Home / IAG / Determination 684557
Determination 684557
Misleading holding letter before renewal and changed renewal terms
Summary
An insured company said the insurer's pre-renewal holding letter was misleading and sought reinstatement of the previous policy terms. AFCA found the letter misleading but found the complainant had not established that the conduct caused loss, so no remedy was ordered.
The complainant must show the misleading conduct caused loss, and it did not, because it did not show it tried to obtain alternative cover and the insurer's renewal terms were not unfair.
Issues
- Misleading conduct primary · upheld“I accept the statement that the terms would not be substantially different was misleading.”
- Policy cancellation or underwriting secondary · not upheld“Providing the insurer acts fairly and reasonably, it is entitled to set premium.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 684557
Financial firm Insurance Australia Limited
Determination | Case number: 684557 Page 1 of 9
Case number: 684557 1 October 2020
1 Determination overview
1.1 Complaint
A complaint was raised with the financial firm (insurer) regarding the insurer‟s renewal
offer made on 30 July 2019.
The complainant says the insurer provided misleading information before the policy
was renewed, which caused a loss. The complainant is seeking the policy to be
reinstated on the same terms as those contained in the policy period before renewal.
The insurer says it issued a holding letter, as renewal terms were not finalised. The
insurer says the letter complied with its obligation to notify the complainant of the
expiry of the contract of insurance and that it was prepared to negotiate to renew. The
insurer says the letter was not misleading.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the insurer.
The insurer accepted the recommendation, but it was not accepted by the
complainant . In the circumstances, the complaint has been referred to me for
determination .
1.2 Issues and key findings
Was the complainant misled at renewal?
Yes. The holding letter said the terms would not be substantially different, but the
terms were substantially different, because the cover was for six months not 12
months, the building cover was on an indemnity basis not replacement basis and the
premium was more.
Has the complainant established a loss?
No. The complainant has not established the insurer‟s conduct caused loss.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 684557 Page 2 of 9
2 Reasons for determination
I have decided this complaint, based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding). I have considered all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The complainant is an insured company. The insured company is represented. For
the sake of brevity and convenience, references in this determination to the
complainant include references to the complainant‟s representatives.
The insurer has also been represented during the claim and the complaint. Again, for
the sake of brevity and convenience, references in this determination to the insurer
include references to the insurer‟s representative.
After the recommendation was rejected, the parties made further submissions in
which they essentially reiterated their positions. No new material was provided.
Where relevant, the further submissions will be referred to in this determination.
2.1 Was the complainant misled at renewal?
Summary of events
A chronology and extracts from relevant documents are set out in supporting section
3.1 of this determination.
In December 2018 and February 2019, two storm events damaged the property. The
property is owned by the complainant and leased.
From 1 August 2018 to 1 August 2019, the property was insured, pursuant to a
commercial plan policy. The insurance covered the business property, glass breakage
and business legal liability. The building sum insured was $3,601,628 (replacement).
The premium was $22,251.
On 18 July 2019, the i nsurer sent a holding letter to the complainant. The insurer said
it wished to negotiate the renewal of the policy, but the renewal notice was not
available, as the terms of the renewal were still to be determined. The insurer said it
did not expect the terms to be substantially different.
On 30 July 2019, a renewal offer was made. From 1 August 2019 to 1 February 2020,
the property was to be insured, pursuant to a commercial plan policy. The insurance
Determination | Case number: 684557 Page 3 of 9
was to cover the business property, glass breakage, business legal liability and
business interruption. The building sum insured was $3,709, 677 (indemnity). The
premium was $28,379.
In its letter of 31 July 2019, the insurer explained the policy was a six-month policy
only, as it was placed into manual review until storm repairs were completed and the
storm claim settled. The insurer acknowledged the increase in premium is significant,
but says it is in line with the size of the claim. The insurer also acknowledged the
cover was changed to indemnity conditions until repairs were completed.
On the same day, the complainant‟s tenant accepted the renewal offer , saying it paid
premium on behalf of its landlord (the complainant). The tenant noted the increase
was substantial and said, while the claim was not finalised, it was difficult to find
alternative insurance.
