Home / Suncorp Group / Determination 682262
Determination 682262
Defective storm repairs and delayed claim settlement
Summary
Storm repairs by the insurer's repairer were defective and the claim was delayed. The insurer accepted liability to rectify the work and was ordered to pay $2,500 for non-financial loss and utility and certification costs, while most other financial losses were refused.
Under its lifetime guarantee the insurer must rectify defective repairs it arranged, and AFCA awards non-financial loss only for an unusual amount of time and stress.
Issues
- Repairs or contractors primary · upheld“The insurer accepts there are quality issues with its repair work.”
- Claim amount dispute secondary · not upheld“I am not satisfied, however, that all of the claimed costs are reasonably attributable to the actions or failings of the insurer.”
- Delay secondary · upheld“the claim is taking an unusual amount of time to finalise, not least because of the quality issues with the repairs.”
Subjects and remedies
home or building damagenatural disasterpay compensationpay non financial lossrepair or rectify
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 682262
Financial firm AAI Limited
Determination | Case number: 682262 Page 1 of 6
Case number: 682262 4 December 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) in July 2018 for
damage to his property following a storm. The insurer assessed and accepted the
claim and agreed to repair the damage.
During the course of the work, the complainant discovered that some repairs were
defective and incomplete. The complainant says there are several outstanding areas
of concern, including the roof and water entry through the master bedroom window.
The complainant seeks compensation for financial and non-financial loss suffered due
to the delays in finalising repairs and settling his claim.
The insurer accepts there are quality issues with its repair work. It has offered to
rectify the repairs after first engaging an engineer and builder to inspect the areas of
concern, undertake a forensic building audit and provide a defect scope of works
(SOW) for areas requiring rectification.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the insurer. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
Yes. The findings contained in the recommendation were correct and are adopted in
this determination. Further submissions provided after the recommendation have
been considered. I agree with the case analyst ’s reasons for the recommendation and
the recommended outcome.
Is the insurer’s offer for inspection/rectification fair and reasonable?
Yes. The insurer has accepted liability for the claim and acknowledges its
responsibility to ensure claim-related repairs are carried out properly. The insurer’s
offer for inspection and rectification is fair and reasonable in the circumstances. This
is because:
there are acknowledged outstanding quality issues that require further inspection
and rectification
the extent of the rectification work required cannot be fully determined until an
engineer completes a thorough focussed inspection of the property
Determination | Case number: 682262 Page 2 of 6
the insurer is unable to assess its outstanding liability and appropriately progress
the repair/rectification work until such time as the complainant has allowed it to
undertake that inspection
it is not reasonably necessary for the insurer to provide all the work safety
documents requested by the complainant prior to any inspection or the
commencement of repair work.
What is the fair resolution of this complaint?
The insurer is to arrange both an independent building consultant/engineer and a
qualified repairer to inspect and report on the property and provide an appropriate
scope of works (SOW) and quote for all outstanding repairs/rectification. The insurer
is responsible for prompt completion of the agreed repairs.
Alternatively, if the complainant prefers a cash settlement, the insurer is to cash settle
the claim based on the quote obtained, subject to any additional allowances required
to ensure that cash settlement reflects the likely cost of repairs to the complainant as
a retail customer, and caters for contingencies and the transfer of risk.
Is the complainant entitled to compensation for its claim handling?
Yes. The insurer is required to pay $2,500 for non-financial loss given the adverse
experience and the significant impact this had on the complainant. The insurer should
also reimburse the complainant’s costs for expert reports, as well as for electricity,
water and gas incurred in the course of the claim and complaint as a result of the
insurer’s repairer’s usage .
The insurer is not required to reimburse other expenses claimed by the complainant,
as the policy does not cover consequential financial loss; nor is the insurer otherwise
responsible for those costs.
1.3 Determination
This determination is substantially in favour of the insurer. The claim is to be resolved
within the timeframes and resolution mechanisms set out in detail in section 2.2 of this
determination. The insurer is also required to pay the complainant $2,500 in non-
financial loss compensation, and reimburse the complainant for:
costs of a roof plumber and obtaining plumbing certification, subject to the
complainant providing tax invoices confirming those costs
electricity costs in the amount of $458.28, water costs in the amount of $889.80
and gas costs in the amount of $221.16
further electricity, water and gas costs reasonably attributable to the insurer’s
usage while completing repairs in the property (reasonable evidence to be
provided by complainant).
