Text of the determination
Determination
Case number 683738
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 683738 Page 1 of 11
Case number: 683738 15 November 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with insurer. He lodged a claim
for storm damage on 21 June 2016 via his broker. The damage had occurred around 31
January 2016. Several areas of the home have been affected and require repairs.
Repairs for internal water damage have been completed ($56,608). There are further
outstanding works ($130,020) to the atrium and terrace.
After assessing the claim, the insurer denied liability. For the internal water damage which
was repaired before the claim was lodged, the insurer says it has been prejudiced as the
complainant failed to comply with several policy conditions. For the atrium and terrace, the
insurer says the damage falls within several policy exclusions.
The complainant disputes this decision.
1.2 Issues and key findings
Is the insurer is entitled to deny the claim?
Yes. This is because the available information shows:
for the internal water damage, the complainant breached several policy conditions which
prejudiced the insurer’s ability to f airly assess the claim, and
the damage to the atrium and terrace falls within several policy exclusions.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim and is not required to take any further action.
Determination | Case number: 683738 Page 2 of 11
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Complainant has the onus to establish a claim within the terms of the policy
The complainant is required to show that, on the balance of probabilities, he has suffered a
loss caused by a risk insured under the policy. This is known as a valid (or prima facie ) claim.
If the complainant can establish a valid claim, the onus shifts to the insurer to show that, on
the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the
claim.
The policy covers insured events, including loss or damage caused by storm.
Two main areas of damage
There is an extensive amount of damage. However, there are two main areas in dispute.
The first involves internal water entry damage to the home. This includes damage to around
five bedrooms, lounge room staircase, guest room and second floor foyer. All these areas
had bee n repaired before the insurer’s contractors could inspect the damage.
The second involves the atrium and terrace.
Experts have provided information about the internal damages
The complainant provided several reports from his nominated builder (PJ).
For the internal water damage, PJ says the cause was due to heavy storm activity. PJ says
high volume rain and strong winds have resulted in overflow where the valleys join with the
box gutter. For various areas of the home, PJ noted the following:
the bedrooms, bathrooms and second floor foyer were damaged by box gutter overflow
the lounge room damage was caused by a terrace above that had a blocked floor drainage
grate which contained debris
the nearby reception room was damaged due to a rainhead being blocked with a birds nest
and leaves causing overflow
The insurer is relying upon a report from a building consultant, AA. AA found inherent
concerns with the balconies adjacent to the bedrooms. This included substantial volumes of
rainwater pooling on the floor, including against the home, as well as inadequate step downs
or drainage. AA also could not observe any secondary overflow facilities for the gutters and
rainheads. AA also noted that much of the works being claimed mirrored those that were cash
settled for a claim lodged in 2010.
Further, as the areas had been repaired, the damaged items have been disposed of and
there are no photos of the damaged areas, AA said he was:
… unable to appropriately assess existence, extent, severity, timeframe or
cause/s of damaged internal components.
Determination | Case number: 683738 Page 3 of 11
Insurer can deny claim for internal water damage
The insurer denied the claim for the internal water damage as the complainant breached
several policy conditions.
These policy conditions required the complainant to keep evidence of any loss or damage,
not authoring repairs and contacting the insurer as soon as possible. The policy says that if
these conditions are not met, the insurer may not pay a claim.
The complainant has not provided any submission explaining:
why these areas were repaired before the claim was lodged, or
why it took him more than four months to lodge a claim.
Given this, the panel accepts the complainant breached these policy conditions.
The panel also accepts the insurer has been prejudiced by these brea ches. The insurer’s
contractors were not able to verify the cause, or the extent of the damage caused by the
water entry. No photos were available of the damaged areas. The damaged items could not
be inspected.
Further, given the previous cash settlement and the complainant’s inability to provide
evidence to show these works were undertaken, the insurer could not verify if those repairs
were done.
