Adequacy of flood and mould claim settlement
Summary
After two water escapes at his home, the complainant sought a further $117,307.92 for mould remediation and other damage. AFCA ordered the insurer to pay about $5,100 in additional amounts, plus receipt-based accommodation and removalist costs, but rejected the mould and tile claims and any non-financial loss compensation.
The insurer may cash settle under the policy, and AFCA expects that discretion to be exercised fairly; the mould and further damage claims were not established by the evidence.
Issues
- Claim amount dispute primary · upheld“the insurer is required to pay the complainant $2,000 towards the non-salvageable contents items, $1,500 for the shower screen and $600 for the central heating duct, $1,000 for the cost to remove debris”
- Claim denial secondary · not upheld“The panel is satisfied that the complainant has not established the presence of mould or further water damage at the premises. The insurer is entitled to deny this aspect of the claim.”
- Delay secondary · not upheld“the panel is satisfied the insurer has handled the claim reasonably overall. The complainant is not entitled to any compensation.”
- Repairs or contractors secondary · not upheld“The panel is satisfied that the insurer is entitled to deny the claims in relation to the tiles and the flooring.”
Subjects and remedies
home or building damagepay claim
Related
Text of the determination
Determination
Case number 682499
Financial firm Insurance Australia Limited
Determination | Case number: 682499 Page 2 of 15
Case number: 682499 22 September 2020
1 Determination overview
1.1 Complaint
The complaint relates to two water flooding events at the complainant’s home in 2014.
The financial firm (insurer) accepted the claim and arranged for repairs to the
bathroom and main bedroom. It also cash settled some repairs and contents items.
The complainant says there are items the insurer missed including damage to the
kitchen and mould throughout large areas of the home. The complainant is seeking a
settlement of a further $117,307.92.
1.2 Issues and key findings
Is the insurer required to increase its settlement?
Yes. The panel considers it is fair the insurer pays the complainant the additional
amounts detailed below.
Is the complainant entitled to non-financial loss compensation?
The panel is satisfied the insurer has handled the claim reasonably overall. The
complainant is not entitled to any compensation.
1.3 Determination
This determination is substantially in favour of the insurer.
Upon acceptance of this determination by the complainant, the insurer is required to
pay the complainant:
$2,000 towards the non-salvageable contents items,
Payment for the reasonable cost of two week’s temporary accommodation upon
provision by the complainant of a receipt for the cost incurred
Payment for the reasonable cost for the removalist and storage fees for contents
upon provision by the complainant of a receipt for the cost incurred,
$1,500 for the shower screen and $600 for the central heating duct,
$1,000 for the cost to remove debris and building material.
The insurer is not required to take any further action.
Determination | Case number: 682499 Page 3 of 15
2 Reasons for determination
2.1 Is the insurer required to increase its settlement?
The property has been subject to an escape of liquids event
There is no dispute the property has been subject to an escape of liquid event where
the toilet in the main bathroom has leaked. There is damage to the bathroom,
hallway, laundry, linen cupboard, carpets and bedding.
Following the event, the insurer engaged a builder (PT) to assess the extent of the
damage and commence repairs. In its report PT, says the event has affected three
bedrooms, bathroom, linen cupboard, laundry and hallway.
Following the repairs, the complainant raised concerns regarding the adequacy of the
repairs and the existence of mould in the property. The insurer has undertaken
numerous mould assessments since 2016 and subsequently cash settled the
complainant $16,835.08, for High-Efficiency Particulate Air (HEPA) cleaning.
The complainant is dissatisfied with the cash settlement and seeks an extra
$117,307.92. In doing so, the complainant says the property sustained further mould
damage because of the insurer’s actions and the insurer’s cash settlement is not
adequate.
The insurer’s scope of works outlined the resultant damage
PT organised for make safe repairs, installed blowers and removed the affected
carpet in the hallway, bedroom three and linen cupboards and floating boards to the
bathroom and laundry.