Determination | Case number: 682262 Page 3 of 6
2 Reasons for determination
2.1 Were the findings of the recommendation correct?
I have decided this case based on what I consider is fair in the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
AFCA decisions. I have taken into account all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
I am satisfied that the case analyst’ s recommendation contains an accurate summary
of the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
2.2 Is the insurer’s offer for inspection/rectification fair and reasonable?
Insurer must settle the claim fairly and in line with policy terms
The policy gives the insurer the optio n of how to settle a claim: it can repair the
damage or cash settle a claim for repairs.
If the insurer undertakes repairs, then it guarantees the quality of materials and
workmanship of the work. If a defect arises because of poor quality workmanship or
incorrect materials, then the insurer is required to rectify the problem. In that case, it
is fair and appropriate that the insurer be given the opportunity to assess and attend
to any necessary rectification.
Insurer has accepted responsibility for repairs/rectification
After the claim was lodged, repairs commenced, but various delays occurred and
quality issues arose.
That includes, the complainant says, water leaking through the roof and window, and
defects with the heating and electrical systems. In support of his position, the
complainant provided a report from his roofer (ER), who has referred to non-compliant
workmanship as well as further damage resulting from subsequent efforts to fix that.
When it became apparent there were justifiable concerns with the repair work, the
insurer acknowledged that and has offered to appoint an engineer/building consultant
to re-assess the property and prepare a scope of works (SOW) for the necessary
rectification work.
The complainant believes the insurer’s o ffer is not enough to address the quality
issues and provide him with the reassurance that the work will proceed safely. He has
not consented to the insurer undertaking any further inspections or work until it makes
available a wide range of documentation relating to work safety procedures, some of
which has now been provided.
Determination | Case number: 682262 Page 4 of 6
Given his experience to date, it is understandable that the complainant is concerned
about the insurer’s builder’s ability to properly deal with the repair/rectification work.
However, I am not satisfied that it is reasonable or necessary to further delay action
on the claim because the requested information has not been provided.
Further inspection and rectification of disputed damage is required
As has been offered by the insurer, I am satisfied it is fair and appropriate that the
insurer have the opportunity (and responsibility) to arrange for a forensic building
inspection and audit and a defects SOW and quote to be prepared by appropriately
qualified parties.
The insurer should also ensure full supervision of repairs and compliance with the
applicable building standards and its lifetime guarantee under the policy once repairs
are completed, if the insurer undertakes the further repairs/rectification work (rather
than a cash settlement being requested by the complainant).
I am not satisfied the insurer should be required to provide any further work safety
documents as previously requested by the complainant. The inspection, quote and
work can proceed without those.
I also note the complainant has indicated he might wish to lodge a formal complaint
with the Victorian Building Authority (VBA), and the insurer has said it would assist if
that were the case. However, I consider it fair and reasonable in the first instance that
the insurer have the opportunity to inspect and assess the possible rectification
needed.
2.3 What is the fair resolution to this complaint?
Insurer to obtain report, SOW and quote and attend to rectification work
I am satisfied the insurer’s offer to resolve th is complaint is fair and reasonable in the
circumstances. The following mechanism is to be followed to do so:
the insurer is required to identify two independent building consultants/engineers
and two repairers who are suitably qualified and available to undertake a
comprehensive examination of the complainant’s property , report on the
repairs/rectifications needed and prepare a SOW and quote
the insurer is to email the complainant with the qualifications of the proposed
experts within 14 days of this determination
upon receipt of these details, the complainant is to advise the insurer within 14
days by return email of his preferred engineer and repairer
upon receipt of the complainant’s confirmation of his preferred building
consultant/engineer and repairer, the insurer is to arrange for the expert(s) to
attend site to complete a comprehensive inspection report and SOW/quote within
28 days, and the complainant is to co-operate to allow the inspections to take place
Determination | Case number: 682262 Page 5 of 6
once an appropriate report, SOW and quote is completed, that is to be provided to
the complainant so that the parties can clarify any issues and confirm the SOW
the insurer is to then arrange for repairs to commence as soon as reasonably
practicable, preferably within 28 days
the insurer is to ensure that all repair works are appropriately supervised, and that
they proceed and are completed in a timely manner (keeping the complainant
regularly updated as to progress)
the insurer is to obtain and provide to the complainant all necessary compliance
certificates at the conclusion of works
alternatively, if the complainant prefers a cash settlement, then the insurer is to
cash settle the claim, using as a starting point the quote obtained from the repairer
selected by the complainant above. To be clear, the final cash settlement amount
must be sufficient to allow the complainant to complete the agreed repairs as a
retail customer. It must also include a reasonable allowance for unforeseen
damage, and other contingencies, as well as taking account of the transfer of risk
to the complainant.
