Determination 683384
Liability for recurring subsidence and cracking damage after 2002 claim
Summary
The owner of a home with recurring cracking and movement damage argued the insurer's cosmetic repairs after a 2002 leak claim were inadequate. AFCA found the ongoing damage was caused by soil settlement and faulty design rather than the insured event, but ordered the insurer to reimburse the full cost of the complainant's engineering report.
Settlement, reactive soil and design defects are not insured events, while AFCA rules allow reimbursement of professional costs where the expert report assisted determination of the complaint.
Subjects and remedies
home or building damagepay compensation
Text of the determination
Determination
Case number 683384
Financial firm Insurance Australia Limited
Determination | Case number: 683384 Page 2 of 7
Case number: 683384 26 February 2021
1 Determination overview
1.1 Complaint
The complainant held an accidental damage Home insurance policy with the
financial firm (insurer). In 2002 she lodged a claim for movement and cracking at
the home caused by leaking pipes beneath the property. The insurer accepted
liability and repairs were completed in about 2004.
In 2017 the complainant lodged a further claim for reoccurrence of the same
damage at the property. The complainant says the repair method used was
inadequate and extensive damage has occurred to the property as a result.
The insurer says it is not liable for the damage as:
the repairs were adequate, and the complainant agreed to the method of repair
loss or damage caused by subsidence, natural deterioration and faulty design
or workmanship is excluded by the policy
it did not offer a lifetime guarantee when the works were carried out
the complainant has no current policy
1.2 Issues and key findings
Is the insurer liable for the ongoing damage to the complainant’s home?
No. The panel is satisfied that the damage claimed is not due to the insurers
failure to adequately repair the damage arising from the original insured event.
The panel is satisfied the ongoing damage is related to continued settlement,
earth movement and faulty design or workmanship.
1.3 Determination
This determination is in favour of the insurer.
The insurer has met its liability under the terms of the policy and has no further
liability under the claim.
Determination | Case number: 683384 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer liable for ongoing dama ge to the complainant’s home?
Insurer accepted liability for original claim
The complainant’s policy in 2002 included cover for accidental damage. The
complainant has not held a current policy with the insurer since 2006.
The complainant’s home was built in 1988. The complainant purchased the
property in 2001 and made a claim in March 2002 after movement and cracking
damage appeared at the property.
It is not disputed that over time due to the settlement of the soil the sewer pipes
ruptured which allowed large amounts of water to infiltrate the calcareous layer,
reducing its bearing capacity.
The insurers assessor BW said the sewer pipes cracked due to minor settlement
at the front of the property and the escaping water caused the subsidence and
resultant damage. The insurer accepted the claim and elected to repair the
property.
Repairs were completed in July 2004 at a cost of $80,991.14. By March 2005,
minor cracking was reoccurring in the walls and ceiling in the lounge area, a wall
joint in the main bathroom and mortar joint in the north west corner of the home.
Further repairs were subsequently authorised in August 2005, completed in May
2006, four years after the date of loss. The complainant signed a settlement
document at this time discharging the claim for water damage to the property.
The complainant says from 2006 they were constantly repairing small to medium
cracks in the walls and ceilings and noticing movement in the same areas. The
complainant says that calls to the insurer in 2012 were dismissed as they had no
current policy. As damage became more severe, including separation/cracking of
the concrete slab, cracking of the walls, ceiling, tiles and external brick damage,
the complainant again raised concerns with the insurer.
There is no suggestion the ongoing damage was related to continuing issues with
the sewer pipes or any insured cause under the terms of the original policy. The
complainant says the ongoing damage is due to the inadequate repairs completed
by the insurer.
Property built on highly reactive soil.
The engineer appointed by the insurer (WA) noted the soil borelogs indicate a
zone of calcareous clays, which have a very low strength and thus low bearing
capacity on saturation. While these clays were logged by the engineer cons ulting
Determination | Case number: 683384 Page 4 of 7
on the build, they were not noted as a potential problem. WA found the calcareous
clays continued to a depth of at least 3 -4 metres.
Ongoing damage due to due to settlement and earth movement
The insurer appointed engineer FM who attended the property in 2018. FM had
previously inspected the property in 2016 for the complainant’s then current
insurer.
FM said the excessive footing slab movement and the pattern and location of the
cracking are due to footing settlement caused by long term consolidation of fill soil
at the site. FM considered most of the consolidation movement appears to have
occurred at earlier stages following construction of the house.
Based on the 2018 FM report, the insurer maintains that the damage is not the
result of inadequate repairs, but due to compaction of the fill material the house
was founded on.
The engineer appointed by the builder of the home (SE) determined via soil
sampling and excavation that the footings were founded in natural soil in general
accord with the design specifications, and not fill as suggested by FM.
WA also excavated alongside two piers and confirmed that they were founded
either on the original surface or around 250mm into the topsoil as specified in the
footing plan, and not founded in fill. WA however considered the soils to be highly
reactive.
The complainant also provided a report dated 16 July 2019 from geotechnical
engineer AW. AW’s report is based on a desktop review of the available material.