The exchanged information shows that following the repairs, the complainant
identified some issues:
water splashing out of the walk-in shower
bedroom three had more water damaged flooring which he had to remove and
replace
hallway doors were painted on one side only
hallway tiles have cracked
existing heater thermostat had an automatic timer whereas the new one does not.
As part of the rectification works the insurer completely demolished and re-built the
bathroom and laundry as the original tiler did not comply with Australian Standards.
The exchanged information shows the rectification works were completed and signed
off by the complainant on 14 September 2015.
Determination | Case number: 682499 Page 4 of 15
The panel notes some of the repairs were cash settled by the insurer based on the
complainants’ quotes as PT was unable to warrant the repairs in these areas:
$1,127.50 for the hallway tiles on 26 February 2015
$1,850 for the carpet in the three bedrooms on 5 November 2015.
The complainant identified mould issues in 2016
On 27 June 2016, the complainant advised the insurer he is experiencing health
problems with mould associated symptoms. The complainant says the property is
showing signs of moisture and dampness.
The complainant suggests the water has traveller further than the insurer initially
identified and possibly has not been dried properly.
Hygienist reports
The insurer engaged a hygienist (WS) to assess the extent of the mould. In his report,
WS says:
there is low level of moisture content found throughout the walls, floors and ceilings
elevated levels of airborne mould identified within the residence especially in the
bathroom and the bedroom at the end of the hallway
further mould was identified in the lounge room and kitchen.
Whilst WS identified mould and recommended cleaning of all surfaces, he did not
identify the cause and source of the mould.
Subsequently, a hygienist (VA), assessed causation and extent of the mould (if any).
In its report, VA says:
the first water escape event (not the subject of this complaint) resulted in damage
to the bathroom only, where the second event resulted in water damage to other
areas outside the bathroom
water damaged floor coverings and underlay were still present in bedrooms one
and two
there was a slight musty smell in bedroom one
the pine lining boards of the verandah ceiling were water damaged and microbially
affected. This appears to be because of the rainwater overflowing the upper edge
of the roof linings and ingressing the roof cavity
there was no exhaust fan installed at the bathroom.
VA concluded the moisture levels within the building materials to be acceptable and a
lack of visual mould growth. VA noted an abnormal fungal ecology in bedrooms one
and two which indicated a high level of water activity.
Determination | Case number: 682499 Page 5 of 15
VA recommended the remediation of the floor coverings in bedroom one and two.
Further, slight abnormal fungal ecology in the bathroom due to inadequate ventilation
in the absence of an exhaust fan.
The panel notes slight water staining to the bearers underneath the bathroom area.
This is visible from the crawl space.
On the 28 October 2016, the insurer called VA to clarify the cause of the identified
mould. During this telephone conversation, as evident in the claims notes, VA says:
the mould is a cross contamination from spores throughout the property especially
when the builders have removed mouldy items throughout the property
these items were not covered correctly to ensure there is no cross contamination
the carpet in two bedrooms needs to be removed and anti-bacterial spray is
completed on the base of the floor
there are different types of mould present at the rafter of the alfresco and the
mould located inside the property.
The insurer concluded, given the builders and the restoration company failed to
ensure the rooms were sealed against cross contamination, a restoration company
should attend and spray the entire inside of the property.
The claims notes show the insurer engaged a builder (AJ) to clean the property and to
engage a restoration company to proceed with the cleaning of the property.
The insurer undertook a leak detection test to assess if there are any sources of
water. It was only the shower screen that has failed. No other leaks were identified in
the property.
Maintenance work was required prior to mould remediation
The insurer requested the complainant undertake maintenance work which VA
identified, prior to mould remediation. These works include:
the removal of the affected carpet in the two bedrooms
the removal of the mouldy pine lining in the verandah
install a ceiling fan in the bathroom.
On 13 January 2017, the complainant called the insurer and advised he does not
want to remove the pine wood or install the fan as he would like to know the extent of
the mould remediation first.