The available information indicates a site inspection/risk survey was arranged by the
insurer sometime prior to policy renewal.
The complainant says the insurer did not attend and did not advise the complainant of
the non-attendance.
The insurer says the risk survey was to be conducted by the insurer‟s area manager ,
but on the day of the survey, his daughter fell ill. It says the insurer contacted the
complainant that day to explain what had occurred.
By letter, dated 14 September 2019, the complainant protested the renewal terms
and, save for maintaining cover for legal liability, he said that otherwise he would self-
insure. He asked the policy to be cancelled from 1 October 2019.
In its letter of 13 December 2019, the insurer said it wished to continue meaningful
discussion and resolve the complaint. It asked the complainant to organise a risk
survey, so it could complete its underwriting review and determine the appropriate
terms of renewal.
Alternatively, it suggested the complainant could find an alternative insurer and it
provided information regarding insurance referral services.
By letter dated 3 April 2020, the insured provided its terms for the reinstatement of the
insurance cover. The policy was to take effect from 1 February 2020, in line with the
renewal for legal liability.
Additional policy wording was added in relation to the current claims. Due to COVID -
19, the insurer said it was unable to complete the risk survey (the insurer
acknowledged the complainant confirmed access to complete a risk survey on 3
March) but will do so once the current situation is resolved.
The offer was rejected by the complainant on 8 April 2020, saying the offer was
ambiguous and dangerous to accept without advice.
Determination | Case number: 684557 Page 4 of 9
Parties’ submissions
The complainant says:
the last-minute change to the policy terms left him without options to seek timely
and competitive alternative cover and so the offer was accepted at the time ;
he requires the policy to be reinstated from 1 August 2019 on the same terms as
the previous year with a suitable premium increase;
the insurer has breached section 58 of the Insurance Contracts Act (the Act) ;
the insurer has not acted in good faith and the holding letter was misleading;
the letter was misleading because the cover was changed from replacement to
indemnity without proper explanation, the premium increased substantially, and
cover was reduced from 12 months to 6 months ;
the misleading conduct caused loss to the complainant;
it is highly unlikely any insurer will accept or consider the risk until the repairs from
the storm damage are completed;
at first the complainant required the site inspection to be conducted by a suitably
qualified and independent third-party, but, in March 2020, agreed the insurer was
to conduct the site inspection.
The insurer says:
as there was a large loss against the policy, the renewal terms were determined by
the underwriter;
it cannot reinstate the policy and, if the complainant wished to re-insure the
building, it needed confirmation there were no claims/damage sustained from 1
October 2019, it needed to complete a survey and then refer to the underwriter to
determine terms and approve cover;
its offer to reinstate risks previously removed stands , but is subject to underwriting
review and requires a survey of the risks to be undertaken by the insurer, not a
third party;
the holding letter was not misleading, but it appreciates the complainant
misinterpreted the intention of the letter;
the holding letter was issued, as renewal terms were not finalised by the
underwriter, because the risk survey could not be done by the area manager
before renewal;
the renewal offer was sent without the risk survey being completed and, as the
claim has not been finalised, renewal terms were offered for six months and the
cover was indemnity only until repairs were completed;
it is at commercial liberty to decide on premium offered;
the complainant is free to find an alternative insurer;
Determination | Case number: 684557 Page 5 of 9
the complainant has not provided any evidence to show it has attempted to explore
the market, or that it has been prejudiced by the insurer‟s actions when seeking
insurance from other providers.
Insurer complied with section 58 of the Act
I have carefully reviewed all the available information. I am satisfied the insurer has
complied with section 58 of the Act. This is because, no later than 14 days before the
day on which the cover was to expire, the insurer advised the complainant in writing,
in its letter of 18 July 2019, that the cover was to expire on 1 August 2019 and that it
was prepared to negotiate to renew the cover.
Renewal terms were substantially different
The letter says the terms of the renewal were still to be determined. From the
available information, I assume this was because the site survey to be conducted by
the insurer‟s area manager had not occurred. The parties agree the insurer‟s area
manager was to conduct a site survey, but do not say when it occurred and provide
conflicting information as to why the site survey did not take place.