2.4 Is the complainant entitled to compensation for the claim handling?
Fair for the insurer to pay $2,500 compensation for non-financial loss
The claim is taking an unusual amount of time to finalise, not least because of the
quality issues with the repairs which should reasonably have been able to be
completed to an appropriate standard by now. I do, however, also acknowledge there
were some delays caused by matters outside the insurer’s control.
The complainant ’s concern and upset has been significant and justified in the
circumstances. The insurer has since acknowledged the issues and has made a fair
and reasonable offer to address the complainant’s concerns and move the matter
forward.
In the particular circumstances, I consider it fair that the insurer pays the complainant
$2,500 as compensation for non-financial loss.
Complainant not entitled to all costs being sought
The complainant has also sought reimbursement of a broad range of out of pocket
financial expenses and losses, which he says have arisen because of delays in the
repairs being completed. These include costs for utilities, other usual property-related
expenses, report fees, and interest on his loan and devaluation of the property.
I am not satisfied, however, that all of the claimed costs are reasonably attributable to
the actions or failings of the insurer, nor are they payable under the terms of the
policy (as explained in the attached recommendation).
Determination | Case number: 682262 Page 6 of 6
The insurer is li able for utility costs (gas, water, electricity) incurred by the insurer’s
repairer’s presence in the property during repair work, and while the complainant was
not living there. Those costs are set out in section 1.3 of this determination.
I also consider it fair that the insurer covers additional utility costs that are incurred in
the course of further repairs conducted by the insurer (over and above what the
complainant would have paid had he been in occupation of the property for the
relevant period). The complainant will need to provide reasonable evidence of the
difference in the amounts, as set out in the recommendation. To be clear, the
complainant will not be entitled to these further costs if he decides to accept a cash
settlement.
It is also f air in the circumstances that the insurer pay the complainant’s costs of
obtaining the plumbing certification and report from his roofing expert, as that
evidence has assisted in this complaint. The complainant is required to provide tax
invoices for those costs he incurred, and the insurer is required to reimburse him for
those costs.
Recommendation
Case number 682262
Financial firm AAI Limited
Recommendation | Case number: 682262 Page 1 of 11
Case number: 682262 15 September 2020
3 Overview
3.1 Complaint
The complainant lodged a claim with the financial firm (insurer) in July 2018 for
damage to his property following a storm. The insurer assessed and accepted the
claim and agreed to repair the damage.
During the course of repairs, the complainant discovered that repairs were defective
and incomplete. The complainant says there are several outstanding areas of repair,
including the roof and water entry through the master bedroom window.
The complainant seeks compensation for financial and non-financial loss suffered due
to the delays in settling his claim.
The insurer accepts there are quality issues with its repair work. It is willing to rectify
the repairs by engaging an engineer to inspect the areas of concern and provide a
scope of works (SOW) for items requiring rectification.
3.2 Issues and key findings
Is the offer for rectification by the insurer fair and reasonable?
The insurer’s offer for rectification is fair in all the circumstances. This is because:
there are outstanding quality issues that require further inspection and rectification
the extent of the rectification work required cannot be fully determined until an
engineer completes a thorough inspection of the property
I do not believe it is necessary for the insurer to provide work safety documents
prior to commencement of repair.
Given the insurer accepted the claim and arranged initial repairs, it is fair in the
circumstances that it is allowed the opportunity to assess and rectify quality issues
with its repairs to the property.
What is the fair resolution to this complaint?
