Home / Westpac / Determination 682032
Determination 682032
Partial denial of movement damage claim from leaking mains pipe
Summary
A homeowner claimed about $273,364 after a mains leak caused movement damage, and the insurer declined the south-west side damage as tree-related. AFCA found the leak was the proximate cause for the claimed areas, excluded the driveway and bathroom works, and ordered repairs to be assessed with interest and professional and legal costs reimbursed.
The proximate cause is the dominant, efficient or operative cause of loss, and the leak was found to be that cause over the tree roots.
Issues
- Claim denial primary · upheld“The panel is persuaded the proximate cause is the leak. The panel does not accept the trees are the dominant, efficient or operative cause of the damage.”
- Claim amount dispute secondary · unclear“For the areas of damage covered by the policy, the insurer is to assess the complainants costs to ascertain if they are fair and reasonable.”
Subjects and remedies
home or building damagepay claimpay interestreassess claim
Related
Text of the determination
Determination
Case number 682032
Financial firm Westpac General Insurance Limited
Determination | Case number: 682032 Page 2 of 11
Case number: 682032 7 August 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim under his home building insurance policy for
movement damage caused by a leaking copper pipe. The financial firm (insurer)
assessed and partially accepted the claim.
The insurer appointed its engineer who considered the damage to the main bedroom,
hallway and ensuite was due to localised, excessive drying of the soils . This was
caused by trees to the front and left side (south-west) of the building. The insurer
declined cover for this damage.
The insurer accepted the damage to the south-east (front right) side of the property.
This was mainly to the study, dining room and hallway.
The complainant disagrees with the insurer’s decision and says his expert maintains
all of the movement damage was due to the leaking pipe. Further, the complainant
says his expert does not believe nearby trees significantly contributed to the building
movement.
1.2 Issues and key findings
Is the insurer entitled to partially deny the claim?
The insurer is liable for the movement and cracking damage identified. This is
because the available information shows the proximate cause of the damage was the
leaking pipe.
This does not include the driveway, or the amount sought for the bathroom repairs
completed by the complainant. This is because the driveway had pre-existing damage
and the complainant renovated the bathroom before lodging the claim.
What is the fair resolution to this complaint?
The insurer is to settle the dispute as set out in section 2.2.
1.3 Determination
This determination is partially in the favour of the complainant.
The insurer is to settle this dispute as set out in section 2.2.
Determination | Case number: 682032 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer entitled to partially deny the claim?
Complainant established a valid claim for part of the damage claimed
The complainant has the onus to establish any loss or damage arises from an event
covered by the terms and conditions of the policy. This is known as a valid ( prima
facie ) claim.
If the complainant does so, the onus shifts to the insurer to show, on the balance of
probabilities, it is entitled to:
rely on an exclusion under the policy
otherwise entitled to deny the claim.
The product disclosure statement (PDS) outlines the circumstances under which the
policy provides cover.
The complainant’s policy is a defined events policy. This means the policy only
responds where one or more of the listed events causes damage to the complainant’s
property, subject to any exclusions.
The complainant’s claim relates to movement damage to his property. He says this
occurred due to escape of liquid from a pipe.
There is no dispute there has been leak. The leak came from a mains water supply
which resulted in an escape of liquid of about 370 kilolitres. This was to the eastern
side of the property near the dining room.
There is also no dispute this has caused movement damage to the dining room, study
and hallway.
Parties dispute whether the leak caused the damage to the south-west side
The parties dispute whether this leak caused the damage to the south-west side of
the property. This includes the movement damage to the main bedroom, ensuite,
bathroom, hallway and second bedroom.
Therefore, the complainant must show the leak caused this damage. This would
require consideration of the proximate cause of the loss.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not
required to be last in time or the sole cause. It is a question of fact that depends on
the circumstances of each case. It requires a common sense evaluation of the
evidence.
Determination | Case number: 682032 Page 4 of 11
Experts ’ reports draw different conclusions on the cause of damage
The complainant and insurer are mainly relying on engineers they have engaged to
support their position. These reports have been summarised in section 3. The panel
does not propose to go through their evidence in detail.
The insurer’s engineer (IC) says the damage to the south -west side was caused by
the trees. This has caused increased localised shrinkage of the soil, resulting in
cracking.
The complainant’s engineer (BG) disagrees. He says the damage was caused by the
leak.
Insurer liable for the damage caused by the leak
Having carefully reviewed the available information, the panel is persuaded by BG’s
evidence for the following reasons.
There is clear evidence of heave on the south-east side. This is consistent with the
extent of the leak. This is despite the fact that large trees were on that side. In normal
conditions, it would be expected that area of the house should be at the lowest point.
