Progress payments released to builder without inspection; original building contract not kept
Text of the determination
Determination
Case number 684527
Financial firm Australia and New Zealand Banking Group Limited
Determination | Case number: 684527 Page 2 of 12
Case number: 684527 19 December 2020
1 Determination overview
1.1 Complaint
In December 2016, the financial firm (bank) provided the complainants (Mr V and
Mrs V) a Business Mortgage Loan (loan) for $650,000. The loan was secured by
three adjacent properties on K Road (properties) and was intended to be used to
construct three separate dwellings on those properties. The loan was intended to be
paid progressively to the builder fund the construction.
Part way through the construction, the local council issued a stop work order due to
mould proliferation on the timber frames in the properties. The complainants and the
builder were involved in court proceedings, which recently been settled.
The complainants have raised several complaints against the bank including it:
failed to keep the original signed building contracts safely which they needed for
the court proceedings with the builder
failed to inspect the properties prior to releasing the progress payment for the
timber framing stage
accepted a “ loaded-up ” schedule in the building contract that was not arranged in
their best interests and which meant the builder was paid for work he did not do
breached their privacy when they sent bank statements to their lawyer without
authorisation, and
failed to provide hardship assistance to them.
1.2 Issues and key findings
Did the bank fail to keep the building contract safe?
Based on the available information, I am unable to conclude that the bank retained
the original signed building contract.
Did the bank make an error by releasing the payments?
By signing the payment request forms, the complainants authorised the bank to
release the progress payments to the builder. The bank was not obliged to inspect the
building site prior to releasing the progress payments and it did not owe a duty of care
to inspect the quality of the construction.
Was the bank required to check the building contract payment schedule?
The bank did not have a duty to ensure the payment schedule was arranged in the
best interests of the complainants.
Determination | Case number: 684527 Page 3 of 12
Did the bank breach the complainants’ privacy?
The bank sent the complainants‟ lawyer information that was beyond the scope of the
authority they signed. However, I am not satisfied this resulted in a breach of privacy.
Did the bank meet its financial hardship obligations to the complainants?
I am satisfied that the available information shows the bank met its hardship
obligations.
1.3 Determination
This determination is in favour of the bank. The bank is not required to take any action
or pay any compensation to the complainants.
If the complainants are in financial difficulty, they should complete a statement of
financial position for the bank and contact it to discuss a repayment arrangement. The
parties should work together to try and come to an arrangement for the complainants
to pay the loan. In doing so, the bank should have regard to its obligations for dealing
with customers in hardship.
If the parties are unable to reach an agreement and the complainant is in financial
difficulty, the complainant can lodge a further complaint with AFCA about that issue.
If the complainants take no action, then the bank may exercise any rights it has under
the loan contract following the expiry of a 30-day period after this complaint is closed.
Determination | Case number: 684527 Page 4 of 12
2 Reasons for determination
2.1 Did the bank fail to keep the building contract safe?
The bank took a copy of the contract
The complainants say that in 2016, when they initially applied for the loan, the bank
requested the original building contracts from them. They say the bank manager
(GS) told them the bank would keep the original building contract in a central location.
In October 2019, a lawyer acting on the complainants‟ behalf requested the original
building contracts from the bank for the court proceedings as the terms of the building
contract were in dispute with the builder. In response, the bank said it did not hold the
original building contracts. The bank has produced an electronic .pdf version of the
building contract but says it is not standard process to retain such documentation
when those documents relate to an agreement the bank is not a party to.
Based on the available information, I am satisfied the bank obtained copies of the
signed building contracts. However, it was not required to safely store the building
contracts and therefore has not made an error by failing to do so. The reason for this
is set out in further detail below.
The bank was not required to retain the building contracts
The complainants say GS told them the building contracts were “safely stored in a
central location within the bank” and the bank said it would return them once they
signed and returned the document release form. They say they did sign and return
the release form, but the bank failed to return the building contracts.
In support of their position, the complainants have provided a series of emails from
when the loan was being arranged. On 5 July 2016, the complainants emailed GS
attaching a copy of the building contracts with supporting documents. On 6 July 2016,
GS replied saying he was unable to open the documents that were made available on
a google drive. He wrote:
If the files are too big to attach I can organise a courier to pick up a hard copy of
the documents then I will scan up at my office.
On 6 July 2016, the complainants emailed GS:
Yes they are large. I think a courier will be the best option. Do you require original
signatures as the builder has sent the scanned ones to us.
On 7 July 2016, GS replied stating:
At this stage I don‟t need a copy of the signed building contracts so happy to work
with these until we meet in person when I‟ll collect a signed copy.
Determination | Case number: 684527 Page 5 of 12
The complainants have confirmed this is the only email relating to original building
contracts as other discussions were by phone.
