergola sustained damage that requires some repair work and strengthening, as per F’s scop e of works. Neither of them recommended replacement of the pergola. F provided a scope of works setting out the required repairs to the pergola. In subsequent reports and inspections, F did not conclude that the rear pergola required replacement. GP considered the major issues were dilapidation of the timber members and natural defects. In support, GP noted the following:  the method of anchorage of the posts were wholly inadequate  should the verandah have moved in the manner the complainant suggests, the most likely location of distress would be to the connections of the rafters to the pole plate to the main home given the lifting action  careful inspection was made of this area and it was evident that no visible damage was present to the upper portion of the pole plate no r to the rafters in this location  the remainder of the members to the pergola were visually inspected with no damage evident that could be associated with movement of the structure  the only distress noted was to a small number of members where shakes (natural defects) had formed and the rotational distortion of the most easterly rafter. The complainant has not presented any expert evidence to refute this. F and GP are appropriately qualified to provide an opinion on this issue. I am satisfied their reasoning is plausible, logical and consistent with the available information. Therefore, the insurer can limit its liability for the pergola to F’s scope of works . Gates and walls are excluded by the policy The complainant is claiming for damages to:  the side gate  front gate  rear retaining wall; and  front masonry stone wall. F provided several reports to say the gates have likely suffered damage due to wind and their pre- existing condition. This is consistent with the complainant’s position. The insured event of ‘Storm and rainwater runoff’ contains these exclusions: Determination | Case number: 684949 Page 4 of 7 But we will not cover you f or loss or damage: …  caused by wind to gates and fences  to a path, driveway, garden, paving, free standing or retaining walls This means that even if I accept the wind damaged the gates, they are not covered. In terms of retaining or free standing walls, any damage to them is excluded if it is caused by ‘Storm and rainwater run off’. This would apply to the rear retaining wall and front masonry stone wall. The complainant says the walls are not retaining walls. They are raised flower boxes. I do not agree. The photos show they are retaining soil that is being used for planting. This would still make them a retaining wall as they are being used to retain soil. Therefore, any storm damage to them is excluded by the policy. The insurer is not liable for these items. Insurer not liable for noise in roof void The complainant raised the issue of a noise in the roof void. This was assessed by both F and GP. Neither engineer could identify the cause of the noise or associate it with the claimed event. The complainant has provided no information to establish any noise in the roof void exists or that it was caused by the claimed event or repairs. The insurer is not liable for this item. Insurer not liable for cost of damage fascia boards on upper level The complainant says the fascia boards surrounding the concrete columns on the property have been damaged by the event, resulting in water staining. The insurer has accepted this damage. In its s ubmission dated 2 July 2020, the insurer confirmed that it has repaired this damage and paid for it on 27 September 2018. No evidence has been provided to dispute this. The complainant says the insurer should also be liable for the repair or replacement of the concrete columns. The insurer disputes this. F inspected this issue back in 2015 and 2016. F noted the water ingress is very minor and hence, does not currently provide any risk of deterioration. The photos provided do not show the columns were damaged by the event. No evidence has been provided to refute F’s opinion. Further, no evidence has been provided to date to show that damage has since occurred that now requires repairs. Whilst the complainant has provided photos, the Determination | Case number: 684949 Page 5 of 7 damage being claimed is not apparent. Even if such damage has since occurred, then it is not clear the insurer should be liable for this cost. This is because the complainant has a duty to maintain the property and mitigate his loss. Given this, I am not satisfied there is sufficient basis to conclude the insurer is liable for this item. Insurer is not liable for the cost of replacement of upper level flyscreens and clips The complainant says the upper level flyscreens were blown off during the wind event and that some clips on the windows were broken. The insurer says it has accepted and repaired this damage. The insurer provided an invoice in support. The invoice said it supplied and installed four flywire screens to the western side of the property. The complainant has responded with photos of various windows. It is not clear from these photos though which windows:  do not have screens,  had screens before the claim, and  were blown off during the storm and yet to be replaced . As the insurer has produced an invoice for works done, I am not persuaded any further amount is payable. Insurer ’s liability for pergola is limited to $18,193.97 A preliminary assessment was issued saying the insurer should settle the rear pergola based on Q’s quote titled ‘QTE -15381- 1’ plus an additional 15% given the time that lapsed. In a submission dated 2 July 2020, the insurer noted it paid $1,921.75 for works under this quotation and this should be deducted from its liability. No evidence has been provided to refute this. I note the preliminary assessment awarded $20,115.72. This would leave an amount of $18,193.97 payable. Having reviewed the available quotes, it appears the one titled ‘QTE -15381- 1’ was based on a more extensive scope of works. This quote was issued before F provided a scope of works to address the repairs to the rear pergola. Following F’s s cope of works, A issued another quote titled ‘QTE -15381-2 ’ . This totalled $13,080.10. Determination | Case number: 684949 Page 6 of 7 Given this, I do not consider it is fair to increase the insurer’s liability. The amount payable under the preliminary assessment provides sufficient allowance for the following:  any additional costs that would have incurred given the time that has passed since the quote was issued  the fact A’s quote may not be actionable Determination | Case number: 684949 Page 7 of 7 3 Supporting information 3.1 AFCA approach to this complaint This complaint has been determined based on what is fair in all of the circumstances, having regard to:  legal principles,  applicable industry codes of practice,  good industry practice, and  previous relevant decisions of AFCA and its predecessors. A full exchange of the relevant information has take n place between the respective parties. Each party has had the opportunity of addressing any issues raised.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.