Home / Suncorp Group / Determination 682532

Determination 682532

Ensuite bathroom water damage claim declined; mould remediation and claim delay

FirmSuncorp Group
Decided2021-01-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

The ensuite bathroom water damage claim was declined because a leaking shower base is excluded. AFCA affirmed that decline but ordered the insurer to scope and remediate mould and pay $750 for delays in the first claim.

Escape-of-liquid cover excludes leaks from shower bases, and AFCA awards non-financial loss under Rule D3.3 where claim delay caused unusual inconvenience.

Issues

Subjects and remedies

home or building damagepay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 682532 Financial firm AAI Limited Determination | Case number: 682532 Page 2 of 5 Case number: 682532 6 January 2021 1 Determination overview 1.1 Complaint The complainants hold a Home and Contents policy with the financial firm (insurer). On 19 December 2018, they lodged a claim for storm damage to the complainants’ sun room and contents which was cash settled. There is a dispute however with respect to the delays and insurer’s claims handling. A second claim was lodged on 17 January 2019 for damage to an ensuite bathroom. The insurer declined that claim and says the damage was caused by a leaking shower base. The complainants dispute the cause of damage. This dispute has been the subject of a recommendation. The recommendation was in favour of the insurer. A copy of the recommendation has been attached to this determination. 1.2 Issues and key findings Is the insurer liable for the damage to the ensuite bathroom? No. I am not satisfied the damage to the insured ensuite caused by an insured event under the terms of the policy. Is the insurer liable for the mould remediation? Yes, the insurer is to obtain a scope of works (SOW) to allow for the completion of the mould remediation of the home as set out under section 2.2 of this determination. Are the complainants entitled to compensation for non-financial loss? Yes. Compensation for non-financial loss of $750 in accordance with the AFCA Rules is payable because of the delays in handling the complainants’ first claim. 1.3 Determination This determination is in favour of the insurer. The insurer is to obtain a SOW to allow for the completion of the mould remediation as set out under Section 2.2 of this determination. Further the insurer is to pay the complainants $750 compensation for non-financial loss pursuant the AFCA Rules because of the delays associated with the complainants’ first claim. The insurer is otherwise entitled to decline payment of the balance of the complainants’ claim. Determination | Case number: 682532 Page 3 of 5 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. In rejecting the recommendation, the complainants have confirmed that they are no longer seeking compensation for loss of rent. The complainants maintain that the insurer has failed to have the mould damage assessed and to commence remediation. The complainants say they have encouraged the insurer to remediate the mould issues throughout the residence but have not been provided with a scope of works or even a costing despite their requests. Further, the complainants say that the damage to the ensuite was not caused by a leaking shower base but based on the report from KBS was most likely caused by a water leak from loose skylight tiles, a leaking decommissioned hot water service tank and corroded ceiling pipe work. This determination follows consideration of all the available information. It is based on what is fair in all the circumstances, having regard to relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the insurer liable for damage to the ensuite bathroom? The complainants have the onus to establish a claim within the terms of the policy It is established insurance law that an insured has the onus to establish on the balance of probabilities, that is more likely than not, that a claim falls within the terms of the policy. Once a complainant establishes this, the onus then shifts to an insurer to establish the application of any relevant exclusion if it is to refuse payment of the claim. The complainants’ policy is a listed events policy. The policy provides cover for a series of listed events including loss or damage caused by storm, lightning or escape of liquid subject to several conditions. The onus is therefore on the complainants to establish that the damage was caused either through a storm or through the escape of liquid within the terms of the policy. No evidence of damage being caused by an insured event The insurer obtained a report from KBS dated 25 October 2019. The purpose of that report was to determine the cause of mould to the ceiling in the ensuite and master bedroom, it was not to determine the cause of damage to the ensuite and bathroom. Determination | Case number: 682532 Page 4 of 5 The complainants say the report from KBS supports