In my view, the chain of emails do not conclusively support the complainants position
that the bank took the original building contracts or that it would store them in a
central location. The email thread does not show:
GS confirmed the original building contracts would be stored a central location, or
the complainants were to request the documents back by signing a release form.
I also note that the initial email the complainants sent to the bank said that they, in
fact, only had a scanned copy of the original building contract.
I am satisfied the bank obtained copies of the building contract. Indeed, I would
expect it to do so as part of its loan assessment process. However, the available
information does not show the bank made any assurance or promise to the
complainants that it would retain the original building contract for safekeeping. In my
view, this would be unusual. Indeed, if the bank was going to store original documents
on behalf of its customers, I would expect a safe custody deposit box to be opened
and for there to be some sort of paper trail available.
Insufficient information to show bank retained original building contract
It is important to note that AFCA relies on the parties to a complaint to provide
relevant information. When we assess a complaint, we consider the available
information, the recollection of the parties, and all relevant circumstances. We give
more weight to contemporaneous documentary information.
AFCA also does not have the power to take or test evidence on oath, nor require third
parties to give evidence. If there is no documentation, we will decide what is most
likely to have occurred based on the available information. If the parties have
conflicting recollections which are evenly weighted, we may find that the claim is not
established.
In my view, the emails do not support the bank told the complainants it would retain
the original bank contracts. While the complainants recollect GS told them the bank
would retain the original contracts, GS has a different recollection. During this
investigation, AFCA asked the bank to obtain a statement of recollection about his
dealings with the complainants. Mr GS‟s statement was:
First conversation with the client was to discuss finance options for their town
house development. If I recall correctly prior to our face to face meeting the client
was advised to provide a copy of supporting documents which would be used to
assess their application which [they] brought to our meeting.
I do not remember details of the following conversation however I would have
discussed the loan approval terms and conditions as well as the process to
manage the progress payments associated with their new construction loan.
Determination | Case number: 684527 Page 6 of 12
… I do not recall asking the client to specifically bring in the original signed
building contracts as my process is to ask any potential applications to bring in
copies of all their supporting documents including copies of contracts, a copy of
the builder‟s „Bank‟ bank which includes the specifications of a project and
building plans along with any council approvals.
In the meeting at the C… branch I do recall the client bringing in documents but
could not tell you now whether they were the original signed contract documents
or simply a copy that was prepared for the Bank to assist with their application.
The complainants have provided information about discussions Mrs V held with a
different bank branch. Mrs V said she asked whether a bank would take original
building contracts for construction loans, and the banker she spoke to confirmed this
was the case. I have considered this information, but it does not change the outcome
– this is a conversation about the practice of the bank now and does not necessarily
reflect what actually occurred in 2016. It is not a contemporaneous record of what
occurred in 2016.
In the absence of any contemporaneous documents, I am unable to conclude that the
complainants provided the bank with the original loan contract for safe keeping.
2.2 Did the bank make an error by releasing the payments?
The complainants say the bank should have inspected the site before releasing
payments
The complainants say the timber framing was damaged and there were other defects
in the build which resulted in the council issuing the stop work order. The
complainants say the bank should have completed a thorough inspection of the work
prior to releasing progress payments to the builder. They say this view is supported
when GS initially facilitated an inspection in relation to the first (or one of the first)
progress claims and that the bank is “estopped” from denying that it promised to
inspect the construction as it progressed.
The complainants signed the payment requests
The complainants say the payment request form was “slipped” to them in an email
well after they signed the loan contract and was never properly explained to them.
Further, they say the Loan Disbursement Order is the only form that was properly
explained to them and formed part of their contract.
The complainants signed the following progress payment requests:
progress claim 1 – footings/slab invoiced on 5 December 2016
progress claim 2 – substantial completion of first fix timbers invoiced on 10
February 2017
progress claim 3 – substantial completion of brickwork and roof cover invoiced on
14 July 2017
Determination | Case number: 684527 Page 7 of 12
Even if the bank provided different payment request forms after the complainants
signed the loan contract, this does not invalidate them. This is because the
complainants had an opportunity to re view the payment request forms each time they
signed them to authorise the bank to pay the builder. Whether the complainants
chose to read the payment request forms is a matter for themselves.
Ultimately, the complainants do not dispute signing the payment requests and accept
by doing so, the payments were released to the builder, upon their authorisation.
The bank said not to sign the payment requests before works were completed
One of the mistakes the complainants say the bank made was failing to warn them
against signing the payment requests before the relevant building work was done.
However, the documentary information provided shows the bank did warn them.