The insurer is to arrange both an independent building consultant/engineer and
repairer to inspect the property and provide an appropriate scope of works (SOW)
and quote respectively. The insurer is responsible for completion of agreed repairs.
The mechanism for this resolution is set o ut in section 2.2 of the recommendation.
Alternatively, if the complainant prefers a cash settlement, the insurer is to cash settle
the claim based on the quote obtained.
Recommendation | Case number: 682262 Page 2 of 11
Is the complainant entitled to compensation for the claim handling?
The insurer is required to pay $2,500 in non-financial losses given the adverse
experience and the significant impact this had on the complainant.
The insurer should also reimburse the following costs:
expert fees incurred for appointing a roof plumber and the cost to obtain plumbing
certification
electricity costs in the amount of $458.28
water costs in the amount of $889.80
gas costs in the amount of $221.16.
The insurer is not required to compensate the other losses claimed by the
complainant.
3.3 Recommendation
This recommendation is substantially in favour of the insurer.
Should both parties accept the recommendation, the claim is to be resolved within the
timeframes and resolution mechanisms set out in section 2.2 of this recommendation.
The insurer is to reimburse the complainant for:
costs incurred for appointing a roof plumber and obtaining plumbing certification
electricity costs in the amount of $458.28
water costs in the amount of $889.80
gas costs in the amount of $221.16
The insurer is to pay the complainant $2,500 in non-financial loss compensation.
Recommendation | Case number: 682262 Page 3 of 11
4 Reasons for recommendation
4.1 Is the offer for rectification by the insurer fair and reasonable?
The onus rests with the complainant to establish his loss
There is no dispute between the parties the complainant suffered a loss from a risk
insured against or that the insurer accepted the initial claim. It is also not in dispute
there are quality issues with previous repairs that require rectification.
However, a dispute has arisen between the parties as to the insur er’s offer for
rectification of the property. The offer consisted of the insurer appointing an
engineer/building consultant to re-assess the property and compile a scope of works
(SOW) which adequately captures the necessary work for the rectification.
The complainant maintains the offer is insufficient to remedy quality issues from
previous repairs. The complainant says the insurer has not demonstrated to his
satisfaction, its ability to successfully repair his property.
Complainant says property is subject to quality related damage
The complainant initially contacted the insurer to lodge the claim on 23 July 2018. The
insurer authorised its repairer (JL) to repair the property in November 2018. From 25
March 2019 until 1 April 2019 work at the property was delayed, due to bad weather.
Following a previous AFCA determination in May 2019, the insurer provided
temporary accommodation while repairs were in progress.
On 6 March 2020, JL informed the insurer that works were delayed again, and a
variation to the original SOW was required.
Whilst repairs were underway, the complainant expressed his dissatisfaction with the
quality of repairs. The complainant says he agreed to a contract with the insurer
stipulating that repairs would be completed in 12 weeks. However, he says numerous
delays and quality issues prevented the completion of repair.
Amongst other things, the complainant says water is leaking through the roof and
window. The complainant also says there are defects with the heating and electrical
systems. He requests a certificate of compliance to ensure they are safe. He also
seeks the insurer to notify the Victoria Building Authority (VBA) of the defects.
The complainant provided a report from his roofer (ER) .ER says the roof requires
rectification to stop further water damage from non-compliant workmanship. ER says
high traffic of tradesmen trying to fix the poor quality of work deteriorated the roof.
It is clear from the information provided, there are quality issues with repairs the
insurer previous completed.
Recommendation | Case number: 682262 Page 4 of 11
The insurer must settle the claim fairly
The relevant policy terms are set out in section 3 of this recommendation. I consider
the policy terms are clear and unambiguous. Pursuant to the terms of the policy, it is
clear it is at the insurer’s election whether it:
repair damage to the building;
rebuild the building;
pay what it would cost to repair or rebuild the building.
Notwithstanding its entitlement under the terms of the policy, the insurer m ust
exercise its discretion on this issue fairly.
When the insurer repairs the building, it guarantees the quality of materials and
workmanship of the work. If a defect arises because of poor quality workmanship or
incorrect materials, then the insurer is required to rectify the problem.
A cash settlement means the complainant gives up the guarantee provided under the
insurer’s policy. Further, a cash settlement transfers all the risk from the insurer to the
complainant for any unforeseen damage and any additional work required once
repairs commence.