In addition, there are concerns about the adequacy of the balconies and the gutters. AA
identified potential issues with the gutters not having sufficient overflow facilities. This is
relatively consistent with PJ saying the box gutter needed to be raised under the roof tiles
along the nearby valleys so the box gutter could hold more water. AA also identified issues
with the bedrooms’ adjacent balconies.
Therefore, the panel accepts the insurer has been prejudiced to the full extent of the claim
due to the complainant’s failure to meet the policy conditions. This is because the insurer
cannot fairly assess whether the damage being claimed falls within the policy coverage. This
means the insurer is entitled to deny liability for the internal water damage.
Experts have provided information about the atrium and terrace
PJ said the damage was due to two blocked terrace grates. Heavy rainfall and rainwater
overflow exposed on the terraces over several months has slowly penetrated through the
grout. This damaged the tiles, the flooring, floor joists and infill ceiling timber.
AA concluded the damage to the atrium ceiling and terrace above was as a result of water
entry over a period of years. AA said this was due to drainage defects on the terrace which
has allowed water to pool on the terrace as well as a breakdown of the waterproofing under
the tiles. AA also said the use of sheet plasterboard flooring for external balconies has not
been allowed since 2007.
The experts are relatively consistent in explaining the damage has happened over a period of
time. None of them say this damage could have happened from one specific event or unusual
circumstance. This is consistent with the extent or damage identified. This included severe
and widespread damages to the underside of the sheet particleboard. Rot and mould was
also found. There is also no evidence that water is entering the atrium and terrace through a
storm created opening.
Determination | Case number: 683738 Page 4 of 11
This is damage consistent with ordinary environmental conditions over a long period of time.
Such damage would fall within the policy exclusions for gradual deterioration or wear and
tear. On this basis, the insurer can deny the claim for the atrium and terrace.
Why is this outcome fair?
It is fair in all the circumstances for the insurer to deny the damage being claimed because:
the complainant does not dispute receiving the policy
the policy clearly explains the coverage provided
the available information does not show the damage being claimed falls within the policy
coverage.
Determination | Case number: 683738 Page 5 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as a field of expertise.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 683738 Page 6 of 11
3.2 Relevant reports
Record Key points
Complainant’s expert (PJ )
Builder’s Report
27 June 2016
On 31st of January 2016, where I conducted an inspection with the
owner and in our observation and opinion, the wat er damage is due
to heavy storm activity, high volume rain fall and strong winds have
resulted in valleys join with box gutter overflow.
I f ound the box gutter need to be raised under the roof tiles along
the nearby valleys, so the box gutter holds more water before it runs
away. This is all completed, and a separate quotation has been
given to the owners. Also, I had a quick inspection inside on water
damages to ceiling walls and skirting.
On the 6th of February 2016, after work, I inspected the entire place
to determine what damage was done to the living areas including all
bedrooms, bathrooms and second floor foyer where damage was
done by box gutter overflow. The lounge room damage was caused
by the terrac e above where a there was blocked floor drainage grate
that contained debris. The water overflow penetrated via the terrace
double door seal. Some of the ceiling and walls were extensively
damaged and needed replacing, some ornamental cornice has
fallen on to the flooring, the cornice along the external side of the
walls were cracked ready to fall due to being extensively damaged.
In order to
prevent the cornice collapsing, 65mm screws wer e fixed on every
ceiling batten, some screws on the walls as necessary. Further,
nearby the reception room a rainhead was blocked with a bird’s nest
and leaves causing overflow back into the cavity wall and water
penetrated into internal walls.
During the repairs, (now fully complet ed) there was additional work
done unforeseen at time of quoting the job, where material and
labour costs incurred and has already been re quoted. Not e: There
was an error in my original quot e relating to the second - floor foyer.
This was identified and since has re quoted.