The panel acknowledges that not all assessment reports were available to AW,
and AW reserved its right to alter its opinion should further information become
available.
AW was critical of FM’s report and raised issues with WB’s report, in particular
WA’s change of opinion on repairs. However, AW ackno wledged the additional
two piers appear to have stabilised the home from 2004 to 2014 before new
movement and cracking occurred.
AW confirmed that the problematic calcareous soils if saturated would not have
sufficient bearing capacity to support the home. There is no dispute the leaking
sewer from the original claim had been repaired. The is no evidence of further
leaks.
In the circumstances the panel accepts that most likely the ongoing damage to the
home is due to the continued settlement and earth movement due to the
problematic soil conditions on which the home was built. The insurer is not
Determination | Case number: 683384 Page 5 of 7
responsible for building defects that arise from the home being built on highly
reactive soil.
Insurer completed cosmetic repairs
In December 2002, WA said any remedial work would require underpinning to the
calcareous siltstone in the front section of the home, and recommended 16
underpins, to be followed by a review and decision on whether further
underpinning was necessary.
BW preferred the cosmic repair method d ue to being ‘significantly more cost
effective’, the possibility that relevelling may lead to further damage, and a
concern about ‘betterment issues’ as the underpinning work would rectify an
identified defect in the footing system.
BW’s report dated 7 Ma rch 2003 refers to discussing cosmetic repair options
without underpinning with WA, and said WA agreed it was a more cost effective
solution. In October 2003, WA provided a report recommending only two
additional piers and stating no relevelling should be attempted, as this could lead
to overloading of the new piers when the soils again become saturated.
AW was strongly of the opinion that if WB’s recommendation in 2002 of installing
16+ underpinning piers and relevelling had been carried out, the current damage
would not have developed. The panel accepts that to limit the likelihood of further
damage due to the ongoing settlement of the foundation soils it would have been
preferable to have completed the 16 underpins as recommended by WA.
This would have likely addressed the underlying issues with the home. The need
for the 16 underpins was not because of the saturation of the soil. It was not
caused by an insured event. It was related to the underlying foundation soil
settlement, earth movement and defective design and was not covered under the
terms of the policy.
Complainant agreed to the cosmetic repair
BW said the repair options were discussed with the complainant who agreed ‘in
principle’ to proceed with the more economical repairs. The complainant denies
being given any choice of repair method, and says she was not advised of any
concerns with the repair method used by the insurer or that it was a cosmetic
repair.
The complainant says she would not have opted for a cosmetic repair over
stabilising the footings of the home, and if they had to make a financial
contribution to correctly repair the home they would have done so.
The report from BW is a relatively contemporaneous account of discussion that
occurred nearly 18 years ago. It records that discussions took place about the
Determination | Case number: 683384 Page 6 of 7
repair process. There is no reason for this to be recorded in the report if it did not
occur.
Insurer not liable for ongoing damage
The panel accepts the insurer had adequately repaired the original damage. While
the panel accepts the home has continued to suffer movement damage and
cracking, that is largely due to the failure of the original foundations and the
problematic foundation soil settling.
The recommendation to use 16 underpins was in the panel ’ s view a
recommendation designed to remedy the underlying defects in the building and to
attempt to avoid further movement damage because of the problematic foundation
soils. Effectively the recommendation was to address a design flaw, not an
insured event.
The panel is satisfied that these issues were most likely discussed with the
complainant and a decision made to only complete the cosmetic repairs arising
from the insured event. The complainant’s expert confirms these repairs stabilised
the home for ten years once the soil had dried.
In the circumstances the insurer has meet its liability under the terms of the policy
and has not further liability arising from the claim.
Complainant is entitled to reimbursement of professional costs
Paragraph D.5 of the AFCA Rules says AFCA may determine an insurer should
contribute towards a complainant’s professional costs in pursuing a complaint.
Unless special circumstances apply, AFCA will not require an insurer contribute
more than $5,000 to these costs.
The complainant provided an expert report from AW which assisted in determining
the outcome of this complaint. It was reasonable for the complainant to obtain this
report to assist in determining the cause of the damage, particularly noting the
complex nature of the engineering advice provided by the insurer.
The panel considers it fair that the insurer reimburse the complainant for the full
cost of AW’s report , subject to the complainant providing invoices for the costs
incurred.
Determination | Case number: 683384 Page 7 of 7
3 Supporting information
3.1 Our approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with
the Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment
and has proceeded directly to determination.
The determination is made by a panel consisting of the ombudsman together with
a representative who has extensive experience in consumer claims and a
representative who has extensive experience in the insurance industry.
This complaint has been determined based on what is fair in all the
circumstances, having regard to the relevant law, good industry practice, codes of
practice and previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the
purposes of this determination and each party has had the opportunity to address
any issues raised by the other. All the material provided by the parties has been
reviewed and considered.
The complainant and her husband were jointly covered by the policy and it is
unclear which insured is referred to in the assessment reports provided. For ease
of reference, both the complainant and her husband are referred to as the
complainant in this determination.
While the parties have raised numerous issues in their submissions, for the
purposes of this determination, commentary has been restricted to those issues
considered directly relevant to the outcome only.