The exchanged information shows the complainant installed the fan in February 2017,
however, he says he does not wish to remove the pine lining as he feels it is not his
responsibility. The complainant opted to lodge a new claim for the damaged pine
lining.
Determination | Case number: 682499 Page 6 of 15
In April 2017, AJ confirmed the complainant had replaced the timber lining boards and
disposed of them, however, the new roof sheets have been poorly installed. The
complainant had removed the carpet, however, he has not replaced it as he believed
the yellow tongue flooring was damaged and required replacement as it is creaking.
AJ confirmed he did not observe any mould to the flooring.
The insurer undertook mould assessment in 2017
Following the complainant ’s dissatisfaction with the claim and concerns, the insurer
engaged another hygienist (EH) to assess the extent of the mould and provide a
scope of works for its remediation.
In its first report, dated 22 July 2017, EH says:
upon entering the property, no malodour associated with mould growth or water
damage was observed
no visible mould or ongoing water damaged building materials were observed
there is pre-existing water damage, wear and tear observed to the cabinet in the
kitchen
a thick coat of settled dust was observed to many surfaces and contents. The
panel notes this observation is consisted with VA’s findings
an inspection of the subfloor revealed that the infill was dry and underside of the
flooring clean with no visible water damage or mould
some localised areas of water staining exist to the carpet in the dining/living room
and kitchen cabinetry which is unrelated to the claimed event.
EH says the air sampling results suggest an active mould source exists within the wall
cavities or behind the skirting board of the restored areas. EH suggests it is possible
for mould to grow on wet framing or bottom plates .
EH requested an invasive assessment in the master bedroom wall cavity where it
boarders the bathroom.
In the second report, dated 23 August 2017, following the invasive testing, EH
identified water staining to the bottom plate of the wall cavity. Further, EH identified
traces of visible mould on the lower sections of the framework and bottom plate of the
cavity.
EH says while sections of the particleboard floor were removed in the master
bedroom, the sections under the bottom plates remained. It is likely that water
damage/mould exists between the bottom plates and remaining particleboard flooring.
Further, the floor to the adjoining bedroom was never removed and has visible
evidence of water damage and staining. EH outlined a remediation plan for the
identified mould.
Determination | Case number: 682499 Page 7 of 15
The complainant engineer s’ findings are inconclusive
Following his disagreement wit h EH’s mould remediation plan, t he complainant
engaged an engineer (CW) to assess the suitability of the proposed rectification
works and the causation of the mould.
In his report, dated 7 August 2017, CW says:
during the repairs following the initial flooding, the insurer repaired the vinyl in the
bathroom and laundry however did not replace the vinyl cement sheet underlay
following the second event the insurer removed the affected carpet however left
the underlay in place for a long time
the insurer used the vinyl underlay as a base of new ceramic tiles for the bathroom
and laundry
the complainant engaged the insurer’s tiling contractor to install the tiles to the
hallway and a part of the section.
CW says following the first event, the insurer should have removed the tile underlay.
Further, the second event likely has caused the circulation of mould spores
throughout the house due to the hot air blowing under the carpet.
CW asserts the scope of works for both events should have included decontamination
of the underfloor central heating duct system. The water inside the ductwork also
assists in the spreading of mould spores.
CW identified issues which it says EH has missed in its conclusions:
under floor flooding of the foundations;
poor workmanship of pervious trades in removing and reinstallation of yellow
tongue flooring
supply and installation of tiled floor areas to the hallway & kitchen that failed
because of foundation movement due to flooding & consequential floor movement
central heating unit requiring disposal of existing ductwork, decontamination of
heat exchange unit & supply and installation of new d uctwork
saturation of the structural members
removal of all porous material should include the yellow tongue flooring in the
affected areas
supply & installation of floor covering
disposal of existing stored soft furnishings in storage
disposal of existing soft furnishings currently in the dwelling
decontamination of hard furnishings in storage and in current use.