As noted above, the material provided indicates there are quality issues with previous
repairs which require rectification and the insurer is not disputing this. As the insurer
originally elected to complete the repairs itself, it therefore needs to be given the
opportunity to attend to the rectification work.
Insurer is prepared to assess the disputed damage
The insurer is seeking to inspect the quality issues and arrange any required make
safe at the property. However, the complainant wants specific work safety and
compliance documentation from the insurer before he will consent to any further
progress at the property. This documentation relates to work safety procedures from
JL and future contractors. He seeks data on demolition, rebuild methods, fall
prevention, dewatering procedure, inductions, work method statement and verification
of competency.
The complainant believes this information is necessary for repairs to be successfully
completed. Further, the complainant wants the insurer to obtain a SOW and supervise
all works completed on his property.
The insurer did provide some of the requested documents. It offered to progress the
complainant’s claim by arranging an engineer/building consultant to attend and
inspect all outstanding quality issues at the property. The insurer agrees to arrange
supervision of repairs. The insurer maintains it cannot determine the c omplainant’s
claim against its quality of repair unless it can assess the property.
Recommendation | Case number: 682262 Page 5 of 11
The insurer says it has always been willing to complete the repairs and is prepared to
re-assess the damage and obtain a SOW to complete additional rectification. The
insurer also agrees to contact the VBA on the complainant’s behalf to lodge a
complaint and request an independent inspector to view the property defects.
However, when it offered to arrange an engineer and make safe for rectification, the
complainant did not consent as he wanted specific job documentation (as above).
Further inspection and rectification of disputed damage is required
Based on the available information, I am satisfied the insurer is required to arrange an
engineer/building consultant to inspect the damage and compile an appropriate SOW
for the outstanding repair work. I am also satisfied it is fair that the insurer arranges
full supervision of all repairs and ensures it meets VBA compliance.
I however do not believe it is necessary for the insurer to provide work safety
documents prior to commencement of repair. This is because under the lifetime
guarantee, the insurer reserves the right to authorise and arrange a builder to repair
the property. I do believe it is fair in the circumstances that the insurer assists the
complainant in lodging a complaint with the VBA to assess any property defects if he
wishes to pursue that avenue.
Based on the available information, I am satisfied the insurer’s proposal to move
forward with the repair and rectification work is appropriate. The insurer is required to
rectify the quality issues associated with is previous repairs in line with its lifetime
guarantee and the complainant should allow the insurer to attend the property as
soon as possible for this purpose.
4.2 What is the fair resolution to this complaint?
Insurer to organise report, SOW and quote and attend to rectification work
In my view, the insurer is liable to appoint an appropriate SOW by an
engineer/building consultant and a quote by a suitably qualified independent repairer
is the most effective and fair way to resolve the aspects for which the insurer is liable.
Should both parties accept this recommendation, the following must occur in order to
affect the resolution of this complaint:
the insurer is to identify two independent building consultants/engineers and two
repairers who are suitably qualified to undertake a comprehensive examination of
the complainant’s property and for the purposes of a SOW and quote
the insurer is to email the complainant with qualifications of the proposed experts
within 14 days of this recommendation being accepted by both parties
upon receipt of these details, the complainant is to advise the insurer within 14
days by return email of his preferred repairer
Recommendation | Case number: 682262 Page 6 of 11
upon receipt of the complainant’s preferred building consultant/engineer and
repairer, the insurer is to arrange for the expert(s) to attend site to complete a
comprehensive inspection report and SOW/quote within 28 days and the
complainant is to allow the insurer to do this
once an appropriate report, SOW and quote is complete, the insurer and the
complainant are to be in agreeance with the contents of the documentation.
once both parties are agreeance to proceed, the insurer to is to arrange for repairs
to commence within 28 days
the insurer is to ensure that all repairs are supervised and completed in a timely
manner
alternatively, if the complainant prefers a cash settlement. The insurer is to cash
settle the claim based on the quote obtained.
4.3 Is the complainant entitled to compensation for the claim handling?
AFCA can award non-financial and consequential loss in certain circumstances
AFCA has power to award compensation for non-financial loss. Non-financial loss
includes claims for stress or inconvenience caused by an error of the insurer.