In any event, the insurer says in its holding letter it does not expect the renewal terms
to be “substantially different.” The terms were different. The renewal term was for six
months only, the building cover was o n an indemnity basis not replacement basis and
the premium was substantially more. In the circumstances, I accept the statement that
the terms would not be substantially different was misleading.
2.1 Has the complainant established a loss?
Complainant has not established insurer’s conduct caused loss
The AFCA approach is that the remedy is not to make the misrepresentation come
true, but, if we find the insurer misled the insured, AFCA will assess how much worse
off the insured is because of the misrepresentation. As the complainant asserts this
misleading conduct caused loss, the complainant must establish, on the balance of
probabilities, that the misleading conduct caused loss.
Having reviewed the available information, I am not satisfied the complainant has
established the misleading conduct caused loss. I accept there was little time to
obtain alternative insurance when the renewal offer was made on 30 July and the
policy was due to expire on 1 August 2019. The tenant accepted the offer and paid
the rent until the policy was cancelled by the complainant on 1 October 2019.
I accept alternative insurance may be difficult to obtain where the storm damage
repairs were still incomplete, but the complainant has provided no evidence as to
what attempts he or his tenant made in the days and weeks thereafter to obtain
alternative insurance, on or after receiving the renewal offer on 30 July 2019. Rather,
the tenant paid the premium for two months and the complainant remained with the
insurer but altered the cover to liability cover only.
Determination | Case number: 684557 Page 6 of 9
The complainant says the insurer has not acted in good faith and did not provide a
proper explanation for the changed policy terms on renewal. Providing the insurer
acts fairly and reasonably, it is entitled to set premium. In circumstances where the
insurer says the premium increase is in line with the size of a claim and the claim
repairs were not complete, and in the absence of evidence to the contrary, I am not
satisfied the available information establishes the insurer did not act fairly when
making the renewal offer. Further, in its letter of 31 July 2019 I am satisfied the
insurer did properly explain why the renewal terms were different.
When the complainant asked for reinstatement of the old policy terms, I also accept
the insurer was not unreasonable in its request to consider its position. To re-insure, I
accept it was entitled to know there had been no claims or damage since the policy
was cancelled on 1 October 2019 and it was entitled to conduct a survey.
Further, in circumstances where the insurer must itself decide whether it is prepared
to accept the risk or not, I accept it was reasonable for the insurer to insist that the
survey be conducted by one of its officers and not by an independent third party.
Thereafter, until early March 2020, the complainant did not agree to the insurer
conducting the survey and, so, policy terms could not be agreed. Once the
complainant agreed to the insurer carrying out the survey, I also accept it was
reasonable not to conduct a survey at that time, in view of COVID-19 concerns and
restrictions.
Nonetheless, in the absence of a survey, the insurer was still prepared to offer cover
to the complainant in early April 2020. The cover was for one year. The cost was
slightly less than the previous year. The difference was the building cover was based
on indemnity cover, not reinstatement cover, and it would not cover pre-existing
damage. In circumstances where the uncontradicted evidence is extensive damage
was caused by the storm events and this damage was still unrepaired, this offer was
not unfair or unreasonable.
Further, it was not unreasonable for the insurer to offer these terms in circumstances
where COVID-19 meant it could not complete the risk survey. The insurer said it
would conduct a survey once the COVID-19 situation allowed it.
In short, having considered all the available information, I am not satisfied the
complainant has established the insurer has acted unfairly, or that the insurer‟s
conduct has caused loss.
The insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 684557 Page 7 of 9
3 Supporting information
3.1 Chronology and extracts from relevant material
Record Key points
20 December 2018
8 February 2019
Hail, rain and wind events.
Commercial plan policy
1 August 2018 – 1 August
2019
Includes business property damage, glass breakage, business
legal liability: Premium $22,251.
Premium Comparison $26,409.00 (previous year).
Building sum ins ured $3, 601,628 (replacement). Total sum
insured for buildings $3,601,628. Additional benefits: demolition,
clearing of debris $320,000.
Holding letter from
insurer
18 July 2019
Existing policy expires 1 August 2019.
