Home / Allianz Australia / Determination 683738

Determination 683738

Storm damage claim denied for internal water damage and atrium/terrace damage

FirmAllianz Australia
Decided2021-11-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$186,628
SourceAFCA PDF

Summary

The complainant claimed storm damage to his home, including internal water damage that was repaired before lodging and damage to an atrium and terrace. AFCA found the insurer entitled to deny the claim, as the complainant breached policy conditions prejudicing the insurer for internal damage, and the atrium/terrace damage was gradual deterioration excluded by policy.

The complainant breached evidence-keeping and prompt-notice conditions, prejudicing the insurer's assessment, and the atrium/terrace damage fell within wear-and-tear and inherent defect exclusions.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 683738 Financial firm Allianz Australia Insurance Limited Determination | Case number: 683738 Page 1 of 11 Case number: 683738 15 November 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with insurer. He lodged a claim for storm damage on 21 June 2016 via his broker. The damage had occurred around 31 January 2016. Several areas of the home have been affected and require repairs. Repairs for internal water damage have been completed ($56,608). There are further outstanding works ($130,020) to the atrium and terrace. After assessing the claim, the insurer denied liability. For the internal water damage which was repaired before the claim was lodged, the insurer says it has been prejudiced as the complainant failed to comply with several policy conditions. For the atrium and terrace, the insurer says the damage falls within several policy exclusions. The complainant disputes this decision. 1.2 Issues and key findings Is the insurer is entitled to deny the claim? Yes. This is because the available information shows:  for the internal water damage, the complainant breached several policy conditions which prejudiced the insurer’s ability to f airly assess the claim, and  the damage to the atrium and terrace falls within several policy exclusions. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim and is not required to take any further action. Determination | Case number: 683738 Page 2 of 11 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Complainant has the onus to establish a claim within the terms of the policy The complainant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured under the policy. This is known as a valid (or prima facie ) claim. If the complainant can establish a valid claim, the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The policy covers insured events, including loss or damage caused by storm. Two main areas of damage There is an extensive amount of damage. However, there are two main areas in dispute. The first involves internal water entry damage to the home. This includes damage to around five bedrooms, lounge room staircase, guest room and second floor foyer. All these areas had bee n repaired before the insurer’s contractors could inspect the damage. The second involves the atrium and terrace. Experts have provided information about the internal damages The complainant provided several reports from his nominated builder (PJ). For the internal water damage, PJ says the cause was due to heavy storm activity. PJ says high volume rain and strong winds have resulted in overflow where the valleys join with the box gutter. For various areas of the home, PJ noted the following:  the bedrooms, bathrooms and second floor foyer were damaged by box gutter overflow  the lounge room damage was caused by a terrace above that had a blocked floor drainage grate which contained debris  the nearby reception room was damaged due to a rainhead being blocked with a birds nest and leaves causing overflow The insurer is relying upon a report from a building consultant, AA. AA found inherent concerns with the balconies adjacent to the bedrooms. This included substantial volumes of rainwater pooling on the floor, including against the home, as well as inadequate step downs or drainage. AA also could not observe any secondary overflow facilities for the gutters and rainheads. AA also noted that much of the works being claimed mirrored those that were cash settled for a claim lodged in 2010. Further, as the areas had been repaired, the damaged items have been disposed of and there are no photos of the damaged areas, AA said he was: … unable to appropriately assess existence, extent, severity, timeframe or cause/s of damaged internal components. Determination | Case number: 683738 Page 3 of 11 Insurer can deny claim for internal water damage The insurer denied the claim for the internal water damage as the complainant breached several policy conditions. These policy conditions required the complainant to keep evidence of any loss or damage, not authoring repairs and contacting the insurer as soon as possible. The policy says that if these conditions are not met, the insurer may not pay a claim. The complainant has not provided any submission explaining:  why these areas were repaired before the claim was lodged, or  why it took him more than four months to lodge a claim. Given this, the panel accepts the complainant breached these policy conditions. The panel also accepts the insurer has been prejudiced by these brea ches. The insurer’s contractors were not able to verify the cause, or the extent of the damage caused by the water entry. No photos were available of the damaged areas. The damaged items could not be inspected. Further, given the previous cash settlement and the complainant’s inability to provide evidence to show these works were undertaken, the insurer could not verify if those repairs were done. In addition, there are concerns about the adequacy of the balconies and the gutters. AA identified potential issues with the gutters not having sufficient overflow facilities. This is relatively consistent with PJ saying the box gutter needed to be raised under the roof tiles along the nearby valleys so the box gutter could hold