a view that the damage was either storm related or caused by the escape of liquid. I do not agree with this view. The report identifies that the roof tiles above the ensuite light well were not flash and it is possible that wind driven rain could have entered during storm events. This does not mean that such an event would have led to any damage to the ensuite bathroom. Insofar as the wind driven rain may have caused mould to develop, then I accept this would be an insured event. The report also identifies evidence of some prior leaking from a copper hot water tank as there was some rusting in the bottom tray. There is no indication that this leaking was ongoing or the extent of any leak. The report also identifies some corrosion to the copper connections of the water pipes but at the same time the tank was full of water. There is no suggestion of ongoing leaks or if there was that this was causing damage to the cavity wall of the ensuite bathroom. The insure r had the damage assessed by RC a building assessor. RC’s report identified the shower recess in poor condition with separation cracks between the grout tiles and broken tiles. RC considered the waterproof membrane in the shower recess had failed and had been leaking for some time. A leak detection test did not find any leaking pipework or drainage features suggesting of any ongoing leak. Complainants have not established a claim within the terms of the policy. I am not satisfied the complainants have estab lished the damage to ensuite bathroom was caused by an insured event. The reports from RCC and KBS confirm that most likely the damage was caused by a leaking shower base. Damage caused by a leaking shower base is excluded from cover under the terms of the policy. 2.2 Is the insurer liable for the mould remediation? The insurer is liable for the mould remediation The insurer confirmed in an email on 22 July 2020 that it was willing to remediate any additional mould found in other areas of the complainants’ hous e. Despite an indication from the insurer that a SOW was to be completed by KBS, no such SOW has been completed. The complainants have confirmed they are willing for KBS to prepare a SOW. They are willing to provide access to the home for the assessment and for the insurer to complete the remediation. In the circumstances, it is fair that within 21 days of the complainants ’ acceptance of this determination the insurer arrange for its mould remediation expert to attend the complainants’ property and prepare an appropriate SOW. The complainants must ensure that the insurer is allowed appropriate access to the property for the remediation to be conducted. The insurer must then make arrangements for the remediation of any mould found in other areas of the property. Determination | Case number: 682532 Page 5 of 5 2.3 Are the complainants entitled to compensation for non-financial loss? AFCA can award compensation for non-financial loss Under Rule D3.3 of the AFCA Rules, AFCA can award compensation of up to $5,000 for non-financial loss where complainants experience an unusual degree of physical inconvenience or time taken to resolve a situation. AFCA takes a conservative approach to the award of compensation and expects complainants to be moderately robust when dealing with an insurance claim. The complainants first claim was lodged on 15 December 2018. It was not until three months later, on 28 February 2019 that the insurer had the property assessed. It was not until 2 May 2019 until the roof of the sun room was replaced. Because of the delays, there was further damage to blinds, flooring and contents. I am satisfied that it took the insurer an unreasonable time to resolve the claim. Based on the information exchanged, the insurer did not appear to apply any urgency to the claim or the need to replace the roof of the sun room. In the circumstances, I accept that it is fair that the complainants be paid compensation for non-financial loss under Rule D3.3 of the AFCA rules. I consider an amount of $750 to be fair. Recommendation Case number 682532 Financial firm AAI Limited Recommendation | Case number: 682532 Page 1 of 9 Case number: 682532 15 October 2020 3 Overview 3.1 Complaint The complainants hold a home and contents policy with the financial firm (insurer) for their residential property. The complainants lodged two separate claims for damage to the property, one on 19 December 2018 and one on 17 January 2019. The first claim was in relation to hail storm damage to the complainants’ sunroom and contents. The second claim was in relation to water damage to the ensuite bathroom due to a leak in the shower where tiles had fallen off the wall. The insurer accepted damage to the sunroom and its contents and has cash settled this accordingly. These items are not in dispute. The insurer agreed to pay for mould remediation to the ceiling of the ensuite bathroom and bedroom walk in robe. However, it declined cover for damage to the ensuite shower and wall as it says the damage was caused by failed waterproofing. The complainants dispute this decision and are seeking:  cover for the ensuite damage  cover for mould damage throughout the rest of the property  loss of rent as he says the house was being prepared for rental prior to the damage. Further, the complainant says the insurer mishandled the claim. 