We wish to negotiate the renewal of this policy. Unfortunately,
your Renewal N otice is not available as the terms of the renewal
are still being determined although we do not expect them to be
substantially different. Your renewal notice will be issued as soon
as this is resolved.
Renewal offer
30 July 2019
1 August 2019 – 1 February
2020
Pre mium $28,379 .
Noted 12 February 2019 extensive storm damage to building.
Payable 1 August 2019.
Includes business property damage, glass breakage, business
legal liability, business interruption.
Building sum ins ured $3 ,709, 677 (indemnity). Total sum insured
for buildings $3, 709, 677. Additional benefits: demolition, clearing
of debris $320,000.
Complainant to insurer 14
September 2019
Moving our policy from a reinstatement to indemnity cover now
for only six months a nd increasing the annual fee to $56,758 or
2.55 times per annum is outrageous - the two storm events were
beyond our control.
Save for maintaining business legal liability (cost $496), cancel
policy from 1 October 2019.
Complainant to insurer
4 November 2019
Offer to renew the policy probably breaches section 58.
Require policy to be immediately reinstated on the same terms
as 2017 – 2018.
Insurer to complainant
5 November 2019
Unable to reinstate.
If you wish to re - insure the building need confirmation there has
been no claims or damage sustained from 1 October 2019, we
will need to complet e a survey and then refer our request to our
underwriting department who will determine terms and approve
the cover.
Determination | Case number: 684557 Page 8 of 9
Record Key points
Complainant to insurer
10 December 2019
Not aware of the „offer to renew‟.
Willing to accept the offer on the basis the period of insurance is
for twelve (12) months from the original renewal date inclusive of
all and any previous policy terms and conditions inclusive of
„reinstatement‟ conditions.
There have been no further „claims‟ for property damage.
As for the offer being subject to, and predicated on, further
underwriting considerations based on a risk survey being
conducted, happy for a risk survey to be conducted by a suitably
qualified and independent third party.
Insurer to complainant
13 December 2019
Decline request for a risk survey to be conducted by an
independent third party of (c omplainant‟s) choosing.
Encourage you to contact insurer to organise a risk survey to be
completed whic h will enable ins urer to fulfil underwriting review
and determine the appropriate terms of renewal.
Complainant to insurer
3 March 2020
Access granted enabling the FF to complete a risk survey.
Insurer says due to current COVID 19 restrictions unable to
conduct risk survey.
Insurer to complainant
3 April 2020
Enclose terms for the reinstatement of the insurance.
Endorsed policy will take effect as of the 1 February 2020 in line
with the renewal for legal liability.
Following policy wording has be en applied to the policy in relation
to the current claims. Business Propert y Damage Policy. The
policy will not cover any pre - existing physical loss of or damage
to the Building nor any resulting physical loss of or damage,
directly caus ed by any pre - exis ting damage.
Due to COVID - 19, insurer unable to complete the risk survey but
will be doing so once the current situation is resolved.
Let me know if you have any concerns about the policy and
confirm your agreement before 8 April to ensure that no debit i s
made without your authorisation.
Commercial plan
alteration schedule
3 April 2020
Period of ins urance 1 February 2020 – 1 February 2021.
Total premium $21,098.86.
Instalments will commence 8 April 2020.
Business property damage, glass breakage and business
interruption.
Building sum ins ured $3,200,000 (indemnity). Total sum insured
for buildings $3, 200, 000. Additional benefits: demolition, clearing
of debris $320,000.
Business Property Damage Polic y. The policy will not cover any
pre - existing physic al loss of or damage to the Building nor any
resulting physical loss of or damage, directly caused by any pre -
existing damage.
Complainant to insurer
8 April 2020
Decline to accept your offer as it is ambiguous, and a dangerous
document for me to accept without advice.
Determination | Case number: 684557 Page 9 of 9
Record Key points
Response from
complainant
15 May 2020
… the fact the Renewal was issued with the removal of
„Reinstatement‟ conditions and them being replaced with
„Indemnity‟, and the very substantial increase in premium, are
demonstrably misleading an d deceptive in accordance wit h the
insurer‟s own advice.
3.2 Other relevant material considered and relied on
Parties‟ submissions/emails and all attachments to all submissions/emails both
before and after the recommendation.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.