For example, each payment request includes the warning that when signing, the
complainants acknowledge the build has reached the stage indicated by the builder
and as such, payment is authorised:
In authorising this payment, I/we confirm and acknowledge it is not [the bank‟s]
responsibility to ensure that:
the quality of the work is to my/our satisfaction
the work done is in accordance with the building contract
sufficient work has been done to cover progress payments.
Further, section 3 of the loan terms and conditions says that where a customer
requests payment to some other person or organisation, the bank will so in
accordance with the customer‟s instructions. The terms and conditions do not confirm
the bank will review the quality of the works carried out before releasing payments.
Rather, it is implicit in each payment authority form that building quality is a matter for
the complainants.
The bank did not have to inspect the site or ensure the builder was entitled to
payment
The complainants say the bank verbally agreed to release payments once inspections
are carried out. AFCA‟s approach to assessing what is more likely than not to have
occurred (including statements of recollection) is set out above.
AFCA has reviewed the following documents provided by the parties:
loan contract
terms and conditions
contact notes
email correspondence
th e complainants‟ statement of recollection, and
GS‟s statement of recollection .
Determination | Case number: 684527 Page 8 of 12
Upon review, the documents do not say payments will only be released only once
inspections are carried out. Rather, the documents are consistent with the bank‟s
position. That is, that payments will be released once the complainants sign the
payment requests.
The loan contract and welcome letter makes it clear the complainants were
responsible for ensuring the build was progressing satisfactorily before authori sing the
bank to pay the builder. In short, when signing the payment requests, the
complainants acknowledge the build has reached the stage indicated by the builder
and they are authorising payment.
There was no independent obligation on the bank to inspect the build or satisfy itself
the builder should be paid. There was nothing in the loan contract which required it to
do so before it released payments (other than the final payment which has not been
released). In the ordinary course, a bank does not as a “project manager” when a
construction is being undertaken. The complainants were responsible for ensuring the
build was progressing satisfactorily before the builder was paid and it was at their
discretion to instruct the bank to pay him.
In other words, the available documents (such as the acknowledgement in the
payment requests) clarified the bank‟s role as the financier of the construction, rather
than as project manager. The bank was not required to inspect the site to ensure that
it met quality standards. Ultimately, the builder is responsible for the quality of the
construction.
It is also important to bear in mind that when a bank does undertake a building
inspection part-way through a construction, it does so for its own purposes to ensure
that the construction is progressing and that its security position is adequate. The
level of the bank‟s inspection does not need to be to building standards.
The bank did not breach its internal policy
The complainant says the bank breached its own policy by releasing payments to the
builder without first conducting a valuation because the total build was over $800,000.
AFCA has reviewed the bank‟s policy. The policy says for constructions contracts
under $500,000, the bank is required to obtain a valuation on the property at the final
or practical completion stage.
Each of the construction contracts were under $500,000. Therefore, the bank was
only required to value the constructions at a later stage.
The bank has provided a valuation report dated 27 November 2019 showing the
construction was valued at the later stages of the project. As such, the bank has
complied with its own policy.
Determination | Case number: 684527 Page 9 of 12
The bank is not responsible for the builder’s conduct
I understand the court proceedings were initiated by the bui lder, but I am not aware
what his claim against the complainants was. I also understand that complainants
counterclaimed against the builder for defective work and the cost of rectification. It is
unfortunate the complainants found themselves in the position that they did. However,
the bank is not responsible for the builder‟s conduct.
2.3 Was the bank required to check the building contract payment
schedule?
The bank is not obliged to check the building contract payment schedule
The complainants say:
the building contracts had “ front loaded ” progress payments in favour of the builder
the bank is supposed to review this during the loan application process, and
the building contract needed to adhere to a standard payment schedule before the
finance could be approved by the bank.
In general, a financial firm that is a bank or credit provider does not have a “fiduciary”
duty or responsibility to its customer. This means that it is not obliged to advise a
customer that a service or product is not in their interests or that there may be other
services that would better suit their needs.
A fiduciary responsibility arises only where the bank‟s role is seen to extend beyond
that of finance provider and into the area of advice. This happens if the bank provides
advice or otherwise causes the customer to reasonably believe that the bank has
assumed that responsibility.
In this instance, the bank did not provide any form of advice to the complainants
during the application and approval process. Rather, it assumed (and maintained) its
position as a lender assessing a credit application. Given this, the bank‟s involvement
extended to that of lender assessing and offering credit rather than that of advisor in
this instance. The bank was not required to provide advice about the building contract
and payment schedule. This is a matter entirely for the complainants.
2.4 Did the bank breach the complainant s’ privacy?
A financial firm has privacy obligations
Under section 24 of the Code of Banking Practice (CBP), the bank owes the
complainant a general duty of confidentiality.