Determination | Case number: 682499 Page 8 of 15
The panel notes CW has proposed an extensive scope of works, however, did not
supply any mould readings or assessment. The panel notes CW is a forensic
structural engineer and not a hygienist. It is not evident the mould has affected the
property to the extent to which CW has proposed in his scope of works.
EH has not identified any mould inside the walls (apart from the mould identified by
the invasive testing). The exchanged material shows the insurer was willing to
undertake further mould testing following the mould remediation proposed by EH,
including the contents. The insurer agreed to rescope once the mould cleaning had
occurred to rectify any damage.
The insurer conducted further mould assessment in 2018
In February 2018, EH undertook further assessment. In its report, dated 20 March
2018, EH concluded there is no visible evidence in the property to denote ongoing
water damage or mould growth. The sample collected form the porch showed mould,
however, the panel notes this area is not subject to the current claim.
EH recommends a HEPA vacuum to be completed throughout the entire property on
all surfaces and contents. HEPA air filtration to be installed for 48 hours and then
further air sampling run in the property to ascertain its return to condition one.
Following further dissatisfaction from the complainant, EH reattended for further
assessment in May 2018. In its report, dated 14 May 2018, EH says:
no visible evidence exists at the property to denote ongoing water damage or
mould growth
at the time of the assessment, the dwelling was vacant, but the heating was on and
the area very warm
a review of the air sampling results for total mould indicated all assessed areas
(including the wall cavity of the master bedroom, ceiling space and subfloor) were
all assess ed as ‘normal mould ecology’ with no fungal hyphae detected.
EH concluded the property is condition 1, being normal mould ecology as per the
required standard.
The insurer then engaged another hygienist (PN) to undertake another mould
assessment at the com plainant’s property.
In its report, dated August 2018, PN says:
the subfloor is well ventilated with gaps in weather board allowing airflow
no visible mould was identified
no musty or mould like odours were present
the ceiling cavity appears to be clean and dry
water staining was observed to the subfloor joists
Determination | Case number: 682499 Page 9 of 15
no results indicative of excess moisture retention were identified during the
assessment
a damp area of soil within the subfloor area near the hatch was identified
timber, debris and cement sheet associated with the removal of flooring was
present within the subfloor and directly beneath the bathroom
thermal images taken throughout the rooms identified no abnormal moisture
presence
two wall cavity penetrations within the master bedroom showed no sig ns of water
staining or mould growth
carpet and underlay remained in the wardrobes of the affected area however these
showed no signs of staining when lifted and metre reading showed chip board
below was comparable to unaffected areas that had been replaced.
PN concluded it did not identify any visual mould growth, odour or elevated moisture
retention. Further the airborne microbial results indicated there were no elevated
spore counts in any of the rooms.
PN asserts the moisture meter readings taken from visibly stained timber members in
the subfloor were noted to be comparable to the readings of the unaffected materials.
PN recommended that the affected carpet and underlay in the rooms to be removed.
Following this, the readily accessible areas throughout the property should be HEPA
vacuumed and wet wiped clean to reduce the significant levels of visible dust within
the property.
PN also recommended that the debris and building material relating to the repairs
should be removed to mitigate the risk of mould growth.
The complainant has not established contamination
The complainant has provided a quote from an expert mould removal (MP) totalling
$106,205.00. The report shows no mould sampling was required or taken by MP. The
scope of works addresses all the rooms. The proposed works include the removal of
all the walls sheeting and internal timber walls.
The complainant says this scope of works is inclusive of all the items missed by AJ
and items the insurer has failed to adequately indemnify him for. Further, the
complainant asserts this quote is based on CW’s scope of works.
As outlined above, CW is a structural engineer and he is not a hygienist. Neither CW
nor MP’ s findings are substantiated by any sampling or any moisture or humidity
testing.