3.2 Issues and key findings Is the insurer entitled to decline the claim for the ensuite damage? The damage to the ensuite is at the base of the wall and shower area. The policy specifically excludes loss or damage to, or caused by, a leaking shower base. The insurer has already accepted cover for the mould. The complainant has not established any further damage to the ensuite itself which is not covered under the policy. Is insurer liable for mould remediation to any other areas of the house? The insurer has said it is willing to remediate any additional mould found in the complainant’s home. Recommendation | Case number: 682532 Page 2 of 9 Is insurer required to compensate the complainants for loss of rent? No, the insurer is not required to compensate the complainants for any potential loss of rent as the policy is not a landlord’s policy and does not provide cover for loss of rent. There is no information to show the insurer is directly liable for any rent the complainants intended to receive in the future. Has the insurer handled the claim reasonably overall? No, the insurer unreasonably delayed the handling of the complainants’ first claim. The insurer is required to pay $500 to the complainant for non-financial loss. 3.3 Recommendation This recommendation is substantially in favour of the insurer. The insurer is entitled to decline the claim for damage to the bathroom however, it is required to pay the complainants the sum of $500 for non-financial loss. Recommendation | Case number: 682532 Page 3 of 9 4 Reasons for recommendation 4.1 Is the insurer entitled to decline the claim for the ensuite damage? The complainants say the damage was caused by a leak in the wall cavity The complainants lodged the claim when they noticed dislodged tiles in the ensuite bathroom. The complainants say the damage was caused by a leak within the wall cavity which subsequently caused the ensuite and shower wall to collapse. The complainants say there may have been a historical leak in the pipes or the copper hot water tank in the roof, which is no longer in use, could have contributed to the leak in the wall cavity. The complainants’ policy does not provide cover for accidental damage. The policy provides cover for specifically listed insured events. Relevant to this complaint, the policy covers loss or damage caused by liquid escaping from listed things such as a fixed pipe, drain, tank or water supply line. When lodging an insurance claim, the complainants must first show they have suffered a claimable loss. That is, there is loss or damage to the property that is, on balance, caused by a risk insured against under the policy. There is no dispute there is water damage to the ensuite area. The photographs provided show tile and wall damage to the base of the shower area, with wood rot evident. However, the parties dispute where the water that caused damage to the ensuite is coming from. The complainants say the water is coming from a leaking pipe, tank or water supply line. The complainants also say the damage could have occurred from a leaking roof during storm events. The insurer says the water is escaping from the shower base. The policy does not cover damage caused by a leaking shower base Under the insured event the ‘escape of liquid’ the poli cy outlines that it covers damage caused by liquid escaping from baths, sinks, toilets and basins but it does not include showers as one of those listed items. Further, the policy specifically excludes ‘loss or damage to, or caused by, a leaking shower flo or or base, shower cubicle walls, shower glass screening or doors’. It is evident the policy is not intended to cover damage caused by water leaking from the shower cubicle or shower walls as opposed to water coming from a covered item. Available information shows water coming from the shower base The insurer organised a building assessor (RC) to review the ensuite damage. RC was of the opinion the damage was caused by a failed waterproofing membrane in the shower recess rather than a leak from a pipe or similar. Recommendation | Case number: 682532 Page 4 of 9 The RC’s report, dated 20 February 2019, confirmed the waterproof membrane had been leaking for a while and staining all around the outside of the hob showed this. It also reported that inside the wall there was only damaged down low which suggested that the base was leaking. RC reattended on 23 January 2020 to assess the compainants claim that the water damage may have been caused by the roof tiles leaking during storm events. RC said the visual damage in the ensuite is at the base of the shower only. RC says