more water. AA also identified issues with the bedrooms’ adjacent balconies. Therefore, the panel accepts the insurer has been prejudiced to the full extent of the claim due to the complainant’s failure to meet the policy conditions. This is because the insurer cannot fairly assess whether the damage being claimed falls within the policy coverage. This means the insurer is entitled to deny liability for the internal water damage. Experts have provided information about the atrium and terrace PJ said the damage was due to two blocked terrace grates. Heavy rainfall and rainwater overflow exposed on the terraces over several months has slowly penetrated through the grout. This damaged the tiles, the flooring, floor joists and infill ceiling timber. AA concluded the damage to the atrium ceiling and terrace above was as a result of water entry over a period of years. AA said this was due to drainage defects on the terrace which has allowed water to pool on the terrace as well as a breakdown of the waterproofing under the tiles. AA also said the use of sheet plasterboard flooring for external balconies has not been allowed since 2007. The experts are relatively consistent in explaining the damage has happened over a period of time. None of them say this damage could have happened from one specific event or unusual circumstance. This is consistent with the extent or damage identified. This included severe and widespread damages to the underside of the sheet particleboard. Rot and mould was also found. There is also no evidence that water is entering the atrium and terrace through a storm created opening. Determination | Case number: 683738 Page 4 of 11 This is damage consistent with ordinary environmental conditions over a long period of time. Such damage would fall within the policy exclusions for gradual deterioration or wear and tear. On this basis, the insurer can deny the claim for the atrium and terrace. Why is this outcome fair? It is fair in all the circumstances for the insurer to deny the damage being claimed because:  the complainant does not dispute receiving the policy  the policy clearly explains the coverage provided  the available information does not show the damage being claimed falls within the policy coverage. Determination | Case number: 683738 Page 5 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as a field of expertise. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 683738 Page 6 of 11 3.2 Relevant reports Record Key points Complainant’s expert (PJ ) Builder’s Report 27 June 2016 On 31st of January 2016, where I conducted an inspection with the owner and in our observation and opinion, the wat er damage is due to heavy storm activity, high volume rain fall and strong winds have resulted in valleys join with box gutter overflow. I f ound the box gutter need to be raised under the roof tiles along the nearby valleys, so the box gutter holds more water before it runs away. This is all completed, and a separate quotation has been given to the owners. Also, I had a quick inspection inside on water damages to ceiling walls and skirting. On the 6th of February 2016, after work, I inspected the entire place to determine what damage was done to the living areas including all bedrooms, bathrooms and second floor foyer where damage was done by box gutter overflow. The lounge room damage was caused by the terrac e above where a there was blocked floor drainage grate that contained debris. The water overflow penetrated via the terrace double door seal. Some of the ceiling and walls were extensively damaged and needed replacing, some ornamental cornice has fallen on to the flooring, the cornice along the external side of the walls were cracked ready to fall due to being extensively damaged. In order to prevent the cornice collapsing, 65mm screws wer e fixed on every ceiling batten, some screws on the walls as necessary. Further, nearby the reception room a rainhead was blocked with a bird’s nest and leaves causing overflow back into the cavity wall and water penetrated into internal walls. During the repairs, (now fully complet ed) there was additional work done unforeseen at time of quoting the job, where material and labour costs incurred and has already been re quoted. Not e: There was an error in my original quot e relating to the second - floor foyer. This was identified and since has re quoted. Financial firm’s expert (A A ) Building Consultant’s Report 12 July 2016 […] 2.2.3) Further inspection showed inherent concerns with Balc ony construction including but not necessarily limited to:  Substantial volumes of rainwater pool on Balcony floor surfaces including against the home, therefore are not sufficiently graded toward grate drains  Balconies do not drain externally but are provided with a grade drain and 40mm waste  Substrate had pote ntially been provided in sheet particleboard (as per front Terrace – see Section 2.4)  Some Balconies appear to have been provided with stepdown from access doorways less than the 50mm minimum (150mm preferred) requirement 2.2.4) As Balconies are of timber frame construction, substrate should be provided in a compressed / semi - compressed cement sheet (such as HP ) or similar substrate that is approved for an external Balc ony application. 2.2.5) Review of the HP Decking Techn ical Specification showed abovementioned aspects of Balcony construction is in contradiction to installation requirements and the writ er considers poor building practices have been adopted that are conducive to failure. Below are extracts from the JH HP D ecking Technical Specification Determination | Case number: 683738 Page 7 of 11 Record Key points publication. 2.2.6) During the course of inspection into B’s r oom, the writer noted evidence of damages to recently repaired internal wall render, indicating further wat er ent ry and / or mas onry substrate had not been adequat ely dried prior to repairs being undertaken. The writ er noted Balcony servicing B ’s Bedroom had not been stripped as other Balconies had and original tiles remain in - situ. 2.2.7) The writer reviewed quotation compiled by insurer appointed repairers, M (25 83 - dated 6 March 2012) and not e Scope of Works encompasses much of the works and in the same rooms as that quoted and recently undertaken by Mr J . 