Determination | Case number: 682499 Page 10 of 15
If the panel were to accept their findings (which it does not), the mould would have
been evident at much earlier stages. Both CW’s and MP’s unfounded findings
contradicts all the hygienists’ findings since 2016. Further, PN’s report being the latest
hygienist, confirmed the absence of any visual mould growth, odour or elevated
moisture retention. Further the airborne microbial results indicated there were no
elevated spore counts in any of the rooms, when compared with outdoor reference
samples.
Having reviewed all the exchanged material, the panel is satisfied that the
complainant has not established the presence of mould or further water damage at
the premises.
The insurer is entitled to deny this aspect of the claim.
The insurer’s engineer shows the tiles were damaged due to poor installation
Following PN’s report, the insurer engaged an engineer (HW) to assess tiles damage
following the complainant ’s concerns regarding foundation movement. HW says
additional screws have been installed to re-fix the particle board flooring, however,
squeaky floor boards were evident in the lounge room area.
HW concluded the cracking floor tiles to the passage way and kitchen area is typical
of problems that occur due to either minor movement of the timber sub floor framing
or poor installations of the tiles. All of tiles including the underlay have been removed
and therefore it is difficult to comment on the method of fixing of the tiles.
HW noted the new tiles laid in the laundry and bathroom area show no issues or
problems. HW says it would appear the problem with the floor tiles cracking and
movement is related to poor installation of the tiles.
HW asserts floor levels taken on the house showed that generally the movement in
the house was less than 20 mm which is within normal building tolerance .
The subfloor seemed dry except for a minor damp area isolated to underneath the
bathroom area. HW concluded the cracking and movement in the hallway tiles was
due to poor installation and laying and is not related to movement of the sub base
from the water leak.
HW says the squeaking floors evident throughout the property is a problem that can
occur particularly if the particle board flooring becomes wet and then dries out. In
addressing the squeaky floors, HW recommended gluing its joints and re-screwing
the particle board flooring in the areas where squeaking is occurring.
The insurer cash settled the complainant for both the tiles and the flooring.
The panel is satisfied that the insurer is entitled to deny the claims in relation to the
tiles and the flooring.
Determination | Case number: 682499 Page 11 of 15
The policy allows the insurer to cash settle the claim.
The insurer’s policy says if the building suffers loss or damage, the insure r will decide
to repair, rebuild or pay the insured the cost to repair or rebuild that part of the
building.
Whilst the policy gives the insurer the discretion to cash settle, AFCA expects the
insurer to exercise such discretion fairly. The panel is satisfied that there is a
breakdown in communication and trust between the parties. The panel accepts it is
appropriate for any outstanding repairs to be cash settled.
The insurer is required to increase its settlement
The exchanged evidence shows that the ins urer has cash settled the complainant:
$1,850 for the carpets in the three bedrooms
$12,352.24 for contents HEPA vacuum including the items in the garage
$4,482.84 for building HEPA vacuum
$5,959.05 for the contents directly damaged by water
$1,127.50 for the tiles in the hallway
$1,369.48 for the reinstatement of the walls used to cut the holes to enable EH’s
intrusive testing.
Relevant to the complaint, the panel notes the insurer was willing to undertake the
mould remediation and contents restoration and the complainant refused. The
complainant says the insurer’s settlement is inadequate to return the property to its
pre-loss state . In addition to his MP’s quote, the complainant is seeking:
$1,500 for a shower screen
$10,880 for non-salvageable contents
$600 for the central heating duct
$12,558 for accommodation during the further repairs
$2,800 for his engineering reports and quote fee.
Despite the insurer paying the complainant a lump sum for HEPA vacuum in 2018,
the complainant has not provided any evidence to show he has started repairs or
carried out any safe works to mitigate further losses. Further the claim notes show the
complainant has refused to let AJ on site.
The panel is satisfied that the exchanged information shows the complainant delayed
undertaking maintenance repairs such as the installation of an exhaust fan, removal
of water damaged carpet and sealing the porch roof lining opening to prevent further
moisture ingress into the property.
The panel considers the complainant failed to mitigate any further damage and his
actions arguably have contributed to problems.