Financial firm’s expert (A A )
Building Consultant’s Report
12 July 2016
[…]
2.2.3) Further inspection showed inherent concerns with Balc ony
construction including but not necessarily limited to:
Substantial volumes of rainwater pool on Balcony floor surfaces
including against the home, therefore are not sufficiently graded
toward grate drains
Balconies do not drain externally but are provided with a grade
drain and 40mm waste
Substrate had pote ntially been provided in sheet particleboard (as
per front Terrace – see Section 2.4)
Some Balconies appear to have been provided with stepdown
from access doorways less than the 50mm minimum (150mm
preferred) requirement
2.2.4) As Balconies are of timber frame construction, substrate
should be provided in a compressed / semi - compressed cement
sheet (such as HP ) or similar substrate that is approved for an
external Balc ony application.
2.2.5) Review of the HP Decking Techn ical Specification showed
abovementioned aspects of Balcony construction is in contradiction
to installation requirements and the writ er considers poor building
practices have been adopted that are conducive to failure.
Below are extracts from the JH HP D ecking Technical Specification
Determination | Case number: 683738 Page 7 of 11
Record Key points
publication.
2.2.6) During the course of inspection into B’s r oom, the writer noted
evidence of damages to recently repaired internal wall render,
indicating further wat er ent ry and / or mas onry substrate had not
been adequat ely dried prior to repairs being undertaken.
The writ er noted Balcony servicing B ’s Bedroom had not been
stripped as other Balconies had and original tiles remain in - situ.
2.2.7) The writer reviewed quotation compiled by insurer appointed
repairers, M (25 83 - dated 6 March 2012) and not e Scope of Works
encompasses much of the works and in the same rooms as that
quoted and recently undertaken by Mr J .
2.2.8) Following review of Documentation provided, limited
inspection at the risk address and inf ormation provided by Mr J , the
writer offers the following:
The writer was unable to substantiate if damages sustained during
the 2010 – 2011 water inundation events (cash settled at that
time) had been rectified as all recent repairs had been completed
(removing all evidence) and much of the damages repaired by Mr
J appeared to mirror that quoted by M back in 2012
Nil photographic references are available of damages that had
been rectified by Mr J prior to works commencing
Balcony construction displays aspects o f what the writ er considers
poor building practices and in contradiction with substrate
manufacturer’ specifications
Balcony construction is conducive to failure and the writer
suspects will almost invariably fail in future
Water / moisture penetration m ay be an on - going concern in and
around the vicinity of Bedroom Balconies
Considerable further investigation is necessary in the event
property insurers require further information in relation to Balcony
construction, failure, damages sustained and / or r ectification to
prevent further water ingress. Further investigation will include
moisture readings (penetrative pins) and potential destructive
works including removal of skirting boards and sheet plasterboard
under first floor Bedroom Balconies
Rainwate r Entry via Roof:
2.3) General inspection showed sizeable ornate cornic es provided
throughout vast majority of ground and first floor rooms.
2.3.1) The vast majority of walls / ceiling / co rnice pointed out by Mr
J that he had reportedly repaired / replaced were to perimeter
external walls or within Bedroom bay window alcoves and all repairs
had been completed.
All evidence of reported damages had again been removed severely
inhibiting the writers’ ability to asses s extent, severity, age and / or
cause of damages.
2.3.2) Review of Documentation provided showed rainwat er ent ry
had reportedly occurred on various occasions with the first
documented event being 2010 – 2011 (cash settled in 2012), then
again in March 20 15 and apparently again in January 2016.
2.3.3) Review of M’s quotation 2583 - dated 6 March 2012 and
works apparently re cently undertaken by Mr J again are almost
identical in location and description.
Similarly, to water ingress concerns around Balconi es, a common
denominator to roof rainwater ingress appears to be the Bedroom
Determination | Case number: 683738 Page 8 of 11
Record Key points
bay window alcoves and perimeter walls, indicative of perimeter box
gutter inadequacies and / or non - compliance.