2.2.8) Following review of Documentation provided, limited inspection at the risk address and inf ormation provided by Mr J , the writer offers the following:  The writer was unable to substantiate if damages sustained during the 2010 – 2011 water inundation events (cash settled at that time) had been rectified as all recent repairs had been completed (removing all evidence) and much of the damages repaired by Mr J appeared to mirror that quoted by M back in 2012  Nil photographic references are available of damages that had been rectified by Mr J prior to works commencing  Balcony construction displays aspects o f what the writ er considers poor building practices and in contradiction with substrate manufacturer’ specifications  Balcony construction is conducive to failure and the writer suspects will almost invariably fail in future  Water / moisture penetration m ay be an on - going concern in and around the vicinity of Bedroom Balconies  Considerable further investigation is necessary in the event property insurers require further information in relation to Balcony construction, failure, damages sustained and / or r ectification to prevent further water ingress. Further investigation will include moisture readings (penetrative pins) and potential destructive works including removal of skirting boards and sheet plasterboard under first floor Bedroom Balconies Rainwate r Entry via Roof: 2.3) General inspection showed sizeable ornate cornic es provided throughout vast majority of ground and first floor rooms. 2.3.1) The vast majority of walls / ceiling / co rnice pointed out by Mr J that he had reportedly repaired / replaced were to perimeter external walls or within Bedroom bay window alcoves and all repairs had been completed. All evidence of reported damages had again been removed severely inhibiting the writers’ ability to asses s extent, severity, age and / or cause of damages. 2.3.2) Review of Documentation provided showed rainwat er ent ry had reportedly occurred on various occasions with the first documented event being 2010 – 2011 (cash settled in 2012), then again in March 20 15 and apparently again in January 2016. 2.3.3) Review of M’s quotation 2583 - dated 6 March 2012 and works apparently re cently undertaken by Mr J again are almost identical in location and description. Similarly, to water ingress concerns around Balconi es, a common denominator to roof rainwater ingress appears to be the Bedroom Determination | Case number: 683738 Page 8 of 11 Record Key points bay window alcoves and perimeter walls, indicative of perimeter box gutter inadequacies and / or non - compliance. 2.3.4) Roof inspection was not possible at the time of inspection due to exceedingly high winds. However, from ground level the writer identified some potential concerns with box gutter / rain - head installation including nil secondary overflow facilities provided at time of construction which is mandatory for this type of application. Following review of Documentation provided, limited inspection at the risk address and information provided by Mr J, the writer offers the following:  The writer is unable to substantiate if damages sustained during the 2010 – 2011 water in undation events (cash settled at that time) had been rectified as all recent repairs had been completed (removing all evidence) and much of the damages repaired by Mr J appeared to mirror that quoted by M back in 2012  Nil photographic references are avail able of damages that had been rectified by Mr J prior to works commencing  Evidence of multiple rainwat er ent ry events being reported is indicative that box guttering / rain - head installations are susceptible to overflow, and this is at least partially att ributable to non - compliant installation issues.  The writer highly rec ommends an appropriate roof inspection is undertaken which will require mechanical boom lift access  In the event property insurers require further information in relation to roof / plumbing failure, damages sustained and / or rectification to prevent further water ingress, minor demolition works including removal of roof tiles may be required Note: Roo f plumbing works described by Mr J at time of inspection appear to the writer to be inadequate and further investigation is required. Additionally, these works should have been undertaken by a suitably qualified and registered roofing plumber. Front Atrium and Terrace: 2.4) Inspection showed a section of cement sheet soffit linings approximately 10sqm in area had dislodged and fallen from the front Atrium. Debris had been removed and it appeared electrical components secured prior to the writers’ attendanc e. 2.4.1) Inspection to exposed framing showed the front Terrace is a post - and - beam type construction with central steel ‘I’ beam, large section pine floor joists spanning either side and sheet particleboard substrate. 2.4.2) Inspection showed severe and widespread water damages to underside of sheet particleboard substrate and joist framing including rot and Condition 3 (visual and active) mould contamination. Extent and severity of damages was indicative rainwater had been penetrating upper surface of the Terrace for an extended period of time, in all probability years. Note : Us e of sheet particleboard flooring for an external Balcony application has been disallowed in the ‘Guide to Standards and Tolerances’ since 2007, however prior to this, no manufa cturers of particleboard flooring products have ever endorsed their particleboard flooring as suitable for an external application of any kind. 2.4.3) Inspection to Terrace above the Atrium showed a tiled Determination | Case number: 683738 Page 9 of 11 Record Key points surface with grate drains x 4 in total dispersing r ainwater from the Balcony surface, again in contradiction to what the writer considers good building practice and compressed cement sheet Balcony substrate manufacturer specifications. Inadequate gradient had been provided toward grate drains with evidenc e apparent showing water had been pooling on tiled surfaces. 