its plumbing specialist completed a leak detection test and did not find any leaking pipe work or drainage fixtures. The plumber was unable to flood test the shower recess due to the damage to the wall tiles, however, it was reported that:  the shower recess is in poor condition with seperation cracks between grout lines and broken tiles  water proof membrane in the shower recess has failed allowing warer to penetrate causing the observed damage. Builder assessment report shows other possible causes of mould on ceiling While RC says there was only visual damage at the base of the ensuite, it is not in dispute there is mould on the ceiling of the master walk in robe and adjacent ensuite ceiling. The insurer organised another building assessor (KS) to inspect the roof cavity. KS’s report of 25 October 2019 says it was requested to determine the cause of mould to the ceilng above the ensuite and robe in the master bedroom. KS found two possible sources of mould to the ceiling in those areas. While KS’s report identifies two possible causes of mould in the ceiling, it makes no direct link between these two causes and the visible damage to the ensute tiles and wall. KS said the copper hot water tank in the ceiling had evidence of prior leaking. This is because it had rusting in the bottom tray and corrosion on the copper connections going to the tank. KS also noted the tank was still full of water despite being decommissioned some time ago. There is no mention that this water had been travelling down the wall cavity affecting anything other than mould in the ceiling. The other possible cause of mould was the roof tiles above the ensuite light. KS noted there are visible gaps in the tiles which ‘would most likely allow wind driven rain during storm events’. While KS mentions this as a possible cause of ceiling mould, there is no further information to show this caused the damage to the ensuite tiling and internal wood rot at floor level. Recommendation | Case number: 682532 Page 5 of 9 The insurer agreed to cover the mould damage to the ceiling likely caused by either the roof tiles or the previous leak of the copper water tank. However it maintains the ensuite damage to the tiles and wall is not covered. Insurer entitled to decline the claim for the ensuite damage While KS’s report identifies possible c auses of mould in the ceiling, I am not satisfied it establishes the decommissioned water tank or the mismatched roof tiles caused the visible damage to the shower recess and ensuite wall. There was no evidence of wood rot in the ceiling or saturated materials that would have allowed water to travel down the wall cavity to the shower base. The photographs of the shower base show severely deteriorated wood within the cavity at the base of the shower. I am satisfied, on balance, the damage to the shower base and wall was caused by water escaping from the shower itself, whether it be via a failed water proof membrane or the deteriorated grout and tiles noted by RC. There is no further information to show the ensuite damage was caused by a water leak from one of the covered items. I am satisfied the insurer is entitled to rely on the policy exclusion for loss or damage caused by water leaking from a shower base to decline the claim for the ensuite damage. 4.2 Is insurer liable for mould remediation to any other areas in the house? The insurer says it is willing to remediate any additional mould The insurer covered the cost to remediate mould to the ensuite and walk in robe ceiling. It also addressed the mould in the sunroom. The complainants say there is mould to other areas of the house which require remediation. The insurer confirmed in an email of 22 July 2020 that it is willing to remediate any additional mould found in other areas of the house. Despite requests, the complainants have not provided to AFCA or the insurer any further information or photos evidencing where additional mould is. In any event, I am satisfied the insurer has offered to assess any further mould damage and arrange for it to be remediated. The complainants will need to allow the insurer an opportunity to assess the mould in the other areas of the property before this aspect of the claim can be resolved. 4.3 Is insurer required to compensate the complainants for loss of rent? The complainants’ policy does not provide cover for loss of rent The certificate of insurance provided by the insurer confirms that the complainants disclosed that the insured property was owned and occupied by them. The PDS provided to the complainants also makes no mention of cover for loss of rent, as the Recommendation | Case number: 682532 Page 6 of 9 intention of the policy is to insure the property which the complainant occupies. The available information also supports that there was no point at which the complainants notified the insurer they intended to lease or rent the property. The complainants say they intended to lease out the property for an estimated $750 