Under the Privacy Act 1988 (Cth), an organisation can collect personal information
about any individual whose identity is apparent, or can easily be ascertained, from the
information. The personal information collected by an organisation can be disclosed
Determination | Case number: 684527 Page 10 of 12
only for the primary purpose of collection or a secondary, related purpose where the
individual the information relates to would reasonably expect it to do so.
The bank sent information not requested in a letter of authority
On 31 October 2019, the complainants signed a “Letter of Authority” (authority)
authorising the bank to release certain information to their lawyer. The authority
stated:
Please release the original signed contract documentation (including associated
Specification and New Home Estimate Documents) for … [the property].
The complainants ‟ lawyer forwarded the authority to the bank‟s “Access Request”
team. In response, the bank provided:
bank agreements,
and business loan statements relevant to the construction finance.
The complainants say the bank breached their privacy by providing their lawyer
information beyond the scope of the authority.
Strictly, the bank ought to have taken steps to ensure the documents it provided to
the complainants‟ lawyer was within the scope provided for in the authority. By
sending the lawyer the account statements, the bank provided documents to the
lawyer that the complainants did not authorise.
The bank‟s response would have no doubt caused the complainants‟ som e level of
frustration, but I do not consider this is because of the disclosure of personal
information. Rather, I consider the frustration would have arisen from the inability of
the bank to produce the original building contract, which the complainants (and their
lawyer) view as critical for the court proceeding involving the builder. This view is
supported by the emails passing between the lawyer and the complainants
immediately after. The complainants‟ lawyer emailed the complainants that:
… they have o nly provided irrelevant material; they seem to have completely
missed the point.
Any award of non-financial loss compensation must be to compensate the
complainants for the stress and frustration that arises from a bank error. Here, I do
not consider the frustration can be said to arise from the disclosure of account
statements to the complainants‟ lawyer, but rather, rests in the bank‟s inability to
produce the signed building contract.
Determination | Case number: 684527 Page 11 of 12
2.5 Has the bank met its financial hardship obligations to the
complainants?
The bank has an obligation to its customers in financial difficulty
A bank is required to consider a customer‟s financial circumstances when they are in
financial difficulty. If a bank rejects a proposal made by a customer, it should give
reasons and ensure that those reasons reflect legitimate considerations that relate to
the customer‟s specific circ umstances.
AFCA also expects customers to be willing to work with the bank and respond
promptly to requests for information. They should propose a realistic repayment plan
that will result in the eventual repayment of the debt and make whatever payments
they can while the bank is considering their application and/or while AFCA is
considering the complaint.
The bank has met its financial hardship obligations to the complainants
The complainants say the bank:
was not concerned with their financial hardship and failed to help when the builder
sued them, and
they had to borrow money from family to ensure their repayment obligations were
met.
AFCA obtained a copy of the bank‟s contact notes. Upon review, I note:
on 13 August 2018 the complainants fell into arrears of $1,358 but they had
sufficient funds to clear the arrears
the bank contacted the complainants to discuss the arrears and on the same day,
the complainants advised the bank they would transfer funds to clear the arrears
there are no notes in relation to the legal case with the builder or them having to
borrow funds from family to fund court costs,
the complainant s‟ have not applied for hardship assistance.
Therefore, based on the available information, I am satisfied the bank has met its
financial hardship obligations because:
the complainants did not apply for hardship assistance, and
there were no other factors indicating the complainants were in financial distress.
Relevantly, on 7 March 2020, the complainants provided to AFCA a summary of
accounts held at the bank. The summary shows that funds of $268,380 are available
in an offset account. Hardship assistance is generally offered when the borrower does
not have the necessary funds to meet the loan repayments.
I acknowledge the difficult position the complainants have been placed in giving their
dealings with the builder. I am also mindful of the significant expenses involved in
going to court. If the complainants are experiencing financial hardship in relation to
Determination | Case number: 684527 Page 12 of 12
their ability to meet their contracted loan repayments, then they should take the steps
outlined in section 1.3 above.
3 Supporting information
3.1 AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All the provided material has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.
3.2 Matters not considered in this determination
During this investigation, the complainants have asked AFCA to obtain certain
information relating to the builder. The complainants say that the builder banked at
the same bank branch and the bank‟s actions have favoured the builder.
AFCA‟s Rules ( here ) set out the types of complaints we can consider. Relevantly, any
complaint must arise from, or relate to, the provision of a financial service to the
complainant. AFCA cannot consider the bank‟s conduct insofar as it relates to a third -
party (in this case, the builder). Indeed, the bank cannot even disclose to AFCA (or
the complainants) whether the builder did, in fact, hold an account with it. I have
therefore not considered this aspect of the complaint in this determination.