Determination | Case number: 682499 Page 12 of 15
The complainant is seeking $10,880 for the non-salvageable contents. The panel is
not satisfied the complainant has established the extent of the loss i.e. no damage
reports, quotes or invoices. However, the panel notes AJ in his quote mentions his
contents quote does not factor in non-salvageable items.
The panel considers it is fair the insurer pays $2,000 towards the non-salvageable
contents. The panel notes the complainant provided a quote for the dry cleaning of his
contents totalling $9,735. Dry cleaning has already been factored into AJ’s quote.
The insurer accepted one week’s accommodation for the complainant whilst the
HEPA vacuum is proceeding. The panel considers it is fair the insurer pays the
complainant for two weeks accommodation to factor in any unforeseeable delays.
The complainant is to provide the insurer with a receipt for the reasonable cost he
incurs for two weeks temporary accommodation.
The complainant is claiming for the cost incurred for his expert ’s report . The panel is
not satisfied the insurer is liable for this cost. The panel does not accept the
complainants’ experts have advanced his position.
Shower screen and central heating duct
Having reviewed the exchanged evidence the panel is satisfied that it fair that the
insurer reimburses the complainant the cost to repair the leaking shower screen and
to install the central heating duct.
Conclusion
Upon acceptance of the determination by the complainant, the insurer is required to
pay the complainant:
$2,000 towards the non-salvageable contents items
The reasonable cost of two weeks temporary accommodation, upon the
complainant providing a receipt for the cost he incurred weeks of accommodation.
The reasonable cost for the removalist and storage fees for contents upon
provision by the complainant of a receipt for the cost incurred,
$1,500 for the shower screen and $600 for the central heating duct
$1,000 for the cost to remove the debris and building material
The insurer is entitled to deny all other claims.
Determination | Case number: 682499 Page 13 of 15
2.2 Is the complainant entitled to non-financial compensation?
AFCA may award compensation for non-financial loss
Under its Rules, AFCA may award compensation for non-financial loss where a
complainant has suffered an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with the complainant ’s expectation of
enjoyment or peace of mind.
However, AFCA adopts a conservative approach to the award of compensation for
non-financial loss. AFCA expects complainants to be moderately robust and bear the
usual inconvenience associated with an insurance claim.
The complainant is dissatisfied with the way the insurer has handled the claim and the
associated delays.
The complainant is not entitled to compensation
Having reviewed the exchanged evidence, parties’ submissions and the
circumstances of the loss, the panel accepts there were delays associated with the
repairs. In noting that, the complainant has been placed in alternative accommodation
throughout the repairs process.
Having reviewed the claims notes, the panel accepts the insurer has acted promptly
in addressing any arising repair issues. The insurer has promptly addressed the
complainant ’ s concerns by appointing different experts to address the extent of the
damage.
The notes show the insurer has continuously attempted to call the complainant to
provide him with an update or address any concerns he may have. Conversely, the
complainant has caused significant delays throughout the life of the claim.
The panel notes:
the complainant has requested PT to modify the bathroom by replacing the bath
with a shower recess
when VA turned up for the assessment, there was a note on the door saying the
insured is crooked and he had to leave
the insurer has attempted to contact the complainant to discuss the remediation of
the mould on numerous occasions and the complainant does not respond in a
timely manner
the complainant failed to undertake the maintenance related works in a timely
manner
AJ was unable to get hold of the complainant to proceed with the mould
remediation, despite leaving the complainant different messages. This process was
for approximately 8 weeks, from September 2017 until November 2017
Determination | Case number: 682499 Page 14 of 15
the complainant refused to let the hygienist on the property to undertake the mould
remediation.
Having reviewed the evidence, the panel is not satisfied that the complainant has
established an entitlement for compensation.
Determination | Case number: 682499 Page 15 of 15
3 Supporting information
3.1 Our approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determination.
The determination is made by a panel consisting of the ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.