This is supported by BG. This means there has likely been a significant amount of
movement in this part of the house in a short time. It is reasonable to expect this
would cause substantive damage.
The leak was large. There is no dispute it caused around 370 kilolitres of water to leak
into the foundations. There was evidence of moisture and dampness in the soil
months later.
The panel accepts there has likely some form of settlement on the south-west side.
The complainant acknowledges there was ‘very minor spider plaster movement’.
However, it appears there was little movement in recent years.
This is consistent with the complainant ’s evidence . This is also consistent with BG ’s
measurements. BG measured the floor levels on 12 December 2017. This was more
than two years after the event. The floor levels in the main bedroom, hallway, ensuite
and bedroom 2 had not changed.
IP appears to accept this given he says the soil has reached a point of being lowly
hydrated that it cannot shrink anymore.
There is no dispute that there is movement damage to the south-west side of the
property. The complainant says this happened contemporaneous to the leak. This
position is supported by BG.
Given all this, the panel is persuaded the proximate cause is the leak. Whilst the
panel acknowledges the trees are influencing the property, this is minor for reasons
set out above. The panel does not accept they are the dominant, efficient or operative
Determination | Case number: 682032 Page 5 of 11
cause of the damage. Particularly when you consider the extent of the leak and most
of the movement damage to all areas being claimed is fresh.
Driveway not covered
Part of the complainant ’s claim included cracking to the driveway.
The insurer provided photos showing the driveway had cracks in 2013. This shows it
was pre-existing.
The complainant says the driveway had significantly cracked beyond what would
reasonably be expected.
Even if that is the case, it is clear the driveway was damaged before the event. The
panel does not accept the insurer is liable for this.
Bathroom
The insurer says the complainant had completed these repairs before it had an
opportunity to inspect the damage and assess it. No photos have been provided for
the alleged damage. Therefore, the insurer says it has been significantly
disadvantaged in assessing this damage.
The complainant says he had to attend to the repairs to avoid further damage.
The panel accepts the insurer has been prejudiced. The complainant said he detected
the leaking pipe on 31 July 2015. The repairs were completed months later. If this
was damaged due to the leak, it is not clear why the complainant did not inform the
insurer before undertaking these repairs.
Further, it does not appear any photographs have been provided of the damage.
A report completed by BS dated 18 December 2015 only referred to cracking in the
main bathroom to cornices. No reference to any other damage identified.
The policy contains this condition when making a claim:
When we ask, you will need to … provide us with acce ss and a reasonable time
to inspect the loss or damage before you allow anyone to fix or interfere with it
The panel accepts the complainant failed to follow this. The panel does not accept the
information shows the complainant was required to urgently repair this before lodging
the claim. The panel also accepts the insurer has been prejudiced in its ability to
assess this damage given:
the complainant is claiming over $20,000 for this area of the home
no photos were provided of the alleged damage
the insurer did not have an opportunity to inspect the damage
BS’s report does not support the extent of works done .
Determination | Case number: 682032 Page 6 of 11
Therefore, the panel does not accept the insurer is liable to reimburse this invoice.
The extent of the insurer’s liability is only limited to the c racking identified by BS.
2.2 What is the fair resolution to this complaint?
Complainant is seeking reimbursement for various losses
As at April 2020, the complainant is seeking about $273,364.53. This does not include
the monthly interest he says is continually accruing.
The amount is broken down in the following way:
building repairs - $187,789
the time he spent on the claim - $37,800 ($150 per hour over 252 hours)
reconciliation of owner costs and insurer payments - $3,555.53
legal fees - $24,020
‘owner total of minor construct repair items’ - $20,200
Building repairs to be settled in this way
The complainant is seeking about $187,789 for the cost of repairs. This includes
invoices, estimates, interest and ‘Owner Free Issue Materials’. It is not clear what th is
last one is.
For reasons expressed, the panel does not accept the insurer is liable for the
driveway and the bathroom (except for the minor cracking to the cornices). Therefore,
these costs are to be excluded from consideration.
For the areas of damage covered by the policy, the insurer is to assess the
complainants’ costs to ascertain if they are fair and reasonable. To the extent those
repairs have been completed and are supported by invoices from independent
contractors, then it is expected the insurer is to accept those sums unless there is
persuasive evidence to show they are not fair or reasonable.
For the parts of the property claimed that are covered but yet to be repaired, the
insurer is to determine the fair and reasonable cost based on actionable quotes.
The complainant is also seeking interest on the sums sought. The panel accepts
interest, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act), should
be paid in the following way:
for the repairs that have been paid pursuant to supported invoices and is accepted
– interest is payable on those sums from the date they were paid until payment is
issued by the insurer
for any other aspect – interest is only payable if the sum is based on an outdated
quotation. If it is, then interest is payable from the time the quotation expired to
when payment is made.