2.3.4) Roof inspection was not possible at the time of inspection due
to exceedingly high winds. However, from ground level the writer
identified some potential concerns with box gutter / rain - head
installation including nil secondary overflow facilities provided at
time of construction which is mandatory for this type of application.
Following review of Documentation provided, limited inspection at
the risk address and information provided by Mr J, the writer offers
the following:
The writer is unable to substantiate if damages sustained during
the 2010 – 2011 water in undation events (cash settled at that
time) had been rectified as all recent repairs had been completed
(removing all evidence) and much of the damages repaired by Mr
J appeared to mirror that quoted by M back in 2012
Nil photographic references are avail able of damages that had
been rectified by Mr J prior to works commencing
Evidence of multiple rainwat er ent ry events being reported is
indicative that box guttering / rain - head installations are
susceptible to overflow, and this is at least partially att ributable to
non - compliant installation issues.
The writer highly rec ommends an appropriate roof inspection is
undertaken which will require mechanical boom lift access
In the event property insurers require further information in relation
to roof / plumbing failure, damages sustained and / or rectification
to prevent further water ingress, minor demolition works including
removal of roof tiles may be required
Note: Roo f plumbing works described by Mr J at time of inspection
appear to the writer to be inadequate and further investigation is
required. Additionally, these works should have been undertaken by
a suitably qualified and registered roofing plumber.
Front Atrium and Terrace:
2.4) Inspection showed a section of cement sheet soffit linings
approximately 10sqm in area had dislodged and fallen from the front
Atrium. Debris had been removed and it appeared electrical
components secured prior to the writers’ attendanc e.
2.4.1) Inspection to exposed framing showed the front Terrace is a
post - and - beam type construction with central steel ‘I’ beam, large
section pine floor joists spanning either side and sheet particleboard
substrate.
2.4.2) Inspection showed severe and widespread water damages to
underside of sheet particleboard substrate and joist framing
including rot and Condition 3 (visual and active) mould
contamination.
Extent and severity of damages was indicative rainwater had been
penetrating upper surface of the Terrace for an extended period of
time, in all probability years.
Note : Us e of sheet particleboard flooring for an external Balcony
application has been disallowed in the ‘Guide to Standards and
Tolerances’ since 2007, however prior to this, no manufa cturers of
particleboard flooring products have ever endorsed their
particleboard flooring as suitable for an external application of any
kind.
2.4.3) Inspection to Terrace above the Atrium showed a tiled
Determination | Case number: 683738 Page 9 of 11
Record Key points
surface with grate drains x 4 in total dispersing r ainwater from the
Balcony surface, again in contradiction to what the writer considers
good building practice and compressed cement sheet Balcony
substrate manufacturer specifications.
Inadequate gradient had been provided toward grate drains with
evidenc e apparent showing water had been pooling on tiled
surfaces.
2.4.4) Inspection to removed tiles around grate drains (reportedly by
Mr J ) suggests a waterproofing membrane had been applied to
sheet particleboard substrate presumably at time of construction ,
however the writ er was unable to categorically ascertain if what was
visible was the original membrane or an attempted repair.
Evidence of such widespread damages to underside of
particleboard substrate is indicative waterproofing membrane had
been inad equate at time of application and / or had broken down
over time.
2 .4.5) Review of M’s quotation 2583 - dated 6 March 2012 showed
reference to preparation and painting of front Portico ceiling,
indicating rainwater penetration through Terrace tile surface had
been a long - term concern.
2.4.6) Following review of Documentation provided and limited
inspection at the risk address, the writer offers the following:
Evidence of rainwater entry had been apparent to underside of
Atrium soffit linings for an extende d period of time evidenced by
2012 M’s quotation
Damages sustained to the Atrium / Terrace had been occurring for
an extended period of time, in all probability years
Damages sustained were primarily attribut able to inadequate
waterproofing membrane appl ied at time of construction and use
of particleboard flooring substrate
Terrace was doomed to failure due to poor building practice
methodology and adopting inappropriate materials for an external
balcony application
Nil evidence was available to suggest damages sustained were
attributable to a single storm event
Sub - Floor:
2.5) During the course of inspection, the writer not ed minimal sub -
floor ventilation provided around perimeter of the main home.