2.4.4) Inspection to removed tiles around grate drains (reportedly by Mr J ) suggests a waterproofing membrane had been applied to sheet particleboard substrate presumably at time of construction , however the writ er was unable to categorically ascertain if what was visible was the original membrane or an attempted repair. Evidence of such widespread damages to underside of particleboard substrate is indicative waterproofing membrane had been inad equate at time of application and / or had broken down over time. 2 .4.5) Review of M’s quotation 2583 - dated 6 March 2012 showed reference to preparation and painting of front Portico ceiling, indicating rainwater penetration through Terrace tile surface had been a long - term concern. 2.4.6) Following review of Documentation provided and limited inspection at the risk address, the writer offers the following:  Evidence of rainwater entry had been apparent to underside of Atrium soffit linings for an extende d period of time evidenced by 2012 M’s quotation  Damages sustained to the Atrium / Terrace had been occurring for an extended period of time, in all probability years  Damages sustained were primarily attribut able to inadequate waterproofing membrane appl ied at time of construction and use of particleboard flooring substrate  Terrace was doomed to failure due to poor building practice methodology and adopting inappropriate materials for an external balcony application  Nil evidence was available to suggest damages sustained were attributable to a single storm event Sub - Floor: 2.5) During the course of inspection, the writer not ed minimal sub - floor ventilation provided around perimeter of the main home. 2.5.1) The writer is unaware how far lower level Ga rages extend under the home however it appears a sizeable sub - floor area exists under the main home that, if provided with inadequate sub - floor ventilation and considering external ground levels, could be a potential risk of significant mould contamination 2.5.2) The writer highly recommends this situation is thoroughly investigated furt her. 3) CONCLUSION: 3.1) Due to all claimed damages reportedly being repaired / replaced by owner appointed repairer Mr J prior to the writers’ attendance (other than minor repairs to Reception Room still to be completed), the writer has been unable to appropriately assess ex istence, extent, severity, timeframe or cause/s of damaged internal components. 3.2) Evidenc e of previous claims and quotations to rectify damages mirroring those being claimed for now suggests that cause/s of Determination | Case number: 683738 Page 10 of 11 Record Key points previous damages had not been appropriately a ddressed and damages reportedly rectified by Mr J were the result of on - going water entry concerns. 3.2.1) Evidence of previous attending insurer appoint ed repairers’ comments, what could be viewed on - site at time of the writers’ inspection all suggests t he vast majority of water related damages relating to Balconies and roof components was the res ult of poor and / or non - compliant building and roof plumbing practices and / or inappropriate use of materials for an external application. 3.2.2) Further inve stigation including destructive works is required to comment further. 3.3) Evidenc e sighted suggests various non - compliant roof plumbing practices exist on box gutter and rain - head installations. Further investigation is required. 3.4) Evidenc e sighted s howed front Terrace damage had been occurring for an extended period of time, in all probability years due to poor choice of building materials and inadequate waterproofing membrane. 3.4.1) Nil evidence was apparent to suggest front Terrace damages were a ttributable to a single storm event. 3.5) Evidenc e sighted suggests inadequate sub - floor ventilation to the main home had been provided at time of construction which, in conjunction with external soil levels etc., is conducive to mould contamination within the sub - floor area. 3.5.1) The writ er highly recommends this situation is investigated further. 3.3 Relevant policy extracts Record Key points PDS Page 28 - 29 9. Storm, rainwater or run - off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run - off. […] We will not pay for loss or damage: g. caused by wat er seeping, percolating or otherwise penetrating into the buildings as a result of: • structural defects, • faulty design of the buildings, • faulty workmanship in the construction of the buildings, or • your failure to adequat ely maintain the buildings; h. caused by wind, rainwat er, hail or snow entering the buildings through an open window or door or any o pening not made by the storm, unless the loss or damage is caused by run - off; PDS Page 57 - 60 When we will not pay a claim under your policy 1. This policy does not cover loss, liability, injury or damage: […] f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; [...] g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship; Determination | Case number: 683738 Page 11 of 11 Record Key points PDS Page 67 - 68 4. Keep evidence of the loss or d amage You must keep evidence of any loss or damage to your insured property. You may not authorise any repairs or replacement unless you are preventing further loss, damage or liability from occurring. 5. Contact us a s soon as possible If there is any loss, liability, injury or damage whic h is likely to result in a claim, you must give us immediate notice of the full details of any loss, anticipated or alleged liability, injury or damage. You or your representative must give us full details in the manner we request which will be either: a. in writing by completing our claim form which will be supplied to you when you contact us; or b. verbally. You must also:  provide us with any original rec eipts, proof of ownership or quotes w e require to settle your claim,  inform us if your property is insured under any other policy,  give us immediat e notice of the commencement of any legal proceedings against you.