Determination | Case number: 682032 Page 7 of 11
To clarify, if any sum is based on current actionable quotes, interest is not payable.
This is because they are based on current rates.
The complainant also included a 7.5% contingency. This is not appropriate for the
costs already incurred. For any sum paid based on an actionable quote, such an
allowance is fair. This would allow for any possible variables that may occur when the
repairs are being done.
The complainant also referred to minor repair items totalling $20,200. He should
provide information in support of this and the insurer is to assess whether those costs
were fair and reasonable and claim related.
Professional costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded
if the complainant needed an expert to understand or establish their claim. These
costs are normally capped at $5,000 unless exceptional circumstances apply.
The complainant’s claim for $3,555.53 includes $2,887 for BS’s fees. The panel
accepts BS’s costs assisted the complainant. His expertise was required for the issue
in dispute. This should be reimbursed.
For legal costs, the complainant noted he became ill and required assistance. This is
not disputed by the insurer. Given this, it is reasonable to reimburse these costs up to
$5,000 subject to the complainant providing invoices in support.
The panel does not accept exceptional circumstances apply for the legal costs. It is
clear the complainant had the capacity to represent himself as evident by the
extensive submissions he has made. Further, the main issue in dispute was the
cause of damage. This issue was determined based on the engineering evidence, not
legal advice.
Interest is not payable on these sums. This is because these are not being paid under
the insurance contract such that they attract section 57 of the Act. Instead, they are
being paid pursuant to AFCA ’s rules.
Other losses
For the time the complainant spent on the claim, this is not a financial loss and
therefore not payable.
Under the reconciliation of owner payments, part of this included BS’s costs . These
have been awarded. The balance being sought is interest on various sums that were
reimbursed by the insurer or where the excess was applied. These are not payable.
The excess water bill was not payable under the policy. This was a payment made
beyond the policy terms. The policy excess is always payable. The other aspects
were invoices paid by the insurer after it had an opportunity to investigate and
Determination | Case number: 682032 Page 8 of 11
determine the claim. Interest is not payable for this period as the insurer is entitled to
investigate the claim before making payment under the policy.
3 Supporting information
3.1 Terms of the policy
Record Key points
General exclusions Of course, insurance can’t cover absolutely everything. Here are
the general exclusions that apply to all cover described in this
PDS.
Your policy does not cover any loss or damage that is caused by
or arises from:
Wear and tear, and environmental conditions
wear and tear, gradual deterioration, or fading
earth or soil movement (other than earthquake) including
landslide, subsidenc e, or erosion settling, expansion, shrinkage or
vibration
tree roots .
3.2 Expert reports
Record Key points
financial firm ’s expert (IC )
Report
06 - 07 - 2016
Front portion of hous e built in 1927 and two storey extension
added to the rear in 2007.
Large vegetation loc ated at front of property.
Large vegetation loc ated at right side of building.
No articulation or movement joints incorporated into masonry walls
and plaster in the original house.
All damage present is located in front (original) section.
The front door has been adjusted to close.
Cracking to all walls and gaps between walls and cornice in the
bedroom in front right corner.
Cracking to wall above door and shower internal wall. Gap
between wall and door and ceiling and cornice in ensuite.
Cracking above front door.
Determination | Case number: 682032 Page 9 of 11
Record Key points
Cracking to walls and gaps between c eiling and walls in dining
room.
Water damage to wall between the study/office and main
bathroom towards the left side of the house.
Cracking in external bricks and concrete to front patio .
NORMAL SOIL MOVEMENT
Property situated on reacti ve clay soils which swell when wet and
shrink when dry.
Movement occurred to the left side of the building resulting in large
deviation to floor levels and cracking due to trees and other items
being planted wit hin the influence zones.
Damage to the left s ide of the building, hallway walls and external
brick work is becaus e of vegetation to front of the building planted
within the zones of influence.
Has caused increas ed shrinkage of soil in the front and left side of
the building resulting in cracking.
EFFECT OF THE WATER LEAK
Without water leak, floor levels to the right side would re semble
the left side of the property.
Due to large level of wat er leak ed.
Along the right side, floor levels rise from - 7mm in the dining room
to 0mm at the front right cor ner, either swelling or moisture
stabilisation of soils occurred to the right of the building for these to
remain at or near the level of the centre of the house during drier
periods.
the right side of the hous e, the floor levels rise from - 7mm in the
dini ng room to 0mm at the front hand corner.