2.5.1) The writer is unaware how far lower level Ga rages extend
under the home however it appears a sizeable sub - floor area exists
under the main home that, if provided with inadequate sub - floor
ventilation and considering external ground levels, could be a
potential risk of significant mould contamination
2.5.2) The writer highly recommends this situation is thoroughly
investigated furt her.
3) CONCLUSION:
3.1) Due to all claimed damages reportedly being repaired /
replaced by owner appointed repairer Mr J prior to the writers’
attendance (other than minor repairs to Reception Room still to be
completed), the writer has been unable to appropriately assess
ex istence, extent, severity, timeframe or cause/s of damaged
internal components.
3.2) Evidenc e of previous claims and quotations to rectify damages
mirroring those being claimed for now suggests that cause/s of
Determination | Case number: 683738 Page 10 of 11
Record Key points
previous damages had not been appropriately a ddressed and
damages reportedly rectified by Mr J were the result of on - going
water entry concerns.
3.2.1) Evidence of previous attending insurer appoint ed repairers’
comments, what could be viewed on - site at time of the writers’
inspection all suggests t he vast majority of water related damages
relating to Balconies and roof components was the res ult of poor
and / or non - compliant building and roof plumbing practices and / or
inappropriate use of materials for an external application.
3.2.2) Further inve stigation including destructive works is required to
comment further.
3.3) Evidenc e sighted suggests various non - compliant roof
plumbing practices exist on box gutter and rain - head installations.
Further investigation is required.
3.4) Evidenc e sighted s howed front Terrace damage had been
occurring for an extended period of time, in all probability years due
to poor choice of building materials and inadequate waterproofing
membrane.
3.4.1) Nil evidence was apparent to suggest front Terrace damages
were a ttributable to a single storm event.
3.5) Evidenc e sighted suggests inadequate sub - floor ventilation to
the main home had been provided at time of construction which, in
conjunction with external soil levels etc., is conducive to mould
contamination within the sub - floor area.
3.5.1) The writ er highly recommends this situation is investigated
further.
3.3 Relevant policy extracts
Record Key points
PDS
Page 28 - 29
9. Storm, rainwater or run - off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run -
off.
[…]
We will not pay for loss or damage:
g. caused by wat er seeping, percolating or otherwise penetrating
into the buildings as a result of:
• structural defects,
• faulty design of the buildings,
• faulty workmanship in the construction of the buildings, or
• your failure to adequat ely maintain the buildings;
h. caused by wind, rainwat er, hail or snow entering the buildings
through an open window or door or any o pening not made by the
storm, unless the loss or damage is caused by run - off;
PDS
Page 57 - 60
When we will not pay a claim under your policy
1. This policy does not cover loss, liability, injury or damage:
[…]
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;
[...]
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design,
structural defects or poor workmanship;
Determination | Case number: 683738 Page 11 of 11
Record Key points
PDS
Page 67 - 68
4. Keep evidence of the loss or d amage
You must keep evidence of any loss or damage to your
insured property. You may not authorise any repairs or
replacement unless you are preventing further loss, damage
or liability from occurring.
5. Contact us a s soon as possible
If there is any loss, liability, injury or damage whic h is likely to
result in a claim, you must give us immediate notice of the
full details of any loss, anticipated or alleged liability, injury
or damage.
You or your representative must give us full details in the
manner we request which will be either:
a. in writing by completing our claim form which will be
supplied to you when you contact us; or
b. verbally.
You must also:
provide us with any original rec eipts, proof of ownership
or quotes w e require to settle your claim,
inform us if your property is insured under any other
policy,
give us immediat e notice of the commencement of any
legal proceedings against you.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.