AFCA will only award compensation for non-financial loss where there has been an
unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or pea ce of mind.
In assessing whether to award compensation for non-financial loss, AFCA expects
complainant’s to be moderately robust, bear the normal degree of inconvenience
experienced when a problem occurs, and take reasonable steps to minimise the
inconvenience suffered.
AFCA takes a conservative approach to assessing compensation for non-financial
loss. The maximum amount AFCA can award for non-financial loss is $5,000 per
claim.
Insurer is to pay $2,500 compensation
It is apparent the complainant’s cla im took an unusual amount of time to finalise. It is
not in dispute there are outstanding quality issues with the repairs.
There is no doubt the complainant became frustrated with the claim delays and the
quality of repairs to his property.
I acknowledge the insurer attempted to mitigate the claims experience by offering
make safe and further inspection of the property. I also acknowledge there were
Recommendation | Case number: 682262 Page 7 of 11
factors outside of the insurer’s control. However, I do not accept these factors
sufficiently mitigated the i mpact of the complainant’s claims experience. This is
because the complainant had an expectation that repairs would be completed within
12 weeks (based on the repair contract) and this did not occur. Significantly, the
repair contract factored in unforeseeable issues such as weather in its total
completion days. Yet despite this, the repair processes exceeded this timeframe.
Therefore, I accept it is fair the insurer pays $2,500 in non-financial loss.
Complainant not entitled to all costs being sought
The complainant has also sought reimbursement of out of pocket financial expenses.
These are:
gas
water
land tax
rates
insurances
excess
interest on loan
internet
electricity
plumbing report
plumbing certification works carried out as per regulations
devaluation of the property.
The complainant says these costs were incurred due to the repairs exceeding the
original repair contract of 12 weeks.
In considering this, some of the above costs are not payable on the policy (refer to
section 3). Financial losses caused by a party’s failure to comply with their contractual
obligations can be recoverable if they are within the reasonable contemplation of the
parties when the contract was entered.
Part of these losses are not recoverable. For example, I do not accept the costs
associated with insurance, land tax, internet, alarm and rates would have been within
the agreement of the parties at the time the policy was issued. This is because the
complainant receives the benefit of his insurance policy with any claim settlement.
Further internet, land tax, alarm, loan interest and rates are normally incurred by the
complainant regardless of the claim, delay and quality issues with the repairs.
The complainant claims the cost of the devaluation of his property of his home.
However, I am satisfied the insurer does not dispute its obligations under the policy
and is willing to rectify outstanding quality issues at the property.
Recommendation | Case number: 682262 Page 8 of 11
For the utility costs, there is evidence to substantiate there was a financial loss
incurred during the repair process and while the complainant was not living at his
property. This is because it is clear there were delays and quality issues during the
repair process. Please see section 3.1 for an outline of each utility cost.
I am satisfied the insurer should pay for utility costs incurred at the insured property in
the period whilst JL was undertaking repairs and the complainant was in temporary
accommodation. Based on the information provided, JL commenced repair on 1
November 2018 and finalised repairs on 7 October 2019.
I am satisfied the insurer is to reimburse electricity incurred. I have reviewed the
electricity invoices and am satisfied the insurer is to pay $458.28 for electricity
incurred. This is based on invoices incurred whilst JL was repairing the property from
November 2018 to October 2019. I note from the claim notes, the insurer paid
$111.38 in September 2019, so this amount has been deducted from the total
amount.
I am satisfied the insurer is to reimburse water costs incurred. I have reviewed the
water invoices and am satisfied the insurer is to pay $889.80 for water incurred. This
is based on invoices incurred whilst JL was repairing the property from November
2018 to October 2019. I note from the claim notes, the insurer paid $169.55 in
September 2019, so this amount has been deducted from the total amount.
I am satisfied the insurer is to reimburse gas costs incurred. I have reviewed the gas
invoices and am satisfied the insurer is to pay $221.16 for gas incurred. This is based
on invoices incurred whilst JL was repairing the property from November 2018 to
October 2019. I note from the claim notes, the insurer paid $146.30 in September
2019, so this amount has been deducted from the total amount.