a week and due to the insurer’s delays, they have been denied this income. However, the complainants do not have cover for loss of rent when an insured event affects their home. Further, there is no information to suggest the insurer is directly liable for the loss of any potential rental payments that may have occurred in the future. There are many factors outside the insurer’s control which could have affected this, such as the rental market and any damage not covered by the policy. As the complainant held a residential, owner occupied insurance policy, I am unable to find that the insurer is required to compensate the complainants for loss of rent. 4.4 Has the insurer handled the claim reasonably overall? Insurer must act fairly and promptly to resolve a claim When considering whether an insurer has delayed processing an insurance claim, we will look at whether:  the insurer acted fairly and promptly to resolve the claim  there has been an unreasonable dela y  there were factors which were outside the control of the insurer or otherwise unavoidable  the insured’s actions caused or contributed to the delay. If we decide the insurer unreasonably handled or delayed the claim, we will look at what loss (if any) stemmed from that conduct. Complainants say insurer unreasonably delayed the handling of first claim The complainants say that the insurer delayed the handling of the first claim from the lodgement on 15 December 2018, as there was no make safe done by the insurer. The available information shows the property was not assessed by a builder until 20 February 2019. The complainants said this had led to further damage to the building and contents in the sunroom. Furthermore, the insurer had refused the claim on 29 March 2019 to replace the blinds on the basis that there had not been enough damage. The roof to the sunroom was not replaced until 2 May 2019, and in this length of time the blinds, flooring and other contents were exposed to the elements. This was noted in a report dated 2 May 2019. The insurer did unreasonably delay its assessment and make safe I acknowledge and agree with the complainant’s concern that the insurer failed to make safe the property on three separate occasions, for the initial damage caused in December 2018, 20 February 2019 and 29 April 2019.This contributed to further Recommendation | Case number: 682532 Page 7 of 9 damage to the complainant’s sunroom as it was left open to the elements. I also acknowledge the complainants’ concerns about the misinformation provided by the insurer in relation to the make safe. Whilst I appreciate the complainants have now been compensated for this damage, I agree that the period of time in which the insurer took to assess the damage would have caused the complainants stress and inconvenience. For this delay and inconvenience caused to the complainants, I recommend that the insurer provide the complainants with $500 compensation for non-financial loss. As noted above, I note that the other outstanding contents items which were initially also raised by the complainants have now been settled by the insurer. Recommendation | Case number: 682532 Page 8 of 9 5 Supporting information 5.1 Relevant policy wording PDS, Claim note s & Plumbers reports Key points Page 37 We do not cover loss or damage to, or caused by, a leaking shower floor or base shower cubicle walls, shower glass screening or doors...” Escape of Liquid The insurer is relying on the exclusion of Escape of Liquid on page 37 of the policy We do not cover loss or damage to, or caused by, a leaking shower floor or base, shower cubicle walls, shower glass screening or doors...” The damage was caused by a failed waterproof membrane The insurer engaged an expert*** to assess the damage. It provided a report in relation to the damage which included photos of the area that was damaged. The available information supports that the underlying cause of the damage was the poor condition of the shower rec ess with separation cracks between grout lines and broken tiles. RC has submitted a Restoration Report for Job 8073550 10/ 02/2020 Normal RC Recommendation | Case number: 682532 Page 9 of 9 PDS, Claim note s & Plumbers reports Key points Claim note s dated 10 Feb 2020 has submitted an Assessment/Report for Job No: 9064320 - Follow Up Report ACTION: - Reviewed file - RC 2nd attend report received. - report confirmed COD: - The water proof membrane in shower recess has failed allowing water to penetrate causing the observed dama ge. The damages to the ensuite bathroom does not relate to the previous hail storm event. - Policy Exclusion/s: Damaged caused by a failed waterproof membrane is not covered under the policy. - NO ACTION REQURIED BY CM: CLAIM WITH IDR: (staff) - Sent link me ssage to (staff)as RC 2nd report received ******************** NEXT ACTION: - refer to DIR. (staff)to review for next step. cm: nil action required as claim with AFCA. - await instructions for next step. MCM not required