The dining room measurement ( - 7 mm) is in closer proximity to
large trees to this side of the building and is likely lower due to
drying effects these are causing .
Damage present to dining room and left spare bedroo m external
walls possibly influenced by water leak.
This has either been the result of soils swelling in this region or
possibly not drying and shrinking as much as soils on the other
side of the building.
It is likely the water leak prevented more signifi cant damage
occurring to the right side external walls as it is expected these
would have dropped at a similar amount as the left side of the
building had the water leak not occurred.
DAMAGE TO STUDY/ OFFICE WALL
E xisted prior to water leak. Therefore, not related to the water leak
to the right side of the building .
Damage to the main bedroom, hallway and ensuite due to
localised, excessive drying of the soils due to the vegetation to the
front and left side of the building.
The cracking to interior of the e xternal walls in the spare bedroom
and dining room is a result of the water leak causing either
swelling of the soils, or slower drying of the soils in this region due
to the water leak.
Determination | Case number: 682032 Page 10 of 11
Record Key points
Complainant’s expert (B S )
Report
18 - 12 - 2015
The external walls are supported on concrete strip footings. \
Observations
This residence has some cracking evident throughout bot h
externally and internally.
Hous e last painted about 2007 (eg. 8 years ago)
Bedroom One - Shows diagonal crack running through corner to
approx . 8m m and note also plaster crack ing
Building built on a foundation/ footing system founded at a depth of
450mm.
The area is known for moderately reactive clays
Such movement is common and generally such ground is higher in
the winter and lower in the summer.
Footings on this site would now be requir ed to be founded at a
depth of 1000 mm so that they are robust enough for the site
conditions (eg. clay/drainage/tree root problems).
South - west corner of building has dropped .
E astern side of building has lifted slightly.
Inadequate footing dept hs.
Drainage problems to the east of the home which may have the
effect of 'wetting up' the moderate clay sub - base and causing
minor ex pansion and lifting the building.
Probable drying effects of street trees causing buildi ng to settle in
the main to the SW corner.
Complainant’s expert (B G )
Report
13 - 02 - 2017
The external walls are supported on concrete strip footings.
The front door of the building is assumed to face south and we
believe that the building was constructed over 80 years ago. The
building has been built on a site that marginally slopes down
towards the south and west.
The house extension was relatively level.
The west side of the original house was between 10 to 20mm
lower than the east side (i.e. beside the leak).
A number of trees were present.
An inspection of the subfloor space revealed the following:
The soil showed signs of excessive moisture.
The air was stale/mouldy, usually associated with stagnant moist
air.
Water stains approximately half way up the stumps.
M ovements and cracks are likely relat ed to changed soil moisture
content and/or surrounding site conditions, which have result ed in
differential building movements.
The site likely has class 'M' soil type.
clay expands when it is moist and shrinks when it dries.
The result with changes in soil moisture content, is ground surface
level fluctuat es (up and down).
A leaking pipe can contribute to the movement of footings and the
building.
A water source can locally saturate the clay, and caus e it to swell.
As the clay swells, the building moves up (heaves) in the area
beside the leak/excessive moisture, whilst the dry areas of the
Determination | Case number: 682032 Page 11 of 11
Record Key points
building remain relatively low.
Floor levels revealed the east side of the original part of the house
(i.e. closest to t he leak) was up to 29mm higher than the west side
of the house.
This building movements is consistent with what could be
expected from a leaking pipe, and is the opposite of what could be
expected from tree root drying effects. For this reason it is our
op inion that the majority of the building movements and
subsequent damage to the front/original parts of this house, is
related to the leaking pipe.
Water source or constantly saturat ed area, may encourage the
growth of tree roots to that area and hence inc rease the damaging
effects of tree roots (as detailed below).
The further settling (i.e. building movements) and subsequent
damage will likely occur after leaks have been repaired and the
soil moisture content returns back to its optimum level, (which
coul d take a number of years, depending on the weather
conditions ).
D rying effects of tree roots affect footings and the building.
Tree roots constantly dry out the soil as they grow and their
influence becomes greater with time (as they grow).
Drying effects of roots make the building move/settle slightly and
this cumulative effect of small movements over the years results in
cracking of the building.
These drying effects can be more evident during a dry
season/drought and when trees are located clos e to each other,
(such as a row of trees), thus trees compete for moisture in the
surrounding soil.
The floor level readings confirm the loc ation where the largest
trees were present (i.e. east side), was not the lowest part of the
house, but rather highe r.
This is not consistent with what could be expected if tree root
drying effects were a significant contributing factor.
The trees around this house have not had a significant contribution
to the building movements.
Generally speaking the building has moved since the first readings
were rec orded