I am also of the view that the complainant can claim utility costs incurred during future
repairs. This is on the basis; the complainant can demonstrate there is a difference
between the usage costs when living in the property and while repairs are ongoing. It
is fair the insurer pays any increase in usage costs while repairs are underway but
conditional on the complainant establishing this increase by providing utility bills for
the period of repair as well as the quarter before repairs for comparison.
For the excess, I am satisfied it is a necessary cost as part of the policy obligations,
and the complainant receives his benefit under the policy upon claim settlement.
For the cost of obtaining a plumbing certification and roofing expert, I am satisfied the
insurer is required to reimburse these costs. The complainant is to provide tax
invoices for the amount paid for these services and the insurer is to reimburse these
costs.
Recommendation | Case number: 682262 Page 9 of 11
5 Supporting information
5.1 Utility charges
Record Dates and amounts
Utility costs Electricity
July 2019: $26.46
4 September 2019: $72. 67
15 August 2019: $56.12
4 November 2019: $146.19
5 December 2019: $156.84
Total: $458.28
Please note $111.38 was paid by the insurer in July 2019.
Water
7 December 2018: $202.85
12 March 2019: $153.25
11 June 2019: $215.70
6 December 2019: $318
Total: $889.80
Please note: $169.55 was paid by the insurer in September 2019.
Gas
15 August 2019: $51.15
3 December 2019: $170.01
Total: $221.16
Please note: $ 146.30 was paid by the insurer in September 2019.
5.2 Terms of the policy
Record Key points
Lifetime guarantee on
building repairs
When we repair or rebuild the building, we guarant ee the quality
of materials and workmanship of that work for the lifetime of the
building if we:
authorise;
arrange; and
pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the
Recommendation | Case number: 682262 Page 10 of 11
Record Key points
workmanship to be free of defects. If a defect arises in the lifetime
of the building as a result of poor quality workmanship or use of
incorrect materials, then we will rectify the problem. It is a
condition of our guarant ee that we reserve the right to decide who
will undertak e the rectification work.
This guarant ee does not apply:
to repairs you authorise or make yourself;
to lo ss, damage or failure of any electrical or mechanical
appliances or machines;
to wear and tear consistent with normal gradual deterioration of
the building (e.g. paint peeling off after its expected life cycle,
wood rotting from moisture in the air or grou nd, roofs weathering
or a hot water tank leaking after its guaranteed life);
where we agree with a repair quote and we give you, or the
builder or repairer, payment for the cost of the repairs and you
arrange the repairs.
How we settle building
claims
If we agree to pay a claim for loss, theft or damage to the
building, we will decide if we will:
repair damage to the building;
r ebuild the building;
pay you what it would cost us to repair or rebuild the building;
pay you the building sum insured shown on y our certificate of
insurance; Note: This does not apply if you have selected the
Complete Replacement Cover® option.
give you a voucher, store credit or stored value card for the
amount it would cost us to repair or rebuild an item.
If we rebuild (or pay you what it would cost us to rebuild), we will
do so on a `new for old’ basis.
If we repair (or pay you what it would cost us to repair), we will at
our option do so on a `new for old’ basis or repair to a similar
condition to what the building was in befo re the loss or damage
occurred. Unless we tell you otherwise, we will deduct any
amounts you owe us from any amount we owe you.
We will not:
pay more than the relevant sum insured (unless you have the
Complete Replacement Cover® option) or policy limit;
pay extra to repair or rebuild the building to a better standard,
specification or quality than it was before the loss or damage
occurred except as stated in the meaning of ‘new for old’;
f ix a fault that existed before the loss or damage occurred.
Recommendation | Case number: 682262 Page 11 of 11
Record Key points
Cons equential losse s or
extra costs following an
incident covered by your
policy
Cons equential loss (financial and non - financial loss) or extra
costs following an incident covered by your policy, such as:
loss of income or wages;
medical expenses;
loss or costs, including the cost of your time (e.g. inconvenience),
to prove your loss or to help us with your claim (e.g. telephone
calls, postage);
cost of hiring appliances after yours suffer loss or damage;
professional, expert, legal, consulting or valuation costs unless
you obtained our prior written authority to incur these costs;
cost of replacing or reapplying pest control chemicals and baits in
or around the ins ured address;
cleaning costs;
any costs related to stress or anxiety;
any costs not covered by your policy.